West Ramp Expansion Project - Bid Documents Summary
These are the final construction plans and bid documents for the West Ramp Expansion project at Page Field Airport (FMY) in Fort Myers, Florida, issued by the Lee County Port Authority. The project scope encompasses the expansion of the existing west apron pavement by approximately 5,900 square yards and includes asphalt milling (300 square yards), removal of 45 existing aircraft tie-down anchors, topsoil stripping (2-3 acres depending on bid schedule), unclassified excavation (275-300 cubic yards), embankment placement (500-600 cubic yards), stabilized subgrade installation (6,650-8,400 square yards), lime rock base course (6,300-7,900 square yards), asphalt surface course placement (1,600-1,980 tons of PG 76-22), installation of 42 aircraft tie-down anchors, permanent pavement markings, sodding of 3,250 square yards of Argentine Bahia grass, and removal of 5 existing edge lights. The project is divided into two bid schedules: Schedule A (Base Bid) and Schedule B (Base Bid plus Bid Additive 1), with the additive incorporating additional earthwork and pavement quantities. Construction is scheduled to occur in five sequential phases over a total of 86 calendar days of work (116 total calendar days including closeout), with work hours limited to 7:00 a.m. to 5:00 p.m., Monday through Saturday. A non-mandatory pre-bid meeting and site visit is scheduled for Monday, March 30, 2026, at 9:00 a.m., with questions and clarification requests due by Monday, April 6, 2026, at 5:00 p.m. Electronic bids must be submitted through OpenGov no later than Thursday, April 23, 2026, at 2:00 p.m. local time.
The project is funded through the Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grants and therefore mandates compliance with Buy American preferences, Davis-Bacon prevailing wage requirements, civil rights assurances, and disadvantaged business enterprise (DBE) participation with a zero percent contract goal. Bidders must hold a current Florida General Contractor license maintained for a minimum of three years, maintain current Florida corporate registration or equivalent legal business entity status, and demonstrate financial responsibility through certified financial statements or State Highway Division prequalification. The successful bidder must provide a bid guaranty of not less than five percent of the total bid amount, performance and payment bonds equal to 100 percent of the bid amount, and comprehensive insurance coverage including commercial general liability of $1,000,000 single limit and workers' compensation at Florida statutory limits. Liquidated damages of $1,000 per calendar day will be assessed for failure to achieve final completion by the contractually established date. All materials and workmanship are warranted for twelve months post-completion, with LED fixtures warranted for four years. The contractor is responsible for all labor, materials, equipment, permits, utility coordination, quality control testing, mobilization costs (limited to 10 percent of total project cost), dust control measures, foreign object debris (FOD) prevention, erosion and sediment control, temporary traffic control during phasing operations, and daily coordination with the Construction Manager and Airport Operations. A local vendor preference may be granted to local contractors submitting pricing within three percent of the lowest responsive bid. Award will be made to the lowest responsive and responsible bidder whose bid serves the best interests of the Authority.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
FOR
NOTE:
DO NOT SCALE PRINTS
REPRODUCTION MAY CAUSE DISTORTION
PRIME CONTRACTOR
MAJOR SUBCONTRACTORS AND/OR SUPPLIERS
CONSTRUCTION DATA FEDERAL AVIATION ADMINISTRATION
FLORIDA DEPARTMENT OF TRANSPORTATION
APPROVED DATE
APPROVED DATE
LEE COUNTY PORT AUTHORITY
FORT MYERS, FLORIDA
APPROVED DATE
DATESUBMITTED
P. E. No.
WEST RAMP
EXPANSION
LCPA PROJECT ID: TBD
DECEMBER 2025
U
PD
AT
ED
O N
SHEET INDEX
G001 COVER SHEET
LOCATION MAP
FAA PROJECT ID: N/A
FDOT PROJECT ID: N/A
CONSULTANT PROJECT ID: 203400
WORK: COMMENCED
PROJECT ENGINEER/INSPECTORS:
COMPLETED
ALL CONSTRUCTION PERFORMED UNDER THIS CONTRACT WAS COMPLETED
IN SUBSTANTIAL CONFORMITY WITH THE DRAWINGS, NOTES AND SPECIFICATIONS
CONTAINED IN THESE PLANS. ALL CHANGES FROM THE PLANS AS BID, HAVE
BEEN NOTED TO THE BEST OF OUR KNOWLEDGE.
(CERTIFIED)
PROJECT ENGINEER DATE
COST: BID $ FINAL $
FMY PROJECT DATA
PROJECT
LOCATION
G002 SUMMARY OF QUANTITIES
C252 SOIL BORING PROFILES (2 OF 2)
G003 GENERAL NOTES
G100 PROJECT LAYOUT, ACCESS, AND STAGING PLAN
PAGE FIELD
I-75CLEVELAND AVE
COLONIAL BLVD
FOWLER ST
METRO PKWY
C201 EXISTING CONDITIONS, SOIL BORING, AND DEMOLITION PLAN (1 OF 2)
C202 EXISTING CONDITIONS, SOIL BORING, AND DEMOLITION PLAN (2 OF 2)
C451 TYPICAL PAVEMENT SECTIONS AND PAVING DETAILS
C401 PAVEMENT GEOMETRY PLAN (1 OF 2)
C402 PAVEMENT GEOMETRY PLAN (2 OF 2)
C251 SOIL BORING PROFILES (1 OF 2)
E001 ELECTRICAL GENERAL NOTES
E102 ELECTRICAL DEMOLITION PLAN
C501 GRADING, DRAINAGE, AND EROSION CONTROL PLAN (1 OF 2)
G401 MAINTENANCE OF TRAFFIC PLAN - PHASE 1
G402 MAINTENANCE OF TRAFFIC PLAN - PHASE 2
C502 GRADING, DRAINAGE, AND EROSION CONTROL PLAN (2 OF 2)
C701 AIRCRAFT TIE-DOWN PLAN (1 OF 2)
C702 AIRCRAFT TIE-DOWN PLAN (2 OF 2)
G451 CONSTRUCTION PHASING DETAILS
C551 EROSION CONTROL DETAILS
C561 STORMWATER POLLUTION PREVENTION PLAN
C751 AIRCRAFT TIE-DOWN DETAILS
C601 PAVEMENT ELEVATION PLAN (1 OF 2)
C602 PAVEMENT ELEVATION PLAN (2 OF 2)
G403 MAINTENANCE OF TRAFFIC PLAN - PHASE 3
G404 MAINTENANCE OF TRAFFIC PLAN - PHASE 4
G400 OVERALL PHASING PLAN
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:
Z
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 2_
G
2- D
R A W
IN
G
I N
D
EX
A N
D S
U M
M A R Y
O F
Q U
A N
TI
TI
ES
.d w g
M on da y, M ar ch
6, 5:
:0
PM
B
ID
D O
C U
M
EN
TS
G002 203400
TBD
NEP
JAR
NCM
S U
M M
A R Y
O F
Q U
A N
TI
TI
ES
SUMMARY OF QUANTITIES - BID SCHEDULE A: BASE BID
ITEM NO. SPEC. NO. ITEM DESCRIPTION UNIT QUANTITY
1 C-100-1 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) LS 1
2 C-102-1 TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL LS 1
3 C-105-1 MOBILIZATION LS 1
4 C-106-1 CONSTRUCTION SAFETY, PHASING, AND SECURITY LS 1
5 C-107-1 CONSTRUCTION SURVEYING (STAKEOUT AND AS-BUILT) LS 1
6 P-101-1 ASPHALT PAVEMENT MILLING, 2-INCH TO 4-INCH DEPTH SY 300
7 P-101-2 REMOVE EXISTING AIRCRAFT TIE-DOWN ANCHOR EA 45
8 P-101-3 REMOVE EXISTING PAVEMENT MARKINGS SF 320
9 P-151-1 TOPSOIL STRIPPING AC 2
10 P-152-1 UNCLASSIFIED EXCAVATION CY 275
11 P-152-2 EMBANKMENT IN PLACE CY 500
12 P-160-1 STABILIZED SUBGRADE, TYPE B, 12-INCH DEPTH SY 6,650
13 P-211-1 LIMEROCK OR RECYCLED CONCRETE AGGREGATE BASE COURSE, 6-INCH DEPTH, LBR 120 SY 6,300
14 P-401-1 ASPHALT SURFACE COURSE, PG 76-22 TON 1,600
15 P-602-1 EMULSIFIED ASPHALT PRIME COAT GAL 1,950
16 P-603-1 EMULSIFIED ASPHALT TACK COAT GAL 500
17 P-608-R-1 ASPHALT SURFACE TREATMENT, RAPID CURE LS 1
18 P-620-1 PERMANENT NON-REFLECTIVE PAVEMENT MARKING SF 500
19 P-622-1 AIRCRAFT TIE-DOWN ANCHOR EA 42
20 T-904-1 SODDING, ARGENTINE BAHIA SY 3,250
21 L-125-5.1 REMOVAL OF EXISTING EDGE LIGHT IN EARTH, COMPLETE EA 5
SUMMARY OF QUANTITIES - BID SCHEDULE B: BASE BID + BID ADDITIVE 1
ITEM NO. SPEC. NO. ITEM DESCRIPTION UNIT QUANTITY
1 C-100-1 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) LS 1
2 C-102-1 TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL LS 1
3 C-105-1 MOBILIZATION LS 1
4 C-106-1 CONSTRUCTION SAFETY, PHASING, AND SECURITY LS 1
5 C-107-1 CONSTRUCTION SURVEYING (STAKEOUT AND AS-BUILT) LS 1
6 P-101-1 ASPHALT PAVEMENT MILLING, 2-INCH TO 4-INCH DEPTH SY 300
7 P-101-2 REMOVE EXISTING AIRCRAFT TIE-DOWN ANCHOR EA 45
8 P-101-3 REMOVE EXISTING PAVEMENT MARKINGS SF 320
9 P-151-1 TOPSOIL STRIPPING AC 3
10 P-152-1 UNCLASSIFIED EXCAVATION CY 300
11 P-152-2 EMBANKMENT IN PLACE CY 600
12 P-160-1 STABILIZED SUBGRADE, TYPE B, 12-INCH DEPTH SY 8,400
13 P-211-1 LIMEROCK OR RECYCLED CONCRETE AGGREGATE BASE COURSE, 6-INCH DEPTH, LBR 120 SY 7,900
14 P-401-1 ASPHALT SURFACE COURSE, PG 76-22 TON 1,980
15 P-602-1 EMULSIFIED ASPHALT PRIME COAT GAL 2,415
16 P-603-1 EMULSIFIED ASPHALT TACK COAT GAL 610
17 P-608-R-1 ASPHALT SURFACE TREATMENT, RAPID CURE LS 1
18 P-620-1 PERMANENT NON-REFLECTIVE PAVEMENT MARKING SF 500
19 P-622-1 AIRCRAFT TIE-DOWN ANCHOR EA 42
20 T-904-1 SODDING, ARGENTINE BAHIA SY 3,250
21 L-125-5.1 REMOVAL OF EXISTING EDGE LIGHT IN EARTH, COMPLETE EA 5
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 3_
G
3- G
EN
ER
A L
N O
TE
S .d w g
Th ur sd ay
D ec em be r
4, :5
8:
P M
B
ID
D O
C U
M
EN
TS
G003 203400
TBD
G
EN
ER
A L
N O
TE
S
NEP
JAR
NCM
GENERAL NOTES:
1. ALL EXISTING DIMENSIONS, MEASUREMENTS AND FEATURES SHOWN ON
THE PLANS ARE APPROXIMATE, FROM THE BEST INFORMATION AVAILABLE,
AND SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. A SUBSURFACE SOIL INVESTIGATION REPORT WAS PREPARED BY TSF GEO.
3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES, STRUCTURES,
ETC. AS SHOWN ON THE DRAWINGS ARE TO BE CONSIDERED AS GENERAL
LOCATIONS ONLY AND MAY NOT INCLUDE ALL UTILITIES THAT MAY BE
ENCOUNTERED. THE LOCATION OR DEPTH FOR EXISTING UNDERGROUND
ITEMS SHOULD ONLY BE CONSIDERED AS A GUIDE TO THE GENERAL AREA
IN WHICH AN ITEM IS LOCATED. IT IS THE CONTRACTOR'S RESPONSIBILITY
TO ACCURATELY LOCATE UNDERGROUND ITEMS BEFORE ANY WORK IS
PERFORMED IN THE AREA. THE CONTRACTOR SHALL COORDINATE WITH THE
CM PRIOR TO EXCAVATING IN ANY AREA. UNIDENTIFIED
UTILITIES/STRUCTURES SHALL BE LOCATED, IDENTIFIED, AND REPORTED
PROMPTLY TO THE CM.
4. THE CONTRACTOR SHALL CONTACT LOCAL UTILITY COMPANIES &
AUTHORITIES BY CALLING FLORIDA ONE CALL SYSTEM (1-800-432-4770)
FOR THE UTILITY MARK OUT PRIOR TO CONSTRUCTION.
5. THE CONTRACTOR SHALL NOT INTERRUPT POWER, TELEPHONE, OR THE
UTILITY SERVICE OF THE AIRPORT OR FAA DURING CONSTRUCTION
ACTIVITIES UNLESS 72-HOUR NOTICE IS GIVEN AND WRITTEN APPROVAL
HAS BEEN PROVIDED BY THE CM.
6. THE CONTRACTOR SHALL CHECK THE LOCATION OF EXISTING UTILITIES
THAT ARE REQUIRED TO REMAIN IN PLACE, INCLUDING THOSE OVERHEAD
OR UNDERGROUND, AND TAKE ALL NECESSARY PRECAUTIONS TO PREVENT
INJURY OR DAMAGE DURING THE PERFORMANCE OF THE CONTRACT AND BE
RESPONSIBLE FOR ANY AND ALL THE DAMAGES THERETO. IF, IN THE
COURSE OF THE WORK, ANY UTILITY LINE IS DAMAGED, THE CONTRACTOR
SHALL MAKE AN IMMEDIATE, CONTINUOUS EFFORT TO RESTORE SERVICE
AS SOON AS POSSIBLE AT THE CONTRACTOR'S EXPENSE.
7. CONTRACTOR'S EMPLOYEES SHALL PARK ONLY IN THE DESIGNATED
EMPLOYEE PARKING AREA AS SHOWN ON SHEET G100
8. CONTRACTOR SHALL INSTALL AND MAINTAIN THE EROSION CONTROL
MEASURES AS SHOWN ON THE PLANS, UNTIL DISTURBED AREAS HAVE BEEN
STABILIZED AS DETERMINED BY THE CM. CONTRACTOR SHALL UTILIZE
APPROPRIATE BMP PROCEDURES AS NECESSARY TO ENSURE THAT NO
ADVERSE IMPACTS OCCUR OFFSITE.
9. EXCESS SUITABLE MATERIAL NOT UTILIZED UNDER THE CONTRACT SHALL
BE STOCKPILED AT DESIGNATED STOCKPILED AREAS AND REMAIN
PROPERTY OF THE OWNER OR BECOME PROPERTY OF THE CONTRACTOR AND
HAULED OFFSITE AT THE DISCRETION OF THE OWNER. ALL UNSUITABLE
EXCAVATED MATERIALS SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE HAULED OFF AIRPORT PROPERTY FOR LEGAL
DISPOSAL. STOCKPILED MATERIAL SHOULD BE CONSTRAINED IN A MANNER
TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT JET BLAST OR WIND
CONDITIONS.
10. NO BLASTING OR BURNING IS PERMITTED ON THIS PROJECT. CONTRACTOR
IS REQUIRED TO PERFORM DUST CONTROLLING MEASURES AT ALL TIMES.
11. WATER TRUCKS MUST BE ON SITE AT ALL TIMES TO SUFFICIENTLY CONTROL
DUST. CONTRACTOR MAY USE A NEARBY FIRE HYDRANT IF PROPERLY
METERED. CONTRACTOR TO OBTAIN UTILITY APPROVAL PRIOR TO USE OF
HYDRANT.
12. PRIOR TO START OF WORK, THE CONTRACTOR WILL DESIGNATE A PROJECT
REPRESENTATIVE AUTHORIZED TO ACT ON THE CONTRACTOR'S BEHALF,
WHO WILL BE AVAILABLE FOR CONTACT ON A 24 HOUR BASIS.
13. THE PROJECT PAY ITEMS ARE INTENDED TO BE INCLUSIVE OF ALL WORK TO
BE PERFORMED WITHIN THESE CONTRACT DOCUMENTS AND ALL
REFERENCED REQUIREMENTS. ALL INCIDENTAL WORK REQUIRED TO
COMPLETE THE PROJECT, AND ADHERE TO, THIS PROJECT'S REQUIREMENTS
SHALL BE INCLUDED IN THE CONTRACTOR'S BID UNDER THE NEAREST
APPLICABLE BID ITEM.
SAFETY AND PHASING NOTES:
1. IT IS THE INTENT OF THE LEE COUNTY PORT AUTHORITY (LCPA) TO
MINIMIZE INTERFERENCE OR CONFLICT WITH AIRCRAFT AIR OR GROUND
OPERATIONS. THE CONTRACTOR SHALL COORDINATE ACTIVITIES WITH THE
CONSTRUCTION MANAGER AT RISK (CM) WHILE WORKING NEAR AIRCRAFT
OPERATIONAL AREAS TO MINIMIZE INTERFERENCE WITH AIRCRAFT GROUND
MOVEMENTS. BEFORE STARTING ANY WORK OPERATIONS, THE
CONTRACTOR SHALL ASSURE THAT PROPER SAFETY PRECAUTIONS ARE
TAKEN AND THAT REQUIRED SEPARATION FROM AIRCRAFT ARE
MAINTAINED. AIRCRAFT HAVE THE RIGHT-OF-WAY OVER CONSTRUCTION
ACTIVITIES AND EQUIPMENT. THE CONTRACTOR IS REFERRED TO THE
SPECIFICATIONS FOR INFORMATION AND REQUIREMENTS IN ADDITION TO
THOSE PRESENTED HEREIN REGARDING OPERATIONS AND/OR SAFETY.
2. WORK WITHIN AN OBJECT FREE AREA (OFA) MAY NOT PROCEED NOR MAY
VEHICLES ENCROACH WITHIN THIS AREA UNTIL THE CM HAS ISSUED
WRITTEN AUTHORIZATION AND THE APPROPRIATE NOTAMS HAVE BEEN
ISSUED. CONSTRUCTION VEHICLE ACTIVITY ADJACENT TO OR WITHIN THE
OFA OF OPERATIONAL RUNWAYS, TAXIWAYS, OR APRONS WILL BE
CONTROLLED BY FLAG MEN (WITH RADIOS) FAMILIAR WITH AIR
OPERATIONS TO ENSURE AIRCRAFT SAFETY. CONTRACTOR FLAGGERS SHALL
NOT CONTROL AIRCRAFT.
3. IN THE EVENT THAT CONTRACTOR HAS TO PERFORM WORK INSIDE AN
ACTIVE TAXIWAY/TAXILANE THE CONTRACTOR SHALL UTILIZE LIGHTED
LOW-PROFILE CONSTRUCTION BARRICADES AS SHOWN ON THE PHASING
PLANS TO CLOSE THE ACTIVE TAXIWAY. PRIOR TO CLOSING ANY ACTIVE
TAXIWAY/TAXILANE, THE CONTRACTOR IS REQUIRED TO OBTAIN WRITTEN
AUTHORIZATION FROM THE CM.
4. ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE
AIRPORT IN OR NEAR THE ACTIVE AIRCRAFT OPERATIONS AREA (AOA)
SHALL DISPLAY IN FULL VIEW A FLASHING YELLOW DOME-TYPE LIGHT OR
ABOVE THE VEHICLE A 3'X'3' OR LARGER, ORANGE AND WHITE
CHECKERBOARD FLAG, EACH CHECKERBOARD COLOR BEING 1-FOOT
SQUARE AND ESCORTED UNDER THE CONTROL OF ONE CONTRACTOR
MOBILE (TWO-WAY) RADIO OPERATOR ON THE JOB AT ALL TIMES. ANY
VEHICLE OPERATING IN OR NEAR THE ACTIVE AOA DURING THE HOURS OF
DARKNESS SHALL BE EQUIPPED WITH A FLASHING YELLOW DOME LIGHT,
MOUNTED ON TOP OF THE VEHICLE AND BE OF SUCH INTENSITY TO
CONFORM TO LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES.
ESCORT VEHICLES SHALL BE IDENTIFIED BY COMPANY LOGOS LOCATED ON
BOTH SIDES OF THE VEHICLE WITH LETTERING AT LEAST 3" IN HEIGHT.
5. ALL NON-RADIO EQUIPPED CONTRACTOR VEHICLES THAT ARE REQUIRED TO
OPERATE ON, NEAR OR ACROSS ACTIVE RUNWAYS, TAXIWAYS, APRONS AND
RUNWAY APPROACH AND PROTECTION ZONES SHALL DO SO UNDER
CONTROL OF A RADIO EQUIPPED ESCORT VEHICLE. ESCORT VEHICLES,
OPERATORS, AND RADIO EQUIPMENT SHALL BE APPROVED BY THE AIRPORT
OPERATIONS STAFF. ESCORT VEHICLES SHALL BE MARKED AND LIGHTED AS
DESCRIBED IN SAFETY AND PHASING NOTE 4 AND SHALL BE EQUIPPED
WITH AN APPROVED AVIATION BAND RADIO. RADIO EQUIPPED VEHICLES
SHALL CONTINUOUSLY MONITOR GROUND CONTROL FREQUENCY (121.7
MHz). FREQUENCY CHANGES WILL BE AT THE DISCRETION OF THE
FAA-ATCT. ALL AIRCRAFT TRAFFIC ON RUNWAYS, TAXIWAYS AND APRONS
SHALL HAVE PRIORITY OVER CONTRACTOR'S TRAFFIC. CONTRACTOR IS
RESPONSIBLE FOR COORDINATION WITH AIRPORT OPERATIONS STAFF FOR
RADIO FREQUENCY UPDATES OR CHANGES.
6. NO TAXIWAY, APRON OR AIRPORT ROADWAY SHALL SHALL BE CLOSED
WITHOUT WRITTEN APPROVAL OF AIRPORT OPERATIONS STAFF. TO ENABLE
NECESSARY "NOTICES TO AIRMEN" (NOTAM) OR ADVISORIES TO AIRPORT
SERVICES OR TENANTS, A MINIMUM OF 72 HOURS WRITTEN NOTICE
REQUESTING A CLOSURE SHALL BE DIRECTED TO CM WHO WILL
COORDINATE THE REQUEST WITH AIRPORT OPERATIONS STAFF, FAA, RAMP
CONTROL AND AIRPORT TENANTS. NO RUNWAY CLOSURE SHALL BE
PERMITTED FOR THIS PROJECT AT ANY TIME.
7. DURING TIMES WHEN SAFETY OF FLIGHT OPERATIONS COULD BE IMPAIRED,
OR WHEN EQUIPMENT IS IDLE, ALL CONTRACTORS BOOMS, TOWERS, AND
OTHER MOVABLE APPENDAGES WILL BE LOWERED TO THE MINIMUM EXTENT
POSSIBLE AND PARKED IN THE DESIGNATED STAGING AREA.
8. THE CONTRACTOR SHALL CONFORM TO FAA ADVISORY CIRCULAR
150/5370-2G, "OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION" AND THE CONSTRUCTION SAFETY AND PHASING PLAN
(CSPP). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BRIEF ALL OF
THE SUBCONTRACTOR AND CONTRACTOR EMPLOYEES ON THE FAA
OPERATING AND SAFETY REQUIREMENTS. A COMPREHENSIVE SAFETY PLAN
COMPLIANCE DOCUMENT SHALL BE SUBMITTED TO THE CM FOR REVIEW.
9. FINES: THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
PAYMENT OF ANY FINES ASSESSED TO PAGE FIELD OR THE LEE COUNTY
PORT AUTHORITY RESULTING FROM THE CONTRACTOR’S VIOLATIONS OF
FAA REGULATIONS, OPERATING PROCEDURES, SAFETY OR SECURITY
REQUIREMENTS, OR OSHA SAFETY STANDARDS. SUCH FINES WILL BE
DEDUCTED FROM THE CONTRACTOR’S PAY APPLICATIONS.
10. THE CONTRACTOR SHALL RESPOND IMMEDIATELY TO DIRECTION FROM
LCPA, FAA, OR THE CM REGARDING AIRSIDE OPERATIONS.
11. THE CONTRACTOR SHALL COORDINATE DAILY CONSTRUCTION OPERATIONS
WITH THE CM EACH DAY PRIOR TO THE BEGINNING OF EACH WORK SHIFT.
12. THE CONTRACTOR SHALL PREVENT ANY MATERIAL ASSOCIATED WITH THE
CONTRACTOR'S OPERATIONS FROM BLOWING, SPILLING, OR BEING
TRANSPORTED ONTO ACTIVE PAVEMENT WHERE IT CAN POSE A FOREIGN
OBJECT DEBRIS (FOD) HAZARD TO AIRCRAFT. THE CONTRACTOR SHALL
IMMEDIATELY REMOVE ANY FOD MATERIAL RESULTING FROM THEIR
ACTIVITIES FROM ACTIVE PAVEMENT AND SHALL BE RESPONSIBLE FOR ANY
DAMAGE WHICH RESULTS. IN ADDITION, ALL PAVEMENTS ADJACENT TO
CONTRACTOR WORK AREAS WILL BE SWEPT CLEAN AT THE AT THE END OF
EACH WORK DAY. CONTRACTOR SHALL PROVIDE CONTINUOUS DUST
CONTROL BY APPROVED MEANS TO PREVENT DUST FROM BEING BLOWN
FROM THE JOBSITE OR STOCKPILES. FAILURE TO CONTROL DUST OR DEBRIS
MAY RESULT IN IMMEDIATE WORK STOPPAGE AND/OR TERMINATION OF
CONTRACT.
13. ALL ACCESS GATES SHALL BE CLOSED DURING CONSTRUCTION, UNLESS
THE CONTRACTOR PROVIDES A FULL-TIME GATE GUARD WHO IS TRAINED
FOR ACCESS TO THE AIRPORT SITE. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO KEEP THE AIRPORT SECURED AT ALL TIMES DURING
CONSTRUCTION.
14. CONTRACTOR SHALL ESTIMATE ALL DIFFICULTIES TO BE ENCOUNTERED
AND MAKE DUE ALLOWANCE IN BID TO COVER THE NON-PRODUCTIVE
COSTS WHICH MAY ARISE. NO EXTRA COMPENSATION WILL BE MADE FOR
SUCH WORK DELAYS NECESSARY TO MAINTAIN AIRPORT OPERATIONS.
CONTRACTOR SHALL CONTINUOUSLY COORDINATE OPERATIONS THROUGH
THE CM AND WITH AIRPORT OPS.
15. THE CONTRACTOR SHALL NOT ENTER INTO MOVEMENT AREAS WITHOUT
APPROVAL FROM THE AIR TRAFFIC CONTROL TOWER (ATCT).
16. CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON SHEET G100.
NO OTHER ACCESS POINTS SHALL BE ALLOWED UNLESS APPROVED IN
WRITING BY THE CM. ALL CONTRACTOR TRAFFIC AUTHORIZED TO ENTER
THE SITE SHALL BE EXPERIENCED IN THE ROUTE OR GUIDED BY
CONTRACTOR PERSONNEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION AREAS ON
AIRPORT PROPERTY. THE CONTRACTOR IS RESPONSIBLE FOR IMMEDIATE
CLEANUP OF ANY DEBRIS DEPOSITED ALONG ANY ROUTE USED AS A RESULT
OF THEIR CONSTRUCTION TRAFFIC.
17. THE CONTRACTOR SHALL FAMILIARIZE THEIR SUPERVISORS AND
EMPLOYEES WITH PAGE FIELD OPERATIONS AND SHALL CONDUCT THEIR
CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE EMERGENCY AIR
TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY AS SPECIFIED IN THE
CONTRACT DOCUMENTS.
18. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING
AROUND POTENTIALLY ENERGIZED UNDERGROUND OR ABOVE GROUND
ELECTRICAL UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR SITE
SAFETY AT ALL TIMES AND WILL CONFORM TO ALL OSHA, FAA, AND OTHER
FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS.
19. NO EQUIPMENT OR MATERIALS SHALL BE LEFT UNATTENDED ON AIRPORT
PROPERTY UNLESS WITHIN DESIGNATED STAGING AREAS UNLESS THE
CONTRACTOR RECEIVES PRIOR WRITTEN APPROVAL FROM THE CM.
20. PROTECT THE PUBLIC AND AIRCRAFT TRAFFIC AT ALL TIMES.
21. OPEN FLAMES, WELDING, OR TORCH CUTTING OPERATIONS ARE
PROHIBITED.
22. THE EMERGENCY NUMBER TO CALL FOR ANY INCIDENT OR EMERGENCY IS
(239) 590-4810. THIS NUMBER SHALL BE VERIFIED WITH THE CM.
23. THE CONTRACTOR SHALL PROVIDE AN APPROVED VACUUM TRUCK AT THE
START OF CONSTRUCTION TO VACUUM ALL PAVEMENTS AFFECTED BY
CONSTRUCTION AND ALL APPLICABLE HAUL ROUTES ON A DAILY BASIS. THE
VACUUM TRUCK SHALL REMAIN ON‑SITE IN FULL WORKING CONDITION FOR
THE DURATION OF THE PROJECT. IT SHALL BE AVAILABLE AT THE
DISCRETION OF AIRPORT OPERATIONS OR THE CM TO VACUUM PAVEMENT
AREAS ADJACENT TO AND WITHIN THE CONSTRUCTION ZONE, ENSURING
NO FOD IS PRESENT OR WITHIN 500 FEET OF ANY CONSTRUCTION AREA
24. ALL WASTE MATERIAL INCLUDING CONCRETE, ASPHALT RUBBLE/MILLINGS,
AND EXCAVATION WASTE MATERIAL, ETC. SHALL BE REMOVED DAILY FROM
THE CONSTRUCTION AREA AND SHALL BE DISPOSED OF LEGALLY OFF
AIRPORT PROPERTY. NO TEMPORARY STOCKPILES OF WASTE MATERIAL
WILL BE PERMITTED WITHIN THE CONSTRUCTION AREA OUTSIDE OF THE
APPROVED WORKING HOURS.
TSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFAROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TSA TSA TSA
TOFA TOFA
RVZ RVZ RVZ RVZ RVZ
R
VZ
R
VZ
R
VZ
R
VZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
R
VZ
R
VZ
R
VZ
R
VZ
R
VZ
R
VZ
TO
FA
TOFATOFA
TS
A
TSATSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
BRL
BRL
BRL
TOFA
TOFA
TOFA
TOFA
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 4_
G
0-
PR
O
JE
C T
LA
YO
U T, A C C
ES
S
A N
D S
TA
G
IN
G
P
LA
N .d w g
Th ur sd ay
D ec em be r
4, :5
8:
P M
B
ID
D O
C U
M
EN
TS
G100 203400
TBD
PR
O
JE
C T
LA
YO
U T, A C C
ES
S
A N
D S
TA
G
IN
G
P
LA
N
NEP
JAR
NCM
0 700350175
GRAPHIC SCALE IN FEET
TAXILANE D
RUNWAY 13-31
RU
NWAY
5-
TA
XI
WAY
A
PHASE IV T-HANGARS
SOUTHWEST
RAMP SOUTHEAST
RAMP
SOUTH RAMP
L RAMP
WEST
RAMP
NORTH
RAMP
TA
XI
WAY
C
TAXIWAY E
TAXIWAY B
TAXIWAY E
TAXIWAY A3
DANLEY DRIVE
FO
W
LE
R
ST
RE
ET
S C
LE
V
EL
A N
D A
V
EN
U E
M
ET
R O
P A R K W
A Y
PROJECT LIMITS
LEGEND
PROPERTY BOUNDARY LINE
CONTRACTOR STAGING AND
STOCKPILE AREA
ACCESS HAUL ROUTE
RUNWAY VISIBILITY ZONE
EXISTING BUILDINGS
NOTES
1. LOCATION OF HAUL ROUTES ON THE AIRPORT SITE SHALL BE
AS SPECIFIED AND APPROVED BY THE CM AND AIRPORT
OPERATIONS. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES
WITH THE APPROPRIATE OWNERS WHO HAVE JURISDICTION
OVER THE AFFECTED ROUTE. ON-SITE HAUL ROUTES SHALL BE
MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED
TO THEIR ORIGINAL CONDITION OR TO THE SATISFACTION OF
THE CM UPON COMPLETION OF THE PROJECT. THE BEFORE
AND AFTER CONDITION OF THE ON-SITE HAUL ROUTES AND
STAGING AREA, SHALL BE JOINTLY INSPECTED, DETERMINED,
AND DOCUMENTED BY THE CONTRACTOR AND THE CM.
MISCELLANEOUS CONSTRUCTION AND RESTORATION
REQUIRED TO CONSTRUCT TEMPORARY HAUL ROUTES OR
ACCESS POINTS TO THE CONTRACTOR'S STAGING AREA ON
THE AIRPORT WILL BE THE CONTRACTOR'S TOTAL
RESPONSIBILITY AND SHALL BE APPROVED BY THE CM PRIOR
TO THE START OF THE WORK.
2. LIMITS OF WORK SHALL BE VERIFIED BY THE CONTRACTOR
AND CM PRIOR TO BEGINNING WORK. THE CONTRACTOR'S
VEHICLES AND EQUIPMENT SHALL BE RESTRICTED TO THE
CONSTRUCTION LIMITS, HAUL ROUTES, AND CONTRACTOR'S
STAGING AREA ONLY. NO VEHICLES ARE PERMITTED ON THE
ACTIVE AIRCRAFT OPERATIONS AREA (AOA) UNLESS
ESCORTED WITH PROPER IDENTIFICATION AND TRAINING.
DESIGNATED PARKING FOR THE CONTRACTOR'S EMPLOYEES'
VEHICLES SHALL BE RESTRICTED TO THE AREA SHOWN ON
THIS SHEET.
3. THE CONTRACTOR SHALL MARK HAUL ROUTES USING
DELINEATORS OR SIGNAGE AS APPROVED BY THE CM.
DELINEATORS SHALL BE SPACED EVERY 50 FEET AS DIRECTED
BY THE CM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE DEVICES AS REQUIRED.
4. THIS PROJECT MAY BE CONSTRUCTED IN CONJUNCTION WITH
OTHER AIRPORT PROJECTS. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER CONTRACTORS ON-SITE AS REQUIRED TO
ENSURE SEAMLESS PROJECT SITE CONSTRUCTION AND
MINIMAL DISRUPTION TO AIRPORT OPERATIONS.
5. CONTRACTOR SHALL INSTALL A TEMPORARY GRAVEL ROAD
CONNECTION FROM GATE 21 TO CAPTAIN CHANNING PAGE DR.
CONTRACTOR SHALL ALSO REMOVE SIDEWALK AND CURB
ALONG TEMPORARY GRAVEL ROAD CONNECTION (USE FDOT #1
AGGREGATE). RESTORE THE ACCESS ROUTE TO
PRECONSTRUCTION CONDITION UPON PROJECT COMPLETION.
THE COST OF THIS WORK SHALL BE INCIDENTAL TO
CONSTRUCTION SAFETY, PHASING, AND SECURITY PAY ITEM
(C-106-1).
6. A GATE GUARD SHALL BE PROVIDED AT GATE 21 ALL TIMES
WHEN THE GATE IS OPENED OR UNLOCKED. GATE SHALL
REMAIN LOCKED EXCEPT DURING MAJOR HAULING
OPERATIONS.
PROPOSED ASPHALT
PAVEMENT
PROJECT AREA LIMITS
AIRPORT SECURITY FENCE
RVZ
X
GATE 21
GATE 20
GATE 19
BASE OPERATIONS
& AIRPORT
ADMINISTRATION
CROSSING GUARD LOCATION
CG
CG
1S T
S T
2N D
S T
3R D
S T
4T H
S T
5T H
S T
N AIRPORT ROAD
CENTER ROAD
SOUTH ROAD
CONTRACTOR EMPLOYEE
PARKING AREA
CG
CAPTAIN CHANNING
PAGE DR
FO
W
LE
R S
TR
EE
T
GATE 21,
SEE NOTES 5 AND 6
INSET
TRUCKS
ENTERING
AND
EXITING
SEE INSET,
THIS SHEET
S AIRPORT RD
TRUCKS
ENTERING
AND
EXITING
RS
A
RS
A
RS
A
RS
A
ROFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BRL
BRL
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
PHASE 2
PHASE 1
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 5_
G
0- C O
N S
TR
U C
TI
O N
P H
A S
IN
G P
LA
N
.d w g Th ur sd ay
D ec em be r 4, :5 8:
P
M
B
ID
D O
C U
M
EN
TS
G400 203400
TBD
O V
ER
A
LL
P H
A S
IN
G P
LA
N
NEP
JAR
NCM
LEGEND
0 1005025
PHASE 1
PHASE 2
FACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE WORK ELEMENTS
INCLUDED
7AM - 5PM
GRAPHIC SCALE IN FEET
PROPOSED ASPHALT PAVEMENT
(BID ADDITIVE 1)
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
PHASE 1 LIMITS
PHASE 2 LIMITS
RUNWAY OBJECT FREE AREAROFA
BUILDING RESTRICTION LINEBRL
MON - SAT
7AM - 5PM
MON - SAT
CONTRACTOR STAGING AREA
EXISTING
WEST
RAMP
TOE OF SLOPE (TYP.)
TOP OF BANK (TYP.)
ACCESS HAUL ROUTE
GATE 21
AIRPORT SECURITY FENCEX
TAXIWAY OBJECT FREE AREATOFA
PROPOSED ASPHALT PAVEMENT
(BASE BID)
TAXIW
AY C
TAXIWAY C3
PHASE 4 WEST RAMP7 CALENDAR DAYS7AM - 5PM
MON - SAT
TIE-DOWN ANCHOR INSTALLATION,
SODDING, DEMOBILIZATION
PHASE 3 7 CALENDAR DAYS7AM - 5PM
MON - SAT
ASPHALT PAVING, SODDING
PHASE 5 WEST RAMPAS REQUIRED7AM - 5PM
MON - SAT
PAVEMENT MARKING (30 DAYS AFTER
ASPHALT PAVING IS COMPLETE)
PHASE 4 LIMITS
PHASE 3 LIMITSTOPSOIL STRIPPING, EXCAVATION,
SUBGRADE, TIE-IN MILLING, BASE
COURSE, ELECTRICAL DEMOLITION14 CALENDAR DAYS TAXIWAY C3, WEST RAMP
WEST RAMP28 CALENDAR DAYS
TOPSOIL STRIPPING, TIE-DOWN ANCHOR
DEMOLITION, EXCAVATION, SUBGRADE,
TIE-IN MILLING, BASE COURSE
TAXIWAY C3, WEST RAMP
RS
A
RS
A
RS
A
ROFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BRL
BRL
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
PHASE 1
85.5'
' M
A X
35' (TYP.)
N:819646.13 E:699861.07
N:819666.28 E:699949.70
N:819420.32 E:700005.61
N:819253.75 E:699952.18
N:819537.47 E:699890.15
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 6_
G
1- M
A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
P
LA
N
.d w g Th ur sd ay
D ec em be r 4, :5 9:
P
M
B
ID
D O
C U
M
EN
TS
G401 203400
TBD
M A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
PL
A N
P
H A S E
NEP
JAR
NCM
0 1005025
PHASE 1 WEST RAMP28 CALENDAR DAYS
GRAPHIC SCALE IN FEET
7AM - 5PM
MON - SAT
TOPSOIL STRIPPING, EXCAVATION,
SUBGRADE, TIE-IN MILLING, BASE
COURSE, TIE-DOWN ANCHOR DEMOLITION
EXISTING
WEST
RAMP
TOE OF SLOPE (TYP.)
TOP OF BANK (TYP.)
GATE 21
LEGEND
FACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE WORK ELEMENTS
INCLUDED
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
PHASE 1 LIMITS
RUNWAY OBJECT FREE AREAROFA
BUILDING RESTRICTION LINEBRL
CONTRACTOR STAGING AREA
ACCESS HAUL ROUTE
AIRPORT SECURITY FENCEX
TAXIWAY OBJECT FREE AREATOFA
LOW-PROFILE BARRICADE
TAXIW
AY C
TAXIWAY C3
TEMPORARY SOIL TRACKING
PREVENTION DEVICE
NOTES:
1. ALL CLOSURES OF AIRFIELD PAVEMENTS ARE TO BE COORDINATED WITH THE AIRPORT OPERATIONS DESIGNEE A MINIMUM OF 7 DAYS PRIOR TO PROPOSED CLOSURE.
2. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION TO AIRPORT OPERATIONS.
3. THE CONTRACTOR WILL BE REQUIRED TO HAVE BOTH A 2-WAY RADIO TO COMMUNICATE WITH CONSTRUCTION VEHICLES AND AN ATCT RADIO TO COMMUNICATE WITH GROUND CONTROL. ALL CROSSING GUARDS SHALL BE TRAINED IN ATCT GROUND COMMUNICATIONS.
4. PHASES ARE TO BE COMPLETED SEQUENTIALLY IN ORDER UNLESS OTHERWISE NOTED.
5. NO PARKED OR ACTIVE CONSTRUCTION EQUIPMENT OR STOCKPILE SHALL ENCROACH UPON THE RUNWAY VISUAL ZONE (RVZ) OR ANY TAXIWAY OBJECT FREE AREA (TOFA).
6. WORK LIMITS SHOWN ARE BASED ON AWARD OF BID SCHEDULE B: BASE BID + BID ADDITIVE 1. IF BID SCHEDULE A IS AWARDED REVISED PHASING SHEETS WILL BE
PROVIDED.
7. UPON COMPLETION OF PHASE 1 AND PRIOR TO TRANSITIONING TO PHASE 2, THE CONTRACTOR SHALL APPLY PRIME COAT TO THE EXPOSED LIMEROCK BASE COURSE TO MINIMIZE THE GENERATION OF FOD. THE CONTRACTOR REMAINS RESPONSIBLE FOR PREVENTING FOD IN PHASE 1 AND THROUGHOUT SUBSEQUENT PHASES OF WORK.
THE CM AND AIRFIELD OPERATIONS RETAIN SOLE AUTHORITY TO DETERMINE WHEN THE CONDITION OF THE LIMEROCK BASE COURSE IS INADEQUATE AND REQUIRES
CORRECTIVE ACTION.
EXISTING TIE-DOWN
MARKINGS (TYP)
RS
A
RS
A
RS
A
ROFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BRL
BRL
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
PHASE 2
85.5'
' M
A X
15'
35' (TYP.)
102' (T
YP.)
N:819646.13 E:699861.07
N:819666.28 E:699949.70
N:819420.32 E:700005.61
N:819253.75 E:699952.18
N:819537.47 E:699890.15
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 6_
G
1- M
A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
P
LA
N
.d w g Th ur sd ay
D ec em be r 4, :5 9:
P
M
B
ID
D O
C U
M
EN
TS
G402 203400
TBD
M A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
PL
A N
P
H A S E
NEP
JAR
NCM
LEGEND
0 1005025
PHASE 2
FACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE WORK ELEMENTS
INCLUDED
TOPSOIL STRIPPING, EXCAVATION,
SUBGRADE COMPACTION, BASE COURSE,
ELECTRICAL DEMOLITION
7AM - 5PM 14 CALENDAR DAYS
GRAPHIC SCALE IN FEET
TAXIWAY C3, WEST RAMP
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
PHASE 2 LIMITS
RUNWAY OBJECT FREE AREAROFA
BUILDING RESTRICTION LINEBRL
MON - SAT
CONTRACTOR STAGING AREA
EXISTING
WEST
RAMP
TOE OF SLOPE (TYP.)
TOP OF BANK (TYP.)
ACCESS HAUL ROUTE
GATE 21
AIRPORT SECURITY FENCEX
TAXIWAY OBJECT FREE AREATOFA
LOW-PROFILE BARRICADE
TAXIW
AY C
TAXIWAY C3
TEMPORARY SOIL TRACKING
PREVENTION DEVICE
CONSTRUCTED LIMEROCK
BASE COURSE
COMPLETED LIMEROCK
BASE COURSE
COMPLETED
TIE-IN MILL
EXISTING TIE-DOWN
MARKINGS (TYP)
NOTES:
1. ALL CLOSURES OF AIRFIELD PAVEMENTS ARE TO BE COORDINATED WITH THE AIRPORT OPERATIONS DESIGNEE A MINIMUM OF 7
DAYS PRIOR TO PROPOSED CLOSURE.
2. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION TO AIRPORT OPERATIONS.
3. THE CONTRACTOR WILL BE REQUIRED TO HAVE BOTH A 2-WAY RADIO TO COMMUNICATE WITH CONSTRUCTION VEHICLES AND AN ATCT RADIO TO COMMUNICATE WITH GROUND CONTROL. ALL CROSSING GUARDS SHALL BE TRAINED IN ATCT GROUND
COMMUNICATIONS.
4. PHASES ARE TO BE COMPLETED SEQUENTIALLY IN ORDER UNLESS OTHERWISE APPROVED BY THE CM.
5. NO PARKED OR ACTIVE CONSTRUCTION EQUIPMENT OR STOCKPILE SHALL ENCROACH UPON THE RUNWAY VISUAL ZONE (RVZ)
OR ANY TAXIWAY OBJECT FREE AREA (TOFA).
6. WORK LIMITS SHOWN ARE BASED ON AWARD OF BID SCHEDULE B: BASE BID + BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS WILL BE PROVIDED.
RS
A
RS
A
RS
A
ROFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BRL
BRL
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
85.5'
' M
A X
N:819646.13 E:699861.07
N:819666.28 E:699949.70
N:819420.32 E:700005.61
N:819253.75 E:699952.18
PHASE 3
15'
N:819537.47 E:699890.15
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 6_
G
1- M
A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
P
LA
N
.d w g Th ur sd ay
D ec em be r 4, :5 9:
P
M
B
ID
D O
C U
M
EN
TS
G403 203400
TBD
M A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
PL
A N
P
H A S E
NEP
JAR
NCM
0 1005025
PHASE 3 TAXIWAY C3, WEST RAMP7 CALENDAR DAYS
GRAPHIC SCALE IN FEET
7AM - 5PM
MON - SAT
ASPHALT PAVING, SODDING
EXISTING
WEST
RAMP
TOE OF SLOPE (TYP.)
TOP OF BANK (TYP.)
GATE 21
LEGEND
FACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE WORK ELEMENTS
INCLUDED
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
PHASE 3 LIMITS
RUNWAY OBJECT FREE AREAROFA
BUILDING RESTRICTION LINEBRL
CONTRACTOR STAGING AREA
ACCESS HAUL ROUTE
AIRPORT SECURITY FENCEX
TAXIWAY OBJECT FREE AREATOFA
LOW-PROFILE BARRICADE
CONSTRUCTED LIMEROCK
BASE COURSE
TAXIW
AY C
TAXIWAY C3
TEMPORARY SOIL TRACKING
PREVENTION DEVICE
COMPLETED LIMEROCK
BASE COURSE
COMPLETED
TIE-IN MILL
EXISTING TIE-DOWN
MARKINGS (TYP)
NOTES:
1. ALL CLOSURES OF AIRFIELD PAVEMENTS ARE TO BE COORDINATED WITH THE AIRPORT OPERATIONS DESIGNEE A MINIMUM OF 7
DAYS PRIOR TO PROPOSED CLOSURE.
2. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION TO AIRPORT OPERATIONS.
3. THE CONTRACTOR WILL BE REQUIRED TO HAVE BOTH A 2-WAY RADIO TO COMMUNICATE WITH CONSTRUCTION VEHICLES AND AN ATCT RADIO TO COMMUNICATE WITH GROUND CONTROL. ALL CROSSING GUARDS SHALL BE TRAINED IN ATCT GROUND
COMMUNICATIONS.
4. PHASES ARE TO BE COMPLETED SEQUENTIALLY IN ORDER UNLESS OTHERWISE APPROVED BY THE CM.
5. NO PARKED OR ACTIVE CONSTRUCTION EQUIPMENT OR STOCKPILE SHALL ENCROACH UPON THE RUNWAY VISUAL ZONE (RVZ)
OR ANY TAXIWAY OBJECT FREE AREA (TOFA).
6. WORK LIMITS SHOWN ARE BASED ON AWARD OF BID SCHEDULE B: BASE BID + BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS WILL BE PROVIDED.
RS
A
RS
A
RS
A
ROFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BRL
BRL
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
85.5'
' M
A X
N:819646.13 E:699861.07
N:819666.28 E:699949.70
N:819420.32 E:700005.61
N:819253.75 E:699952.18
N:819537.47 E:699890.15
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 6_
G
1- M
A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
P
LA
N
.d w g Th ur sd ay
D ec em be r 4, :5 9:
P
M
B
ID
D O
C U
M
EN
TS
G404 203400
TBD
M A
IN
TE
N
A N
C E
O F
TR
A
FF
IC
PL
A N
P
H A S E
NEP
JAR
NCM
0 1005025
PHASE 4 WEST RAMP7 CALENDAR DAYS
GRAPHIC SCALE IN FEET
7AM - 5PM
MON - SAT
TIE-DOWN ANCHOR INSTALLATION,
SODDING
EXISTING
WEST
RAMP
TOE OF SLOPE (TYP.)
TOP OF BANK (TYP.)
GATE 21
LEGEND
NOTES:
1. ALL CLOSURES OF AIRFIELD PAVEMENTS ARE TO BE COORDINATED WITH THE AIRPORT OPERATIONS DESIGNEE A MINIMUM OF 7
DAYS PRIOR TO PROPOSED CLOSURE.
2. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION TO AIRPORT OPERATIONS.
3. THE CONTRACTOR WILL BE REQUIRED TO HAVE BOTH A 2-WAY RADIO TO COMMUNICATE WITH CONSTRUCTION VEHICLES AND AN ATCT RADIO TO COMMUNICATE WITH GROUND CONTROL. ALL CROSSING GUARDS SHALL BE TRAINED IN ATCT GROUND
COMMUNICATIONS.
4. PHASES ARE TO BE COMPLETED SEQUENTIALLY IN ORDER UNLESS OTHERWISE APPROVED BY THE CM.
5. NO PARKED OR ACTIVE CONSTRUCTION EQUIPMENT OR STOCKPILE SHALL ENCROACH UPON THE RUNWAY VISUAL ZONE (RVZ)
OR ANY TAXIWAY OBJECT FREE AREA (TOFA).
6. WORK LIMITS SHOWN ARE BASED ON AWARD OF BID SCHEDULE B: BASE BID + BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS WILL BE PROVIDED.
FACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE WORK ELEMENTS
INCLUDED
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
PHASE 4 LIMITS
RUNWAY OBJECT FREE AREAROFA
BUILDING RESTRICTION LINEBRL
CONTRACTOR STAGING AREA
ACCESS HAUL ROUTE
AIRPORT SECURITY FENCEX
TAXIWAY OBJECT FREE AREATOFA
LOW-PROFILE BARRICADE
CONSTRUCTED ASPHALT
PAVEMENT
TAXIW
AY C
TAXIWAY C3
TEMPORARY SOIL TRACKING
PREVENTION DEVICE
COMPLETED
ASPHALT
PAVEMENT
EXISTING
TIE-DOWN (TYP)
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 7-
G
C O
N S
TR
U C
TI
O N
P H
A S
IN
G D
ET
A
IL
S .d w g
Th ur sd ay
D ec em be r
4, :5
9:
P M
B
ID
D O
C U
M
EN
TS
BARRICADE SHALL BE CENTERED ON
TAXILANE, TAXIWAY OR RUNWAY
CENTERLINE
STANDARD SOLAR-POWERED (OR
BATTERY-POWERED) 3-WAY 6
VOLT BARRICADE LIGHT WITH RED
LENS
ORANGE MOLDED BODY WITH
HIGHLY REFLECTIVE DIAGONAL,
ALTERNATING ORANGE AND WHITE
STRIPES
8'-0" (TYP.)
6"
6"
NOTES
1. MAXIMUM TOTAL HEIGHT OF BARRICADES SHALL NOT BE MORE THAN 18 INCHES.
2. TYPICAL BARRICADE SHALL BE PLACED, ALONG THE LIMITS OF THE PHASES OF WORK, AS SHOWN IN THESE PLANS TO DELINEATE THE CONTRACTOR'S WORK AREAS AND CLOSED RUNWAYS/TAXIWAYS/TAXILANES.
3. BARRICADES SHALL BE WATERFILLED TO SECURE AGAINST JET BLAST.
4. ALL BARRICADES SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A DAILY BASIS.
BARRICADES SHALL BE REPAINTED WHEN DEEMED APPROPRIATE BY THE CM. ALL LIGHT FIXTURES SHALL BE IN GOOD WORKING ORDER AND SHALL BE CHECKED BY THE CM. EACH BARRICADE MUST HAVE BOTH LIGHTS OPERATIONAL AT ALL TIMES. CONTRACTOR SHALL INSPECT ON A DAILY BASIS BEFORE THE CONTRACTOR
CEASES OPERATIONS FOR THE DAY.
5. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE EACH WEEK AND THE CONTRACTOR SHALL SWEEP THE ACCUMULATED DEBRIS AND REMOVE AND DISPOSE OF THE DEBRIS OFFSITE IN A LEGAL MANNER. THE
BARRICADES SHALL THEN BE RETURNED TO THE APPROPRIATE LOCATION.
6. CAUTION LIGHTS SHALL BE RED IN COLOR AND FLASHING DURING HOURS OF DARKNESS.
7. ALL LOW PROFILE BARRICADES ARE TO BE PLACED AT A MAXIMUM SPACING OF 4 FEET END TO END.
8. THE CONTRACTOR MAY SUBSTITUTE AN APPROVED EQUAL LOW PROFILE BARRICADE GENERALLY
CONFORMING TO THE ABOVE DETAILS AND CONFORMING TO THE SPECIFICATIONS.
9. COST OF FURNISHING AND MAINTAINING BARRICADES SHALL BE INCLUDED IN THE CONTRACTORS BID UNIT
COST FOR ITEM C-106-1.
10. CONTRACTOR SHALL SEPARATE THE CONSTRUCTION SITE AND AREAS IN WHICH NO PART OF AN AIRCRAFT MAY ENTER BY USING LOW-PROFILE BARRICADES THAT ARE MARKED WITH DIAGONAL, ALTERNATING
ORANGE AND WHITE STRIPES AND RED LIGHTS.
36"
36"
NOTES
1. VEHICULAR MARKINGS: CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE
MARKED WITH CHECKERED FLAGS AND/OR LIGHTED WITH FLASHING
BEACONS TO COMPLY WITH REQUIREMENTS OF FAA AC 150/5210-5D.
A) ALL CONSTRUCTION EQUIPMENT, SUCH AS DOZERS, BACKHOES,
GRADERS, END LOADERS, PANS, OFF-ROAD ARTICULATED DUMP
TRUCKS, TRADITIONAL DUMP TRUCKS STATIONED ON-SITE, PAVING
TRAIN EQUIPMENT, MILLING EQUIPMENT, AND SIMILAR EQUIPMENT,
SHALL BE MARKED WITH AN ORANGE/WHITE CHECKERED FLAG
ATTACHED TO THE HIGHEST STATIONARY PART OF THE PIECE OF
EQUIPMENT; ALL CONSTRUCTION EQUIPMENT OPERATING AT NIGHT OR
LOW VISIBILITY CONDITIONS SHALL BE LIGHTED WITH A YELLOW
FLASHING BEACON.
B) ALL OTHER CONSTRUCTION-RELATED VEHICLES, SUCH AS
SUPERVISOR'S VEHICLES, EQUIPMENT MAINTENANCE AND SUPPORT
VEHICLES (STEP VANS, ONE-TON PICK-UPS, ETC.), DUMP TRUCKS THAT
TRANSPORT MATERIALS BETWEEN OFF-SITE AND ON-SITE LOCATIONS,
AND SIMILAR EQUIPMENT, SHALL BE LIGHTED WITH A YELLOW FLASHING
BEACON THAT IS VISIBLE DURING BOTH LOW VISIBILITY AND DAYLIGHT
CONDITIONS AND MARKED WITH PERMANENT OR MAGNETIC PLACARDS
IDENTIFYING THE COMPANY NAME ON BOTH SIDES OF THE VEHICLE.
2. THE FLAG SHALL BE A 3 FOOT SQUARE HAVING A CHECKERED PATTERN OF
ORANGE AND WHITE SQUARES AT LEAST 1 FOOT ON EACH SIDE.
3. THE COST OF FLAGS AND FLAGGER OPERATIONS SHALL BE CONSIDERED
INCIDENTAL TO PAY ITEM ITEM C-106-1.
G451 203400
TBD
NEP
JAR
NCM
C O
N S
TR
U C
TI
O N
P H
A S
IN
G D
ET
A
IL
S
LOW-PROFILE BARRICADES1 SCALE: NTS
CONSTRUCTION SAFETY CHECKERED FLAG2 SCALE: NTS
TS
TO
FA
TO
FA
TSA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
BRL
BRL
BRL
B-11
B-12
B-10
B-14
B-13
L-15
TAXIWAY E
TOP OF BANK
TOE OF SLOPE
TOP OF BANK
TOE OF SLOPE
EXISTING EDGE OF
PAVEMENT
EXISTING
HELICOPTER PAD
EXISTING
WEST
RAMP
EXISTING EDGE
OF PAVEMENT
EXISTING AIRCRAFT TIE DOWN
ANCHOR TO BE REMOVED
(DETAIL 4 - SHEET C451, TYP.)
CONTRACTOR TO SEAL COAT
PAVEMENT FOLLOWING
PAVEMENT MARKING REMOVAL
EXISTING TIE-DOWN
MARKING (TYP.)
DEMOLIITION POINT TABLE
POINT #
NORTHING
819618.82
819648.32
819671.81
819539.11
819020.89
EASTING
699732.87
699726.37
699856.04
699891.55
700004.97
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 8_
C
0-
EX
IS
TI
N G
C O
N D
IT
IO
N S A
N D
S O
IL
B
O R
IN
G P
LA
N
S .d w g
Th ur sd ay
D ec em be r
4, :5
9:
P M
B
ID
D O
C U
M
EN
TS
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
S O
IL
B
O R
IN
G
A N
D D
EM
O
LI
TI
O N
P
LA
N
O
F 2)
C201 203400
TBD
NEP
JAR
NCMC201
KEY MAP
C202
603015
M A
TC
H
LI
N E, S
EE
S H
EE
T
C
SURVEY
CONTROL
POINT
NORTHING EASTING ELEVATION DESCRIPTION L.B. NO.
12 819251.83 699970.93 11.56 IRS TRAV 58 7203
13 819641.44 699813.84 11.70 IRS TRAV 58 7203
GRAPHIC SCALE IN FEET
NOTES:
1. SEE SHEETS C251-C252 FOR SOIL BORING
PROFILES.
2. FOR ADDITIONAL INFORMATION
REGARDING TESTING SAMPLES REFER TO
GEOTECHNICAL REPORT.
3. SEE ELECTRICAL SHEETS FOR ASSOCIATED
ELECTRICAL DEMOLITION WORK.
4. WORK LIMITS SHOWN ARE BASED ON
AWARD OF BID SCHEDULE B: BASE BID +
BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS
WILL BE PROVIDED.
LEGEND
REMOVE EXISTING
PAVEMENT MARKING
ASPHALT MILL-TIE
DETAIL 2, SHEET C451
TOPSOIL STRIPPING
L-XX
DCP TEST LOCATIONSB-XX
SURVEY CONTROL POINTXX
PAVEMENT CORE TEST
LOCATIONS
RUNWAY VISIBILITY ZONERVZ
BUILDING RESTRICTION LINEBRL
REMOVE EXISTING
TIE-DOWN ANCHOR
RS
A
RS
A
RS
A
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BR
L
BR
L
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
B-16/CBR-1
B-17
B-18
L-19 B-20
L-21
EXISTING EDGE OF
PAVEMENT
EXISTING EDGE OF
PAVEMENT
EXISTING
NON-MOVEMENT
AREA BOUNDARY
MARKINGS
EXISTING TAXIWAY
CENTERLINE MARKINGS EXISTING EDGE
OF PAVEMENT
TOP OF BANK
TOE OF SLOPE
EXISTING
WEST
RAMP
TAXIWAY C3
EXISTING AIRCRAFT TIE-DOWN
ANCHOR TO BE REMOVED
(DETAIL 4 - SHEET C451, TYP.)
CONTRACTOR TO SEAL COAT
PAVEMENT FOLLOWING
PAVEMENT MARKING REMOVAL
EXISTING TIE-DOWN
MARKING (TYP.)
DEMOLIITION POINT TABLE
POINT #
NORTHING
818683.26
818690.48
818637.87
818632.94
818625.12
818595.00
EASTING
699919.09
699931.12
699786.42
699783.82
699784.84
699735.04
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 8_
C
0-
EX
IS
TI
N G
C O
N D
IT
IO
N S A
N D
S O
IL
B
O R
IN
G P
LA
N
S .d w g
Th ur sd ay
D ec em be r
4, 1:
:0
PM
B
ID
D O
C U
M
EN
TS
C202 203400
TBD
NEP
JAR
NCM
M A
TC
H
LI
N E, S
EE
S H
EE
T
C
C201
KEY MAP
C202
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
S O
IL
B
O R
IN
G
A N
D D
EM
O
LI
TI
O N
P
LA
N
O
F 2)
LEGEND
NOTES:
1. SEE SHEETS C251-C252 FOR SOIL BORING
PROFILES.
2. FOR ADDITIONAL INFORMATION REGARDING
TESTING SAMPLES REFER TO
GEOTECHNICAL REPORT.
3. SEE ELECTRICAL SHEETS FOR ASSOCIATED
ELECTRICAL DEMOLITION WORK.
4. WORK LIMITS SHOWN ARE BASED ON
AWARD OF BID SCHEDULE B: BASE BID +
BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS WILL
BE PROVIDED.
RUNWAY VISIBILITY ZONERVZ
RUNWAY SAFETY AREARSA
RUNWAY OBJECT FREE AREAROFA
L-XX
DCP TEST LOCATIONSB-XX
SURVEY CONTROLXX
PAVEMENT CORE TEST
LOCATIONS
TAXIWAY OBJECT FREE AREATOFA
REMOVE EXISTING
PAVEMENT MARKING
ASPHALT MILL-TIE
DETAIL 2, SHEET C451
TOPSOIL STRIPPING
REMOVE EXISTING
TIE-DOWN ANCHOR
GRAPHIC SCALE IN FEET
15 30 60
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 9_
G
0- S O
IL
B
O R
IN
G P
R O
FI
LE
S .d w g
Th ur sd ay
D ec em be r
4, 1:
:1
PM
B
ID
D O
C U
M
EN
TS
C251 203400
TBD
S O
IL
B
O R
IN
G P
R O
FI
LE
S
O
F 2)
NEP
JAR
TGS
N
B10 11/14/2024
Y.PINO
AUTO
B-57 26.58817 -81.865931
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
BORING TERMINATED
AT DEPTH OF 10FT
N
B11 11/14/2024
Y.PINO
AUTO
B-57 26.588622 -81.866583
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN LIMESTONE
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
50/4"
N
B12 11/14/2024
Y.PINO
AUTO
B-57 26.588483 -81.866319
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND WITH
LIMEROCK (FILL)
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
N
B13 11/13/2024
Y.PINO
AUTO
B-57 26.587603 -81.865892
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SILTY SAND
WITH LIMEROCK (FILL)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
N
B14 11/14/2024
Y.PINO
AUTO
B-57 26.587865 -81.866103
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
N
B16 11/13/2024
Y.PINO
AUTO
B-57 26.58728 -81.865946
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
LIGHT BROWN LIMESTONE
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
50/5"
50/4"
N
B17 11/13/2024
Y.PINO
AUTO
B-57 26.586791 -81.866048
TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND WITH
SILT / WOOD (SP-SM)
BROWN SAND WITH WOOD
TRACE SHELL (SP)
LIGHT BROWN SAND TRACE
LIMESTONE TRACE SHELL (SP)
N
B18 11/13/2024
Y.PINO
AUTO
B-57 26.586428 -81.866049
TOPSOIL
LIGHT BROWN SAND WITH
LIMEROCK (FILL)
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND
TRACE LIMESTONETRACE SHELL (SP)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
N TOPSOIL
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND
WITH LIMEROCK (FILL)
LIGHT BROWN SAND
WITH LIMESTONETRACE SHELL (FILL)
N
B23 11/13/2024
Y.PINO
AUTO
B-57 26.585354 -81.867134
TOPSOIL
LIGHT BROWN SAND
WITH LIMEROCK (FILL)
LIGHT BROWN SAND (SP)
LIGHT BROWN SAND WITH
LIMESTONE TRACE SHELL (FILL)
N
B25 11/13/2024
Y.PINO
AUTO
B-57 26.585414 -81.867896
TOPSOIL
LIGHT BROWN SAND WITH LIMEROCK (FILL)
LIGHT BROWN SAND (SP)
BROWN SILTY SAND TRACE LIMESTONETRACE SHELL (SM)
LIGHT BROWN SAND TRACE LIMESTONETRACE SHELL (SP)
BROWN SILTY SAND TRACE LIMESTONETRACE SHELL (SM)
D
EP
TH
(F
EE
T)
D
EPTH
(FEET)
D
EP
TH
(F
EE
T)
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
N
ASPHALT/TOPSOIL
GRAVELLY SAND
SAND
SILTY SAND
LIMESTONE HARD
NOTES
1. STRATA BOUNDARIES ARE APPROXIMATE AND MAY
VARY BETWEEN OR AWAY FROM BORING LOCATIONS.
2. DEPTH SHOWN ARE IN FEET FROM EXISTING GROUND
SURFACE.
3. SPT N-VALUES SHOWN ABOVE WERE OBTAINED
USING AUTOMATIC HAMMERS. GENERALLY DESIGN
CORRELATIONS AND PROGRAMS USE SAFETY
HAMMERS N-VALUES. HENCE, THE ABOVE N-VALUES
NEED TO BE MULTIPLIED BY 1.24 TO OBTAIN
EQUIVALENT SAFETY HAMMER N-VALUES FOR
DESIGN PURPOSE.
4. THE LIMESTONE STRATA ENCOUNTERED WITHIN THE
PROJECT SITE CORRESPOND TO ROCK FORMATION
THAT TYPICALLY OFFER HIGH RESISTANCE TO
EXCAVATION AND DRILLING. SPECIAL EQUIPMENT
AND BREAKING TOOLS ARE TYPICALLY REQUIRED TO
EXCAVATE AND DRILL WITHIN THESE LIMESTONE
LAYERS. THESE LIMESTONE LAYERS ARE ALSO
DIFFICULT TO DEWATER DUE TO ITS HIGH POROSITY
AND PERMEABILITY.
5. THE SAND STRATA ENCOUNTERED IN THIS AREA IS
SOMETIMES MIXED WITH CEMENTED SAND AND
LIMESTONE THAT COULD OFFER HIGH RESISTANCE
AND LEAD TO CAVING SOILS. SPECIAL EQUIPMENT
AND/OR PROCEDURES MAY BE REQUIRED TO
EXCAVATE AND STABILIZE EXCAVATIONS.
6. SEASONAL HIGH GROUNDWATER TABLE (SHGWT)
ESTIMATED AT APPROXIMATELY 1 FOOT BELOW
EXISTING GRADE. THIS ELEVATION SHOULD BE USED
FOR DESIGN CONSIDERATIONS.
ENCOUNTERED WATER TABLE DURING DRILLING
NUMBERS TO THE LEFT OF BORINGS INDICATE
SPT VALUE FOR 12" PENETRATION. (UNLESS
OTHERWISE NOTED.)
LEGEND
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
BORE #
DATE
DRILLER
HAMMER
RIG
LATITUDE
LONGITUDE
B20 11/13/2024
Y.PINO
AUTO
B-57 26.585878 -81.866368
D
EPTH
(FEET)
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
BORING TERMINATED
AT DEPTH OF 10FT
SANDY SILT
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\0 9_
G
0- S O
IL
B
O R
IN
G P
R O
FI
LE
S .d w g
Th ur sd ay
D ec em be r
4, 1:
:2
PM
B
ID
D O
C U
M
EN
TS
C252 203400
TBD
S O
IL
B
O R
IN
G P
R O
FI
LE
S
O
F 2)
NEP
JAR
TGS
L-15 11/12/2024 26.587473 -81.866211
4" ASPHALT
6" LIMEROCK BASE
9" STABILIZED SUBGRADE
D
EP
TH
(F
EE
T)
D
EPTH
(FEET)
ASPHALT/TOPSOIL
LIMEROCK BASE
STABILIZED SUBGRADE
LEGEND
BORE #
DATE
LATITUDE
LONGITUDE
L-19 11/12/2024 26.586142 -81.866453
4.6" ASPHALT
7" LIMEROCK BASE
9" STABILIZED SUBGRADE
BORE #
DATE
LATITUDE
LONGITUDE
L-21 11/12/2024 26.585453 -81.866741
4.9" ASPHALT
6.5" LIMEROCK BASE
BORE #
DATE
LATITUDE
LONGITUDE
NOTES
1. STRATA BOUNDARIES ARE APPROXIMATE AND MAY
VARY BETWEEN OR AWAY FROM BORING LOCATIONS.
2. DEPTH SHOWN ARE IN FEET FROM EXISTING GROUND
SURFACE.
3. SPT N-VALUES SHOWN ABOVE WERE OBTAINED
USING AUTOMATIC HAMMERS. GENERALLY DESIGN
CORRELATIONS AND PROGRAMS USE SAFETY
HAMMERS N-VALUES. HENCE, THE ABOVE N-VALUES
NEED TO BE MULTIPLIED BY 1.24 TO OBTAIN
EQUIVALENT SAFETY HAMMER N-VALUES FOR
DESIGN PURPOSE.
4. THE LIMESTONE STRATA ENCOUNTERED WITHIN THE
PROJECT SITE CORRESPOND TO ROCK FORMATION
THAT TYPICALLY OFFER HIGH RESISTANCE TO
EXCAVATION AND DRILLING. SPECIAL EQUIPMENT
AND BREAKING TOOLS ARE TYPICALLY REQUIRED TO
EXCAVATE AND DRILL WITHIN THESE LIMESTONE
LAYERS. THESE LIMESTONE LAYERS ARE ALSO
DIFFICULT TO DEWATER DUE TO ITS HIGH POROSITY
AND PERMEABILITY.
5. THE SAND STRATA ENCOUNTERED IN THIS AREA IS
SOMETIMES MIXED WITH CEMENTED SAND AND
LIMESTONE THAT COULD OFFER HIGH RESISTANCE
AND LEAD TO CAVING SOILS. SPECIAL EQUIPMENT
AND/OR PROCEDURES MAY BE REQUIRED TO
EXCAVATE AND STABILIZE EXCAVATIONS.
6. SEASONAL HIGH GROUNDWATER TABLE (SHGWT)
ESTIMATED AT APPROXIMATELY 1 FOOT BELOW
EXISTING GRADE. THIS ELEVATION SHOULD BE USED
FOR DESIGN CONSIDERATIONS.
ROFA
TOFA
TOFA
TOFA
TOFA
TOFA
RVZ
RVZ
RVZ
BRL
BRL
BRL
BRL
±60'
TOP OF BANK
TOE OF SLOPE
TOP OF BANK
TOE OF SLOPE
EXISTING
WEST
RAMP
TA
XIW
AY E
C
C
C
C
EXISTING TIE-DOWN
MARKINGS (TYP)
PAVEMENT GEOMETRY POINT TABLE
POINT #
NORTHING
819617.18
819637.76
819642.09
EASTING
699731.47
699824.34
699843.87
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\1 0_
C
1-
PA
V
EM
EN
T
G
EO
M
ET
R Y
PL
A N
S .d w g
Th ur sd ay
D ec em be r
4, 1:
:3
PM
B
ID
D O
C U
M
EN
TS
C401 203400
TBD
PA
V
EM
EN
T
G
EO
M
ET
R Y
PL
A N
(1 O
F 2)
NEP
JAR
NCM
0 603015
M A
TC
H
LI
N E, S
EE
S H
EE
T
C
LEGEND
PROPOSED ASPHALT PAVEMENT
(ADDITIVE 1), DETAIL 1, C451
C401
KEY MAP
C402
RUNWAY VISIBILITY ZONERVZ
BUILDING RESTRICTION LINEBRL
PROPOSED ASPHALT
MILL-TIE, DETAIL 2, C451
PROPOSED SOD,
ARGENTINE BAHIA
GRAPHIC SCALE IN FEET
PROPOSED ASPHALT PAVEMENT
(BASE BID), DETAIL 1, C451
NOTES:
1. WORK LIMITS SHOWN ARE BASED ON
AWARD OF BID SCHEDULE B: BASE BID +
BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS
WILL BE PROVIDED.
RS
A
RS
A
RS
A
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RVZ
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
RO
FA
BR
L
BR
L
BR
L
BR
L
BR
L
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
±84'
TOP OF BANK
TOE OF SLOPE
EXISTING
WEST
RAMP
TAXIWAY C3
TAXIW
AY C
±57'
±79'
C
C
C
C
EXISTING TIE-DOWN
MARKINGS (TYP)
R=55'
RADIUS CENTER
N:818606.03 E:699787.47
PAVEMENT GEOMETRY POINT TABLE
POINT #
NORTHING
819014.51
818967.97
818697.86
818659.04
EASTING
699982.91
699972.74
699914.73
699772.68
0 603015
W
ES
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
R Ex p&
TW
s A 3D
R eh ab -D es ig n\ C A D
D -d w g
W
R E xp an si on
\1 0_
C
1-
PA
V
EM
EN
T
G
EO
M
ET
R Y
PL
A N
S .d w g
Th ur sd ay
D ec em be r
4, 1:
:4
PM
B
ID
D O
C U
M
EN
TS
C402 203400
PA
V
EM
EN
T
G
EO
M
ET
R Y
PL
A N
(2 O
F 2)
NEP
JAR
NCM
M A
TC
H
LI
N E, S
EE
S H
EE
T
C
C401
KEY MAP
C402
TBD
GRAPHIC SCALE IN FEET
LEGEND
PROPOSED ASPHALT PAVEMENT
(ADDITIVE 1), DETAIL 1, C451
RUNWAY VISIBILITY ZONERVZ
BUILDING RESTRICTION LINEBRL
PROPOSED ASPHALT
MILL-TIE, DETAIL 2, C451
PROPOSED SOD,
ARGENTINE BAHIA
PROPOSED ASPHALT PAVEMENT
(BASE BID), DETAIL 1, C451
TAXIWAY OBJECT FREE AREA
RUNWAY SAFETY AREARSA
RUNWAY OBJECT FREE AREAROFA
TOFA
NOTES:
1. WORK LIMITS SHOWN ARE BASED ON
AWARD OF BID SCHEDULE B: BASE BID +
BID ADDITIVE 1. IF BID SCHEDULE A IS
AWARDED REVISED PHASING SHEETS
T R A M
P
EX
PA
N
S
IO
N
DECEMBER 2025
LE
E
CO
UN
TY
P
OR
T
AU
TH
OR
IT
Y
FO
RT
M
YE
RS
, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O
N B Y
PR
O
JE
C T
N A M
E
S H
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
LCPA NO.:
JOB NO.:
DATE:
SHEET NO.:Y:
\P ro je ct s\
Le e
C ou nt y
Po rt
A ut ho ri ty
\P ag e Fi el d
(F M
Y) \2
0_ C A
_F M
Y W
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .