_25Z5AG8 Emergency Replace CMS Shop Row Roof Approved SOW 1.pdf

PDF 77 KB Posted

Attached to
FCI EL RENO ROOF REPLACEMENT (SUPPLYS)
Solicitation number
15B50725Q00000025
Issued by

About this file

This document is a Material Purchase document for an emergency roof replacement project at the Federal Correctional Institution (FCI) El Reno in Oklahoma. The procurement details 11 specific roofing material requirements, including 20 Bright Red Ridge Roll panels, various UPN Rake components, closure strips, utility panels, and screws. The materials are needed for in-house roof repairs, with specific requirements such as pitch specifications and color (Bright Red). Delivery of construction-related supplies is restricted to Monday through Friday between 7:30 AM and 2:00 PM, excluding federal holidays, and all supplies must be submitted with complete product detail sheets and specifications. The project is identified by the number 25Z5AG8 and is associated with the Department of Justice Bureau of Prisons Federal Correctional Institution El Reno.

View the file

Other files

File Type Posted
15B50725Q00000025 25Z5AG8 REPLACE SHOP ROW ROOFS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved 5/15/2025 SCRO

MATERIAL PURCHASE

EMERGENCY REPLACE CMS SHOP ROW ROOF

FCI EL RENO – PROJECT 25Z5AG8

I. REQURIEMENTS

A. Scope of Work

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) El Reno intends to purchase supplies and material for in-house roof repairs at FCI El Reno, located at 4205 Highway 66 West, El Reno, OK 73036.

All supplies and materials must be submitted with full product detail sheets and specifications.

B. Material and Supplies Requirements

1. 20 EA BRIGHT RED RIDGE ROLL #0222 MFG 8’X8’ FLAT (PITCH 120) @18 ft, 4in

2. 8 EA BRIGHT RED #1479 MFG UPN RAKE @19ft

3. 4 EA BRIGHT RED #1479 MFG UPN RAKE @12ft

4. 16 EA BRIGHT UPN TRANSITION #1479 MFG (PITCH 120 REQUIRED)

5. 260 EA 50’ 1/2” X 3/32” SEALANT TAPE GULF STATE

6. 332 EA INSIDE U PLANEL CLOSURE STRIP 6695-A211

7. 332 EA OUTSIDE U PLANEL CLOSURE STRIP 6695-A210

8. 94 EA BRIGHT RED SW #1 PVDF 3.22 RUN PURLIN BEARING UTILITY PANEL 26GA SHED ROOF @23FT

9. 238 EA BRIGHT RED SW #1 PVDF 3.22 RUN PURLIN BEARING UTILITY PANEL 26GA MAIN ROOF @36FT

10. 19500 EA BRIGHT RED 2 ½” WG #9 DECK SCREW

11. 9250 EA BRIGHT RED SW LAP TEK SELF DRILLING SCREW

C. Delivery of Supplies

1. Construction related deliveries which are directly shipped to the institution can be received between the hours of 7:30 AM - 2:00 PM, Monday - Friday, excluding federal holidays.

File details come from the government source that posted it. Updated .