This document is a Frequently Asked Questions (FAQ) file for a road resurfacing project in Macon-Bibb County, Georgia. The project involves road milling, patching, and asphalt paving across multiple roads, with specific details about work parameters, material specifications, and contractor requirements. The work will primarily be conducted during 8-5 weekday hours, with potential for approved night work, and involves full-width milling from curb to curb or road edge to road edge.
The project specifies using 9.5mm Type 1 asphalt at 1.25" depth for most roads, with Fulton Mill Road receiving 19mm asphalt at 1.5" depth. Contractors are required to mill and pave side road intersections, but not driveways, and must remove all clipped shoulder grass material from the site. Patching will be performed as needed, with a maximum depth of four inches, and no compaction tests are required to be submitted to the county. A shuttle buggy is allowed but not mandatory during paving, and advanced warning signs can be placed on tripods or post-mounted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_006_LH_ Attachment A.pdf | ||
| 26_006_LH_ 2025 LMIG Deep Patch with Asphalt.pdf | ||
| 26_006_LH_ Attachment B_2025 LMIG Quantity Wo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frequently Asked Questions
1. What will be the allowed work hours on this project?
Answer: 8-5, Monday – Friday, or as daylight permits. Special requests for night work
(like on downtown streets) may be approved by request.
2. Will the contractor be required to post mount the advanced warning signs or can these signs be placed on tripod stands?
Answer: Advance warning signs may be placed on a tripod or post mounted.
3. How long will a milled surface be allowed to remain without the finished asphalt layer?
Answer: Final repaving to be completed within one day of the milling work.
4. Will the contractor be required to mill and pave into side roads?
Answer: Mill and pave, at the side road intersection, through the side road end of the curb radius.
5. Will the contractor be required to mill and pave into driveways?
Answer: No driveway paving is included.
6. Will any asphalt compaction test be required on this project?
Answer: You are not required to submit compaction tests to Macon – Bibb County.
7. The Milling will be Full Width Milling at the depth of the asphalt being placed – Is this correct?
Answer: Milling to be full depth, lip of curb to lip of curb, or road edge to road edge on roads without curb and gutter.
8. What will the depth of the Patching be?
Answer: Milling for patching to be to a depth to remove cracking as needed, maximum four inches deep.
9. Will the patch areas be marked 7.5’ or wider so a milling machine can be used in this operation?
Answer: Patching width to be at least one lane width. Contractor to patch areas needed, per his judgement.
10. Will 19mm be used for the Patching operation?
All mix placed shall be 9.5 mm asphalt (1.25” asphalt) except for Fulton Mill
Road (19mm , for 1.5” asphalt).
11. Looks like the depth of the 12.5mm asphalt will be 1.5” – is this correct?
Answer: That is correct.
12. Looks like the depth of the 9.5mm asphalt will be 1.25” – is this correct?
Answer: That is correct.
13. What type 9.5mm will be used for this project – Type 1 or Type 2?
Answer: Type 1.
14. For the pay item Clip Grass Shoulders will the clipped material be left on the shoulder or will the contractor be required to remove the material?
Answer: Contractor to remove all clipped material from the site.
15. Will a MTV (Shuttle Buggy) be required when placing the 12.5mm?
Answer: A shuttle buggy is allowed but not required.
16. Will the contractor be required to perform any shoulder building, grassing, place barrels or install any Low/Soft Shoulder Signs on the shoulders without curb and gutter?
Answer: The contractor is only required to clip and remove shoulder material from the site.
17. What mix type will be used for the Patching line item?
Answer: Patching mix to match the paving mix.
18. What thickness will the asphalt topping be placed?
Answer: 1.25” on all roads except for Fulton Mill Road (1.5”).