This is an Invitation to Bid (ITB) issued by the City of Albany, Georgia for the Henderson Park Recreation Center Construction project, referenced as Bid No. 26-006. The project involves constructing a new 17,600 square foot recreation center and a separate 1,600 square foot restroom and concessions building, along with associated park improvements. Sealed bids will be received until 2:30 p.m. on September 9, 2025, with a mandatory pre-bid conference scheduled for August 14, 2025, at 10:00 a.m. via Zoom and at the Government Center. The contract will have a completion timeline of 365 calendar days from the Notice to Proceed, and the project will be bid on a lump sum basis with alternates.

The bid requires a 5% Bid Bond, and the successful bidder must provide 100% Performance and Payment bonds. The City strongly encourages Small Business firms to participate and reserves the right to reject any and all bids. The project will be awarded to the responsive and responsible bidder submitting the lowest total base bid. Bidders must submit various forms including a DBE Subcontractor Participation Form, Addendum Acknowledgement, Indemnity Agreement, and certifications regarding non-collusion, drug-free workplace, and immigration compliance. Insurance requirements include Commercial General Liability of at least $1,000,000, Automobile Liability of $500,000, and Worker's Compensation with Employers' Liability of $100,000, with the City of Albany named as an additional insured.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 07, 2025

INVITATION TO BID

Henderson Park Recreation Center

Construction Bid Reference No. 26-006

Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite 260, Albany, Georgia 31701, until 2:30 p.m. on September 09, 2025, for all work required for construction of Henderson Park Recreation Center in accordance with bid documents, specifications, and all other contract documents contain herein. Bids will be opened and publicly read aloud at the above stated time and place. The scope of work is contained in the linked bid documents.

A Pre-Bid Conference and will be held on August 14, 2025, at 10:00 a.m. on Zoom and the Government Center, 222 Pine Avenue, Suite 260 Albany, Georgia 31701. The Project Manager will provide an overview of the work to be performed and answer questions. All interested bidders are strongly encouraged to attend. Zoom link: https://us06web.zoom.us/launch/edl?muid=d48c5053-6cb4- 4e22-885d-c318c816f45e Meeting ID: 890 9198 3713 Passcode: 288109

This project will be bid on a lump sum basis with alternates for all specified work and will be awarded to the responsive and responsible bidder submitting the lowest total base bid. A 5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or considered. 100% Performance and Payment bonds will be required of the successful bidder.

The City of Albany strongly encourages Small Business firms to participate in this bid. The City of Albany reserves the right to reject any and all bids and to waive any informalities in the bidding process.

Bid documents are available at the Procurement Division, www.albanyga.gov and on the Georgia Procurement Registry.

For additional information, contact Ricky Gladney, Buyer I, at (229) 302-1455. Submit all questions via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and kross@albanyga.gov. The deadline for questions is August 21, 2025, at 2:30 p.m. Replies of substance will be answered in the form of an addendum and made available to all potential bidders.

FINANCE

f Al : fJ)i______, Jo hua Williams, CPPB P ocurement Manager

P.O. BOX 447 ALBANY, GA 31702 I PHONE: 229.431.3211 I FAX: 229.431.2184 I www.albanyga.gov

I

CITY OF ALBANY

FINANCE DEPARTMENT

PROCUREMENT DIVISION

ALBANY, GEORGIA

INSTRUCTIONS TO BIDDERS

These instructions will bind bidders to terms and conditions herein set forth, except as specifically qualified in special bid and contract terms issued with any individual bid.

1. The following criteria are used in determining low responsible bidder.

(a) The ability, capacity and skill of bidder to perform required service.

(b) Whether bidder can perform service promptly or within specified time.

(c) The character, integrity, reputation, judgment, experience and efficiency of bidder.

(d) The performance of previous contracts.

(e) The suitability of equipment or material for City use.

(f) The ability of bidder to provide future maintenance and parts service.

2. Payment terms are Net 30 unless otherwise specified. Favorable term discounts may be offered and will be considered in determining low bids if they are deemed advantageous to The City.

3. Unless otherwise specified all materials, supplies or equipment quoted herein must be delivered within thirty (30) days from date of notification of award or by exception noted on bid sheet.

4. Prospective bidders are responsible for examining the location of the proposed work or delivery and determining, in their own way, the difficulties, which are likely to be encountered in the execution of same.

5. The ESTIMATED QUANTITY given in the specifications or advertisement is for the purpose of bidding only. The City may purchase more or less than the estimated quantity, and the bidder must not assume that such estimated quantity is part of the contract.

6. All bids should be tabulated, totaled and checked for accuracy. The unit price will prevail in case of errors.

7. All requested information should be included in the sealed bid envelope. All documents and information must be signed and included for your bid to receive full consideration. Failure to submit any required information or document will be cause for bid to be rejected as non-responsive.

8. Failure of the bidder to sign the bid document or have the signature of any authorized representative or agent on the bid in the space provided will be cause for rejection of the bid. Signature(s) must be written in ink.

9. Failure to enclose bid bond, where required, will result in rejection of the bid. Bond may be in the form of cash, certified check, cashier’s check or Surety Bond issued by a Surety Company licensed to conduct business in Georgia.

10. All bidders should provide their tax identification number with the bid.

11. All bidding Corporations should provide the corporate seal, a copy of the Secretary of State’s Certificate of Incorporation, and a listing of the principals of the corporation with the bid.

12. Quote all prices F.O.B. Albany or our warehouse or as specified in bid documents.

13. If the bidder proposes to furnish any item of a foreign make or product, he/she should write “Foreign” together with the name of the originating country opposite such item on the bid.

14. When requested, SAMPLES will be furnished free of expense, properly marked for identification and accompanied by list where there is more than one sample. The City reserves the right to mutilate or destroy any samples submitted whenever it may be in the best interests of The City to do so for the purpose of testing.

15. The City will reject any material, supplies or equipment that do not meet the specifications, even though bidder lists the trade name or names of such materials on the bid or price quotation form.

16. Any alterations, erasures, additions or omissions of required information or any changes of specifications, or bidding schedule are done at the risk of the bidder. Any bid will be rejected that has a substantial variation, such as a variation that affects the price, quality or delivery date (when delivery is required by a specific time).

17. Each bid or proposal will be submitted in a SEALED ENVELOPE. Additionally, that envelope shall be clearly marked on the outside as a Sealed Bid with the Bid Number clearly printed.

18. Bids must be received and stamped by the Procurement Office before the date and time stipulated in bid documents. The City of Albany assumes no responsibility for submittals received after the advertised deadline or at any office or location other than that specified herein, whether due to mail delays, courier mistake, mishandling, or any other reason. No responsibility will attach to any City representative or employee for premature opening of bids not properly addressed or identified.

19. If only one bid is received, the bid may be rejected and/or re-advertised, except in the case of only one known source of supply.

20. Bids received late will not be accepted, and The City will not be responsible for late mail delivery.

21. Should a bid be misplaced by The City and found later it will be considered.

22. The unauthorized use of patented articles is done entirely at the risk of the bidder.

23. All bidders must be recognized and authorized dealers in the materials or equipment specified and be qualified to instruct in their application or use. A bidder at any time requested must satisfy the Procurement Office and City Commission that he has the requisite organization, capital, plant, stock, ability and experience to satisfactorily execute the contract in accordance with the provisions of the contract in which he is interested.

Henderson Park Recreation Center Construction Bid Ref. #26-006

24. Only the latest model equipment as evidenced by the manufacturer’s current published literature will be considered.

Obsolete models of equipment not in production will not be acceptable. Equipment shall be composed of new parts and materials. Any unit containing used parts or having seen any service other than the necessary tests will be rejected. In addition to the equipment specifically called for in the specifications, all equipment catalogued by the manufacturer as standard or required by the State of Georgia shall be furnished with the equipment. Where required by the State of Georgia Motor Vehicle Code, vehicles shall be inspected and bear the latest inspection sticker of the Georgia Department of Revenue.

25. All materials, equipment and supplies shall be subject to rigid inspection, under the immediate supervision of the Procurement Officer and/or the Department to which they are delivered. If defective material, equipment or supplies are discovered, the contractor, upon being instructed by the Procurement Officer, shall remove, or make good such material, equipment or supplies without extra compensation. It is expressly understood and agreed that the inspection of materials by The City will in no way lessen the responsibility of the contractor or release him from his obligation to perform and deliver to The City sound and satisfactory materials, equipment or supplies. The contractor agrees to pay the cost of all tests on defective material, equipment or supplies or allow the cost to be deducted from any monies due him by The City.

26. For multi-year contracts the following clauses pursuant to OCGA 36-60-13 apply: (1) The contract shall terminate absolutely and without further obligation on the part of The City or County at the close of the calendar year in which it was executed and at the close of each succeeding calendar year for which it may be renewed; (2) The contract may provide for automatic renewal unless positive action is taken by The City or County to terminate such contract, and the nature of such action shall be determined by The City or County and specified in the contract; (3) The contract shall state the total obligation of The City or County for the calendar year of execution and shall further state the total obligation which will be incurred in each calendar year renewal term, if renewed; and (4) The contract shall provide that title to any supplies, materials, equipment, or other personal property shall remain in the vendor until fully paid for by The City.

27. Unless otherwise specified The City reserves the right to award each item separately or on a lump sum basis, whichever is in the best interest of The City.

28. The successful bidder shall secure all permits, license certificates, inspections (permanent and temporary) and occupational tax certificate, if applicable, before any work can commence. Contractor as well as any and all known subcontractors must possess or will be required to obtain a City of Albany Occupational Tax Certificate or Registration.

29. The successful bidder on motor vehicle equipment shall be required to furnish with delivery of vehicle, Certificate of Origin and Georgia vendors shall provide Georgia Motor Vehicle form MV1.

30. The City reserves the right to reject any and all bids, to waive any informalities in the bid process, and to award the contract as may be in the best interest of the City and/or re-advertise for bids.

31. Local bidder (domiciled in Albany City Limits) will receive bid in the event of tie bids. In the case of tie bids between out of town companies or between local concerns, evaluated as equal, bid will be recommended or awarded by chance coin toss, or drawing straws. The Board of Commissioners passed a local preference ordinance on January 27, 2015.

Where applicable, this ordinance will govern. Local preference will not be a basis for award on bids that are federally funded.

32. No bidder writing restrictive specifications for The City will be allowed to bid on the project.

33. Reasonable grounds for supposing that any bidder is interested in more than one bid for the same item will be considered sufficient cause for rejection of all bids in which he/she is interested.

34. A contract will not be awarded to any corporation, firm or individual who is, from any cause, in arrears to The City/County or who has failed in any former contract with The City to perform work satisfactorily, either as to the character of the work, the fulfillment of the guarantee, or the time consumed in completing the work.

35. It is mutually understood and agreed that if any time the Procurement Officer shall be of the opinion that the contract or any part thereof is unnecessarily delayed or that the rate of progress or delivery is unsatisfactory, or that the contractor is willfully violating any of the conditions or covenants of the agreement, or is executing the same in bad faith, the Procurement Officer shall have the power to notify the aforesaid contractor of the nature of the complaint. Notification shall constitute delivery of notice, or letter, to address given in bid/proposal. If after three working days of notification the conditions are not corrected to the satisfaction of the Procurement Officer, he shall thereupon have the power to take whatever action he may deem necessary to complete the work or delivery herein described, or any part thereof, and the expense thereof, so charged, shall be deducted from any paid by The City out of such monies as may become due to the said contractor, under and by virtue of this agreement. In case such expense shall exceed the last said sum, then and in that event, the bondsman or the contractor, his executors, administrators, successors, or assigns, shall pay the amount of such excess to The City on notice by the Procurement Officer of the excess due.

36. Contracts may be cancelled by The City with or without cause with 30-day written notice.

37. Any complaint from bidders relative to the Invitation to Bid or any attached specifications should be made prior to the time of opening of bids, otherwise such complaint cannot be properly considered.

38. Any bidder may withdraw his bid at any time before the time set for opening of bids. No bid may be withdrawn without cause in the 60-day period after bids are opened.

39. All questions, inquiries and requests for clarification shall be directed to Procurement.

40. Prior to submission, all bidders are encouraged to check the website at www.albanyga.gov or call the

Procurement Office at 229-431-3211 for any addendums.

PROCUREMENT FORM - Revised 11/18/2021

Henderson Park Recreation Center Construction Bid Ref. #26-006 http://www.albanyga.gov/

SPECIAL INSTRUCTIONS

Henderson Park Recreation Center Construction

Bid Reference No. 26-006

1. General: The Henderson Park Recreation Center building and associated park improvements involves new construction on the site of an existing park. Scope of work includes demolition of the existing building and site elements, site work, concrete paving, asphalt paving, site utilities and buildings. The recreation center building consists of concrete slab over structural fill with masonry-faced concrete foundation walls to raise the finished floor elevation due to floodplain location (as required per Albany codes), pre-engineered steel framed structure with masonry veneer and metal panel exterior walls, metal roofing, exterior brick veneer, aluminum windows, exterior metal frames, and insulated metal doors. Interior includes metal frames and doors, painted masonry and gypsum board interior walls, suspended acoustic and drywall ceilings, multiple flooring types (stained concrete, LVT and carpet tile), porcelain tile and base in restrooms, accessories, plumbing, HVAC, electrical, low voltage systems and concessions food service equipment. The gymnasium includes a hardwood gym floor surface and open ceiling with exposed ductwork. The recreation center is 17,600 GSF. A separate 1,600 GSF restroom and concessions building is masonry construction on concrete slab with metal roof, plumbing, HVAC and electrical, and concessions equipment. Exterior improvements include asphalt paved parking lot, concrete sidewalks, playground area, pre-engineered steel structure covered outdoor basketball court, multi-purpose field, stormwater management infrastructure and overall site landscaping. Project construction drawings, technical specifications and pre-demolition asbestos report can be accessed here:

https://www.dropbox.com/scl/fo/w87jrozwq1svu4qq5ex0n/APuESBPvYcfPCQnrQ7LIPGk?rlkey=blrakz xa4rg36ay6xorh6eoyu&st=jznatf24&dl=0

2. Contract: The contract shall be written for all work required, expressed, or implied, that is necessary to perform the work described in the bid documents, special instructions, specifications, project manual and all other contract documents. No money shall be paid for any extra work or modifications to the specifications unless such work or modification is expressly approved in writing by the owner’s designated representative prior to execution. The successful bidder will be required to submit two (2) copies of the contract contained herein within ten (10) days following the issuance of the Notice of Award.

3. Contractor's bid: shall include all necessary labor, materials, tools, equipment, and all other items necessary to complete the contract requirements in accordance with specifications, general conditions, special instructions to bidders and all other provisions included in this invitation to bid.

4. Bidder shall be responsible to visit the job site and familiarize himself with the local conditions.

5. Bid Withdrawal: No bid may be withdrawn for a period of sixty (60) days from the bid opening date.

6. The Owner reserves the right to reject any and all bids and to waive any informalities in the bidding process. The Owner of this project is the City of Albany.

7. Contract Time: Contract must be completed within three hundred sixty-five (365) calendar days following the issuance of the Notice to Proceed. Performance will be monitored and documented by the Project Manager. Not completing this contract within the time specified may hamper the contractor’s ability to secure future contracts with the City.

Henderson Park Recreation Center Construction Bid Ref. #26-006 https://www.dropbox.com/scl/fo/w87jrozwq1svu4qq5ex0n/APuESBPvYcfPCQnrQ7LIPGk?rlkey=blrakzxa4rg36ay6xorh6eoyu&st=jznatf24&dl=0 https://www.dropbox.com/scl/fo/w87jrozwq1svu4qq5ex0n/APuESBPvYcfPCQnrQ7LIPGk?rlkey=blrakzxa4rg36ay6xorh6eoyu&st=jznatf24&dl=0

8. Liquidated Damages: Time is an essential element of the Contract, and any delay in the prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with business. In addition to the aforementioned inconveniences, any delay in completion of The Work will always increase the cost of engineering. For this reason, it is important that the work be pressed vigorously to completion. Should the Contractor fail to complete the work within the time stipulated in the Contract or within such extra time that may be allowed, charges shall be assessed against any money due or that may become due the Contractor in accordance with the rate of five hundred dollars ($500) per calendar day.

9. Bid Bond: Each bid shall be accompanied by a bid bond (surety) acceptable to the Owner, in an amount equal to at least five (5%) percent of the bid, payable without condition to the Owner as a guaranty that the bidder, if awarded the contract, will promptly execute the Agreement in accordance with the bid and other contract documents, and will furnish good and sufficient bond for the faithful performance of the same, and for the payment to all persons supplying labor and material for the work. The bid bond must be presented in its original form. Copies are not acceptable.

10. Performance Bond and Payment Bonds: A 100% Performance Bond and 100% Labor and Materials Payment Bond will be required of awarded bidder. All bonds must be submitted to the Procurement Office before work can commence. The bonds must be presented in their original form.

Copies are not acceptable.

11. Bid Form: Bid must be submitted on the bid form provided by the City of Albany. Bid is for a lump sum contract and will be awarded to the responsive and responsible bidder submitting the lowest total base bid. Bid will be awarded to the responsive and responsible bidder(s) submitting the lowest bid, in the measure that best benefits the City of Albany.

12. General Insurance Requirements: Contractor shall maintain applicable insurance for this project with companies licensed to do business in the State of Georgia acceptable to the City for the protection of the City and name it as an additional insured, against all claims, losses, costs or expenses arising out of injuries or death of persons whether or not employed by contractor, whether arising from the acts or omission, negligence or otherwise of contractor or any of its agents, employees, patrons, or other persons, and growing out of work being done by Contractor on behalf of City, such policies to provide for a liability limit on account of each accident resulting in the bodily injury or death of not less than One Million ($1,000,000) Dollars, a liability limit of not less than One Million ($1,000,000) Dollars for each accident for property damage. Contractor shall also carry product/completed operations liability insurance for personal injuries and/or death in the amount not less than One Million ($1,000,000) Dollars for any one person. Contractor shall maintain a combined single liability limit of One Million ($1,000,000) Dollars covering owned, non-owned, leased, and hired vehicles. Contractor shall furnish to the City satisfactory evidence that it carries Worker’s Compensation Insurance in the statutory limits of Georgia and Employers’ Liability with limits of liability of no less than One Hundred Thousand ($100,000) Dollars of each accident/disease. These polices must also contain a waiver of subrogation in favor of the City of Albany. Contractor shall furnish evidence to the City of the continuance in force of said policy’s declaration page (s) to the Procurement Agent. Acceptable proofs of insurance: (i) a Certificate of Insurance with Additional Insured Endorsement (a Certificate of Insurance by itself is not acceptable) or (ii) Declaration Pages of the insurance policies listed below which show the City of Albany as additional insured. All insurance policies must provide that the City of Albany will be notified within 30 days of any changes, restrictions, and/or cancellation. The City’s sole judgment shall control as to the sufficiency of the coverage.

Henderson Park Recreation Center Construction

13. Indemnity Agreement: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached).

14. Governing Law & Venue: An executed copy of this form should accompany your bid. (See attached).

15. Certificate of Non-Collusion: An executed copy of this form should accompany your bid. (See attached).

16. Drug Free Workplace: An executed copy of this form should accompany your bid. (See attached).

17. Debarred Bidders Integrity Form: An executed copy of this form should accompany your bid.

(See attached).

18. Permits & Fees: Within five (5) days following the issuance of the Notice to Proceed, the contractor shall apply for required permits from City of Albany. Failure to do so may result in award of this contract to the next lowest bidder and the original contractor may be billed for the difference in price. Contractor, as well as any and all known subcontractors, must possess or will be required to obtain a City of Albany Occupational Tax Certificate or Registration prior to commencement of work.

The contractor shall apply for and obtain all required permits through the City of Albany Planning and Development Department (LDP, NPDES etc.), Development Services (permitting and inspection) Division, and provide evidence of license certificates, and occupational tax certificate(s) before any work can commence (https://www.albanyga.gov/City-Departments/Planning- Development/Development-Services). Contractor is responsible for building permit fees as determined by City of Albany Permitting Department and NPDES/LDP fees to the State and City as required. Permit and license documentation shall be on file in the Procurement Office prior to the start of any work associated with this contract. The contractor shall secure all inspections (permanent and temporary) as appropriate and required during the course of the project. The contractor is required to contact the Project Manager, Tripp Swilley, at 229-302-1665 within five (5) days of completion for a final inspection.

19. Compliance: The contractor is responsible for knowledge of and compliance with all laws, codes, ordinances, and regulations that are applicable to this type of work.

20. Superintendent: The contractor shall have a superintendent or representative on the site at all times while work is being performed. He will represent the contractor and all communications given to him shall be binding as if given to the contractor.

21. Preservation of Property: The contractor shall carry out his work with such care and by the proper methods to prevent damage to the property adjacent to the work or within streets, easement locations to the extent the owner may have rights therein, or other property of the owners or of others, whether adjacent to the work site or not, the removal, relocation, or destruction of which is not called for by the provisions of the contract documents; it being a condition of the execution of the contract that the work be performed in such manner that the property of others and other property of the owner shall not be damaged in any way. The word PROPERTY, as used, is intended to include among other types of property, public street improvements, storm and sanitary sewers, water lines and appurtenances, or other structures. Should any property be damaged or destroyed, the contractor at his own expense shall promptly, or within reasonable time, repair or make such restoration as is practical and acceptable to the owner of the damaged or destroyed property. In case of failure on the part of the contractor to repair or restore such property, or make good such damage or injury, the Building Inspector may within forty-eight (48) hours’ notice, proceed to repair, rebuild, or otherwise restore such property as

Henderson Park Recreation Center Construction Bid Ref. #26-006 https://www.albanyga.gov/City-Departments/Planning-Development/Development-Services https://www.albanyga.gov/City-Departments/Planning-Development/Development-Services may be necessary, and the cost thereof will be deducted from any monies due or which may become due the contractor under this contract agreement. The contractor shall, at all times in performance of the work, employ approved methods and exercise reasonable care and skill so as to avoid delay, damage, injury or destruction of existing public service installations and structures; and shall at all times in the performance of the work avoid interference with, or interruption of, public utilities services, and shall cooperate fully with the owners thereof to the end.

22. Public Convenience and Safety: Fire hydrants on or adjacent to the street shall be kept accessible to the fire apparatus at all times and no material or obstructions shall be placed within ten

(10) feet of any hydrant. Adjacent premises must be given access at all times and gutters shall not be obstructed. Materials shall not be stored along the streets. Traffic on streets shall be maintained at all times. Dust and debris shall not create a hazard or a nuisance.

23. Barricades and Warnings: The contractor is responsible for providing security fencing, signage, and any other measures necessary to secure the jobsite and protect the safety of the public utilizing the project area. Fencing shall be properly secured using adequate sandbags to anchor the fence and clamps on posts of adjoining panels to secure the fence. The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient number of watchmen to direct traffic, and take all necessary precautions for the protection of the work and safety of the public. Barricades and obstructions shall be illuminated at night and lights shall be kept burning from sunset to sunrise.

24. Removal of Trash and Rubbish: The contractor shall be responsible for the removal and legal disposal of all waste, trash, and rubbish resulting from the work under this contract. Work site shall be kept clean and orderly during construction; trash shall be removed from the site or adequately containerized daily.

25. Termination for Convenience: This contract may be terminated in whole or in part by the City of Albany with the consent of the contractor in which case the two parties shall agree upon the termination conditions, including the effective date in the case of partial termination, the portion to be terminated or by the contractor upon written notification to the City of Albany setting forth the reasons for such termination, the effective date, and in the case of partial termination, the portion to be terminated. However, if in the case of partial termination, the City of Albany determines that the remaining portion of the award will not accomplish the purposes for which the contract was awarded, the City of Albany may terminate the contract in its entirety.

26. Termination of Contract for Cause: In the event that the contractor shall for any reason or through any cause be in default of the terms, conditions, or obligations of the contract documents, the City may give the contractor written notice of such default and terminate the contract. All terms, conditions, and obligations of the contract documents are considered material. The City may, in its discretion, provide the contractor an opportunity to cure the default, if curable, prior to termination.

Unless a different duration is provided in the notice of default, the contractor shall have fourteen

(14) calendar days to cure the default from the date such notice is mailed to the contractor, unless notification is by facsimile or personal delivery, in which case the opportunity to cure shall commence upon delivery of the notice. Upon failure of the contractor to cure the default the City may immediately terminate the contract effective as of the mailing or delivery of the default notice. If the City terminates the contract, the contractor shall remain liable for performance of all terms, conditions, and obligation through the date of termination. Termination by the City shall not constitute a waiver by the City of any other rights or remedies available to the City by law or contract.

Henderson Park Recreation Center Construction

27. Certification of Bidder’s Experience and Qualifications: The undersigned bidder certifies that he is, at the time of bidding, and shall be, throughout the period of the contract, licensed by the State of Georgia to do the type of work required under terms of the contract documents. Bidder further certifies that he is skilled and regularly engaged in the general class and type of work called for in the contract documents. The bidder represents that he is competent, knowledgeable and has special skills on the nature, extent, and inherent conditions of the work to be performed. Bidder further acknowledges that there are certain peculiar and inherent conditions existent in the construction of the particular facilities, which may create, during the construction program, unusualor peculiar unsafe conditions hazardous to persons and property. Bidder expressly acknowledges that he has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the construction work with respect to such hazards.

28. Corporations: All Corporations should provide corporate seal, a copy of the Secretary of State’s Certificate of Incorporation, and a listing of the principals of the corporation with the bid.

29. Pre-Construction Conference: Successful bidder will be required to attend a Pre-Construction Conference with the owner’s representative to discuss any details of the project, submit a proposed work program schedule prior to the issuance of a Notice to Proceed. When work begins, contractor shall remain on this project, with normal work force, until the project is completed.

30. Georgia Security and Immigration Compliance Act: The successful contractor will provide certification that he is in compliance with the Georgia Security and Immigration Compliance Act, certifying that the provisions of GA Law, O.C.G.A 13-10-91, Chapter 300-10-1, per the Georgia Department of Labor, if applicable, have been complied with in full. Pursuant to O.C.G.A 13-10- 90(2), all subcontractors entering into a contract or agreement for hire on this Project must be registered and participate in the Federal Work Authorization Program. Complete and submit a copy of the form, applicable to your company, and applicable Subcontractor Affidavits, with your bid.

31. Contractor’s Warranty: Contractor shall guarantee all specified work performed for a period of one (1) year from the date of written acceptance of the work by the Owner’s designated representative that all materials, labor, and workmanship provided under this contract are free from defects of any kind. At no expense to the City of Albany, the contractor shall make repairs to any defects found and reported during the warranty period. Final inspection, final acceptance, and final payment shall not be construed as a waiver of this warranty. The following are excluded from this warranty:

a. Defects or failures resulting from abuse by the owner.

b. Damage caused by fire, tornadoes, hail, hurricane, Acts of God, wars, riots, civil commotion, or vandalism.

c. The contractor is not an insurer nor is he a guarantor of the suitability of or adequacy of design. Any other provisions of this warranty to the contrary notwithstanding, the contractor shall not be required to remedy any unsuitable or inadequate design.

32. Davis-Bacon: All construction contracts awarded by Recipients and their subgrantees in excess of $2,000 must include a provision for compliance with Davis- Bacon Act (40 U.S.C. 27ato a-7) as supplemented by Department of Labor regulations (29 CFR, Part 5). Under this act contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by the Secretary of Labor. In addition, contractors shall be required to pay wages not less often than once a week. The Recipient must place a copy of the current Prevailing Wage Determination issued by the Department of Labor in each solicitation and

Henderson Park Recreation Center Construction the award of a contract must be conditioned upon acceptance of the wage determination. This wage determination will be issued by addendum 10 days prior to the bid opening.

33. Civil Rights Compliance: Recipients of Federal financial assistance from the Treasury are required to meet legal requirements relating to nondiscrimination and nondiscriminatory use of Federal funds.

Those requirements include ensuring that entities receiving Federal financial assistance from the Treasury do not deny benefits or services, or otherwise discriminate on the basis of race, color, national origin (including limited English proficiency), disability, age, or sex (including sexual orientation and gender identity), in accordance with the following authorities: Title VI of the Civil Rights Act of 1964 (Title VI) Public Law 88-352, 42 U.S.C. 2000d-1 et seq., and the Department’s implementing regulations, 31 CFR part 22; Section 504 of the Rehabilitation Act of 1973 (Section 504), Public Law 93-112, as amended by Public Law 93-516, 29 U.S.C. 794; Title IX of the Education Amendments of 1972 (Title IX), 20 U.S.C. 1681 et seq., and the Department’s implementing regulations, 31 CFR part 28; Age Discrimination Act of 1975, Public Law 94-135, 42 U.S.C. 6101 et seq., and the Department implementing regulations at 31 CFR part 23.

34. Public Works Construction: Competitive sealed bids DCA, under the authority of 24 CFR 570.489(g), has adopted Title 36, Chapter 91 of the Official Code of Georgia, Georgia Public Works Construction Law, for procurement of public works construction projects. A copy of this law can be found in Appendix 2. The Georgia Municipal Association has published a Guide to the requirements and options available under this state law. The Guide and the text of the law are available on the eCFR website at: https://www.ecfr.gov/current/title-24/section-570.489

35. Copeland "Anti-Kickback" Act (18 U.S.C. 874): as supplemented in Department of Labor regulations (23 CFR, Part 3). This act provides that each contractor or subgrantee shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he is otherwise entitled.

36. Comptroller General: DCA, HUD, the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any books, documents, papers, and records of the contractor which are directly pertinent to a specific grant program for the purposes of making audit, examination, excepts, and transcriptions for 3 years after final payment of the Recipient and all pending matters are closed.

37. Labor Standards: Where applicable, all contracts awarded by Recipients and sub-grantees in excess of $100,000 for construction contracts which involve the employment of mechanics or laborers must include a provision for compliance with sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor regulations (29 CRF, Part 5). Under Section 103 of the Act, each contractor shall be required to compute the wages of every mechanic and laborer based on a standard workday of 8 hours and a standard workweek of 40 hours. Work in excess of the standard workweek is permissible provided that the worker is compensated at a rate of not less than 1.5 times the basic rate of pay of all hours worked in excess of 40 hours in the workweek. Section 107 of the Act is applicable to construction work and provides that no laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health and safety as determined under construction, safety and health standards promulgated by the Secretary of Labor.

These requirements do not apply to the purchases of supplies or material or articles ordinarily available.

38. Byrd Anti-Lobbying Amendment: (31 U.S.C. 1352) Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above

Henderson Park Recreation Center Construction https://www.ecfr.gov/current/title-24/section-570.489 that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award on the open market.

39. Solid Waste: A Non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

40. Rights to Inventions: Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 CFR §401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

41. Clean Air Act: Contracts, sub-contracts and sub-grants of amounts in excess of $100,000 must contain a provision which requires compliance with all applicable standards, orders, or requirements issued under Section 306 of the Clean Air Act (42 U.S.C. 1857(h) or Section 508 of the Clean Air Act (33 U.S.C. 1368). Executive Order 11738, and Environmental Protection Agency regulations (40 CFR, Part 15), that prohibit the use of facilities included on the EPA List of Violating Facilities.

42. Energy Policy: Contracts must recognize mandatory standards and policies relating to energy efficiency which are contained in the State energy conservation plan issued in compliance with the Energy Policy and Conservation Act (PL 94-163).

43. Public Works Construction: Competitive sealed bids DCA, under the authority of 24 CFR 570.489(g), has adopted Title 36, Chapter 91 of the Official Code of Georgia, Georgia Public Works Construction Law, for procurement of public works construction projects. A copy of this law can be found in Appendix 2. The Georgia Municipal Association has published a Guide to the requirements and options available under this state law. The Guide and the text of the law are available on the eCFR website at: https://www.ecfr.gov/current/title-24/section-570.489

44. "Equal Employment Opportunity": All contracts awarded by Recipients and their contractors or sub-grantees having a value of more than $10,000 must contain a provision requiring compliance with Executive Order 11246, entitled "Equal Employment Opportunity", as amended by Executive Order 11375, and as supplemented in the Department of Labor regulations (41 CFR, Part 60).

Henderson Park Recreation Center Construction Bid Ref. #26-006 https://www.ecfr.gov/current/title-24/section-570.489

45. Recordkeeping Requirements: Generally, your organization must maintain records and financial documents for five years after all funds have been expended or returned to Treasury, as outlined inparagraph 4.c.

https://home.treasury.gov/system/files/136/NEU_Award_Terms_and_Conditions.pdf of the Award Terms and Conditions. Treasury may request transfer of records of long-term value at the end of such period. Wherever practicable, such records should be collected, transmitted, and stored in open and machine-readable formats.

46. Program Income: Generally, program income includes, but is not limited to, income from fees for services performed, the use or rental of real or personal property acquired under Federal awards, and principal and interest on loans made with Federal award funds. Program income does not include interest earned on advances of Federal funds, rebates, credits, discounts, or interest on rebates, credits, or discounts.

47. Wage Comparability: The contractor agrees: (1) to pay at least the prevailing applicable Federal Contractor Minimum Wage as required by Executive Order 13658. (Refer to Section 6(a) (1) of the Fair Labor Standards Act of 1938, as amended.

48. Dun & Bradstreet Number (DUNS): Before you can bid on government projects, you need to obtain a Dun & Bradstreet, or D-U-N-S, Number, a unique nine-digit identification number for each physical location of your business. D-U-N-S Number assignment is free for all businesses required to register with the federal government for contracts or grants. Getting your D-U-N-S Number is easy.

Visit http://fedgov.dnb.com/webform to obtain more details on apply for the number.

49. FFATA Sub-award Reporting System (FSRS.gov): When applicable, construction contracts with a value of $25,000 or more, including any subsequent contract modifications are subject to the provisions of FFATA (Federal Funding Accountability and Transparency Act of 2006), per FAR 52.204- 10 Reporting Executive Compensation and First-Tier Subcontract Awards. Reported information will be made public via the FFATA Sub-award Reporting System (FSRS.gov). Upon receipt of the “Intent to Award” letter, the bidder shall deliver this form as required.

50. NAICS Code & Business Size Standards: The North American Industry Classification System (NAICS) is the standard used by Federal statistical agencies in classifying business establishments.

The 6-digit number(s) and title are located at http://www.census.gov/cgi-bin/sssd/naics/naicsrch.

The size standard information can be found at https://www.sba.gov/sites/default/files/files/Size_Standards_Table.pdf. This table lists small business size standards matched to industries NAICS Codes.

51. SF1413 Statement and Acknowledgement Form: Federal Acquisition Regulation (FAR) 52.222- 11 stipulates the requirement for completing and submitting the SF1413. The clause states that contractors and subcontractors (all tiers) performing work on a Federal contract involving construction are required to submit a fully executed SF1413 Statement and Acknowledgement form.

A fillable form is located at https://www.gsa.gov/cdnstatic/SF1413-13d.pdf?forceDownload=1. Upon receipt of the “Intent to Award” letter, the bidder shall deliver this form(s) as required.

52. Bid Submittals (All items listed below must be submitted with bid):

a. Bid Form

b. Bid Bond

c. DBE Subcontractor Participation Form

d. Addendum Acknowledgement Form

Henderson Park Recreation Center Construction Bid Ref. #26-006 https://home.treasury.gov/system/files/136/NEU_Award_Terms_and_Conditions.pdf http://fedgov.dnb.com/webform http://www.census.gov/cgi-bin/sssd/naics/naicsrch https://www.sba.gov/sites/default/files/files/Size_Standards_Table.pdf https://www.gsa.gov/cdnstatic/SF1413-13d.pdf?forceDownload=1

The following items should be submitted with bid:

a. Indemnity Agreement

b. Governing Law and Venue Form

c. Certificate of Non-Collusion Form

d. Drug Free Workplace

e. Debarred Bidders Integrity Form

f. Corporate Seal

g. Secretary of State’s Certificate of Incorporation

h. Listing of the principals of Corporation

i. Affidavit to Comply with OCGA § 13-10-91

j. Advertisement Form

Pre-Bid Conference: A pre-bid conference will be held on August 14, 2025, at 10:00 a.m. at the Government Center, 222 Pine Avenue, Suite 260, Albany, Georgia 3101. All interested bidders are strongly encouraged to attend.

For additional information, contact Ricky Gladney, Buyer I, at (229) 302-1455. Submit all questions via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and kross@albanyga.gov. The deadline for questions is August 21, 2025, at 2:30 pm. Replies of substance will be answered in the form of an addendum and made available to all potential bidders.

Henderson Park Recreation Center Construction Bid Ref. #26-006 mailto:rgladney@albanyga.gov mailto:jswilliams@albanyga.gov mailto:kross@albanyga.gov

* COMPLETE AND SUBMIT *

BID REFERENCE NO. 26-006

ADDENDUM ACKNOWLEDGEMENT FORM

Instructions: Please acknowledge receipt of addenda received by completing this addendum acknowledgement form. Check the box next to each addendum received and sign below. This addendum acknowledgement form should be submitted with your bid to expedite document processing.

Acknowledgement: I, the undersigned, acknowledge receipt of the following addenda to the above referenced Invitation To Bid and have made any necessary revisions to my response or submittal. I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.

Addendum No. 1 ⃣ Addendum No. 3 ⃣

Addendum No. 2 ⃣ Addendum No. 4 ⃣ ⃣ No Addenda received for Bid Reference NO.26-006

Print Name and Title of Authorized Signer

Authorized Signature

Date

Henderson Park Recreation Center Construction

* COMPLETE AND SUBMIT*

Bid Reference No. 26-006

BID FORM

SCHEDULE OF DBE

PARTICIPATION

Name of Proposer:

NAME OF DBE

SUBCONTRACTOR

ADDRESS

(COUNTY, STATE)

TYPE OF WORK

SUBCONTRACTED DBE

SUBCONTRACT

VALUE

DBE

PARTICIPATION

VALUE

DBE PARTICIPATION TOTAL VALUE ........................................................................ $

The attainment of DBE participation goals for this contract will be measured as a percentage of the total dollar value of the contract. The undersigned will enter into a formal agreement with the MBE/WBE Subcontractors identified herein for work listed in this schedule conditioned upon execution of a contract with:

Sworn to and subscribe before me, this day of ,20 .

(SEAL)

NOTARY PUBLIC Name (Typed)

Henderson Park Recreation Center Construction

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, as PRINCIPAL, and (Name of Principal)

(Legal title and address of the Surety) as Surety (hereinafter referred to as "Surety"), are held and firmly bound unto the City of

Albany, Georgia, hereinafter called the "Local Public Agency,' in the penal sum of

Dollars

($ ) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

, 20 for the construction of

NOW, THEREFORE, if the Principal shall not withdraw said Bid within the allowable period…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .