This is a Tabulation of Bids for Excavation Services (SDMC No. 26-0082-MR) issued by the School District of Manatee County, Florida. The district solicited qualified contractors to provide district-wide excavation services on an as-needed basis, including reshaping parking lots and driveways, reshaping swales for proper drainage, repairing minor culverts, implementing erosion control measures, performing general excavation work, and executing other tractor or small equipment operations as necessary. The contract encompasses 21 line items covering various equipment and services, including backhoes, bulldozers, front-end loaders, dump trucks, rollers, tractor trailers, and additional equipment with operators, as well as equipment rental, subcontractor services, and material disposal. Bids were due on October 23, 2025, at 3:00 p.m., with a Notice of Intent to Award scheduled for December 9, 2025. The contract period runs from January 1, 2025, through December 31, 2028.

Five contractors submitted bids: Cathcart Construction Company, Gainey Land Development Inc., G & V Trucking & Excavating, Inc., Rick Richards Inc., and Top Dirt Solutions, LLC. Pricing was structured on hourly, daily, and weekly rate bases for each equipment category and service. The tabulation shows that multiple contractors offered competing rates across the various line items, with some bidders providing "No Bid" responses for specific equipment or services. Top Dirt Solutions, LLC submitted the most comprehensive bid, offering rates for virtually all 21 line items. Item 17 (Total Mobilization Charge) ranged from $7,500.00 to $23,000.00 depending on the contractor. Items 18, 19, and 20 included percentage markups for equipment rental, subcontractor services, and supplied materials, with maximum markups capped at 10 percent, while Item 21 (Disposal Services) allowed for cost-plus percentage markups with similar maximums. The contract is established at firm fixed price with all labor, materials, equipment, and experienced operators to be provided by the awarded contractor(s).

View the file

Other files for this state and local contract opportunity

Other files attached to EXCAVATION SERVICES, SDMC No. 26-0082-MR, newest first.
File Type Posted
26-0082_Excavation_Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF INTENT TO AWARD

BOARD APPROVAL ON DECEMBER 09, 2025

CONTRACT PERIOD: JANUARY 1, 2025 THROUGH DECEMBER 31, 2028

BID ON EXCAVATION SERVICES, SDMC No. 26-0082-MR

TABULATION OF BIDS ON EXCAVATION SERVICES, SDMC No. 26-0082-MR

Bids Due: 3:00 p.m., Thursday, October 23, 2025

$217.00 $2,170.00 $10,850.00 No Bid No Bid No Bid

$120.00 $960.00 $4,800.00 $110.00 $880.00 $4,400.00 $300.00 $2,400.00 $8,000.00

$175.00 $1,750.00 $8,750.00 No Bid No Bid No Bid $95.00 $760.00 $3,800.00 $90.00 $720.00 $3,600.00

Top Dirt Solutions, LLC $200.00 $1,600.00 $8,000.00

$217.00 $2,170.00 $10,850.00 $150.00 $1,200.00 $5,500.00 $125.00 $1,000.00 $5,000.00

$95.00 $760.00 $3,800.00 Top Dirt Solutions, LLC $350.00 $2,800.00 $10,000.00

$195.00 $1,950.00 $9,750.00 $165.00 $1,320.00 $6,000.00 $100.00 $800.00 $4,000.00

$95.00 $760.00 $3,800.00 Top Dirt Solutions, LLC $275.00 $2,200.00 $10,500.00

Rick Richards Inc.

Top Dirt Solutions, LLC

G & V Trucking & Excavating, Inc.

Cathcart Construction Company

Cathcart Construction Company

Gainey Land Development Inc.

Rick Richards Inc.

Rick Richards Inc.

NotesNotes

Weekly Rate

Notes

Notes

Hourly Rate

Daily Rate

2. BOBCAT WITH LOADER BUCKET AND CLAM BUCKET WITH OPERATOR,BOBCAT 753 OR BOB CAT 853 OR EQUAL

Hourly Rate

Hourly Rate Weekly Rate

Notes Notes

1. BACKHOE WITH OPERATOR, CATERPILLAR 320, KOMATSU PC 200 OR JOHN DEERE 690 OR EQUAL Bidder's Name

Daily Rate

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

NotesNotes Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Notes Notes

Notes Hourly Rate Daily Rate

4. FRONT END LOADER WITH UP TO 3 CUBIC YARD CAPACITY BUCKET AND RUBBER TIRES WITH OPERATOR, CATERPILLAR 926E, JOHN DEERE 544E, CASE 621, KOMATSU WA250 OR EQUAL

3. BULLDOZER WITH SIX(6) WAY BLADE WITH OPERATOR CATERPILLAR D3C OR EQUAL

Weekly Rate

NotesWeekly RateDaily Rate

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

Rick Richards Inc.

$217.00 $2,170.00 $10,850.00 $147.00 $1,176.00 $5,200.00 $125.00 $1,000.00 $5,000.00

$95.00 $760.00 $3,800.00 Top Dirt Solutions, LLC $350.00 $2,800.00 $12,000.00

$137.00 $1,370.00 $6,850.00 $160.00 $1,280.00 $5,900.00 $120.00 $960.00 $4,800.00

$85.00 $680.00 $3,400.00 Top Dirt Solutions, LLC $175.00 $1,400.00 $7,000.00

$95.00 $950.00 $4,750.00 No Bid No Bid No Bid

$110.00 $880.00 $4,400.00 $75.00 $600.00 $3,000.00

Top Dirt Solutions, LLC $175.00 $1,400.00 $5,000.00

$95.00 $950.00 $4,750.00 $100.00 $800.00 $3,400.00 $150.00 $1,200.00 $6,000.00

$80.00 $640.00 $3,200.00 Top Dirt Solutions, LLC $125.00 $1,000.00 $5,000.00

Rick Richards Inc.

Rick Richards Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Weekly Rate

5. LOADER WITH CLEARING, ROOT RAKE AND RUBBER TIRES WITH OPERATOR, CATERPILLER 926E OR EQUAL

Notes

Notes

Hourly Rate

Notes

Notes

Daily Rate Hourly Rate Notes

6. SKID STEER OR TRACK LOADER OR EQUAL

Weekly

RateNotesDaily Rate

Notes Daily Rate Notes

7. BUSH HOG, MOWER & TRACTOR OR EQUAL

8. MINI EXCAVATOR OR EQUAL

Hourly Rate

Weekly Rate Notes Hourly Rate

NotesNotes Daily Rate Notes Weekly Rate

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Cathcart Construction Company

Gainey Land Development Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

Rick Richards Inc.

$135.00 $1,350.00 $6,750.00 $130.00 $1,040.00 $5,000.00

$80.00 $640.00 $3,200.00 $55.00 $440.00 $2,200.00

Top Dirt Solutions, LLC $175.00 $1,400.00 $7,000.00

$135.00 $1,350.00 $6,750.00 $130.00 $1,040.00 $5,000.00

$85.00 $680.00 $3,400.00 $80.00 $640.00 $3,200.00

Top Dirt Solutions, LLC $150.00 $1,200.00 $6,000.00

$95.00 $950.00 $4,750.00 $85.00 $680.00 $3,400.00 $75.00 $600.00 $3,000.00 $75.00 $600.00 $3,000.00

Top Dirt Solutions, LLC $175.00 $1,000.00 $5,000.00

$95.00 $950.00 $4,750.00 $95.00 $760.00 $3,500.00 $80.00 $640.00 $3,200.00 $75.00 $600.00 $3,000.00

Top Dirt Solutions, LLC $175.00 $1,000.00 $5,000.00

12. DUMP TRUCK, 6 CUBIC YARD MINIMUM CAPACITY, WITH OPERATOR

11.STAKEBED DUMP TRUCK, 2 TON, 12’ X 8’ X 4’ STAKEBED, 5 TON TOWING CAPABILITY (PINDLE HOOK) AND

ELECTRIC HOOKUP, WITH OPERATOR OR EQUAL

Weekly Rate

Notes Daily Rate Notes

Weekly Rate

9. ROLLER, SELF PROPELLED, 5 TON VIBRATING SINGLE DRUM, WITH OPERATOR BOMAG 142 OR EQUAL

Hourly Rate

NotesNotes Daily Rate

10.ROLLER WITH OPERATOR BOMAG 172 , CATERPILAR CS4338B OR INGERSOLL RAND SD70 OR EQUAL

Hourly Rate

NotesNotes Hourly Rate Daily Rate Notes

Weekly Rate NotesNotes Daily Rate

Weekly Rate Notes

Rick Richards Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Rick Richards Inc.

Gainey Land Development Inc.

Notes Hourly Rate

Notes

Rick Richards Inc.

Cathcart Construction Company

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

$110.00 $1,100.00 $5,500.00 No Bid No Bid No Bid $90.00 $720.00 $3,600.00 $85.00 $680.00 $3,400.00

Top Dirt Solutions, LLC $200.00 $1,600.00 $8,000.00

$95.00 $950.00 $4,750.00 $175.00 $1,400.00 $5,500.00 $110.00 $880.00 $4,400.00 $110.00 $880.00 $4,400.00

Top Dirt Solutions, LLC $250.00 $2,000.00 $10,000.00

$50.00 (2) $500.00 (2) $2,500.00 (2) $125.00 (5) $1,000.00 (5) $4,500.00 (5) $120.00 (1) $960.00 (1) $4,800.00 (1)

No Bid No Bid No Bid Top Dirt Solutions, LLC No Bid No Bid No Bid

$35.00 (3) $350.00 (3) $1,750.00 (3) $120.00 (6) $960.00 (6) $4,300.00 (6)

No Bid No Bid No Bid No Bid No Bid No Bid

Top Dirt Solutions, LLC No Bid No Bid No Bid

Rick Richards Inc.

Rick Richards Inc.

Cathcart Construction Company

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

Weekly Rate NotesNotes

Bidder's Name Notes

Hourly Rate

Daily Rate NotesNotes

Notes Daily Rate

Weekly Rate

Rick Richards Inc.

Rick Richards Inc.

13. DUMP TRUCK, 16 CUBIC YARD MINIMUM CAPACITY, WITH OPERATOR

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

Gainey Land Development Inc.

G & V Trucking & Excavating, Inc.

Cathcart Construction Company

Gainey Land Development Inc.

14.TRACTOR TRAILER WITH OPERATOR, 35 TON TO TRANSPORT VARIOUS TYPES OF HEAVY EQUIPMENT LOW

BOY OR EQUAL.

Notes

G & V Trucking & Excavating, Inc.

Weekly Rate

15A. CONTRACTOR OWNED ADDITIONAL EQUIPMENT (To include operator and all associated charges)

Notes Hourly Rate

Hourly Rate

Daily Rate

Notes Weekly Rate Notes

Notes

Gainey Land Development Inc.

Bidder's Name 15B. CONTRACTOR OWNED ADDITIONAL EQUIPMENT (To include operator and all associated charges)

Hourly Rate Notes Daily Rate

$50.00 (4) $500.00 (4) $2,500.00 (4) $85.00 (7) $680.00 (7) $3,400.00 (7) No Bid No Bid No Bid No Bid No Bid No Bid

Top Dirt Solutions, LLC No Bid No Bid No Bid

$68.00 (10) $680.00 (10) $3,400.00 (10) $110.00 (8) $880.00 (8) $4,100.00 (8)

No Bid No Bid No Bid No Bid No Bid No Bid

Top Dirt Solutions, LLC No Bid No Bid No Bid

$50.00 (9) $500.00 (9) $2,500.00 (9) No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid

Top Dirt Solutions, LLC No Bid No Bid No Bid

$125.00 $1,250.00 $6,250.00 $45.00 $360.00 $1,800.00 $40.00 $320.00 $1,600.00 na na na Top Dirt Solutions, LLC $35.00 $280.00 $1,400.00

ONE WAY

Top Dirt Solutions, LLC No Bid

Weekly Rate Notes

Cathcart Construction Company

Gainey Land Development Inc.

15D. CONTRACTOR OWNED ADDITIONAL EQUIPMENT (To include operator and all associated charges)

Hourly Rate Notes Daily Rate Notes

Cathcart Construction Company

Gainey Land Development Inc.

Daily Rate

Rick Richards Inc.

17. TOTAL MOBILIZATION CHARGE- FLAT RATE FOR ITEMS 1-11 AND 15.

Hourly Rate $23,000.00

$200.00 $7,500.00

Bidder's Name Notes

G & V Trucking & Excavating, Inc.

Rick Richards Inc.

Rick Richards Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

G & V Trucking & Excavating, Inc.

Cathcart Construction Company G & V Trucking & Excavating, Inc.

Gainey Land Development Inc.

Bidder's Name

16.EQUIPMENT OPERATORS - ADDITIONAL LABORERS (PER MAN)

Hourly Rate Notes

Weekly Rate

Notes

Cathcart Construction Company

Gainey Land Development Inc.

$200.00

Bidder's Name

Rick Richards Inc.

Rick Richards Inc.

Notes Weekly Rate

Bidder's Name 15C. CONTRACTOR OWNED ADDITIONAL EQUIPMENT (To include operator and all associated charges)

Hourly Rate Notes Daily Rate Notes Weekly Rate Notes

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name 15E. CONTRACTOR OWNED ADDITIONAL EQUIPMENT (To include operator and all associated charges)

Hourly Rate Notes Daily Rate Notes Notes

% Mark Up % Mark Up

10% 10% 10% 10% 10% 10% 5% 5%

Top Dirt Solutions, LLC 5% 5%

Cost +% Mark Up

Cost +% Mark Up

10% 10% 10% 10% 10% 10% 10% 10%

Top Dirt Solutions, LLC 5% 10%

Notes:

(2) Plate Compactor - walk behind

(3) 4" Bypass Pump with Hoses

(4) 6" Bypass Pump with Hoses

(5) Excavator- Doosan Infracore DX140LCR-3

(6) Bobcat with Loader Bucket and Claim Bucket - Bobcat T750 (7)Tractor with Bush Hog attachment -Massey Ferguson MF 1835M

(8) Dump Truck 18-20 Cubic Yard Peterbilt 279 Tri-Axle

(9) 6" Dewatering Pump

10) 8" Bypass Pump with Hoses

G & V Trucking & Excavating, Inc.

Rick Richards Inc.

Rick Richards Inc.

Gainey Land Development Inc.

Bidder's Name

Cathcart Construction Company

18. RENTAL OF EQUIPMENT

PERCENTAGE MARK UP (MAXIMUM OF

10% MARK UP)

19. SUBCONTRACTOR SERVICES PERFECTAGE MARK UP (MAXIMUM

OF 10% MARK UP)

Notes Notes

G & V Trucking & Excavating, Inc.

(1) Brush Monster with Bobcat or Power Rack with Bobcat or Root Rake with Bobcat

20. SUPPLIED MATERIALS- Materials as needed for services, not limited to Clean fill dirt, 60/40 clay, Georgia clay, Stabilizer/Pit Shell, ½”-1” washed shell, crushed concrete or other materials. (MAXIMUM OF 10%

MARK UP)

Notes

21. DISPOSAL SERVICES Disposal as needed, not limited to concrete debris, asphalt debris, dirt, fill, sod, clay or other materials.

Notes

"Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes."

Cathcart Construction Company

Gainey Land Development Inc.

Bidder's Name

Sheet1

File details come from the government source that posted it. Updated .