25617_Price_Sheet.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Upholstery Services
Solicitation number
25617-ITB-MST
Issued by
Florida

About this file

This is a price sheet for an ITB (Invitation to Bid) for upholstery services issued by HCPS (Hillsborough County Public Schools) in Florida. The procurement covers upholstering and re-upholstering services for accordion walls and doors, including all related labor, materials, supervision, equipment, and incidental items necessary to complete the work. The bid includes five line items: minor consumables such as adhesives, tapes, staples, nails, screws, and fasteners; installation services with an estimated annual usage of 250 square yards, which encompasses removal of old fabric, cleaning, preparation, new fabric installation, and disposal of existing materials; fabric provision with an estimated annual usage of 250 square yards; personnel lifts with capability up to 20 feet available on an as-needed hourly basis; and scissor lifts with capability up to 20 feet available on an as-needed hourly basis.

Bidders must complete the price sheet in the designated blue sections with typed responses only, with no handwritten entries permitted. Pricing terms require vendors to provide costs for fabric materials on a cost-plus basis with a markup percentage that cannot exceed 15 percent. The price sheet specifies that all consumables, labor, equipment, and materials necessary to complete projects must be included in the bid. Vendors must submit comprehensive pricing for all five line items to be considered responsive to the ITB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

Title: 25617-ITB-MST Upholstery Services
Vendor Name:
Please complete the blue sections. No Hand Written Responses
DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF
ItemDESCRIPTIONEstimated Annual UsageUnit of MeasureCost
The bid shall include all minor consumables, such as adhesives, tapes, staples, nails, screws, and fasteners needed to complete the project.
1Installation - Includes removal of old fabric, proper cleaning, preparation, new fabric installation, disposal of existing wall or door fabric.250Square Yard
2Fabric- Provide a cost plus a mark-up percentage for fabric materials250Square Yard
3Personnel Lift with Capability up to 20 feetAs NeededHourly
4Scissor Lift with Capability up to 20 feetAs NeededHourly
5Cost plus mark up based on vendors price. Cannot exceed 15%As Needed%

Sheet1

File details come from the government source that posted it. Updated .