26-01167 Requirements and Specifications-DNA-Hati.docx

DOCX document 134 KB Posted

Attached to
Digital Phase Noise and Frequency Analyzer Federal contract opportunity
Solicitation number
NB688000-26-01167
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements and Specifications document for a Digital Frequency Stability and Phase Noise Analyzer being procured by the National Institute of Standards and Technology (NIST), Precision Photonic Synthesis Group under Solicitation Number NB688000-26-01167. The document outlines technical and operational requirements for a single digital phase noise analyzer unit designed to replace an obsolete Microchip 5125A analyzer used for calibration purposes. The analyzer must operate across a frequency range of 10 MHz to 400 MHz or higher, provide absolute and residual phase noise measurement capability, support frequency stability measurements, and utilize a digital architecture with no-phase lock loop requirement. The complete technical specifications are referenced in a separate attachment document.

The procurement specifies delivery and installation requirements to be completed within 22 weeks after receipt of order. The vendor must provide on-site technician support for installation, equipment setup, and startup services, with US citizens required for on-site work (foreign nationals require preregistration 30 days prior). A 24-month extended manufacturer warranty is required, covering labor, parts, and travel. Training must be provided on-site covering operations, maintenance, troubleshooting, and safety. Government acceptance testing is expected to take 10 business days. This solicitation is issued as a Request for Quotation (RFQ) set aside for small businesses only and is not subject to formal source selection procedures under FAR Part 15. Direct delivery to a building with loading dock capability is required, and the equipment must be compatible with standard US power availability.

View the file

Other files for this federal contract opportunity

Other files attached to Digital Phase Noise and Frequency Analyzer, newest first.
File Type Posted
26-01167 Digital Phase Noise Analyzer_Specifications-DNA-Hati.docx DOCX document
RFQ NB688000-26-01167.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: Digital Frequency Stability and Phase Noise Analyzer Requesting Lab/Division/Group: PML/T&F Div(688)/ Precision Photonic Synthesis Grp (70) General Statement of Need The Group requires a new digital phase noise analyzer to replace the obsolete Microchip 5125A for calibration purposes. The essential specifications for this analyzer include operating frequency range from 10 MHz to 400 MHz or higher, absolute and residual phase noise measurement capability, frequency stability measurements, and a digital architecture with a "no-phase lock loop" requirement.

Items and/or Ancillary Services

Item 1: Digital Frequency Stability and Phase Noise Analyzer Quantity: 1 Specifications: Please see the attached “Digital Phase Noise Analyzer_Specificatios-DNA-Hati.docx for full technical specifications.

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

[List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications

Section
Requirements/Specifications

Planning Considerations ☒ N/A ☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A [Enter shipping and delivery information by item here.] Shipping criteria:

☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

☒ Delivery of goods, installation, and training shall be completed no later than: 22 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☒ N/A [Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A [Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A [List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Warranty ☐ N/A Extended Warranty Required [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☒ Warranty length: 24 months Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A [Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A [Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 10 business days ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☒ N/A [Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1
☐ Option Period 2
☐ Option Period 3
☐ Option Period 4

Government Furnished Material / Equipment ☒ N/A [List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]

Travel ☒ N/A [Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

Requirements / Specifications: Digital Frequency Stability and Phase Noise Analyzer Version 1.0 (2019) Double-click on for further assistance.

image1.jpeg

File details come from the government source that posted it. Updated .