26-028EJ_Pre-Bid_Sign_In_Sheet.PDF

PDF 835 KB Posted

Attached to
Progressive Design-Build Services for Lift Station 8 Relocation and Collection System Improvements Phase 1
Solicitation number
26-028EJ
Issued by
Manatee County, Florida

About this file

This is a Pre-Bid Sign-In Sheet for the City of Bradenton and the State of Florida Department of Environmental Protection related to progressive design-build services for Lift Station 8 Relocation and Collection System Improvements Phase 1. The project involves furnishing and installing a replacement lift station facility at 1302 4th Avenue West, Bradenton, Florida 34205, including an upsized lined wet well, new pumps, upsized discharge piping, and all necessary electrical and instrumentation components. A non-mandatory pre-proposal meeting was scheduled for March 18, 2026, at 2:00 p.m., with a question submission deadline of March 25, 2026, at 5:00 p.m. Proposal submissions are due April 1, 2026, by 2:30 p.m., followed by an evaluation meeting on April 15, 2026, short-listed proposer presentations on April 28, 2026, a notice of recommended award anticipated April 29, 2026, and contract award expected May 27, 2026. The City targets Phase 1 completion by July 1, 2027.

Qualified proposers must be either a Certified General Contractor or Certified Utility Contractor licensed by the State of Florida, with at least one key personnel member holding a current Professional Engineer license from the Florida Board of Professional Engineers. Evaluation criteria include ability of professional personnel (35 percent), proposer's past performance and experience with preference for demonstrated experience with at least three sanitary sewer lift station installation projects within the past ten years (40 percent), and project approach including management techniques and timeline (25 percent). The project is funded through state financial assistance under the Statewide Water Quality Restoration Projects appropriation with a total budget of $2,000,000 in state funding with no match requirement from the City, allocated across preconstruction activities ($600,000), bidding and contractor selection ($50,000), project management ($350,000), and construction ($1,000,000), though construction costs cannot exceed $7,500,000. All proposers must comply with Florida Statutes Chapter 287, maintain specified insurance coverage with the City named as additional insured, comply with E-Verify requirements, and obtain drug-free workplace and scrutinized companies certifications. Multiple Guaranteed Maximum Prices (GMPs) may be requested during design and construction phases, and the project operates under a cost reimbursement agreement structure with monthly invoicing permitted for eligible expenses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .