25QB083 PWS J Hangar Compressor Sys REV1.docx
DOCX document 18 KB Posted
- Attached to
- Air Compressor System
- Solicitation number
- FA252125QB083A
About this file
This Performance Work Statement (PWS) details an air compressor system procurement for Patrick Space Force Base Hangar, focused on acquiring a comprehensive compressed air solution for mission-critical operations. The requirement specifies multiple compressor types, including a 100 HP QGV Rotary Air Compressor, a 10 HP QOF-10 Oil-Free Scroll Compressor, and a 20 HP Reciprocating Air Compressor, along with supporting equipment such as a 400-gallon air receiver tank, compressed air dryer, and filtration system. The system must meet strict specifications including specific air flow capacities, pressure ratings, noise levels, and ISO compliance, with installation requirements mandating proper mounting on concrete equipment pads, electrical connections by licensed professionals, and adherence to Patrick Space Force Base standards. The procurement is currently in a pre-solicitation phase, with the Department of the Air Force Space Command seeking capability statements from potential contractors, and the delivery will be FOB destination to Patrick Space Force Base in Florida, with a manufacturer's warranty including 10-year coverage for certain components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-903.pdf | ||
| P-906.pdf | ||
| P-902.pdf | ||
| P-504.pdf | ||
| P-503.pdf | ||
| P-502.pdf | ||
| P-106.pdf | ||
| P-905.pdf | ||
| 25QB083 Q and A.docx | DOCX document | |
| 25QB083 Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Air Compressor System Procurement for Parick Space Force Base Hangar 24 June 25
1.0 Scope
The objective of this requirement is to furnish and deliver and install a complete air compressor system suitable for installation and operation. This system shall support mission-critical operations by providing a reliable source of compressed utility and breathing air.
2.0 Background
The hangar operations require a high-efficiency, low-maintenance compressed air solution to support various applications. The system shall include rotary air compressors, an air receiver tank, air dryer, and filtration components, all compliant with USAF standards and energy-efficient specifications.
3.0 Requirements
3.1 Equipment Specifications
The contractor shall provide equipment that meets or exceeds the following minimum requirements:
· QGV Rotary Air Compressor
· 100 HP
· Capacity: Minimum 466.6 ACFM at 125 PSIG
· TEFC motor, variable speed drive, 10-year air end warranty
· Sound level: Max 75 dB(A)
· QOF-10 Oil-Free Scroll Compressor
· 10 HP
· Max Pressure: 145 PSIG
· Capacity: Minimum 24.2 ACFM
· Integrated refrigerated dryer
· ISO 8573-1 Class 0 certified
· Reciprocating Air Compressor
· 20 HP
· 64 ACFM @ 175 PSIG
· Mounted on a 120-gallon tank
· ODP premium efficiency motor
· Air Receiver Tank
· Capacity: 400 gallons
· Max Pressure: 165 PSIG
· Vertical configuration
· Compressed Air Dryer
· Capacity: 530 CFM
· Dew Point: 39°F
· Zero-loss drain and diagnostic display
· Compressed Air Filter
· Capacity: 700 CFM
· Filtration Rating: 0.003 PPM
· ISO-compliant housing
3.2 Delivery and Installation
· Delivery shall be FOB destination to the designated USAF facility Patrick SFB, Florida.
· Installation will require the installation of concrete equipment pads designed and constructed in accordance with applicable building codes and PSFB Standards. All compressor-related equipment will be securely anchored to these pads using vibration isolation mounts, as necessary, to minimize noise and vibration transmission.
· Make power connections to existing power systems to include breakers/fused disconnect IAW NEC, building codes and PSFB Standards and must be performed by a qualified licensed electrician.
· Making connections to existing air distribution lines must maintain system integrity and efficiency, adhering to applicable building codes and PSFB Standards. The fresh air inlet and exhaust louvers must be inspected to ensure proper operation and compliance with applicable building codes and PSFB Standards, including verification of adequate airflow and proper sealing to prevent air leakage."
3.3 Documentation The contractor shall provide the following:
· Technical manuals and warranty documents
· Dimensional drawings and maintenance guidelines
· Certification of ISO compliance for oil-free compressor components
· Certification of the breathing air system in accordance with applicable codes and PSFB Standards
4.0 Place of Performance Delivery Address:
Patrick Space Force Base (920th Supply address)
5.0 Warranty
Equipment must include the manufacturer’s standard warranties, including a 10-year warranty and 1-year full unit warranty including installation, where applicable.
File details come from the government source that posted it. Updated .