26-0044_-_Attachment_1_-_Cost_Proposal_sheet.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
26-0044 - Calibration Services for Ovens, Balances and Walk in Temperature controlled Storage Units (Sacramento County)
Solicitation number
0000039797
Issued by
Sacramento County, Sacramento City, West Sacramento City, California

About this file

This is a cost proposal sheet for IFB #26-0044, a calibration services contract with the California Department of Food and Agriculture (CDFA) in Sacramento County. The contract requires accredited ISO 17025 on-site calibration services for laboratory equipment including analytical and top-loading balances, ovens, water baths, temperature-controlled chambers, and walk-in refrigeration units. The scope encompasses up to 65 pieces of equipment annually across multiple facility locations (RA Prep, PDP, Environmental Monitoring, QA Lab, Workers Safety, and Residue areas). The equipment inventory includes 43 balance units from manufacturers such as Mettler, Ohaus, Sartorius, and Denver; multiple ovens and furnaces from Thermo Fisher and Fisher Scientific; two water baths; and six temperature monitoring devices including walk-in freezers and refrigerators requiring biennial calibration. The contract term spans three years with cost proposals required for annual calibration services, biennial calibration services, contingency costs for additional calibrations, and travel expenses across all three contract years.

Bidders must complete the cost proposal template with specific dollar amounts for each line item category, with all costs to be inclusive of labor, equipment, parts, materials, tools, licenses, permits, supervision, inspection, insurance, transportation, travel, and per diem expenses. Any blank cells in the cost proposal may result in rejection of the entire bid, and a zero dollar amount will be interpreted as the bidder performing services at no cost to the State. The cost proposal template prohibits any modifications, alterations, or additions, including company quotes or invoices, with such changes resulting in bid rejection. The proposal requires itemized annual costs for Years 1, 2, and 3, with separate line items for contingency calibrations and travel expenses, ultimately generating grand totals for each contract year.

View the file

Other files

File Type Posted
26-0044_IFB.pdf PDF
Attachment_2_-_Calibartion_items__-_2026_.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

COST PROPOSAL

IFB #26-0044

Complete this form and submit in accordance with the requirements of this IFB.

Bidder proposes that the services required in this IFB shall be provided to CDFA for the following cost:

Rate Sheet- Annual calibration
No.Column1MakeModelSerial NumberLocationBldg.Annual Calibration Cost Year 1Annual Calibration Cost Year 2Annual Calibration Cost Year 3
1Scale, 150 pbsRubbermaid4010068141RA PrepB
2BalanceOhausES6R06969296APRA PrepB
3BalanceMettlerPB3002-S1119501268PDPA
4BalanceMettlerPG3001-S1120101172PDPA
5BalanceMettlerAX205DR1122292661Env. MonitoringB
6BalanceMettlerXS2041122481711RAB
7OvenThermo FisherBF51794C-l1126393001190429RAB
8Water bathArninco2101014188-1RAB
9BalanceOhausEP21022691122372243QA LabA
10BalanceSartoriusCPA124S28650713RAB
11OvenThermo Fisher3608300211862RAB
12BalanceSartoriusE2000D36120065Env. MonitoringB
13BalanceSartoriusU4100S37100132Env. MonitoringB
14Oven ( Furnace)Fisher65()-5870300018RAB
15BalanceMettlerPB300738075Workers SafetyB
16BalanceDenverAA-200B034375PDPA
17BalanceDenverAA-200B034802ResidueA
18BalanceMettlerPC4400Bl2092Env. MonitoringB
19BalanceMettlerXS6002SB2332110525ResidueA
20BalanceMettlerXS204B540513839RAB
21BalanceMettlerXS204B551885106RAB
22BalanceMettlerXS6002SB733520718Env. MonitoringB
23BalanceMettlerXPE105DRB809473026Env. MonitoringB
24BalanceMettlerMS105DUB914477880RAB
25BalanceMettlerME54TB948662815RAB
26BalanceMettlerPE6000E48401RAB
27BalanceMettlerSM3000F87042Env. MonitoringB
28BalanceMettlerPJ4000G09916Workers SafetyB
29BalanceMettlerAE240H66430Env. MonitoringB
30BalanceMettlerAM50113430Env. MonitoringB
31BalanceMettlerAE200K54467Env. MonitoringB
32BalanceMettlerBB2400L46801QA LabB
33BalanceMettlerPM4000188813Env. MonitoringB
34BalanceMettlerPM600M87727Env. MonitoringB
35OvenThermo Fisher, OvenIso Temp42904214RAB
36BalanceSartoriusBCE124-544104095RAB
37BalanceMettlerXPR205C508569762QAB
38BalanceMettlerC512715603RAB
39Oven43408677RAB
40Water bathThermo300653231RAB
41OvenThermoOMH18042988723EA/RAB
42OvenVWREV6113RAB
43BalanceMettlerMX303C607153680Residue/CISA
Rate Sheet- Biennial Calibration
No.Column1MakeModelSerial NumberLocationBldg.Annual Calibration Cost Year 1Annual Calibration Cost Year 2Annual Calibration Cost Year 3
1Walk-in FreezerBally3478-2-C-PDX201648-01-FZRResidueA
2Walk-in FreezerCa. Food / AGCAF-A01QCS112917Env. MonitoringB
3Walk-in RefBally3478-3-ADX201648-01-FRIGResidueA
4Walk-in RefKolpakFS-193288690RReceiving RoomB
5Thermometer, mercuryERTCO0-100 celisusJ99164QA labA
6Thermometer, DigitalN/Aminus 40 celisus11440 & 13088QA labA
Cost Year 1Cost Year 2Cost Year 3
Total Expected Calibration:000
Rate Sheet - Contigency Cost
No.Column1MakeModelSerial NumberLocationBldg.Annual Calibration Cost Year 1Annual Calibration Cost Year 2Annual Calibration Cost Year 3
1Contingency- Additional Calibration required for 10 Balances, 1 scale, 10 Ovens, 5 water baths, 5 thermometers , 2 walk in refrigerators, 1 walk in freezerN/AN/AN/AN/AN/A
Cost Year 1Cost Year 2Cost Year 3
Total Contigency:000
Rate Sheet - Travel
No.Column1MakeModelSerial NumberLocationBldg.Annual Travel Cost Year 1Annual Travel Cost Year 2Annual Travel Cost Year 3
1TravelN/AN/AN/AN/AN/A
Cost Year 1Cost Year 2Cost Year 3
Total Travel:000
Total Calibration Year 10Total Calibration Year 20Total Calibration Year 30
Annual Travel Cost per Year 10Annual Travel Cost per Year 20Annual Travel Cost per Year 30
Annual Contigency per Year 10Annual Contigency per Year 20Annual Contigency per Year 30
Grand Total Year 10Grand Total Year 20Grand Total Year 30
*The above quantities are estimates only and are given as a basis for comparison of bids. No guarantee is made or implied as to the exact quantity that will be needed.

1. Cost proposal shall be inclusive of all labor, equipment, parts, devices, materials, tools, licenses, permits, supervision, inspection, insurance, transportation, travel and per diem, tax and every other item of expense necessary to provide the services listed in this IFBRFP.

2. Bidder is required to bid each line item on the cost proposal template. Failure to indicate a dollar amount (blank cell) in any item may be grounds to reject the entire group bid.

3. A Zero dollar amount ($0.00) listed for any andor all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State.

4. Changes or alterations to this cost proposal will result in your bid being rejected. No additions to this cost proposal shall be accepted. This includes company quotes or invoices.

File details come from the government source that posted it. Updated .