26-03_Notice_of_Inspection_Trip.pdf
PDF 873 KB Posted
- Solicitation number
- 0000039684
- Issued by
- California
About this file
This is a Notice of Inspection Trip document issued by the California Department of Water Resources for Specification No. 26-03, Contract C51692, concerning spillway maintenance at Pyramid Dam. The project involves performing additional concrete repairs at the Pyramid Dam Spillway. A Pre-Pre-Bid Conference is scheduled for June 30 at 10:00 AM, as referenced in Document 00 11 02. Interested parties must email DOE_SPECS@WATER.CA.GOV to register as bidders and obtain additional project information.
The estimated cost range for this project is $1,000,000 to $1,250,000. A California Class A contractor license is required to bid on this project. The project is subject to a Non-Disclosure Agreement, which is available in the contract attachments and should be reviewed prior to submission. Prospective bidders should contact DOE_SPECS@water.ca.gov for additional details regarding project specifications, scheduling, and bidding procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Safety_Prequal_Package.pdf | ||
| Non-Disclosure_Agreement__FERC_.pdf | ||
| 00_11_01_Notice_to_Contractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice of Inspection Trip
00 11 02-1 I-26
DOCUMENT 00 11 02
NOTICE OF INSPECTION TRIP
SPILLWAY MAINTENANCE
PYRAMID DAM
STATE WATER FACILITIES
SOUTHERN FIELD DIVISION
LOS ANGELES COUNTY
CALIFORNIA
SPECIFICATION NO. 26-03
CONTRACT NO. C51692
A Pre-Bid Conference will be held via Microsoft Teams on TUESDAY, JUNE 30, 2026 from 10:00 A.M. to 11:00 A.M. The Department will be presenting the Inspection Trip Presentation Material available on the website listed on Document 00 30 00 – Available Information. Attendance to the Pre-Bid Conference is not required.
Join on your computer or mobile app via the link below:
Microsoft Teams meeting https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting?rtc=1
Meeting ID: 286 891 222 955 1 Passcode: wn23hE96
Or call in (audio only) +1 916-573-2034, United States, Sacramento Phone Conference ID: 228 618 634#
During the Pre-Bid Conference the un-mute function for attendees will be disabled, however the Meeting Chat is available for any typed questions during the presentation. A recording of the Pre-Bid Conference will be available after the event has concluded.
Presentation material is for information only. Nothing contained in the presentation material or discussed in the pre-bid conference modifies information contained in the plans or specifications, nor is it binding to the Department.
An inspection trip for prospective bidders will be conducted at the work site. The inspection trip is expected to take about two hours. Interested parties are requested to schedule their time so as to make the trip on the same day.
CUI//CEII–DO NOT RELEASE
FINAL–ISSUED FOR CONSTRUCTION
https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting?rtc=1
00 11 02-2 I-26
Interested parties are requested to meet TUESDAY, JULY 7, 2026 at 10:00 A.M. at the Frenchman’s Flat Day Use Area at the pipe gate on Golden State Highway. The approximate coordinates are 34.616756, -118.744079.
Access to the meeting location from Sacramento is as follows:
• Take I-5 S for approximately 336 miles
• Take Exit 183 for Templin Hwy and
• Turn right onto 6N32/Templin HWY
• Turn right onto Golden State Hwy. Travel approximately 5.1 miles on Golden State Highway and the meeting location will be on the left side. (See map on following page.)
VICINITY MAP
LOS ANGELES COUNTY
CUI//CEII–DO NOT RELEASE
00 11 02-3 I-26
AREA MAP
FRENCHMAN’S FLAT DAY USE AREA
34.616756, -118.744079
00 11 02-4 I-26
Safety Requirements
All attendees are required to provide their own Personal Protective Equipment (PPE).
Required PPE:
• Hard Hats
• Safety Vests
• Work Boots
Optional PPE:
• Safety Glasses.
• Hearing Protection.
Please contact the Department at doe_specs@water.ca.gov at least two days in advance of the inspection trip if you plan to attend or have questions.
END OF DOCUMENT
mailto:doe_specs@water.ca.gov
File details come from the government source that posted it. Updated .