About this file
This document is Addendum #2 for Invitation to Bid (ITB) #2584-B for the Justice Center Buildout - Construction project issued by Fayette County, Georgia's Purchasing Department. The addendum modifies the original bid documents, providing clarifications and additional information for potential contractors. Key updates include a new bid submission deadline of 3:00 p.m. on Wednesday, July 2, 2025, and detailed technical clarifications regarding structural requirements, security hardware, wood finishes, and site modifications. The addendum addresses specific technical aspects such as man lift tower foundation requirements, bollard specifications, door hardware alternatives, and woodworking finish options.
The document introduces two formal alternates for bidders: Alternate No. 1 involves providing Best 12E and 1E Series rim and mortise cylinders with CORMAX 7-pin Small Format Interchangeable Cores for all locksets, while Alternate No. 2 allows substitution of mahogany with Sepele wood stained to match existing finishes. A contingency allowance of $250,000 is included in the bid schedule, with the county reserving the right to modify project scope and budget as necessary. The contract will be awarded to the responsive bidder submitting the lowest price, including base bid and any selected alternates. The addendum emphasizes that the contractor must coordinate closely with the architect and provide detailed submittals for approval throughout the renovation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IPG, Incorporated Project No. 2312
Renovation of Fayette County Justice Center
ADDENDA 009113 - 1
1.1 ADDENDUM
A. Addendum No. 2
1.2 PROJECT INFORMATION
A. Project Name: Renovation of Fayette County Justice Center
B. Owner: Fayette County Board of Commissioners
C. Architect: IPG, Incorporated.
D. Architect Project Number: 2312
E. Date of Addendum: 6/24/25
1.3 NOTICE TO BIDDERS
A. This Addendum is issued [to all registered plan holders ]pursuant to the [Instructions to Bidders] [and] [Conditions of the Contract]. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda.
Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
1.4 ATTACHMENTS
A. This Addendum includes the following attached Documents, Specifications, and Drawings:
1. Document : None
2. Specification Section:
a. 01 23 00 Alternates (new sheet)
b. 09 93 00 Staining and Transparent Finishing (re-issue)
3. Drawing Sheets:
a. X1.0 Cover Sheet (re-issue)
b. A0.00 Architectural Site Plan & Bldg Elevation (re-issue)
c. A0.01 Site Fencing (new sheet)
ADDENDA 009113 - 2
1.5 CLARIFICATIONS TO SPECIFICATIONS
A. Bid Schedule
1. Item #9 - Site Security Improvements Intended to limit vehicular access and proximity to
Justice Center building. (Traffic Bollards and landscape planter box Barriers.)
1) Remove from scope of work. Pricing for this item will be removed from
Contractor’s Bid Total.
b. Optional Deduct - from bid item #9 for substitute of Landscape Boulders (1000lb minimum) for concrete planter boxes.
1) Remove from scope of work. Pricing for this item will be removed from
Contractor’s Bid Total.
B. 08 7163 Security Hardware
1. Section 1.04 Approved Manufacturer
a. A.3 Add: AirTeq
a) Keying must match existing keying for existing holding cell locks.
b) Pneumatic Locks not required per cut sheet submitted.
c) Surface mounted locks not required per cut sheets submitted.
1.6 REVISIONS TO SPECIFICATIONS
A. 01 23 00 Alternates (new sheet)
1. Alternate 1: Door Hardware
a. Added
2. Alternate 2: Courtroom Decorative Woodworking
a. Added
B. 09 93 00 Staining and Transparent Finishing (re-issue)
1. Replace entire spec.
1.7 CLARIFICATIONS TO DRAWINGS
CIVIL SHEETS
A. C4.1 Site Plan 2
1. Remove all bollards , planters, and boulders from scope of work.
STRUCTURAL DRAWINGS
B. S1.01 Existing Tunnel Foundation Plan
1. General Note #8
a. “…GC to provide an allowance or unit cost for repairs associated with unknown conditions.”
1) Replace with:
a) Awarded Contractor will need to provide lump sum or unit prices for approval before proceeding with the work.
2. General Note #9
ADDENDA 009113 - 3
a. “…GC to provide an allowance or unit cost for repairs associated with unknown conditions.”
1) Replace with:
a) Awarded Contractor will need to provide lump sum or unit prices for approval before proceeding with the work.
ARCHITECTURAL DRAWINGS
C. A4.00 Enlarged Floor Plans
1. Detail 17
a. Revise basis of design to Won-door Fireguard FLP or approved equal.
b. 23” clear min. on striker required.
1.8 REVISIONS TO DRAWINGS
GENERAL DRAWINGS
A. X1.0 Cover Sheet (revised sheet)
1. Sheet Index
a. Added sheet A0.01 Site Fencing
ARCHITECTURAL DRAWINGS
B. A0.00 Architectural Site & Building Elevation (revised sheet)
1. Detail 2
a. Expanded Site plan to show designated contractor parking.
b. Added callout to Site Fencing Detail 1/A0.01
C. A0.01 Site Fencing (new sheet)
END OF DOCUMENT 009113
Renovation of Fayette County Justice Center 01 23 00 - 1 Alternates Addendum 2
SECTION 012300 - ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include, as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation, whether or not indicated as part of alternate.
B. Execute accepted alternates under the same conditions as other Work of the Contract.
C. Schedule: A Part 3 "Schedule of Alternates" Article is included at the end of this Section.
Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No.1: Door Hardware
1. Base Bid: Hardware as specified in Section 08 71 00 Door Hardware.
Justice Center 01 23 00 - 2 Alternates Addendum 2
a. Alternate: Provide an alternate proposal to provide Best 12E and 1E Series rim and mortise cylinders, complete with Best CORMAX, 7-pin, Small Format Interchangeable Cores (SFIC) for all locksets, exit devices, and mullions for entire facility. Alternate will include all required cylinders for this current scope of work in lieu of the cylinders specified in hardware sets above. A site survey of the facility will be required to determine specific requirements and cylinder quantities.
Coordinate site survey with Architect.
B. Alternate No.2: Courtroom Decorative Woodworking
1. Base Bid: Mahogany finished to match existing.
a. Alternate: Substitute wood species such as Sepele stained to match existing with the caveat that the installation cannot begin until the Design Professional has field approved the stained sample submitted.
END OF SECTION 012300
Justice Center 099300 - 1 Staining and Transparent
Finishing Addenda 2
IPG, Incorporated Project No. 2312 Renovation of Fayette County Justice Center
SECTION 099300
STAINING AND TRANSPARENT FINISHING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Field application of stains.
B. Field application of transparent finishes.
1.02 RELATED REQUIREMENTS
A. Section 099123 - Interior Painting: Stains and transparent finishes for concrete substrates.
1.03 REFERENCE STANDARDS
A. MPI (APSM) - Master Painters Institute Architectural Painting Specification Manual; Current
Edition.
1.04 SUBMITTALS
A. See Section 013000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide complete list of products to be used, with the following information for each:
1. Manufacturer's name, product name and catalog number, and general product category.
C. Samples: Two samples on actual wood substrate to be finished, 6 inch by 6 inch (____ by ____ mm) in size, indicating selected colors and sheens for each system, with specified coats cascaded. Compare samples to the existing architectural millwork in the building for approval.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section, with at least three years of documented experience.
B. Applicator Qualifications: Company specializing in performing work of the type specified and with at least three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.
B. Container Label: Include manufacturer's name, type of stain or transparent finish, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.
C. Stain and Transparent Finish Materials: Store at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in ventilated area, and as required by manufacturer's instructions.
1.07 FIELD CONDITIONS
A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by manufacturer of stains and transparent finishes.
B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Provide finishes from the same manufacturer to the greatest extent possible.
B. Transparent Finishes:
1. Behr Process Corporation; ____: www.behr.com/#sle.
2. Bona US; ____: www.bona.com/#sle.
3. Pittsburgh Paints; _____: www.ppgpaints.com/#sle.
Justice Center 099300 - 2 Staining and Transparent
Finishing Addenda 2
IPG, Incorporated Project No. 2312 Renovation of Fayette County Justice Center
4. Sherwin-Williams Company; ____: www.sherwin-williams.com/#sle.
C. Stains:
1. Behr Process Corporation; ____: www.behr.com/#sle.
2. Bona US; ____: www.bona.com/#sle.
3. Nova USA Wood Products; _____: www.novausawood.com/#sle.
4. Pittsburgh Paints; _____: www.ppgpaints.com/#sle.
5. Sherwin-Williams Company; ____: www.sherwin-williams.com/#sle.
2.02 STAINS AND TRANSPARENT FINISHES - GENERAL
A. Finishes:
1. Provide finishes capable of being readily and uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags.
2. Provide materials compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
3. Supply each finish material in quantity required to complete entire project's work from a single production run.
4. Do not reduce, thin, or dilute finishes or add materials unless such procedure is specifically described in manufacturer's product instructions.
B. Flammability: Comply with applicable code for surface burning characteristics.
C. Sheens: Provide the sheens specified; where sheen is not specified, sheen will be selected later by Architect from the manufacturer's full line.
D. Colors: To be selected from manufacturer's full range of available colors.
1. Selection to be made by Architect after award of contract.
2.03 INTERIOR STAIN AND TRANSPARENT FINISH SYSTEMS
A. Finish on Wood:
1. Sealer: Alkyd, sanding sealer, clear; MPI #102.
2. Top Coat: Polyurethane varnish, oil modified; MPI #56 or 57.
3. Top Coat Sheen:
a. Satin: MPI gloss level 4; use this sheen at all locations.
2.04 ACCESSORY MATERIALS
A. Accessory Materials: Cleaning agents, cleaning cloths, sanding materials, and clean-up materials as required for final completion of finished surfaces.
B. Patching Material: Latex filler.
C. Fastener Head Cover Material: Latex filler.
PART 3 EXECUTION
3.01 PREPARATION
A. Clean surfaces thoroughly and correct defects prior to application.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Remove or mask surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings, prior to preparing surfaces or finishing.
D. Wood Surfaces to Receive Transparent Finish: Wipe off dust and grit prior to sealing, seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after sealer has dried; sand lightly between coats. Prime concealed surfaces with gloss varnish reduced 25 percent with thinner.
Justice Center 099300 - 3 Staining and Transparent
Finishing Addenda 2
IPG, Incorporated Project No. 2312 Renovation of Fayette County Justice Center
3.02 APPLICATION
A. Apply products in accordance with manufacturer's written instructions and recommendations in
"MPI Architectural Painting Specification Manual".
B. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.
C. Apply each coat to uniform appearance in thicknesses specified by manufacturer.
D. Reinstall items removed prior to finishing.
3.03 CLEANING
A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site.
3.04 PROTECTION
A. Protect finishes until completion of project.
B. Touch-up damaged finishes after Substantial Completion.
END OF SECTION
T A N N E R C O N S U L T A N T S, I N C.
(678) 656-8832
BUFORD, GA 30519
3447 LAKE SEMINOLE PLACE
SECURITY
ARCHITECT
I P G , I N C O R P O R A T E D
2722 NORTH OAK STREET
VALDOSTA, GA 31602
(229) 242-3557
C R E W S E N G I N E E R I N G , I N C .
VALDOSTA, GA 31601
101 B, SOUTH PATTERSON STREET
STRUCTURAL
(229) 244-3100
FAYETTE COUNTY JUSTICE CENTER
RENOVATION
OF
FAYETTE COUNTY, GEORGIA
BID DOCUMENTS
architects & planners IPG, Incorporated
807 Northwood Park Drive Valdosta, Georgia 31602
T: 229.242.3557 F: 229.242.4339
E: mail@ipgarchitects.com www.ipgarchitects.com
FA
YE
TT
E
CO
U
N
TY
JU
ST
IC
E
CE
N
TE
R
RE
N
O
VA
TI
O
N
F
CE
N
TE
R D
RI
VE
, F
AY
ET
TE
VI
LL
E, G
A
FAYETTE COUNTY
RENOVATION
JUSTICE CENTER
Fayetteville, GABID DOCUMENTS
N B P E N G I N E E R S , I N C .
MACON, GA 31210-1152
316 CORPORATE PARKWAY
PLUMBING MECHANICAL ELECTRICAL
(478)745--1691
CONSULTANTS, LLC
TANNER HOSKINS
ELECTRONIC SECURITY
SYSTEMS, ELECTRICAL
& SECURITY HARDWARE X1.0
TITLE
SHEET
ELECTRICAL
INDEX TO DRAWINGS
ARCHITECTURAL FIRE PROTECTION PLUMBING MECHANICAL ELECTRICAL SECURITY
INTERIORS
CIVIL
GENERAL
STRUCTURAL
CIVIL
E M C E N G I N E E R I N G
103 N CENTER STREET
THOMASTON, GA 30286
(229) 244-0596
AutoCAD SHX Text
RE/ZA/RC/JB
AutoCAD SHX Text
RE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
JOB #
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text or reused without permission and credit.
AutoCAD SHX Text Architect and may not be reproduced
AutoCAD SHX Text IPG, Incorporated. 2025
AutoCAD SHX Text These drawings are the property of the
AutoCAD SHX Text c
AutoCAD SHX Text
14APRIL2025
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text
ROBERT F. EVANS, JR.
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text o.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X1.0 COVER SHEET
AutoCAD SHX Text A0.00 ARCHITECTURAL SITE & BUILDING ELEVATION A0.01 SITE FENCING A1.00 OVERALL FLOOR PLANS EXISTING/DEMO A1.01 OVERALL FLOOR PLANS LIFE SAFETY A2.00 SUB-SURFACE FLOOR LEVEL A2.01 FIRST FLOOR PLAN DEMO A2.02 SECOND FLOOR PLAN DEMO A2.03 THIRD FLOOR PLAN DEMO A2.06 FIRST FLOOR RCP DEMO A2.07 SECOND FLOOR RCP DEMO A2.08 THIRD FLOOR RCP DEMO A2.11 FIRST FLOOR PLAN NEW WORK A2.12 SECOND FLOOR PLAN NEW WORK A2.13 THIRD FLOOR PLAN NEW WORK A2.16 FIRST FLOOR RCP NEW WORK A2.17 SECOND FLOOR RCP NEW WORK A2.18 THIRD FLOOR RCP NEW WORK A3.00 INTERIOR PARTITION TYPES & DETAILS A3.03 OVERALL BUILDING SECTIONS A3.06 PARTIAL BUILDING WALL SECTIONS A3.07 PARTIAL BUILDING WALL SECTIONS A3.12 WALL SECTIONS & DETAILS A4.00 ENLARGED FLOOR PLANS A4.01 ENLARGED COURTROOM PLANS A4.02 ENLARGED COURTROOM PLANS A4.03 ENLARGED COURTROOM PLANS A4.12 DOOR SCHEDULE A4.13 DOOR TYPES & DETAILS A4.14 ALUMINUM FRAMES & DETAILS A5.00 INTERIOR ELEVATIONS A5.01 CASEWORK SECTIONS A5.02 COURTROOM INTERIOR ELEVATIONS A5.03 COURTROOM SECTIONS A5.04 COURTROOM DETAILS A5.05 COURTROOM INTERIOR ELEVATIONS A5.06 COURTROOM INTERIOR ELEVATIONS
AutoCAD SHX Text F0.01 LEGEND, SCHEDULE, NOTES, & DETAILS - FIRE PROTECTION F1.11 FIRST FLOOR PLAN - DEMOLITION - FIRE PROTECTION F1.21 SECOND FLOOR PLAN - DEMOLITION - FIRE PROTECTION F1.31 THIRD FLOOR PLAN - DEMOLITION - FIRE PROTECTION F2.11 FIRST FLOOR PLAN - NEW WORK - FIRE PROTECTION F2.21 SECOND FLOOR PLAN - NEW WORK - FIRE PROTECTION F2.31 THIRD FLOOR PLAN - NEW WORK - FIRE PROTECTION
AutoCAD SHX Text P0.01 LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING P0.10 DEMOLITION & NEW WORK NOTES - PLUMBING P1.01 BASEMENT FLOOR PLAN - DEMOLITION - PLUMBING P1.11 PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING P1.12 PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING P1.13 PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING P1.14 PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING P1.21 PARTIAL SECOND FLOOR PLAN - DEMOLITION - PLUMBING P1.22 PARTIAL SECOND FLOOR PLAN - DEMOLITION - PLUMBING P1.23 PARTIAL SECOND FLOOR PLAN - DEMOLITION - PLUMBING P1.24 PARTIAL SECOND FLOOR PLAN - DEMOLITION - PLUMBING P1.31 PARTIAL THIRD FLOOR PLAN - DEMOLITION - PLUMBING P1.32 PARTIAL THIRD FLOOR PLAN - DEMOLITION - PLUMBING P1.33 PARTIAL THIRD FLOOR PLAN - DEMOLITION - PLUMBING P1.34 PARTIAL THIRD FLOOR PLAN - DEMOLITION - PLUMBING P1.41 ROOF PLAN - DEMOLITION - PLUMBING P2.01 BASEMENT FLOOR PLAN - DEMOLITION - PLUMBING P2.11 PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING P2.12 PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING P2.13 PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING P2.14 PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING P2.21 PARTIAL SECOND FLOOR PLAN - NEW WORK - PLUMBING P2.22 PARTIAL SECOND FLOOR PLAN - NEW WORK - PLUMBING P2.23 PARTIAL SECOND FLOOR PLAN - NEW WORK - PLUMBING P2.24 PARTIAL SECOND FLOOR PLAN - NEW WORK - PLUMBING P2.31 PARTIAL THIRD FLOOR PLAN - NEW WORK - PLUMBING P2.32 PARTIAL THIRD FLOOR PLAN - NEW WORK - PLUMBING P2.33 PARTIAL THIRD FLOOR PLAN - NEW WORK - PLUMBING P2.34 PARTIAL THIRD FLOOR PLAN - NEW WORK - PLUMBING P2.41 ROOF PLAN - NEW WORK - PLUMBING P4.01 RISERS - PLUMBING P4.02 RISERS - PLUMBING P5.01 DETAILS - PLUMBING
AutoCAD SHX Text M0.01 ABBREVIATIONS, LEGEND, & SCHEDULE - HVAC M0.02 SCHEDULES - HVAC M0.03 SCHEDULES - HVAC M1.11 FIRST FLOOR PLAN - DEMOLITION - HVAC M1.21 SECOND FLOOR PLAN - DEMOLITION - HVAC M1.31 THIRD FLOOR PLAN - DEMOLITION - HVAC M1.41 ROOF PLAN - DEMOLITION - HVAC M2.11 FIRST FLOOR PLAN - NEW WORK - HVAC M2.21 SECOND FLOOR PLAN - NEW WORK - HVAC M2.31 THIRD FLOOR PLAN - NEW WORK - HVAC M2.41 ROOF PLAN - NEW WORK - HVAC M4.01 FLOW DIAGRAM - HVAC M5.01 DETAILS - HVAC M5.02 DETAILS - HVAC
AutoCAD SHX Text E0.01 LEGEND, & SCHEDULE - ELECTRICAL E0.10 DEMOLITION & NEW WORK NOTES - ELECTRICAL E1.01 BASEMENT FLOOR PLAN - DEMOLITION - LIGHTING E1.02 BASEMENT FLOOR PLAN - DEMOLITION - POWER E1.03 BASEMENT FLOOR PLAN - DEMOLITION - SYSTEMS/HVAC POWER E1.11 FIRST FLOOR PLAN - DEMOLITION - LIGHTING E1.12 FIRST FLOOR PLAN - DEMOLITION - POWER E1.13 FIRST FLOOR PLAN - DEMOLITION - HVAC POWER E1.21 SECOND FLOOR PLAN - DEMOLITION - LIGHTING E1.22 SECOND FLOOR PLAN - DEMOLITION - POWER E1.23 SECOND FLOOR PLAN - DEMOLITION - HVAC POWER E1.31 THIRD FLOOR PLAN - DEMOLITION - LIGHTING E1.32 THIRD FLOOR PLAN - DEMOLITION - POWER E1.33 THIRD FLOOR PLAN - DEMOLITION - HVAC POWER E1.41 ROOF PLAN - DEMOLITION - SYSTEMS/HVAC POWER E2.01 BASEMENT FLOOR PLAN - NEW WORK - LIGHTING E2.02 BASEMENT FLOOR PLAN - NEW WORK - POWER E2.03 BASEMENT FLOOR PLAN - NEW WORK - SYSTEMS/HVAC POWER E2.11 FIRST FLOOR PLAN - NEW WORK - LIGHTING E2.12 FIRST FLOOR PLAN - NEW WORK - POWER E2.13 FIRST FLOOR PLAN - NEW WORK - HVAC POWER E2.21 SECOND FLOOR PLAN - NEW WORK - LIGHTING E2.22 SECOND FLOOR PLAN - NEW WORK - POWER E2.23 SECOND FLOOR PLAN - NEW WORK - HVAC POWER E2.31 THIRD FLOOR PLAN - NEW WORK - LIGHTING E2.32 THIRD FLOOR PLAN - NEW WORK - POWER E2.33 THIRD FLOOR PLAN - NEW WORK - HVAC POWER E2.34 THIRD FLOOR PLAN - NEW WORK - AV INFRASTRUCTURE E2.41 ROOF PLAN - NEW WORK - SYSTEMS/HVAC POWER E6.01 RISER - ELECTRICAL E7.01 DETAILS - ELECTRICAL E8.01 PANELBOARD SCHEDULES - ELECTRICAL E8.02 PANELBOARD SCHEDULES - ELECTRICAL E8.03 PANELBOARD SCHEDULES - ELECTRICAL E8.04 PANELBOARD SCHEDULES - ELECTRICAL E8.05 PANELBOARD SCHEDULES - ELECTRICAL E8.06 PANELBOARD SCHEDULES - ELECTRICAL E8.07 PANELBOARD SCHEDULES - ELECTRICAL E8.08 PANELBOARD SCHEDULES - ELECTRICAL
AutoCAD SHX Text T0.01 LEGEND AND GENERAL NOTES - LOW VOLTAGE & SECURITY T0.02 LEGEND AND GENERAL NOTES - LOW VOLTAGE & SECURITY SHEET 2 T0.03 LEGEND AND GENERAL NOTES - LOW VOLTAGE & SECURITY SHEET 3 T2.11 FIRST FLOOR PLAN NEW WORK T2.12 SECOND FLOOR PLAN NEW WORK T2.13 THIRD FLOOR PLAN NEW WORK T3.11 LARGE SCALE LAYOUTS NEW WORK T4.11 CCTV DETAILS SHEET ONE NEW WORK FA.21 THIRD LEVEL FIRE ALARM NEW WORK FA.22 THIRD LEVEL FIRE ALARM NEW WORK EX.11 SUB SURFACE EXISTING CAMERA LOCATIONS SUB SURFACE EXISTING CAMERA LOCATIONS EX.12 FIRST FLOOR EXISTING CAMERA LOCATIONS FIRST FLOOR EXISTING CAMERA LOCATIONS EX.13 SECOND LEVEL EXISTING CAMERA LOCATIONS SECOND LEVEL EXISTING CAMERA LOCATIONS
AutoCAD SHX Text ID2.00 FINISH SCHEDULES & INDEX ID2.01 FIRST FLOOR INTERIOR FINISHES PLAN ID2.02 SECOND FLOOR INTERIOR FINISHES PLAN ID2.03 THIRD FLOOR INTERIOR FINISHES PLAN
AutoCAD SHX Text
- COVER SHEET - SITE DEVELOPMENT PLANS COVER SHEET - SITE DEVELOPMENT PLANS C2.0 GENERAL NOTES GENERAL NOTES C3.0 EXISTING CONDITIONS & DEMOLITION PLAN EXISTING CONDITIONS & DEMOLITION PLAN C4.0 SITE PLAN SITE PLAN C4.1 SITE PLAN (2) SITE PLAN (2) C5.0 PAVING, GRADING, & DRAINAGE PLAN PAVING, GRADING, & DRAINAGE PLAN C6.0 CONSTRUCTION DETAILS CONSTRUCTION DETAILS - COVER SHEET - EROSION, SEDIMENT, & POLLUTION CONTROL PLANS COVER SHEET - EROSION, SEDIMENT, & POLLUTION CONTROL PLANS EC2.0 INITIAL PHASE EROSION CONTROL PLAN INITIAL PHASE EROSION CONTROL PLAN EC3.0 INTERMEDIATE PHASE EROSION CONTROL PLAN INTERMEDIATE PHASE EROSION CONTROL PLAN EC4.0 FINAL PHASE EROSION CONTROL PLAN FINAL PHASE EROSION CONTROL PLAN EC5.0 HYDROLOGY PLAN HYDROLOGY PLAN EC6.0 EROSION CONTROL NOTES EROSION CONTROL NOTES EC6.1 EROSION CONTROL NOTES EROSION CONTROL NOTES EC7.0 EROSION CONTROL DETAILSEROSION CONTROL DETAILS
AutoCAD SHX Text
S101 EXISTING TUNNEL FOUNDATION PLAN EXISTING TUNNEL FOUNDATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
ADD 2 6/24/25
AutoCAD SHX Text
BID DOCUMENTS
architects & planners IPG, Incorporated
807 Northwood Park Drive Valdosta, Georgia 31602
T: 229.242.3557 F: 229.242.4339
E: mail@ipgarchitects.com www.ipgarchitects.com
FA
YE
TT
E
CO
U
N
TY
JU
ST
IC
E
CE
N
TE
R
RE
N
O
VA
TI
CE
N
TE
R D
RI
VE
, F
AY
ET
TE
VI
LL
E, G
A
FAYETTE COUNTY
RENOVATION
JUSTICE CENTER
Fayetteville, GA
NORTHWEST ELEVATION
A0.00
ARCHITECTURAL
SITE & BLDG
ELEVATION
CONTRACTOR ACCESS STAGING PARKING FLAGPOLE DETAIL
AutoCAD SHX Text
RE/ZA/RC/JB
AutoCAD SHX Text
RE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
JOB #
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text or reused without permission and credit.
AutoCAD SHX Text Architect and may not be reproduced
AutoCAD SHX Text IPG, Incorporated. 2025
AutoCAD SHX Text These drawings are the property of the
AutoCAD SHX Text c
AutoCAD SHX Text
14APRIL2025
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text
ROBERT F. EVANS, JR.
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text o.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.5
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4.4
AutoCAD SHX Text 4.5
AutoCAD SHX Text
AutoCAD SHX Text 5.5
AutoCAD SHX Text
AutoCAD SHX Text
ELEV:
AutoCAD SHX Text
THIRD LEVEL F.F.
AutoCAD SHX Text 977'-4"
AutoCAD SHX Text
ELEV:
AutoCAD SHX Text
SUB-SURFACE LEVEL F.F.
AutoCAD SHX Text 936'-6"
AutoCAD SHX Text
ELEV:
AutoCAD SHX Text
FIRST LEVEL F.F.
AutoCAD SHX Text 948'-0"
AutoCAD SHX Text
ELEV:
AutoCAD SHX Text
SECOND LEVEL F.F.
AutoCAD SHX Text 962'-8"
AutoCAD SHX Text
ELEV:
AutoCAD SHX Text
ROOF LEVEL T.O.S.
AutoCAD SHX Text 992'-8"
AutoCAD SHX Text 15'-4"
AutoCAD SHX Text 14'-8"
AutoCAD SHX Text 14'-8"
AutoCAD SHX Text 11'-6"
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text 16'
AutoCAD SHX Text 24'
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text A0.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A3.03
AutoCAD SHX Text
AutoCAD SHX Text 25'
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text 150'
AutoCAD SHX Text
SCALE: 1"=50'-0"
AutoCAD SHX Text A0.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A0.00
AutoCAD SHX Text
3RD LEVEL ACCESS.
AutoCAD SHX Text CONTRACTOR LAYDOWN AREA AND POTENTIAL PARKING LIMITS TO BE CONFIRMED w/ COUNTY.
AutoCAD SHX Text
NEW FENCE - SEE CIVIL.
AutoCAD SHX Text TEMPORARY CONSTRUCTION ELEVATOR. CONTRACTOR COORD. POWER w/ EXIST UTILITIES.
AutoCAD SHX Text CONTRACTOR CAREFULLY REMOVE & PROTECT (2) WINDOWS. THEY SITE BELOW HEADER BEAM AND WERE DESIGNED TO PROVIDE FUTURE CONTRACTOR ACCESS. STORE TO PROTECT. RE-INSTALL AT COMPLETION OF WORK.
AutoCAD SHX Text
$AUDIT_BAD_BLOCK
AutoCAD SHX Text INSTALL TEMPORARY GATE FOR CONSTRUCTION EXIT AND REPLACE WITH PERMANENT SECURITY FENCE AT END OF CONSTRUCTION
AutoCAD SHX Text
INSTALL TEMPORARY CONSTRUCTION FENCE TO REMAIN UNTIL END OF CONSTRUCTION
AutoCAD SHX Text
LANDSCAPE AREA
AutoCAD SHX Text
EXIST FENCE
AutoCAD SHX Text A0.00
AutoCAD SHX Text
AutoCAD SHX Text CONTRACTOR TO SEAL OPENING IN FLAGPOLE ASSEMBLY, WHICH ALLOWS OPERATING CABLE, RAISING & LOWERING FLAG, TO MOVE FREELY. PROVIDE RUBBER BOOT WHERE CABLING PROTRUDES FROM FLAGPOLE ASSEMBLY.
AutoCAD SHX Text
AutoCAD SHX Text 4"
AutoCAD SHX Text 8"
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text
SCALE: 1 1/2"=1'-0"
AutoCAD SHX Text
FLAG POLE
AutoCAD SHX Text
DRAW BAND
AutoCAD SHX Text
EXIST DRAW BAND
AutoCAD SHX Text
RIVIT WITH SEALANT
AutoCAD SHX Text
EXIST METAL WATER-TIGH UMBRELLA TO MATCH ROOFING MATERIAL
AutoCAD SHX Text
EXIST TWO PIECE BASE FLASHING - TYP.
AutoCAD SHX Text
PROVIDE NEW SEALANT @ CIRCUMFERENCE
AutoCAD SHX Text
ACCESS PORT TO FLAG RAISING/LOWERING SYSTEM
AutoCAD SHX Text A3.12
AutoCAD SHX Text
AutoCAD SHX Text
VEHICLE GATE
AutoCAD SHX Text
(+-) 75 PARKING SPACES
AutoCAD SHX Text
VEHICLE GATE
AutoCAD SHX Text
GREY HATCHED AREA DESIGNATED CONTRACTOR PARKING
AutoCAD SHX Text 30'-0"
AutoCAD SHX Text
INSTALL ± 285 LFPERIMETER SECURITY FENCE
AutoCAD SHX Text
FUTURE PARKING
AutoCAD SHX Text
TEMPORARY CONSTRUCTION ELEVATOR
AutoCAD SHX Text
DEMO FOR FUTURE PARKING
AutoCAD SHX Text
TREE LINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A0.01
AutoCAD SHX Text
AutoCAD SHX Text
ADD 2 6/24/25
1 SITE FENCING MODIFICATIONS
SCALE: 1" = 10'-0"A0.01
TANK
SECTION - TYPICAL PERIMETER FENCE
SCALE: 3/8" = 1'-0"
A0.01
3447 Lake Seminole Place Buford, Georgia 30519 www.tannerhoskins.com ftanner@tannerhoskins.com 678-656-8832 mobile
ENGINEERING
TANNER HOSKINS
ELECTRONIC SECURITY
SYSTEMS, ELECTRICAL,
LOW VOLTAGE &
CONSULTANTS, LLC
© Tanner Hoskins Consultants, LLC
SECURITY HARDWARE
BID DOCUMENTS
architects & planners IPG, Incorporated
807 Northwood Park Drive Valdosta, Georgia 31602
T: 229.242.3557 F: 229.242.4339
E: mail@ipgarchitects.com www.ipgarchitects.com
FA
YE
TT
E
CO
U
N
TY
JU
ST
IC
E
CE
N
TE
R
RE
N
O
VA
TI
CE
N
TE
R D
RI
VE
, F
AY
ET
TE
VI
LL
E, G
A
FAYETTE COUNTY
RENOVATION
JUSTICE CENTER
Fayetteville, GA
ADD 2 6/24/25
SITE
FENCING
A0.01
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
INSTALL +/- 285LF
AutoCAD SHX Text
PERIMETER SECURITY
AutoCAD SHX Text
FENCE. SEE CIVIL
AutoCAD SHX Text
DEMO +/- 162LF
AutoCAD SHX Text
PERIMETER FENCE.
AutoCAD SHX Text
SEE CIVIL ADDENDA DWGS
AutoCAD SHX Text
FIELD VERIFY
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
INSTALL TEMPORARY
AutoCAD SHX Text
20' WIDE DOUBLE GATE
AutoCAD SHX Text
PADLOCK. SEE CIVIL
AutoCAD SHX Text
DWGS. FIELD VERIFY
AutoCAD SHX Text
(2) SWING GATES WITH
AutoCAD SHX Text
TEMPORARY CONSTRUCTION
AutoCAD SHX Text
FENCE. SEE CIVIL DWGS
AutoCAD SHX Text
DEMO +/- 162LF
AutoCAD SHX Text
PERIMETER FENCE.
AutoCAD SHX Text
SEE CIVIL ADDENDA
AutoCAD SHX Text
DWGS. FIELD VERIFY
AutoCAD SHX Text
ADDENDA DRAWINGS
AutoCAD SHX Text
FIELD VERIFY
AutoCAD SHX Text
INSTALL +/- 285LF
AutoCAD SHX Text
PERIMETER SECURITY
AutoCAD SHX Text
FENCE. SEE CIVIL
AutoCAD SHX Text
ADDENDA DRAWINGS
AutoCAD SHX Text
FIELD VERIFY
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
DEMO +/- 162LF
AutoCAD SHX Text
PERIMETER FENCE.
AutoCAD SHX Text
SEE CIVIL ADDENDA
AutoCAD SHX Text
DWGS. FIELD VERIFY
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text X
AutoCAD SHX Text
24" WIDE
AutoCAD SHX Text
RUN ROCK
AutoCAD SHX Text
CRUSHER
AutoCAD SHX Text
TYPICAL 12 FOOT
AutoCAD SHX Text
3" LINE POST
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text 10"
AutoCAD SHX Text 3"
AutoCAD SHX Text
FOOTING
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text
BOTTOM RAIL
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text
BREAK-AWAY BRACKETS
AutoCAD SHX Text
BARBED WIRE
AutoCAD SHX Text
WITH 3 STRANDS OF
AutoCAD SHX Text
WIRE (CONTINUOUS)
AutoCAD SHX Text
EACH SIDE
AutoCAD SHX Text
BREAKAWAY EXTENSION ARM
AutoCAD SHX Text
FENCE FABRIC
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
CHAIN LINK
AutoCAD SHX Text
CENTER RAIL
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text
TOP RAIL
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text
CONTINUOUS BARBED
AutoCAD SHX Text
TAPE - 1-30" DIA. COIL
AutoCAD SHX Text
THREE STRAND BARBED
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
THESE DRAWINGS ARE COPYRIGHTED AND THE PROPERTY
AutoCAD SHX Text
OF THE COMPANY TANNER HOSKINS CONSULTING, LLC.
AutoCAD SHX Text
THESE DRAWINGS SHALL NOT BE REPRODUCED, PUBLISHED
AutoCAD SHX Text
OR USED IN ANY WAY WITHOUT WRITTEN PERMISSION AND
AutoCAD SHX Text
CREDIT FROM THC,LLC.
AutoCAD SHX Text
FT/CT
AutoCAD SHX Text
FT
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
JOB #
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
REV.
AutoCAD SHX Text or reused without permission and credit.
AutoCAD SHX Text Architect and may not be reproduced
AutoCAD SHX Text IPG, Incorporated. 2023
AutoCAD SHX Text These drawings are the property of the
AutoCAD SHX Text c
AutoCAD SHX Text
14APRIL2025
Frank Wright Rob Seal/Stamp
File details come from the government source that posted it. Updated .