This is a project description and specification document from the Iowa Department of Natural Resources for bridge deck replacement work at the Volga River Recreation Area in Fayette County. The project involves removing and replacing the existing guard rail, bridge deck, and bridge beam nailers on the Frog Hollow Bridge, a pedestrian trail structure located at coordinates 4253'23.5"N 9146'28.4"W. Work scope includes installation of approximately 114 linear feet of 2x pressure-treated wood nailers using Techfast timber-to-steel fasteners, approximately 532 square feet of 3x12 pressure-treated timber decking, and guard rail installation with 4x4 posts spaced at maximum 6-foot intervals, 60 inches in height above the bridge deck, with mid rails and top rail featuring 2x6 cap. The project is organized into five line items: mobilization, demolition, bridge beam nailers, bridge deck, and guard rail, all listed as lump sum bids. Contractors are required to conduct a mandatory site visit and inspection prior to bidding to familiarize themselves with actual job conditions and verify all dimensions and site conditions shown on plans.
Work restrictions include no activity from noon Friday through Monday morning and no work on holidays without explicit approval from the Iowa DNR Engineer or Park Manager. The trail will remain closed during construction, with DNR staff responsible for signage. Contractors must provide their own disposal sites for excess excavated material or broken concrete and are prohibited from disturbing grass areas or trees outside construction limits or using surrounding areas for parking, vehicle servicing, or material storage without approval. Access to the bridge is limited to skid loaders and UTVs using the Frog Hollow pedestrian trail. Contractors must notify the DNR Engineer of any utilities or fixtures encountered and any discrepancies or conflicts identified in plans prior to commencing work. For site verification and specific location details, contractors should contact Volga River Park Manager Austin Lette at austin.lette@dnr.iowa.gov or 515.975.8819.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-03-33-01 Volga River Rec Area-Frog Hollow Bridge-Deck Replacement - Proposal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Iowa Department of Natural Resources
Volga River Recreation Area, Fayette County
26-03-33-01 Volga River Rec Area-Frog Hollow Bridge-Deck Replacement
Project Description:
Work consists of removing existing guard rail, bridge deck and bridge beam nailers and replace.
GENERAL NOTES:
Verify actual locations and elevations with DNR Engineer.
Grass areas around the structures will be protected and minimally disturbed.
No work will be allowed from 12 noon Friday until the following Monday. No work on holidays.
Approval may be allowed per the Iowa DNR Engineer and/or Park Manager.
Trail will be closed while work is being performed. Iowa DNR Staff will set signage
All work shall conform to and be performed in accordance with all applicable codes and ordinances
The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and start of work. Failure to visit the project site shall not relieve contractor from performing the work in accordance to the plans, specifications, special provisions and contract.
The contractor shall verify, at the site, all dimension and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.
It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material
(excavated material or broken asphalt/concrete) which is not desirable to be incorporated into the work involved on this project. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.
The contractor shall not disturb desirable grass areas or desirable trees outside the construction limits.
The contractor shall not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR
Engineer.
Where utilities and fixtures are encountered within the construction area, it shall be the responsibility of the contractor to notify DNR Engineer of those utilities prior to the beginning of any construction. No claims for additional compensation will be allowed to the contractor for any interference or delay.
Frog Hollow Bridge is on the Frog Hollow pedestrian trail. Access is limited to using the trail with skid loaders and UTV’s. approximate coordinates are 42°53'23.5"N 91°46'28.4"W. To verify location please contact Volga River Park Manager Austin Lette at austin.lette@dnr.iowa.gov or 515.975.8819.
Estimated Project Quantities
ITEM NO. ITEM UNIT TOTAL
1 Mobilization L.S. 1
2 Demolition L.S. 1
3 Bridge Beam Nailers L.S. 1
4 Bridge Deck L.S. 1
5 Guard Rail L.S. 1
Estimate Reference Information
ITEM No. DESCRIPTION
Approximately 114 linear feet. Install 2x pressure treated wood nailer using Techfast timber to steel fastener, or equivalent.
Approximately 532 square feet of 3 x 12 pressure treated timbers
Approximately linear feet. All pressure treated wood. 4x4 posts with max spacing of 6 feet and height of 60 inches above bridge deck with 2 mid rails and top rail with 2x6 cap.