26-038-ITB_Terminal_Dr_Bridge_Rehabilitation_-_Drawings_06.23.26.pdf

PDF 36 MB Posted

Attached to
Terminal Drive Bridge Rehabilitation
Solicitation number
26-038-ITB
Issued by
Bell County, Kentucky

About this file

This is a technical drawing document for the Terminal Drive Bridge Rehabilitation project issued by the Kenton County Airport Board (KCAB) in Kentucky. The drawings, dated June 23, 2026, provide detailed design specifications and construction plans for the bridge rehabilitation work. A pre-proposal meeting and mandatory site visit are scheduled for Wednesday, June 10, 2026 at 10:00 am at CVG Centre, Admin. Offices, 77 Comair Blvd., Erlanger, Kentucky 41018. Written questions must be submitted by 11:59 pm on Thursday, June 18, 2026, with answers posted no later than Tuesday, June 23, 2026 at 11:59 pm. Proposals must be received by Thursday, July 2, 2026 at 2:00 pm, with no proposals accepted after that deadline unless an addendum extends the date or time.

The drawing document serves as a critical reference for bidders to understand the scope, specifications, and technical requirements for the Terminal Drive Bridge Rehabilitation project. Bidders should review these detailed plans in conjunction with the project scope of work and supporting exhibits to develop accurate and complete proposals. The drawings establish the baseline for construction methodology, materials, dimensions, and site conditions that contractors must address in their bids.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S01

SPECIFICATIONS

BOONE COUNTY

TERMINAL DRIVE

BRIDGE REHABILITATION

SPECIAL NOTES

STANDARD DRAWINGS

INDEX OF SHEETS

KENTON COUNTY

AIRPORT BOARD

C O

N

ST

R U

C

TI

O N

P R

O

JE

C T

N O

LE

TT

IN

G D

AT

E cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_TITLE_SHEET.DWG 6/19/2026 2:15 PM MICHAEL-H

PREPARED BY

1 - Flowable Fill Under Slab C.Y. L.F. L.F.

Jo in t S ea lin g

S.F.

C on cr et e Pa tc hi ng R ep ai r

S.Y. C.Y.

C on cr et e O ve rla y La te x

H yd ro de m ol iti on

Fl ow ab le

F ill

Sa w

-C le an -R es ea l R an do m C ra ck s

S.Y

Bl as t C le an in g

S.Y.

Ep ox y- Sa nd S lu rry

S.Y.

R em ov e Ep ox y

Bi t

O ve rla y

4 - Patch Spalls in Approach Pavement

C.Y.

Pa rti al D ep th

Pa tc hi ng

C.Y.

C on cr et e C la ss

M Fu ll D ep th

P at ch in g

L.F.

Jo in t S ea l R ep la ce m en t

BID ITEM CODE 08526024094EC085100850408549085340855023386EC0854021173EC02220

S.F

23378EC

C on cr et e Se al in g 2 - Repair Approach Pavement

Cracks 3 - Joint Sealant Repair

LB

08151

BRIDGE TOTALS

REPAIR #

ESTIMATE OF QUANTITIES

St ee l R ei nf or ce m en t

Ep ox y C oa te d

6 - Overlay Approach Slabs 7 - Patch Shallow Traffic Barrier Wall

Spalls 8 - Patch Overhang Bracket Holes

11 - Seal Substructure

9 - Seal Deck and Barrier Walls 10 - Patch Shallow Pier Cap Spalls

13 - Traffic Barrier Wall Patching

15 - Bridge Deck Overlay

18 - Substructure Patching and FRP

16 - Epoxy Resin Sealing Sidewalk and Gutterline & Masonry Coat Barrier

17 - Replace Transverse Strip Seals

19 - Retrofit Elastomeric Bearings

21 - Light Blister Patching and FRP Repairs

22 - Silicone Around Pedestrian Barrier Lights

23 - Patch Overhang and FRP Repairs

24 - Longitudinal Strip Seal Retrofit

20 - Clean and Paint Pot Bearings and Hold Down Anchors

5 - Replace Joint Seals at the Approach Slabs

M as on ry

C oa tin g

02998

S.Y.

FR

P

W ra p

25015EC

S.F.

Be ar in g

R et ai ne r

23166ED

EA EA

Si lic on e

Se al an t

EA

9.5

258 1000

1 267.5 1000 2 8 30

229 15 15 229

57291

42110

776 4168

6190 15

524 1454524

662 539 6419 99401 15 1454 2440

KYTC

BID ITEM

L.S. EA EA

MOT

40178

M ai nt ai n

C on tro l T ra ffi c

M ob iliz at io n

Ba rri ca de

T yp e

III

L.S.

Po rta bl e

C ha ng ea bl e

M es sa ge

S ig n 1 3 1 6

C le an

P ai nt Po t B ea rin g

As se m bl y

02650 02671 02014

L.F.

06556 06556

L.F.

06560

L.F. EA S.F.

06557

ROADWAY STRIPING

Pa ve

S tri pi ng

D

U R

T Y

1-

IN

W

L.F.

22950NN 23253ES717

Pa ve

M ar k

TY

Ta pe C ro ss

-H at ch

23253ES717 23265ES717 26164ES717

S.F. L.F. L.F.

72 38

Pa ve

S tri pi ng

D

U R

T Y

1-

IN

W

(B lu e)

Pa ve

S tri pi ng

D

U R

T Y

1-

IN

Y

Pa ve

S tri pi ng

D

U R

T Y

1-

IN

W

Pa ve

S tri pi ng

Th er m o St op

Pa ve

M ar k

TY

Ta pe C ro ss

-H at ch (B lu e)

Pa ve

M ar k

TY

Ta pe X

-W al k

- 2

IN

Pa ve

M ar k

TY

Ta pe S to p

Ba r

- 2

IN

1945 360 1360 315 3 130 112

S.F.

23331EC

Ep ox y- U re th an e

W at er pr oo fin g

TITLE SHEET

14 - Pedestrian Barrier Wall Patching 278

AutoCAD SHX Text 2026 KYTC Standard Specifications for Road and Bridge Construction.

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text Description

AutoCAD SHX Text Title Sheet

AutoCAD SHX Text General Notes

AutoCAD SHX Text Repair Locations

AutoCAD SHX Text S02

AutoCAD SHX Text S04-S07

AutoCAD SHX Text Special Note for Concrete Repairs

AutoCAD SHX Text Special Note for Pavement Crack and Joint Seal Repairs

AutoCAD SHX Text 2024 AASHTO LRFD Bridge Design Specifications, 10th Edition.

AutoCAD SHX Text S03

AutoCAD SHX Text Project Map

AutoCAD SHX Text S01

AutoCAD SHX Text S08-S14

AutoCAD SHX Text Repairs 1 and 2

AutoCAD SHX Text Special Note for Concrete Sealing and Coatings

AutoCAD SHX Text S15

AutoCAD SHX Text Repairs 3 and 4

AutoCAD SHX Text S16

AutoCAD SHX Text Repairs 5 and 6

AutoCAD SHX Text S17

AutoCAD SHX Text Repairs 7 and 8

AutoCAD SHX Text S18

AutoCAD SHX Text Repairs 9 and 10

AutoCAD SHX Text S19

AutoCAD SHX Text Repair 11

AutoCAD SHX Text S20

AutoCAD SHX Text Repairs 13 and 14

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_TITLE_SHEET.dwg

AutoCAD SHX Text Maintenance of Traffic

AutoCAD SHX Text S21

AutoCAD SHX Text Repair 15

AutoCAD SHX Text S22

AutoCAD SHX Text Repairs 16 and 17

AutoCAD SHX Text S23

AutoCAD SHX Text Repairs 18

AutoCAD SHX Text S24-S25

AutoCAD SHX Text Repair 19 and 20

AutoCAD SHX Text S26

AutoCAD SHX Text Repair 21 and 22

AutoCAD SHX Text S27

AutoCAD SHX Text Repair 23 and 24

AutoCAD SHX Text S28

AutoCAD SHX Text Special Note for Latex Concrete Overlay

AutoCAD SHX Text Special Note for Hydrodemolition

AutoCAD SHX Text Special Note for Fiber Reinforced Polymer (FRP) Wrap

AutoCAD SHX Text Lane Closure Mutli-Lane Highway Case II

AutoCAD SHX Text

TTC-120-04

AutoCAD SHX Text Channelizing Devices

AutoCAD SHX Text

TTS-140

AutoCAD SHX Text Special Note for " Epoxy-Urethane Overlay38" Epoxy-Urethane Overlay

AutoCAD SHX Text Special Note for Bearing Retainer

GENERAL NOTES

S02 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_GENERAL_NOTES.DWG 6/18/2026 8:19 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text SPECIFICATIONS: REFERENCES TO THE SPECIFICATIONS ARE TO THE CURRENT EDITION OF THE KENTUCKY DEPARTMENT OF HIGHWAYS REFERENCES TO THE SPECIFICATIONS ARE TO THE CURRENT EDITION OF THE KENTUCKY DEPARTMENT OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION INCLUDING ANY CURRENT SUPPLEMENTAL SPECIFICATIONS. ALL REFERENCES TO THE AASHTO SPECIFICATIONS ARE TO THE CURRENT EDITION OF THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, WITH INTERIMS. ALL REFERENCES TO THE ASTM STANDARDS ARE TO THE CURRENT EDITION OF THE ASTM STANDARD SPECIFICATIONS, WITH INTERIMS.

AutoCAD SHX Text MATERIALS DESIGN SPECIFICATIONS: FOR CONCRETE: CONSULT MANUFACTURER'S SPECIFICATIONS CONSULT MANUFACTURER'S SPECIFICATIONS FOR EPOXY COATED STEEL REINFORCEMENT: FY = 60,000 PSIFY = 60,000 PSI

AutoCAD SHX Text ASTM SPECIFICATIONS, CURRENT EDITION, AS DESIGNATED BELOW SHALL GOVERN THE FOLLOWING MATERIALS FURNISHED. MATERIAL ASTM, CURRENT ED. MATERIAL ASTM, CURRENT ED. CURRENT ED. STRUCTURAL STEEL FOR ROLLED SHAPES AND PLATES A709 GRADE 36 MIN. A709 GRADE 36 MIN. BOLTS (UP TO 1 " ) F3125 GRADE A325 12" ) F3125 GRADE A325

AutoCAD SHX Text DIMENSIONS: DIMENSIONS SHOWN ON THESE PLANS ARE TAKEN FROM THE ORIGINAL CONSTRUCTION CONTRACT PLANS AND DO NOT DIMENSIONS SHOWN ON THESE PLANS ARE TAKEN FROM THE ORIGINAL CONSTRUCTION CONTRACT PLANS AND DO NOT NECESSARILY REFLECT REVISIONS MADE DURING CONSTRUCTION OR REPAIRS PREVIOUSLY INSTALLED. THE CONTRACTOR SHALL VERIFY ELEVATIONS AND DIMENSIONS, INCLUDING THICKNESS OF PARTS AND FASTENER SIZE/SPACING, WITH FIELD MEASUREMENTS PRIOR TO ORDERING MATERIALS OR FABRICATING STEELWORK. ALL PLAN DIMENSIONS ARE FOR A NORMAL TEMPERATURE OF 60°F. LAYOUTDIMENSIONS ARE HORIZONTAL DIMENSIONS.

AutoCAD SHX Text BRIDGE PLANS: A COPY OF AVAILABLE EXISTING BRIDGE PLANS WILL BE MADE AVAILABLE TO THE SUCCESSFUL BIDDER UPON WRITTEN A COPY OF AVAILABLE EXISTING BRIDGE PLANS WILL BE MADE AVAILABLE TO THE SUCCESSFUL BIDDER UPON WRITTEN REQUEST. ON SITE INSPECTION: EACH CONTRACTOR SUBMITTING A BID FOR THIS WORK SHALL MAKE A THOROUGH INSPECTION OF THE BRIDGE EACH CONTRACTOR SUBMITTING A BID FOR THIS WORK SHALL MAKE A THOROUGH INSPECTION OF THE BRIDGE AND THE WORK SITE PRIOR TO SUBMITTING A BID AND SHALL BE THOROUGHLY FAMILIARIZED WITH EXISTING CONDITIONS SO THAT WORK CAN BE EXPEDITIOUSLY PERFORMED AFTER A CONTRACT IS AWARDED. A SUITABLE METHOD OF PERFORMING THE WORK DESCRIBED HEREIN SHOULD BE INVESTIGATED. SUBMISSION OF A BID WILL BE CONSIDERED EVIDENCE OF THIS INSPECTION HAVING BEEN MADE. ANY CLAIMS FROM SITE CONDITIONS WILL NOT BE HONORED BY OWNER.

AutoCAD SHX Text VERIFYING FIELD CONDITIONS: PLAN DIMENSIONS AND DETAILS RELATIVE TO THE EXISTING STRUCTURE ARE SUBJECT TO NOMINAL PLAN DIMENSIONS AND DETAILS RELATIVE TO THE EXISTING STRUCTURE ARE SUBJECT TO NOMINAL CONSTRUCTION VARIATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY SUCH DIMENSIONS AND DETAILS IN THE FIELD AND MAKE THE NECESSARY APPROVED ADJUSTMENTS PRIOR TO CONSTRUCTION OR ORDERING OF MATERIALS. SUCH VARIATIONS SHALL NOT BE CAUSE FOR ADDITIONAL COMPENSATION FOR A CHANGE IN THE SCOPE OF THE WORK; HOWEVER THE CONTRACTOR WILL BE PAID FOR THE QUANTITY ACTUALLY FURNISHED AT THE UNIT PRICE BID FOR THE WORK. IN ADDITION, THE OVERRUN AND UNDERRUN FORMULAS MAY BE APPLIED TO APPROPRIATE REPAIRS PROVIDED THAT THE REQUIREMENTS OF ARTICLE 104.02.02 OF THE STANDARD SPECIFICATIONS ARE SATISFIED.

AutoCAD SHX Text AT LEAST 14 DAYS IN ADVANCE OF BEGINNING CONSTRUCTION, THE SUCCESSFUL CONTRACTOR SHALL SUBMIT TO THE OWNER A WORK PLAN FOR PERFORMING WORK. THIS WORK PLAN SHALL INCLUDE BUT IS NOT LIMITED TO METHODS FOR CONTAINING DEBRIS, DEBRIS REMOVAL, AND MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.

AutoCAD SHX Text BEVELED EDGES: BEVEL ALL EXPOSED CONCRETE EDGES ", UNLESS OTHERWISE NOTED. BEVEL ALL EXPOSED CONCRETE EDGES ", UNLESS OTHERWISE NOTED.34", UNLESS OTHERWISE NOTED.

AutoCAD SHX Text MILL TEST REPORTS: NOTARIZED MILL TEST REPORTS SHALL BE FURNISHED IN TRIPLICATE TO THE OWNER SHOWING THAT ALL NOTARIZED MILL TEST REPORTS SHALL BE FURNISHED IN TRIPLICATE TO THE OWNER SHOWING THAT ALL STRUCTURAL STEEL CONFORMS TO THE REQUIREMENTS OF THE SPECIFICATIONS. WELDING SPECIFICATIONS: ALL WELDING AND WELDING MATERIALS SHALL CONFORM TO "JOINT SPECIFICATION ALL WELDING AND WELDING MATERIALS SHALL CONFORM TO "JOINT SPECIFICATION ANSI/AASHTO/AWS D1.1 : 2025 BRIDGE WELDING CODE". WELDING PROCEDURES: QUALIFICATION TEST OF ALL WELDING PROCEDURES, WHEN REQUIRED BY AWS, SHALL BE COMPLETED BY THE QUALIFICATION TEST OF ALL WELDING PROCEDURES, WHEN REQUIRED BY AWS, SHALL BE COMPLETED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL APPROVAL OF THE SHOP DRAWINGS AND THE START OF THE FABRICATION.

AutoCAD SHX Text WELD SIZES: UNLESS SPECIFIED OTHERWISE, USE THE FOLLOWING FILLET WELD SIZES: UNLESS SPECIFIED OTHERWISE, USE THE FOLLOWING FILLET WELD SIZES:

AutoCAD SHX Text

THE WELD SIZE NEED NOT EXCEED THE THICKNESS OF THE THINNER PART JOINED.

AutoCAD SHX Text HIGH STRENGTH BOLT CONNECTIONS: UNLESS OTHERWISE SPECIFIED ON THE PLANS, ALL BOLTED CONNECTIONS SHALL BE ASTM UNLESS OTHERWISE SPECIFIED ON THE PLANS, ALL BOLTED CONNECTIONS SHALL BE ASTM F3125 GRADE A325 HIGH STRENGTH BOLTS, A563DH NUTS, AND F436 FLAT WASHERS. OPEN HOLES SHALL BE 1/16 INCH GREATER THAN THE BOLT DIAMETER, UNLESS OTHERWISE NOTED. BOLT THREADS SHALL BE EXCLUDED FROM THE SHEAR PLANE IN ALL BOLTED CONNECTIONS, UNLESS OTHERWISE NOTED.

AutoCAD SHX Text DISPOSAL OF MATERIALS: ALL MATERIALS AND DEBRIS REMOVED FROM OR BENEATH THE BRIDGE OR APPROACHES SHALL BECOME THE ALL MATERIALS AND DEBRIS REMOVED FROM OR BENEATH THE BRIDGE OR APPROACHES SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE RIGHT-OF-WAY.

AutoCAD SHX Text UTILITIES: UTILITIES PRESENT ON THE BRIDGE OR AROUND THE STRUCTURE ARE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, UTILITIES PRESENT ON THE BRIDGE OR AROUND THE STRUCTURE ARE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, DEACTIVATE AND COORDINATE ACTIVITIES WITH THE OWNER.

AutoCAD SHX Text STABILITY OF THE STRUCTURE: THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE FROM THE THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE FROM THE TIME OF MOBILIZATION UNTIL AFTER THE BRIDGE HAS BEEN REOPENED TO NORMAL TRAFFIC FOLLOWING COMPLETION OF ALL WORK REQUIRED IN THE CONTRACT. DAMAGE OUTSIDE CONSTRUCTION LIMITS: ANY AREA THAT IS DISTURBED OUTSIDE THE LIMITS OF THE CONSTRUCTION DURING THE LIFE ANY AREA THAT IS DISTURBED OUTSIDE THE LIMITS OF THE CONSTRUCTION DURING THE LIFE OF THE PROJECT SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE, SHOULD SUCH DAMAGE RESULT FROM THE CONTRACTOR'S ACTIONS. DAMAGE TO THE STRUCTURE: THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY AND EXPENSE FOR REPAIR OF ANY AND ALL THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY AND EXPENSE FOR REPAIR OF ANY AND ALL DAMAGES TO THE STRUCTURE, SHOULD SUCH DAMAGE RESULT FROM THE CONTRACTOR'S ACTIONS. AFTER COMPLETION OF ALL OPERATIONS, THE STRUCTURE AND SITE SHALL BE LEFT IN A CONDITION THAT IS IN ACCORDANCE WITH SECTION 105.12 OF THE SPECIFICATIONS. CONSTRUCTION LOAD: STORAGE OF MATERIAL ON THE BRIDGE IS PROHIBITED WITHOUT WRITTEN APPROVAL OF THE ENGINEER. STORAGE OF MATERIAL ON THE BRIDGE IS PROHIBITED WITHOUT WRITTEN APPROVAL OF THE ENGINEER. SALVAGE AND REINSTALL CONDUIT: SALVAGE THE EXISTING CONDUIT, CONNECTION, AND HANGER SYSTEM FOR THE BRIDGE LIGHTING. SALVAGE THE EXISTING CONDUIT, CONNECTION, AND HANGER SYSTEM FOR THE BRIDGE LIGHTING. SOME TEMPORARY SUPPORT MAY BE REQUIRED. TAKE CARE NOT TO DAMAGE THE CONDUIT OR HANGERS DURING CONSTRUCTION, ANY DAMAGE DUE TO THE CONTRACTOR MUST BE REPLACED AT NO COST TO THE OWNER.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text BASE METAL THICKNESS OF THICK PART JOINED (IN.) TO " INCLUSIVE 14" INCLUSIVE OVER " TO " 14" TO " 12" OVER " TO " 12" TO " 34" OVER " 34"

AutoCAD SHX Text

MINIMUM SIZE OF FILLET WELD (IN.) 18" 316" 14" 516"

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_GENERAL_NOTES.dwg

PAVEMENT MARKING AND STRIPING: NO SEPARATE STRIPING PLANS ARE INCLUDED IN THE CONTRACT DOCUMENTS. PRIOR TO BEGINNING ANY WORK WITHIN THE LIMITS OF A REPAIR AREA, THE CONTRACTOR SHALL FIELD-DOCUMENT THE EXISTING PAVEMENT MARKING CONFIGURATION, INCLUDING THE TYPE, COLOR, WIDTH, LOCATION, AND LAYOUT OF ALL LANE LINES, EDGE LINES, TURN ARROWS, CROSSWALKS, STOP BARS, AND ANY OTHER PAVEMENT MARKINGS PRESENT WITHIN OR ADJACENT TO THE WORK AREA. THIS DOCUMENTATION SHALL BE SUBMITTED TO THE ENGINEER 7 DAYS BEFORE WORK BEGINS FOR REVIEW AND APPROVAL. UPON COMPLETION OF ANY OVERLAY, PATCHING, OR SURFACE TREATMENT WORK THAT DISTURBS OR COVERS EXISTING PAVEMENT MARKINGS, THE CONTRACTOR SHALL RESTORE ALL PAVEMENT MARKINGS TO MATCH THE PRE-EXISTING CONFIGURATION AS DOCUMENTED UNLESS DIRECTED OTHERWISE. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE CURRENT EDITION OF THE MUTCD, APPLICABLE KYTC STANDARD DRAWINGS AND SPECIFICATIONS, AND THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. RE-STRIPING SHALL BE CONSIDERED INCIDENTAL TO THE ASSOCIATED REPAIR BID ITEM UNLESS OTHERWISE SPECIFIED.

cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_EBASE.DWG 6/18/2026 8:22 PM MICHAEL-H

PREPARED BY

N

PROJECT MAP

S03

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

ORIGINAL MSE APPROACH

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

CONRAC APPROACH SLAB

AutoCAD SHX Text

SPAN 2C

AutoCAD SHX Text

SPAN 3C

AutoCAD SHX Text

SPAN 4C

AutoCAD SHX Text

SPAN 5C

AutoCAD SHX Text

SPAN 6C

AutoCAD SHX Text

SPAN 7C

AutoCAD SHX Text

SPAN 8C

AutoCAD SHX Text

SPAN 9C

AutoCAD SHX Text

SPAN 10C

AutoCAD SHX Text

SPAN 11C

AutoCAD SHX Text

SPAN 12C

AutoCAD SHX Text

SPAN 13C

AutoCAD SHX Text

SPAN 14C

AutoCAD SHX Text

SPAN 1

AutoCAD SHX Text

SPAN 2

AutoCAD SHX Text

SPAN 3

AutoCAD SHX Text

SPAN 4

AutoCAD SHX Text

SPAN 5

AutoCAD SHX Text

SPAN 6

AutoCAD SHX Text

SPAN 7

AutoCAD SHX Text

SPAN 8

AutoCAD SHX Text

SPAN 9

AutoCAD SHX Text

SPAN 11

AutoCAD SHX Text

SPAN 12

AutoCAD SHX Text

SPAN 13

AutoCAD SHX Text

SPAN 14

AutoCAD SHX Text

SPAN 15

AutoCAD SHX Text

SPAN 17

AutoCAD SHX Text

SPAN 18

AutoCAD SHX Text

SPAN 16

AutoCAD SHX Text

SPAN 10 SKYWAY

AutoCAD SHX Text

SPAN 1C

AutoCAD SHX Text

ORIGINAL APPROACH SLAB

AutoCAD SHX Text

ABUTMENT 1

AutoCAD SHX Text

PIER 1C

AutoCAD SHX Text

PIER 2C

AutoCAD SHX Text

PIER 3C

AutoCAD SHX Text

PIER 4C

AutoCAD SHX Text

PIER 5C

AutoCAD SHX Text

PIER 6C

AutoCAD SHX Text

PIER 7C

AutoCAD SHX Text

PIER 8C

AutoCAD SHX Text

PIER 9C

AutoCAD SHX Text

PIER 10C

AutoCAD SHX Text

PIER 12C

AutoCAD SHX Text

PIER 13C

AutoCAD SHX Text

PIER 14C PIER 1

AutoCAD SHX Text

PIER 11C

AutoCAD SHX Text

PIER 2

AutoCAD SHX Text

PIER 3

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 6

AutoCAD SHX Text

PIER 5

AutoCAD SHX Text

PIER 7

AutoCAD SHX Text

PIER 8

AutoCAD SHX Text

PIER 9

AutoCAD SHX Text

PIER 11

AutoCAD SHX Text

PIER 12

AutoCAD SHX Text

PIER 13

AutoCAD SHX Text

PIER 14

AutoCAD SHX Text

PIER 15

AutoCAD SHX Text

PIER 16

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

PIER 18

AutoCAD SHX Text

ABUTMENT 2

AutoCAD SHX Text

SECTION 1

AutoCAD SHX Text

SECTION 2

AutoCAD SHX Text

SECTION 3

AutoCAD SHX Text

SECTION 4

AutoCAD SHX Text

BEGINNING OF PROJECT

AutoCAD SHX Text

END OF PROJECT

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_EBASE.dwg

AutoCAD SHX Text

PIER 10

AutoCAD SHX Text

PIER A

PROJECT MAP (PLAN VIEW) - CVG DEPARTURES BRIDGE

N

REPAIR LOCATIONS 1 OF 4

S04 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_EBASE.DWG 6/18/2026 8:22 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

CONRAC APPROACH SLAB

AutoCAD SHX Text

SPAN 2C

AutoCAD SHX Text

SPAN 1C

AutoCAD SHX Text

ABUTMENT 1

AutoCAD SHX Text

PIER 1C

AutoCAD SHX Text

PIER 2C

AutoCAD SHX Text 30'-0"

AutoCAD SHX Text 63'-3"

AutoCAD SHX Text

REPAIR LEGEND:

AutoCAD SHX Text

TOWARD DONALDSON ROAD

AutoCAD SHX Text

BEGINNING OF PROJECT

AutoCAD SHX Text 1'-7 "34"

AutoCAD SHX Text 1'-7 "34"

AutoCAD SHX Text

LEFT SHOULDER

AutoCAD SHX Text

LEFT LANE

AutoCAD SHX Text

RIGHT LANE

AutoCAD SHX Text

RIGHT SHOULDER

AutoCAD SHX Text

FLOWABLE FILL UNDER SLAB

AutoCAD SHX Text

REPAIR APPROACH PAVEMENT CRACKS

AutoCAD SHX Text

JOINT SEALANT REPAIR

AutoCAD SHX Text

PATCH SPALLS IN APPROACH PAVEMENT

AutoCAD SHX Text

REPLACE JOINT SEALS AT THE APPROACH SLABS

AutoCAD SHX Text

OVERLAY APPROACH SLAB

AutoCAD SHX Text

PLAN - SECTION 1: CONRAC MSE APPROACH

AutoCAD SHX Text

LEFT TRAFFIC BARRIER WALL

AutoCAD SHX Text

RIGHT TRAFFIC BARRIER WALL

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

TOWARD SECTION 2 (CONCRAC BRIDGE)

AutoCAD SHX Text 8'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 8'

AutoCAD SHX Text

CRACK ARREST JOINT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_EBASE.dwg

AutoCAD SHX Text

SEAL BARRIER WALLS

REPAIR LOCATIONS 2 OF 4

S05 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_EBASE.DWG 6/18/2026 8:22 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

CONRAC APPROACH SLAB

AutoCAD SHX Text

SPAN 2C

AutoCAD SHX Text

SPAN 3C

AutoCAD SHX Text

SPAN 4C

AutoCAD SHX Text

SPAN 5C

AutoCAD SHX Text

SPAN 6C

AutoCAD SHX Text

SPAN 7C

AutoCAD SHX Text

SPAN 8C

AutoCAD SHX Text

SPAN 9C

AutoCAD SHX Text

SPAN 10C

AutoCAD SHX Text

SPAN 11C

AutoCAD SHX Text

SPAN 12C

AutoCAD SHX Text

SPAN 13C

AutoCAD SHX Text

SPAN 14C

AutoCAD SHX Text

SPAN 1

AutoCAD SHX Text

SPAN 1C

AutoCAD SHX Text

ABUTMENT 1

AutoCAD SHX Text

PIER 1C

AutoCAD SHX Text

PIER 2C

AutoCAD SHX Text

PIER 3C

AutoCAD SHX Text

PIER 4C

AutoCAD SHX Text

PIER 5C

AutoCAD SHX Text

PIER 6C

AutoCAD SHX Text

PIER 7C

AutoCAD SHX Text

PIER 8C

AutoCAD SHX Text

PIER 9C

AutoCAD SHX Text

PIER 10C

AutoCAD SHX Text

PIER 12C

AutoCAD SHX Text

PIER 13C

AutoCAD SHX Text

PIER 14C PIER 1

AutoCAD SHX Text

PIER 11C

AutoCAD SHX Text 30'-0"

AutoCAD SHX Text 63'-3"

AutoCAD SHX Text 83'-6"

AutoCAD SHX Text 60'-0"

AutoCAD SHX Text 60'-0"

AutoCAD SHX Text 65'-0"

AutoCAD SHX Text 65'-0"

AutoCAD SHX Text 68'-0"

AutoCAD SHX Text 55'-0"

AutoCAD SHX Text 55'-0"

AutoCAD SHX Text 50'-0"

AutoCAD SHX Text 78'-9"

AutoCAD SHX Text 78'-9"

AutoCAD SHX Text 78'-9 "364"

AutoCAD SHX Text 56'-0 "58"

AutoCAD SHX Text

REPAIR LEGEND:

AutoCAD SHX Text

PATCH SHALLOW TRAFFIC BARRIER WALL SPALLS

AutoCAD SHX Text

PATCH OVERHANG BRACKET HOLES

AutoCAD SHX Text

SEAL DECK AND BARRIER WALLS

AutoCAD SHX Text

PATCH SHALLOW PIER CAP SPALLS

AutoCAD SHX Text

SEAL SUBSTRUCTURE

AutoCAD SHX Text

LEFT SHOULDER

AutoCAD SHX Text

LEFT LANE

AutoCAD SHX Text

RIGHT LANE

AutoCAD SHX Text

RIGHT SHOULDER

AutoCAD SHX Text

LEFT TRAFFIC BARRIER WALL

AutoCAD SHX Text

RIGHT TRAFFIC BARRIER WALL

AutoCAD SHX Text 1'-7 "34"

AutoCAD SHX Text

PLAN - SECTION 2: CONRAC BRIDGE

AutoCAD SHX Text

MATCH

AutoCAD SHX Text

MATCH

AutoCAD SHX Text

LINE

AutoCAD SHX Text

LINE

AutoCAD SHX Text

TOWARD SECTION 1 (CONRAC MSE APPROACH)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TOWARD SECTION 3 (ORIGINAL TERMINAL BRIDGE)

AutoCAD SHX Text 1'-7 " 34"

AutoCAD SHX Text 8'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 8'

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

CVG_EBASE.dwg

REPAIR LOCATIONS 3 OF 4

S06 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_EBASE.DWG 6/18/2026 8:22 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

SPAN 14C

AutoCAD SHX Text

SPAN 1

AutoCAD SHX Text

SPAN 2

AutoCAD SHX Text

SPAN 3

AutoCAD SHX Text

SPAN 4

AutoCAD SHX Text

SPAN 5

AutoCAD SHX Text

SPAN 6

AutoCAD SHX Text

SPAN 7

AutoCAD SHX Text

SPAN 8

AutoCAD SHX Text

SPAN 9

AutoCAD SHX Text

SPAN 11

AutoCAD SHX Text

SPAN 12

AutoCAD SHX Text

SPAN 13

AutoCAD SHX Text

SPAN 14

AutoCAD SHX Text

SPAN 15

AutoCAD SHX Text

SPAN 17

AutoCAD SHX Text

SPAN 18

AutoCAD SHX Text

SPAN 16

AutoCAD SHX Text

ORIGINAL APPROACH SLAB

AutoCAD SHX Text

PIER 14C PIER 1

AutoCAD SHX Text

PIER 2

AutoCAD SHX Text

PIER 3

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 6

AutoCAD SHX Text

PIER 5

AutoCAD SHX Text

PIER 7

AutoCAD SHX Text

PIER 8

AutoCAD SHX Text

PIER 9

AutoCAD SHX Text

PIER 11

AutoCAD SHX Text

PIER 12

AutoCAD SHX Text

PIER 13

AutoCAD SHX Text

PIER 14

AutoCAD SHX Text

PIER 15

AutoCAD SHX Text

PIER 16

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

PIER 18

AutoCAD SHX Text

ABUTMENT 2

AutoCAD SHX Text 56'-7"

AutoCAD SHX Text 56'-7 "12"

AutoCAD SHX Text 58'-3 "78"

AutoCAD SHX Text 52'-8"

AutoCAD SHX Text 54'-4 " 38"

AutoCAD SHX Text 90'-0"

AutoCAD SHX Text 90'-0"

AutoCAD SHX Text 87'-6"

AutoCAD SHX Text 85'-0"

AutoCAD SHX Text 87'-6"

AutoCAD SHX Text 90'-0"

AutoCAD SHX Text 55'-0"

AutoCAD SHX Text 65'-0"

AutoCAD SHX Text 51'-0"

AutoCAD SHX Text 50'-0"

AutoCAD SHX Text 136'-8 " 38"

AutoCAD SHX Text 137'-2 " 38"

AutoCAD SHX Text

REPAIR LEGEND:

AutoCAD SHX Text

SEAL SUBSTRUCTURE

AutoCAD SHX Text

TRAFFIC BARRIER WALL PATCHING

AutoCAD SHX Text

PEDESTRIAN BARRIER WALL PATCHING

AutoCAD SHX Text

BRIDGE DECK OVERLAY

AutoCAD SHX Text

EPOXY RESIN SEALING SIDEWALK / GUTTERLINES AND MASONRY COAT BARRIERS

AutoCAD SHX Text

REPLACE TRANSVERSE STRIP SEALS

AutoCAD SHX Text

SUBSTRUCTURE PATCHING INDICATES FRP SUBSEQUENT TO PATCH

AutoCAD SHX Text

RETROFIT ELASTOMERIC BEARING

AutoCAD SHX Text

CLEAN AND PAINT POT BEARINGS AND HOLD DOWN ANCHORS

AutoCAD SHX Text

LIGHT BLISTER PATCHING AND FRP REPAIRS

AutoCAD SHX Text

SILICONE AROUND PEDESTRIAN BARRIER LIGHTS

AutoCAD SHX Text

PATCH OVERHANG AND FRP REPAIRS

AutoCAD SHX Text

PLAN - SECTION 3: ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

TOWARD SECTION 2 (CONRAC BRIDGE)

AutoCAD SHX Text

TOWARD SECTIONN 4 (ORIGINAL MSE APPROACH)

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

AutoCAD SHX Text

LEFT SHOULDER/SIDEWALK

AutoCAD SHX Text

LEFT THROUGH LANE 1

AutoCAD SHX Text

LEFT THROUGH LANE 2

AutoCAD SHX Text

RIGHT PULLOFF LANE 3

AutoCAD SHX Text

RIGHT PULLOFF LANE 4

AutoCAD SHX Text

RIGHT SHOULDER/SIDEWALK

AutoCAD SHX Text

PIER 10

AutoCAD SHX Text

RIGHT TRAFFIC BARRIER WALL (TYP.)

AutoCAD SHX Text

LEFT TRAFFIC BARRIER WALL

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

LEFT TRAFFIC BARRIER WALL

AutoCAD SHX Text

LEFT PEDESTRIAN BARRIER WALL

AutoCAD SHX Text

PATCH OVERHANG BRACKET HOLES

AutoCAD SHX Text

LONGITUDINAL STRIP SEAL RETROFIT

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

CVG_EBASE.dwg

REPAIR LOCATIONS 4 OF 4

S07 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_EBASE.DWG 6/18/2026 8:22 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text

ORIGINAL MSE APPROACH

AutoCAD SHX Text

SPAN 18

AutoCAD SHX Text

ORIGINAL APPROACH SLAB

AutoCAD SHX Text

ABUTMENT 2

AutoCAD SHX Text

REPAIR LEGEND:

AutoCAD SHX Text

REPAIR APPROACH PAVEMENT CRACKS

AutoCAD SHX Text

JOINT SEALANT REPAIR

AutoCAD SHX Text

REPLACE JOINT SEALS AT APPROACH SLABS

AutoCAD SHX Text

OVERLAY APPROACH SLAB

AutoCAD SHX Text

PLAN - SECTION 4: ORIGINAL MSE APPROACH

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

TOWARD SECTION 3 (ORIGINAL TERMINAL BRIDGE)

AutoCAD SHX Text

LEFT SHOULDER

AutoCAD SHX Text

LEFT LANE

AutoCAD SHX Text

RIGHT TRANSITION LANE

AutoCAD SHX Text

RIGHT SHOULDER

AutoCAD SHX Text

RIGHT TRAFFIC BARRIER WALL (TYP.)

AutoCAD SHX Text

LEFT TRAFFIC BARRIER WALL (TYP.)

AutoCAD SHX Text 1'-7 "34"

AutoCAD SHX Text 1'-7 "34"

AutoCAD SHX Text

TOWARD DONALDSON ROAD

AutoCAD SHX Text

END OF PROJECT

AutoCAD SHX Text 8'

AutoCAD SHX Text

VAR.

AutoCAD SHX Text 12'

AutoCAD SHX Text 6'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_EBASE.dwg

SEAL BARRIER WALLS

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_REPAIRS_MOT_2.DWG 6/12/2026 12:15 PM MICHAEL-H

PREPARED BY

N

MAINTENANCE OF TRAFFIC 1 OF 7

S08

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

ORIGINAL MSE APPROACH

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

PIER 11

AutoCAD SHX Text

END OF PROJECT

AutoCAD SHX Text

LIMITS OF PHASE B

AutoCAD SHX Text

LIMITS OF PHASE B

AutoCAD SHX Text

BEGINNING OF PROJECT

AutoCAD SHX Text

PIER 9

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_REPAIRS_MOT_2.dwg

AutoCAD SHX Text

MAINTENANCE OF TRAFFIC - FOR TOP OF BRIDGE REPAIRS

AutoCAD SHX Text

PHASE B-II

AutoCAD SHX Text

PHASE B-I

AutoCAD SHX Text

PHASE B-IV

AutoCAD SHX Text

PHASE B-III

AutoCAD SHX Text MAINTENANCE OF TRAFFIC NOTES: SEE THE CONSTRUCTION SEQUENCE FOR ADDITIONAL INFORMATION ON LANE CLOSURES AND MOT. SEE MUTCD CURRENT EDITION SECTION 6 FOR TEMPORARY TRAFFIC BARRIERS AND ADDITIONAL INFORMATION. A. FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING ALL BARRIERS, ALONG THE FULL LENGTH OF ALL FULL LANE CLOSURES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN THE CONSTRUCTION ZONE SO AS NOT TO IMPEDE FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING ALL BARRIERS, ALONG THE FULL LENGTH OF ALL FULL LANE CLOSURES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN THE CONSTRUCTION ZONE SO AS NOT TO IMPEDE TRAFFIC OR DAMAGE ANY FACILITIES, STRUCTURES, OR PROPERTY OUTSIDE THE DESIGNATED WORK AREA. B. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

- PHASE B-II MOT

AutoCAD SHX Text

- PHASE B-I MOT

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text

SPAN 10

AutoCAD SHX Text

SPAN 11

AutoCAD SHX Text

RAISED CROSSWALK

AutoCAD SHX Text

DETAIL A (NEXT SHEET)

AutoCAD SHX Text

- PHASE B-III MOT

AutoCAD SHX Text

- PHASE B-IV MOT

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

12'-0" LANE (MIN.)

AutoCAD SHX Text

THRU LANE

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

DECK

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

12'-0" LANE (MIN.)

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

PULL-OFF LANE

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

SECTION A-A - TYPICAL MOT PHASE A-II

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

SECTION A-A - TYPICAL MOT PHASE A-I

AutoCAD SHX Text

7' TALL (MIN.) APPROVED DEBRIS BARRIER

AutoCAD SHX Text

7' TALL (MIN.) APPROVED DEBRIS BARRIER

AutoCAD SHX Text

DECK

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

LANE

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

LANE

AutoCAD SHX Text

LONG. JOINTJOINT

AutoCAD SHX Text

LONG. JOINTJOINT

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text NOTE: DURING TYPICAL PHASE A-I CONSTRUCTION A 3'-0" SHOULDER, 10'-0" PULL-OFF LANE, AND 12'-0" THRU LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES.

AutoCAD SHX Text NOTE: DURING TYPICAL PHASE A-II CONSTRUCTION A 5'-0" SHOULDER AND ONE 12'-0" LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES.

AutoCAD SHX Text

SPAN 8

AutoCAD SHX Text

SPAN 16

AutoCAD SHX Text

SPAN 4

AutoCAD SHX Text

PHASE A-I CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE A-II CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE A-III CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE A-IV CONSTRUCTION (TYP.)

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

LIMITS OF PHASE A

LIMITS OF PHASE A

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_REPAIRS_MOT_2.DWG 6/12/2026 12:15 PM MICHAEL-H

PREPARED BY

MAINTENANCE OF TRAFFIC 2 OF 7

S09

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_REPAIRS_MOT_2.dwg

AutoCAD SHX Text

MAINTENANCE OF TRAFFIC - FOR TOP OF BRIDGE REPAIRS

AutoCAD SHX Text NOTES: RAISED SIDEWALK OVERLAY (SEE REPAIR 15 ON SHEET S22) TO BE : RAISED SIDEWALK OVERLAY (SEE REPAIR 15 ON SHEET S22) TO BE COMPLETED IN 4 PHASES AS SHOWN IN DETAIL A.

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

12'-0" LANE (MIN.)

AutoCAD SHX Text

THRU LANE

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

DECK

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

PULL-OFF LANE

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

7' TALL (MIN.) APPROVED DEBRIS BARRIER

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

LANE

AutoCAD SHX Text

LONG. JOINTJOINT

AutoCAD SHX Text NOTE: DURING TYPICAL PHASE A-III CONSTRUCTION A 3'-0" SHOULDER, 10'-0" PULL-OFF LANE, AND 12'-0" THRU LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES.

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

12'-0" LANE (MIN.)

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

7' TALL (MIN.) APPROVED DEBRIS BARRIER

AutoCAD SHX Text

DECK

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

LANE

AutoCAD SHX Text

LONG. JOINTJOINT

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text NOTE: DURING TYPICAL PHASE A-IV CONSTRUCTION A 5'-0" SHOULDER AND ONE 12'-0" LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES.

AutoCAD SHX Text

SECTION B-B - TYPICAL MOT PHASE A-III

AutoCAD SHX Text

SECTION B-B - TYPICAL MOT PHASE A-IV

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text MAINTENANCE OF TRAFFIC NOTES: SEE THE CONSTRUCTION SEQUENCE FOR ADDITIONAL INFORMATION ON LANE CLOSURES AND MOT. SEE MUTCD CURRENT EDITION SECTION 6 FOR TEMPORARY TRAFFIC BARRIERS AND ADDITIONAL INFORMATION. A. FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING ALL BARRIERS, ALONG THE FULL LENGTH OF ALL LANE CLOSURES. THE CONTRACTOR SHALL FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING ALL BARRIERS, ALONG THE FULL LENGTH OF ALL LANE CLOSURES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN THE CONSTRUCTION ZONE SO AS NOT TO IMPEDE TRAFFIC OR DAMAGE ANY FACILITIES, STRUCTURES, OR PROPERTY OUTSIDE THE DESIGNATED WORK AREA. B. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.

AutoCAD SHX Text

DETAIL A - RAISED CROSSWALK PHASING

AutoCAD SHX Text I

AutoCAD SHX Text

II

AutoCAD SHX Text

III

AutoCAD SHX Text

IV

AutoCAD SHX Text

LIMITS OF REPAIR 15 RAISED CROSSWALK OVERLAY

(CAN BE PERFORMED IN EITHER PHASE A OR PHASE B)

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_REPAIRS_MOT_3.DWG 6/11/2026 4:02 PM MICHAEL-H

PREPARED BY

N

MAINTENANCE OF TRAFFIC 3 OF 7

S10

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

ORIGINAL MSE APPROACH

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

PIER 11

AutoCAD SHX Text

END OF PROJECT

AutoCAD SHX Text

LIMITS OF PHASE B

AutoCAD SHX Text

LIMITS OF PHASE B

AutoCAD SHX Text

BEGINNING OF PROJECT

AutoCAD SHX Text

PIER 9

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_REPAIRS_MOT_3.dwg

AutoCAD SHX Text

MAINTENANCE OF TRAFFIC - FOR TOP OF BRIDGE REPAIRS

AutoCAD SHX Text

PHASE B-II CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-I CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-IV CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-III CONSTRUCTION (TYP.)

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

7" TALL (MIN.) TL-2 TRAFFIC AND DEBRIS BARRIER OR APPROVED EQUIVALENT

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

DECK OR

AutoCAD SHX Text

APPROACH SLAB

AutoCAD SHX Text

SECTION C-C - TYPICAL MOT PHASE B-I

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

DECK OR

AutoCAD SHX Text

APPROACH SLAB

AutoCAD SHX Text

SECTION C-C - TYPICAL MOT PHASE B-II

AutoCAD SHX Text

AutoCAD SHX Text MAINTENANCE OF TRAFFIC NOTES CONSTRUCTION SEQUENCE: SEE THE CONSTRUCTION SEQUENCE FOR ADDITIONAL INFORMATION ON LANE CLOSURES AND MOT. SEE MUTCD CURRENT EDITION SECTION 6 FOR TEMPORARY TRAFFIC BARRIERS AND ADDITIONAL INFORMATION. A. FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING BARRIERS, 7' TALL DEBRIS BARRIERS (OR APPROVED EQUIVALENT), ALONG THE FULL LENGTH OF ALL FULL LANE CLOSURES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN FOR PHASED TRAFFIC CONTROL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING AND MAINTAINING BARRIERS, 7' TALL DEBRIS BARRIERS (OR APPROVED EQUIVALENT), ALONG THE FULL LENGTH OF ALL FULL LANE CLOSURES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN THE CONSTRUCTION ZONE SO AS NOT TO IMPEDE TRAFFIC OR DAMAGE ANY FACILITIES, STRUCTURES, OR PROPERTY OUTSIDE THE DESIGNATED WORK AREA. B. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A 15' EMERGENCY LANE THROUGH THE DURATION OF CONSTRUCTION FOR THE TOP OF BRIDGE REPAIRS AT ALL TIMES.

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

- PHASE B-II MOT

AutoCAD SHX Text

- PHASE B-I MOT

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

SPAN 11

AutoCAD SHX Text

RAISED CROSSWALK

AutoCAD SHX Text

- PHASE B-III MOT

AutoCAD SHX Text

- PHASE B-IV MOT

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

SECTION C-C - TYPICAL MOT PHASE B-III

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

AutoCAD SHX Text

SECTION C-C - TYPICAL MOT PHASE B-IV

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

7" TALL (MIN.) TL-2 TRAFFIC AND DEBRIS BARRIER OR APPROVED EQUIVALENT

AutoCAD SHX Text

SPAN 8

AutoCAD SHX Text

SPAN 16

AutoCAD SHX Text

SPAN 4

AutoCAD SHX Text

LIMITS OF PHASE A

AutoCAD SHX Text

PHASE A-I

AutoCAD SHX Text

PHASE A-II

AutoCAD SHX Text

PHASE A-III

AutoCAD SHX Text

PHASE A-IV

SPAN

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_MOT_1.DWG 6/19/2026 2:00 PM MICHAEL-H

PREPARED BY

N

MAINTENANCE OF TRAFFIC 4 OF 7

S11

AutoCAD SHX Text

CONRAC MSE APPROACH

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

ORIGINAL MSE APPROACH

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

PHASE A-I

AutoCAD SHX Text

END OF PROJECT

AutoCAD SHX Text

PARTIAL BRIDGE CLOSURE

AutoCAD SHX Text

PARTIAL BRIDGE CLOSURE

AutoCAD SHX Text

SPAN 4

AutoCAD SHX Text

SPAN 16

AutoCAD SHX Text

PHASE A-II

AutoCAD SHX Text

EMERGENCY VEHICLE ENTRANCE FOR PHASE A-II

AutoCAD SHX Text

BEGINNING OF PROJECT

AutoCAD SHX Text

EMERGENCY VEHICLE ENTRANCE FOR PHASE A-I

AutoCAD SHX Text

FULL BRIDGE CLOSURE

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_MOT_1.dwg

AutoCAD SHX Text

BID ALTERNATE #1 - MAINTENANCE OF TRAFFIC - FOR TOP OF BRIDGE REPAIRS

AutoCAD SHX Text

PHASE B-II CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-I CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-II CONSTRUCTION (TYP.)

AutoCAD SHX Text

PHASE B-I CONSTRUCTION (TYP.)

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

DECK OR

AutoCAD SHX Text

APPROACH SLAB

AutoCAD SHX Text

SECTION A-A - TYPICAL MOT PHASE B-I

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

10'-0" LANE (MIN.)

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

TRAFFIC

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LANE

AutoCAD SHX Text

SECTION A-A - TYPICAL MOT PHASE B-II

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text

(LOOKING AHEAD)

AutoCAD SHX Text BID ALTERNATE #1 - MAINTENANCE OF TRAFFIC NOTES: SEE THE CONSTRUCTION SEQUENCE FOR ADDITIONAL INFORMATION ON LANE CLOSURES AND MOT. SEE MUTCD CURRENT EDITION SECTION 6 FOR TEMPORARY TRAFFIC BARRIERS AND ADDITIONAL INFORMATION. A. CONTRACTOR SHALL COMPLETE ALL REPAIR WORK IN SPANS 4-15 DURING A FULL BRIDGE CLOSURE TO VEHICULAR TRAFFIC (SEE CONSTRUCTION SEQUENCE FOR DETAILS AND ADDITIONAL INFORMATION). THE SPAN 10 SKYWAY (PEDESTRIAN BRIDGE) AND RAISED CROSSWALK SHALL REMAIN OPEN CONTRACTOR SHALL COMPLETE ALL REPAIR WORK IN SPANS 4-15 DURING A FULL BRIDGE CLOSURE TO VEHICULAR TRAFFIC (SEE CONSTRUCTION SEQUENCE FOR DETAILS AND ADDITIONAL INFORMATION). THE SPAN 10 SKYWAY (PEDESTRIAN BRIDGE) AND RAISED CROSSWALK SHALL REMAIN OPEN TO ALL PEDESTRIAN TRAFFIC FOR THE DURATION OF THE WORK IN THESE SPANS EXCEPT AS SPECIFIED IN SECTION 6.3 OF THE CONSTRUCTION SEQUENCE. WORK THAT AFFECTS TRAFFIC OPERATIONS BENEATH THE STRUCTURE SHALL NOT BE PERMITTED DURING THIS FULL BRIDGE CLOSURE PERIOD. B. FOR FULL BRIDGE CLOSURE PHASE A-I: THE CONTRACTOR MAY WORK THROUGHOUT THE CONRAC MSE APPROACH AND THE CONRAC BRIDGE. THE CONTRACTOR MAY WORK ON SPANS 17 AND 18 OF THE ORIGINAL TERMINAL BRIDGE AND THE ORIGINAL MSE APPROACH WHILE MAINTAINING A 15' FOR FULL BRIDGE CLOSURE PHASE A-I: THE CONTRACTOR MAY WORK THROUGHOUT THE CONRAC MSE APPROACH AND THE CONRAC BRIDGE. THE CONTRACTOR MAY WORK ON SPANS 17 AND 18 OF THE ORIGINAL TERMINAL BRIDGE AND THE ORIGINAL MSE APPROACH WHILE MAINTAINING A 15' EMERGENCY VEHICLE LANE THROUGH THE DURATION OF PHASE A-I. C. FOR FULL BRIDGE CLOSURE PHASE A-II: THE CONTRACTOR MAY WORK THROUGHOUT SPANS 17 AND 18 OF THE ORIGINAL TERMINAL BRIDGE AND THE ORIGINAL MSE APPROACH. THE CONTRACTOR MAY WORK ON THE CONRAC MSE APPROACH AND THE CONRAC BRIDGE WHILE MAINTAINING A 15' FOR FULL BRIDGE CLOSURE PHASE A-II: THE CONTRACTOR MAY WORK THROUGHOUT SPANS 17 AND 18 OF THE ORIGINAL TERMINAL BRIDGE AND THE ORIGINAL MSE APPROACH. THE CONTRACTOR MAY WORK ON THE CONRAC MSE APPROACH AND THE CONRAC BRIDGE WHILE MAINTAINING A 15' EMERGENCY VEHICLE LANE THROUGH THE DURATION OF PHASE A-II. D. THE EMERGENCY ACCESS LANE MAY UTILIZE THE HYDRODEMOLISHED BRIDGE DECK SURFACE, PROVIDED ALL FULL DEPTH PATCHES WITHIN THE EMERGENCY ACCESS LANE HAVE BEEN COMPLETED AND HAVE ATTAINED THE REQUIRED COMPRESSIVE STRENGTH.THE EMERGENCY ACCESS LANE MAY UTILIZE THE HYDRODEMOLISHED BRIDGE DECK SURFACE, PROVIDED ALL FULL DEPTH PATCHES WITHIN THE EMERGENCY ACCESS LANE HAVE BEEN COMPLETED AND HAVE ATTAINED THE REQUIRED COMPRESSIVE STRENGTH.

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

- PHASE B-II MOT (PARTIAL BRIDGE CLOSURE)

AutoCAD SHX Text

- PHASE B-I MOT (PARTIAL BRIDGE CLOSURE)

AutoCAD SHX Text

- PHASE A-I MOT (FULL BRIDGE CLOSURE)

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

TRAFFIC BARRIER (TYP.)

AutoCAD SHX Text

LIMITS OF REPAIR WORK

AutoCAD SHX Text

- PHASE A-II MOT (FULL BRIDGE CLOSURE)

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

DECK OR

AutoCAD SHX Text

APPROACH SLAB

AutoCAD SHX Text

7' TALL (MIN.) APPROVED TRAFFIC AND DEBRIS BARRIER

AutoCAD SHX Text

7' TALL (MIN.) APPROVED TRAFFIC AND DEBRIS BARRIER

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

CONSTRUCTION

NOTE: AT A MINIMUM, ONE 12'-0" LANE AND A 5'-0" SHOULDER MUST BE OPEN TO TRAFFIC DURING BOTH PHASE B-I AND B-II.

ALP# 72

CIN. BELL

TELEPHONE

EXCHANGE

ALP# 20

POLICE

DEPT.

ALP# 15

PARKING GARAGE 2

ALP# 17

PARKING GARAGE 3

ALP# 10

TERMINAL

ALP# 19

NORTH

ELECTRIC

VAULT

LOBBY

ALP# 16

PARKING GARAGE

TOLL PLAZA

ALP# 140

GLYCOL TEST

POINT

ALP# 148

PARKING

GARAGE

EXIT PLAZA

TERMINAL DRIVE

TERMINAL LOOP ROAD

LI

N

C O

LN

R

O

AD

6" cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_REPAIRS_MOT.DWG 6/18/2026 9:04 PM MICHAEL-H

PREPARED BY

N

MAINTENANCE OF TRAFFIC 5 OF 7

S12

AutoCAD SHX Text

ORIGINAL TERMINAL BRIDGE

AutoCAD SHX Text

CONRAC BRIDGE

AutoCAD SHX Text

REAR ABUTMENT

AutoCAD SHX Text

PIER 1C

AutoCAD SHX Text

PIER 2C

AutoCAD SHX Text

PIER 3C

AutoCAD SHX Text

PIER 4C

AutoCAD SHX Text

PIER 5C

AutoCAD SHX Text

PIER 6C

AutoCAD SHX Text

PIER 7C

AutoCAD SHX Text

PIER 8C

AutoCAD SHX Text

PIER 9C

AutoCAD SHX Text

PIER 10C

AutoCAD SHX Text

PIER 12C

AutoCAD SHX Text

PIER 13C

AutoCAD SHX Text

PIER 14C PIER 1

AutoCAD SHX Text

PIER 11C

AutoCAD SHX Text

PIER 2

AutoCAD SHX Text

PIER 3

AutoCAD SHX Text

PIER 4

AutoCAD SHX Text

PIER 6

AutoCAD SHX Text

PIER 5

AutoCAD SHX Text

PIER 7

AutoCAD SHX Text

PIER 8

AutoCAD SHX Text

PIER 9

AutoCAD SHX Text

PIER 11

AutoCAD SHX Text

PIER 12

AutoCAD SHX Text

PIER 13

AutoCAD SHX Text

PIER 14

AutoCAD SHX Text

PIER 15

AutoCAD SHX Text

PIER 16

AutoCAD SHX Text

PIER 17

AutoCAD SHX Text

ARRIVALS

AutoCAD SHX Text

END OF LANE CLOSURES

AutoCAD SHX Text

BEGINNING OF BRIDGE

AutoCAD SHX Text

PHASE B-V CONSTRUCTION PHASE B-VI CONSTRUCTION

AutoCAD SHX Text

MOT PHASE B-VIII

AutoCAD SHX Text

PHASE B-V CONSTRUCTION PHASE B-VI CONSTRUCTION

AutoCAD SHX Text

PHASE B-VII CONSTRUCTION

AutoCAD SHX Text

MOT PHASE B-IX

AutoCAD SHX Text

BEGIN OF LANE CLOSURE

AutoCAD SHX Text

MEDIAN (TYP.)

AutoCAD SHX Text

GARAGE (TYP.)

AutoCAD SHX Text

THROUGH LANE

AutoCAD SHX Text

THROUGH LANE

AutoCAD SHX Text

TURN-OFF LANE

AutoCAD SHX Text

TURN-OFF LANE

AutoCAD SHX Text

TURN-OFF LANE

AutoCAD SHX Text

THROUGH LANE

AutoCAD SHX Text

THROUGH LANE

AutoCAD SHX Text

TERMINAL SIDEWALK (TYP.)

AutoCAD SHX Text

2 EXT. THROUGH LANES TO REMAIN OPEN AT ALL TIMES

AutoCAD SHX Text

PHASE B-X CONSTRUCTION

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DWN.BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

APPR.BY:

AutoCAD SHX Text

CHK.BY:

AutoCAD SHX Text 05-29-2026

AutoCAD SHX Text M.B.H.

AutoCAD SHX Text J.P.M.

AutoCAD SHX Text D.E.R.

AutoCAD SHX Text

NTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

BY

AutoCAD SHX Text

AUTH.

AutoCAD SHX Text 6/4/26

AutoCAD SHX Text

ISSUE FOR BID

AutoCAD SHX Text CVG_REPAIRS_MOT.dwg

AutoCAD SHX Text

MAINTENANCE OF TRAFFIC - FOR BENEATH THE BRIDGE ACCESS AND REPAIRS

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text MAINTENANCE OF TRAFFIC NOTES: SEE THE CONSTRUCTION SEQUENCE FOR ADDITIONAL INFORMATION ON LANE CLOSURES AND MOT. SEE MUTCD CURRENT EDITION SECTION 6 FOR TEMPORARY TRAFFIC BARRIERS AND ADDITIONAL INFORMATION. -FOR TRAFFIC CONTROL BENEATH THE STRUCTURE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING TRAFFIC BARRIERS AND MAINTAINING A WORK ZONE. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WITHIN THE CONSTRUCTION ZONE SO AS NOT TO IMPEDE TRAFFIC OR DAMAGE ANY FACILITIES, STRUCTURES, OR PROPERTY WITHIN OR OUTSIDE THE DESIGNATED WORK AREA. -FOR MOT PHASES B-VIII AND B-IX, THE WORK ZONE SHALL NOT EXCEED 150' IN LENGTH. BEGINNING AND END OF LANE CLOSURES ARE TO FOLLOW KYTC STANDARD DRAWINGS. LABELS ON THIS SHEET ARE APPROXIMATIONS. -PHASE B-VII AND B-X CONSTRUCTION IS RESTRICTED TO NIGHTTIME. SEE CONSTRUCTION SEQUENCE NOTES.

AutoCAD SHX Text

HOTEL/CELL PHONE LOT ENTRANCE

AutoCAD SHX Text

RENTAL CAR

AutoCAD SHX Text

VALET/GTC WEST ENTRANCE

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

PHASE B-VI

AutoCAD SHX Text

PHASE B-V

AutoCAD SHX Text

PHASE B-VIII

AutoCAD SHX Text

PHASE B-IX

AutoCAD SHX Text

PHASE B-VII

AutoCAD SHX Text

CROSSWALK

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

PHASE B-X

-ACCESS TO ALL PULL-OFF ROADS, INCLUDING VALE/GTC WEST ENTRANCE AND HOTEL/CELL PHONE LOT ROAD, SHALL BE MAINTAINED FOR REGULAR TRAFFIC THROUGHOUT THE DURATION OF CONSTRUCTION. PARTIAL LANE OR ENTRANCE CLOSURES WITH FLAGGERS MAYBE PERMITTED WITH APPROVAL FROM CVG.

MAINTENANCE OF TRAFFIC 6 OF 7

S13 cvg departures bridge repair plans

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

KENTON COUNTY AIRPORT BOARD

C:\PW_WORKDIR\PEWIN_MICHAEL-H\D0248181\CVG_REPAIRS_MOT.DWG 6/18/2026 9:04 PM MICHAEL-H

PREPARED BY

AutoCAD SHX Text

NOT ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

CAD NO:

AutoCAD SHX Text

PROJ.NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .