25421_32nd_Ave_100%_ConstPlans.pdf
PDF 31 MB Posted
- Attached to
- 32nd Avenue Bike Lanes
- Solicitation number
- ITB-25-031
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This document is a comprehensive construction plan set for the 32nd Avenue Bike Lanes project, developed by the City of Wheat Ridge and the Colorado Department of Transportation (CDOT) in Jefferson County, Colorado. The project involves extending bike facilities from Wright Court to west of I-70, including improvements through the Zinnia Street intersection, with bike lane detection at traffic signals. The construction plan includes detailed design specifications for roadway modifications, including pavement widths, curb and gutter adjustments, retaining wall modifications, and slope paving under I-70. The project scope involves restriping and lane reconfiguration, with a planned completion time of 65 working days.
The project will involve mill and overlay of existing asphalt, installation of new bike lanes, adjustments to traffic signals and signage, and implementation of stormwater management and erosion control measures. Funding appears to be through municipal and state transportation budgets, with the project involving multiple utility coordination points including Comcast, Consolidated Mutual Water, Jefferson Public School District, Northwest Lakewood Sanitation, Xcel Energy, and Zayo. The construction plans detail specific technical requirements, including pavement section details, storm drainage improvements, traffic control strategies, and environmental compliance measures such as native seeding and inlet protections.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32ND AVE
I7
EB
I7
W B
YO
U
N G
FI
EL
D S
T
C
LE
AR
C
R
EE
K D
R
AL
KI
R E
ST
ZI
N
N
IA
C T
ZI
N
N
IA
S T
N Z
IN
N
IA
C
T
AL
KI
R E
C T
XE
N
O N
S T
W R
IG
H
T C
T
W R
IG
H
T
ST
W
AR
D C
T
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
PROJECT LOCATION MAP
Feet 0 500 1000
PROJECT
AREA
CITY OF WHEAT RIDGE
32ND AVENUE BIKE LANES @ I-70 IMPROVEMENT PLANS
CDOT PROJECT NO. ARPA M361-011
CONSTRUCTION PROJECT CODE NO. 25421
JEFFERSON COUNTY, COLORADO
Related Project:
P.E. UNDER PROJECT:
Project Number FBR 0703-469 Project Code: 23673
R.O.W. Projects:
Project Number: N/A Project Code: N/A
CONTACTS
COMCAST
8000 E ILIFF AVE
DENVER, CO 80231
CONTACT: TIM WILLINGHAM
PHONE: (720)-648-3041
CONSOLIDATED MUTUAL
WATER
12700 W 27TH AVE
LAKEWOOD, CO 80215
OFFICE: (303)-274-7406
JEFFERSON PUBLIC SCHOOL
DISTRICT (FACILITIES)
13341 W 2ND PL
LAKEWOOD, CO 80228
CONTACT: MIKE WALKER
PHONE: (909)-455-6163
NORTHWEST LAKEWOOD
SANITATION
141 UNION BLVD
#150
LAKEWOOD, CO 80228
CONTACT: ISMAEL GOMEZ
PHONE: (303)-653-7305
XCEL ENERGY BLCO
1800 LARIMER ST
DENVER, CO 80202
OFFICE: 1-800-628-2121
XCEL ENERGY
1800 LARIMER ST
DENVER, CO 80202
CONTACT: GREG ORTICELLE
PHONE: (303)-416-2449
ZAYO
1805 29TH ST
BOULDER, CO 80301
CONTACT: ERIC BOE
PHONE: (719)-649-3675
CONTACT: JAMES BLACK
PHONE: (719)-216-8508
STANDARD PLAN NO.STANDARD
M-100-1
M-208-1
M-203-1
M-203-2
M-203-11
STANDARD SYMBOLS (3 SHEETS)
APPROACH ROADS
DITCH TYPES
M-203-12
M-206-1
M-206-2
M-214-1
M-412-1
M-510-1
M-601-1
M-601-2
M-601-3
M-601-10
M-601-11
M-601-12
M-601-20
M-603-1
M-603-2
M-603-3
M-603-10
M-604-10
M-604-11
M-604-12
M-604-13
M-604-20
M-605-1
SUPERELEVATION STREETS (2 SHEETS)
EXCAVATION AND BACKFILL FOR BRIDGES (2 SHEETS)
CONCRETE PAVEMENT JOINTS (9 SHEETS)
STRUCTURAL PLATE PIPE H-20 LOADING
HEADWALL FOR PIPES
TYPE "S" SADDLE HEADWALLS FOR PIPE
HEADWALLS AND PIPE OUTLET PAVING
REINFORCED CONCRETE PIPE
PRECAST CONCRETE BOX CULVERT
INLET, TYPE C
INLET, TYPE D
CURB INLET TYPE R (2 SHEETS)
CONCRETE INLET TYPE 13
MANHOLES (3 SHEETS)
SUBSURFACE DRAINS
1-3
M-607-1
M-607-2
M-607-3
M-607-4
M-607-10
M-608-1
M-609-1
M-611-1
M-615-1
M-615-2
M-616-1
M-620-1
M-620-2
M-620-11
M-620-12
WIRE FENCES AND GATES (3 SHEETS)
CHAIN LINK FENCE (3 SHEETS)
BARRIER FENCE
PICKET SNOW FENCE
CURB RAMPS (10 SHEETS)
CATTLE GUARD (2 SHEETS)
EMBANKMENT PROTECTOR TYPE 3
EMBANKMENT PROTECTOR TYPE 5
INVERTED SIPHON
FIELD LABORATORY CLASS 1
FIELD OFFICE CLASS 1
FIELD OFFICE CLASS 2
M-210-1 MAILBOX SUPPORTS (2 SHEETS)
M-614-1 RUMBLE STRIPS (3 SHEETS)
M-629-1 SURVEY MONUMENTS (2 SHEETS)
19-29
17-18
30-31
35-39
41-42
43-44
45-46
52-55
67-68
70-72
GUARDRAIL TYPE 7 F-SHAPE BARRIER (4 SHEETS)M-606-13
138-147
148-151
152-153
156-158
169-170
73-77VANE GRATE INLET (5 SHEETS)M-604-25
PRECAST TYPE 7 CONCRETE BARRIER (4 SHEETS)M-606-14
ROAD CLOSURE GATE (9 SHEETS)M-607-15
15-16
159-160SAND BARREL ARRAYS (2 SHEETS)M-614-2
S-614-40 219-223
TUBULAR STEEL SIGN SUPPORT DETAILS (7 SHEETS)S-614-8 198-204
290-313
281-289
255-266S-614-50
224-227
211-214
196-197
194-195
191-193
187-188
171-178DELINEATOR INSTALLATIONS (8 SHEETS)
FLASHING BEACON (PORTABLE) DETAILSS-630-3
PAVEMENT MARKINGS (11 SHEETS)
TYPICAL MULTI-SIGN INSTALLATIONS
TYPICAL POLE MOUNT SIGN INSTALLATIONS
FLASHING BEACON AND SIGN INSTALLATIONS (4 SHEETS)
MARKER ASSEMBLY INSTALLATIONS
CLASS III SIGNS (3 SHEETS)
CLASS II SIGNS
CLASS I SIGNS
GROUND SIGN PLACEMENT (2 SHEETS)
S-627-1
S-630-2
S-630-1
S-614-40A
S-614-22
S-614-21
S-614-20
S-614-14
S-614-12
S-614-10
S-614-6
S-614-5
S-614-4
S-614-3
S-614-2
S-614-1
S-612-1
M-603-4
S-614-11 MILEPOST SIGN DETAIL FOR HIGH SNOW AREAS
METAL PIPE (4 SHEETS)
M-603-5 POLYVINYL CHLORIDE (PVC) PIPE (AASHTO M304)
M-100-2
TEMPORARY EROSION CONTROL (11 SHEETS)
CURBS, GUTTERS, AND SIDEWALKS (4 SHEETS)
S-630-4
S-630-5
S-630-6 EMERGENCY PULL-OFF AREA (TEMPORARY)
S-630-7
PORTABLE RUMBLE STRIPS (TEMPORARY) (2 SHEETS)
13-14
119-121
123-127
129-137
318-319
ACRONYMS AND ABBREVIATIONS (4 SHEETS) 4-7
10-12
116-118
FIELD LABORATORY CLASS 2 (2 SHEETS) 165-166
S-614-9
S-614-41
241-244S-614-42 CABINET FOUNDATION DETAIL (4 SHEETS)
245-252S-614-43
267-280S-614-60 DYNAMIC SIGN MONOTUBE STRUCTURES (14 SHEETS)
316-317STEEL SIGN SUPPORT (TEMPORARY) INSTALLATION
DETAILS (2 SHEETS)
321-323ROLLING ROADBLOCKS FOR TRAFFIC CONTROL (3 SHEETS)
STATIC SIGN MONOTUBE STRUCTURES (12 SHEETS)
M-216-1 33-34
50-51WINGWALLS FOR PIPE OR BOX CULVERTS (2 SHEETS)
CORRUGATED POLYETHYLENE PIPE (AASHTO M294) AND
CORRUGATED POLYPROPYLENE PIPE (AASHTO M330) (2 sheets)
M-603-6 STEEL REINFORCED POLYETHYLENE
RIBBED PIPE (AASHTO MP 20)
M-606-1 79-97MIDWEST GUARDRAIL SYSTEM TYPE 3 W-BEAM
31 INCHES (19 SHEETS)
102-104
M-606-15 105-115GUARDRAIL TYPE 9 SINGLE SLOPE BARRIER
(11 SHEETS)
DEER FENCE, GATES, AND GAME RAMPS (7 SHEETS)
M-611-2 154-155DEER GUARD (2 SHEETS)
SOIL RETENTION COVERING (2 SHEETS)
SINGLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
DOUBLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
TRIPLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
SUPERELEVATION CROWNED AND
DIVIDED HIGHWAYS (3 SHEETS)
EXCAVATION AND BACKFILL FOR STRUCTURES
(2 SHEETS)
CONCRETE FOOTINGS AND SIGN ISLANDS
FOR CLASS III SIGNS (2 SHEETS)
M-603-12 62-64
CONCRETE AND METAL END SECTIONS 61
NURSERY STOCK DETAILS
98-101
PEDESTRIAN PUSH BUTTON POST ASSEMBLY (2 SHEETS) 205-206
STRUCTURE NUMBER INSTALLATION (2 SHEETS) 209-210
216-217CONCRETE BARRIER SIGN POST INSTALLATIONS
(2 SHEETS)
TYPICAL TRAFFIC SIGNAL 30'-75' DOUBLE MAST ARMS
65'-75' SINGLE MAST ARMS (5 SHEETS)
TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION
(26 SHEETS)
BARRICADES, DRUMS, CONCRETE BARRIERS (TEMP)
AND VERTICAL PANELS
ALTERNATIVE TRAFFIC SIGNAL
25'-55' SINGLE MAST ARMS (4 SHEETS)
TEMPORARY SPAN WIRE SIGNALS (13 SHEETS) 228-240
COLORADO
DEPARTMENT OF TRANSPORTATION
July 31, 2019
M&S STANDARDS PLANS LIST
ALL OF THE M&S STANDARD PLANS, AS SUPPLEMENTED
AND REVISED, APPLY TO THIS PROJECT WHEN USED
BY DESIGNATED PAY ITEM OR SUBSIDIARY ITEM.
PLAN NUMBER M STANDARD TITLE PAGE NUMBER
179-186S-613-1 ROADWAY LIGHTING (6 SHEETS)
TRAFFIC LOOP AND MISCELLANEOUS SIGNAL DETAILS
(7 SHEETS)
253-254S-614-44 PEDESTAL POLE SIGNALS (2 SHEETS)
BREAK-AWAY SIGN SUPPORT DETAILS
FOR CLASS III SIGNS (2 SHEETS)
TRAVERSABLE END SECTIONS AND SAFETY GRATES
(3 SHEETS)
M-412-2 CONCRETE PAVEMENT CRACK REPAIR (6 SHEETS)
(REVISED ON SEPTEMBER 6, 2022)
THE M&S STANDARD PLANS USED TO DESIGN THIS PROJECT ARE
INDICATED BY A MARKED BOX , AND WILL BE ATTACHED TO THE
PLANS. ALL OTHER M&S STANDARD PLANS ARE STILL ELIGIBLE FOR USE
IN CONSTRUCTION IF APPROVED BY AN APPROPRIATE CDOT ENGINEER.
(REVISED ON SEPTEMBER 30, 2020)
(SUPERSEDED ON JANUARY 23, 2020 BY S-614-45)
S-614-45 PEDESTRIAN PUSH BUTTON POST ASSEMBLY DETAILS (6 SHEETS)
(REVISED ON DECEMBER 3, 2020)
(REVISED ON MARCH 5, 2020)
(REVISED ON FEBRUARY 17, 2023)
(REVISED ON FEBRUARY 9, 2023)
(REVISED ON JULY 13, 2020)
(REVISED ON SEPTEMBER 10, 2020)
(REVISED ON SEPTEMBER 21, 2020)
S-613-2 ALTERNATIVE ROADWAY LIGHTING (4 SHEETS)
(NEW, ISSUED ON SEPTEMBER 30, 2020)
(REVISED ON MARCH 1, 2024)
(REVISED ON JANUARY 31, 2022)
(REVISED ON MARCH 7, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON APRIL 30, 2024)
(REVISED ON FEBRUARY 3, 2023)
S-613-4 TRAFFIC SIGNAL ONE-LINE DIAGRAMS (6 SHEETS)
(NEW, ISSUED ON JUNE 15, 2023)
(REVISED ON APRIL 30, 2024)
Revised on December 20, 2024
(REVISED ON
MARCH 1, 2024)
(REVISED ON MARCH 1, 2024)
(REVISED ON MARCH 1, 2024)
(REVISED ON
MARCH 1, 2024)
(REVISED ON
MARCH 1, 2024)
J-POST SIGN SUPPORT (3 SHEETS)S-614-23 (NEW, ISSUED ON MAR. 1, 2024)
PLAN NUMBER M STANDARD TITLE PAGE NUMBER PLAN NUMBER S STANDARD TITLE PAGE NUMBER
S-613-3 PULL BOX DETAIL (2 SHEETS) (NEW, ISSUED ON APRIL 4, 2024)
(REV. DEC. 20, 2024)
(REVISED ON APRIL 4, 2024)
CHAIN STATION SIGNAGE (1 SHEET)S-614-15 (NEW, ISSUED ON APRIL 30, 2024)
(REVISED ON
APRIL 4, 2024)
(REVISED ON MAY 16, 2024)
M-400-1 SAFETYEDGE FOR PAVEMENT
(NEW, ISSUED ON DECEMBER 12, 2024)
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
4.0'
BIKE
LANE
11.0'
EB TRAVEL
LANE
11.0'
EB TRAVEL
LANE
11.0'
EB LT TURN
LANE
VARIES 12.5'-17.5'
WB TRAVEL
LANE
10.5'
EB TRAVEL
LANE
10.5'
EB TRAVEL
LANE
10.0'
EB LT TURN
LANE
10.5'
WB TRAVEL LANE
10.5'
WB TRAVEL
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 10+00 TO STA 11+58
32ND AVE PROPOSED TYPICAL SECTION
STA 12+26 TO STA 13+32
10.0'
WB LT TURN
LANE
10.5'
WB TRAVEL
LANE
11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 14+55 TO STA 15+50
INTERSECTION
STA 11+58 TO STA 12+26
INTERSECTION
STA 13+32 TO STA 14+55
10.5'
EB TRAVEL
LANE
10.5'
EB TRAVEL
LANE
4.0'
BIKE
LANE
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
HCL 32ND AVE
HCL 32ND AVE
3.0'
BIKE
LANE
HCL 32ND AVE
10.5'
WB TRAVEL
LANE
VARIES
VARIES
VARIES
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
BEGINS AT STA 15+11
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
4.0'
BIKE
LANE
11.0'
EB TRAVEL
LANE
11.0'
EB TRAVEL
LANE
10.0'
WB LT TURN
LANE
11.0'
WB TRAVEL LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 9+35 TO STA 10+00
EXISTING GROUND
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
HCL 32ND AVE
VARIES
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
VARIES (2.5'-8')
MEDIAN
VARIES 6.5'-11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 15+50 TO STA 17+95
11.0'
EB TRAVEL LANE
5.0'
BIKE
LANE
VARIES (2.5'-5.0')
MEDIAN
11.0'
WB TRAVEL
LANE
11.0'
WB TRAVEL
LANE
5.0'
BIKE LANE VARIES
0.0'-6.0'
BUFFER
32ND AVE PROPOSED TYPICAL SECTION
STA 17+95 TO STA 20+18
12.0'
EB LT TURN
LANE
11.0'
EB LT TURN
LANE
5.0'
BIKE
LANE
10.0'
EB RT TURN
LANE
9'
SWLK
5.0'
INTERSECTION
STA 20+18 TO STA 21+60
11.0'
WB TRAVEL
LANE
11.0'
WB TRAVEL
LANE
11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 21+60 TO STA 22+55
11.0'
WB LT TURN
LANE
11.0'
WB LT TURN
LANE
VARIES 12.0'-19.0'
EB TRAVEL
LANE
8.0'
SWLK
EXISTING GROUND
EXISTING GROUND
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING GROUND
EXISTING RETAINING WALL
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
5.0'
BIKE
LANE
CURB TYPE 2
(SECTION B)
MEDIAN COVER
MATERIAL
(PATTERNED
CONCRETE)
CURB TYPE 2
(SECTION B)
VARIES 0.0'-12.0'
EB LT TURN LANE
EXISTING CURB AND GUTTER
CONCRETE SIDEWALK (6 INCH)
CURB AND GUTTER TYPE 2 (SECTION II-B)
HOT MIX ASPHALT (PATCHING)(ASPHALT)
EXISTING GROUND
EXISTING RETAINING WALL
11.0'
EB TRAVEL
LANE
10.5'
WB TRAVEL
LANE
10.5'
WB TRAVEL
LANE
HCL 32ND AVE
HCL 32ND AVE
HCL 32ND AVE
VARIES
VARIES
VARIES
EXISTING
SLOPE AND DITCH PAVING
MEDIAN COVER
MATERIAL
(PATTERNED
CONCRETE)
HOT MIX ASPHALT
SEE FULL DEPTH
PAVEMENT SECTION
DETAIL
VAR
(3.8'-7.2')
HOT MIX ASPHALT
(PATCHING)(ASPHALT)
CURB TYPE 2
(SECTION B)
CURB TYPE 2
(SECTION B)
VAR
(3.5'-3.9')
HOT MIX ASPHALT
(PATCHING)(ASPHALT)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
HOT MIX ASPHALT
SEE FULL DEPTH
PAVEMENT SECTION
DETAIL
VARIES
(0'-10')
EB RT TURN
LANE
2.0' BUFER
VARIES 0.0'-11.0'
EB LT TURN LANE
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
11.0'
WB TRAVEL
LANE
11.0'
WB TRAVEL
LANE
11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 22+55 TO STA 24+75
11.0'
WB LT TURN
LANE
VARIES 0.0'-11.0'
WB LT TURN
LANE
12' EB TRAVEL
LANE
11.0'
WB TRAVEL
LANE
11.0'
WB TRAVEL
LANE
11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 24+75 TO STA 26+00
0'-12.0'
EB LT TURN
LANE
12.0'
EB TRAVEL
LANE
4.0'
BIKE
LANE
2.0'
BUFFER
INTERSECTION
STA 26+00 TO STA 27+31
12.0'
WB TRAVEL
LANE
12.0'
WB TRAVEL
LANE
11.0'
WB RT TURN
LANE
5.0'
BIKE
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 27+31 TO STA 28+72
VARIES 4.0'-10.0'
STRIPED
MEDIAN
12.0'
EB TRAVEL
LANE
4.0'
BIKE
LANE
2.0'
BUFFER
INTERSECTION
STA 28+72 TO STA 29+33
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING GROUND
EXISTING RETAINING WALL
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
4.0'
BIKE
LANE
HCL 32ND AVE
HCL 32ND AVE
HCL 32ND AVE
VARIES
VARIES
VARIES
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
VARIES
(0'-2.5')
GORE
VARIES 0.0'-6.5'
EB LT TURN
LANE
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
11.0'
EB TRAVEL
LANE
12.0'
TWLTL
5.0
BIKE
LANE
11.0'
WB TRAVEL
LANE
32ND AVE PROPOSED TYPICAL SECTION
STA 29+33 TO END OF PROJECT
5.0'
BIKE
LANE
EXISTING GROUND
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
EXISTING SIDEWALK
EXISTING CURB AND GUTTER
HCL 32ND AVE
2" MILL AND OVERLAY
HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
FULL DEPTH ASPHALT PAVEMENT DETAIL
N.T.S.
MILL & OVERLAY DETAIL
N.T.S.
2" HOT MIX ASPHALT (GRADING SX)(100)(PG 76-28)
2" HOT MIX ASPHALT
(GRADING SX)(100)(PG 76-28)
3" HOT MIX ASPHALT (GRADING S)(100)(PG 64-22)
EX. ASPHALT
PAVEMENT
3" HOT MIX ASPHALT (GRADING S)(100)(PG 64-22)
3" HOT MIX ASPHALT (GRADING S)(100)(PG 64-22)
SUBGRADE NOTE:
SUBGRADE MATERIAL:
SUBGRADE SHALL CONSIST OF NATURAL EXISTING MATERIALS WITH A CLASSIFICATION OF A-2-6 OR LOWER FOR A MINIMUM OF 1 FOOT BELOW PAVEMENT SECTION. IF MATERIALS CLASSIFYING HIGHER THAN A-2-6 ARE ENCOUNTERED AT SUBGRADE, THAT MATERIAL SHOULD BE SUB-EXCAVATED A MINIMUM OF 1 FOOT BELOW PAVEMENT SECTION AND REPLACED WITH COMPACTED STRUCTURAL FILL CLASSIFYING AS A-2-6 OR LOWER
COMPACTION AND MOISTURE TREATMENT OF SUBGRADE:
ACCEPTABLE EXISTING MATERIAL SHALL BE THOROUGHLY PLOWED AND WELL MIXED TO A DEPTH OF 12 INCHES BELOW PAVEMENT SECTION. REWORKED NATURAL MATERIALS AS WELL AS IMPORTED MATERIALS SHALL HAVE A MOISTURE CONTENT WITHIN 2 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT.
SOILS THAT CLASSIFY BETWEEN A-1 AND A-2-5 SHOULD BE COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR AND ALL OTHER ACCEPTABLE SOILS SHOULD BE COMPACTED TO AT LEAST 95% OF THE STANDARD
PROCTOR. AT MINIMUM ALL SUBGRADE SHALL HAVE AN R-VALUE OF 20.
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARD AND SPECIAL PROVISIONS, THE
CONSTRUCTION PLANS FOR THE PROJECT, THE 2023 EDITION OF THE CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE CDOT STANDARD PLANS AS APPLICABLE TO THE WORK.
2. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE CITY A STORMWATER MANAGEMENT PLAN (SWMP) AT THE TIME OF THE PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL ADDRESS EROSION MITIGATION & PROTECTIVE MEASURES TO LIMIT EROSION RELATING TO CONSTRUCTION ACTIVITIES. UNLESS PREVIOUSLY OBTAINED BY THE CITY, THE CONTRACTOR SHALL OBTAIN A CDPHE STORMWATER DISCHARGE
PERMIT AS STATED IN SECTION 208 OF THE PROJECT SPECIAL PROVISIONS.
3. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A CONSTRUCTION SCHEDULE AT THE PROJECT PRE-CONSTRUCTION MEETING. THIS SCHEDULE WILL SHOW THE BEGINNING AND ENDING DATES OF MAJOR CONTRACT ITEMS. THIS SCHEDULE WILL BE UPDATED BY THE CONTRACTOR EVERY 10 WORKING DAYS, OR AS
REQUIRED BY THE CITY.
4. CONSTRUCTION STAKING SHALL BE PROVIDED BY THE CONTRACTOR.
5. [INTENTIONALLY LEFT BLANK]
6. FOR FINAL PLAN QUANTITIES THE FOLLOWING RATES OF APPLICATION WERE USED:
* BITUMINOUS PAVEMENT AT 110 LBS/SY-IN (0.055 TONS/ SY-IN)
* AGGREGATE BASE COURSE AT 133 LBS/CUBIC FOOT
* DILUTED EMULSIFIED ASPHALT SLOW SETTING AT 0.1 GAL./SQ. YD. (DILUTED)
7. A SKI TYPE DEVICE AT LEAST 30 FEET IN LENGTH, SHORT SKI OR SHOE AND 5000 FEET OF CONTROL LINE AND STAKES SHALL BE FURNISHED WITH EACH BITUMINOUS PAVER. THE CONTROL LINE SHALL BE REQUIRED FOR
ALL LAYERS, OR AS DIRECTED BY THE CITY.
8. [INTENTIONALLY LEFT BLANK]
9. UNCLASSIFIED EXCAVATION QUANTITIES FOR SUBGRADE STABILIZATION WILL BE MEASURED IN THE FIELD.
TYPICAL DEPTH OF CUT FOR SUBGRADE STABILIZATION WILL BE LESS THAN 15 INCHES BELOW DESIGN
SUBGRADE, UNLESS OTHERWISE DIRECTED BY THE CITY.
10. FULL DEPTH ASPHALT TO BE REMOVED HAS BEEN CALCULATED AS REMOVAL OF ASPHALT MAT. REMOVED
ASPHALTIC PAVEMENT MATERIAL WILL BECOME THE PROPERTY OF THE CONTRACTOR.
11. ATTACHED SIDEWALK, CURB AND GUTTER SHALL BE PLACED MONOLITHICALLY, UNLESS OTHERWISE
SPECIFIED OR DIRECTED BY THE CITY.
12. BREAK POINTS ON SLOPES AND IN BOTTOMS OF DITCHES SHALL BE ROUNDED DURING CONSTRUCTION AS DIRECTED BY THE CITY. SEE STANDARDS FOR DETAILS OF CUT SLOPE TREATMENT, FLARING AND WIDENING.
13. WHERE IT IS REQUIRED TO REMOVE EXISTING CONCRETE OR ASPHALT, CUTTING SHALL BE DONE TO A NEAT WORK LINE TO FULL DEPTH USING A SAW, CUTTING WHEEL, OR OTHER METHODS APPROVED BY THE ENGINEER. THIS WORK WILL NOT BE PAID SEPARATELY BUT SHALL BE INCLUDED IN THE WORK.
14. LIMITS OF ASPHALT REMOVAL SHALL BE CUT TO A STRAIGHT LINE WITH A VERTICAL EDGE. THE VERTICAL EDGE SHALL BE SAW CUT UNLESS OTHER WISE APPROVED BY CITY. ASPHALT PAVEMENT SHALL BE REMOVED A MINIMUM OF TWO FEET, OR AS DIRECTED BY THE CITY, FROM ANY GUTTER PAN LIP. ASPHALT PATCHBACK
SHALL BE PLACED IN LIFTS NOT EXCEEDING 4 INCHES.
15. [INTENTIONALLY LEFT BLANK]
16. EXCAVATION FOR THE COMPACTION OF THE BASE OF CUTS AND FILLS WILL NOT BE PAID FOR SEPARATELY
BUT SHALL BE INCLUDED IN THE COST OF EXCAVATION & EMBANKMENT PAY ITEMS.
17. DEPTH OF MOISTURE-DENSITY CONTROL FOR THIS PROJECT SHALL BE AS FOLLOWS: FULL DEPTH OF ALL EMBANKMENTS. BASES OF CUTS AND FILLS SHALL BE 6 INCHES. COMPACTION OF BASES OF CUTS AND FILLS SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN THE COST OF EXCAVATION & EMBANKMENT PAY ITEMS. WATER FOR COMPACTION WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. WATER FOR DUST CONTROL SHALL NOT BE PAID FOR
SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
18. SWEEPING SHALL BE DONE BY A PICKUP TYPE BROOM WITH DUST CONTROL AND BEYOND INCLUDED PAY
ITEMS, SHALL BE DONE AT NO ADDITIONAL COST TO THE PROJECT.
19. SALVAGE ITEMS REMAINING AS PROPERTY OF THE CITY OF WHEAT RIDGE SHALL BE DELIVERED TO THE CITY MAINTENANCE FACILITY LOCATED AT 11220 W. 45TH AVE. EQUIPMENT & OPERATOR FOR UNLOADING WILL BE PROVIDED BY THE CITY IF REQUESTED IN ADVANCE. CONTRACTOR WILL ASSIST WITH UNLOADING.
DELIVERY AND UNLOADING SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
20. REINFORCING STEEL SHALL BE GRADE 60. CONCRETE SHALL BE CLASS B AND D, REINFORCED STEEL IS
INCIDENTAL TO STRUCTURE PAY ITEMS.
21. CURB CUT LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL STAKE THE APPROXIMATE LIMITS OF GRADING, LOCATION OF CURB CUTS, AND LOCATION OF MAILBOX(ES) IN THE FIELD.
22. [INTENTIONALLY LEFT BLANK]
23. ALL TRENCHES AND PITS SHALL BE ADEQUATELY SUPPORTED AND THE SAFETY OF WORKERS PROVIDED FOR AS REQUIRED BY THE MOST RECENT OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) "SAFETY
AND HEALTH REGULATIONS FOR CONSTRUCTION." THESE REGULATIONS ARE DESCRIBED IN SUBPART P, PART 1926 OF THE CODE OF FEDERAL REGULATIONS. SHEETING AND SHORING SHALL BE UTILIZED WHERE NECESSARY TO PREVENT ANY EXCESSIVE WIDENING OR SLOUGHING OF THE TRENCH OR PIT WHICH MAY BE DETRIMENTAL TO HUMAN SAFETY, TO THE PIPE BEING PLACED, TO TREES OR TO ANY EXISTING STRUCTURE
WHERE EXCAVATIONS ARE MADE. UNDER SEVERE WATER CONDITIONS, THE CONTRACTOR MAY BE
REQUIRED TO USE AN APPROVED PILING INSTEAD OF SHEETING AND SHORING.
24. THE CONTRACTOR SHALL HAVE ONE SIGNED FULL SIZE COPY OF THE PLANS APPROVED BY THE GOVERNING
AGENCIES AND ONE COPY OF THE APPROPRIATE DESIGN AND CONSTRUCTION STANDARDS AND
SPECIFICATIONS, CDOT PERMIT (IF APPLICABLE), AND SWMP DOCUMENT ON THE JOB SITE AT ALL TIMES.
25. REPAIR OF ANY DAMAGE TO EXISTING IMPROVEMENTS AND/OR LANDSCAPING IS THE RESPONSIBILITY OF THE
CONTRACTOR AT HIS EXPENSE.
26. ALL DAMAGE CAUSED TO EXISTING CURB, GUTTER AND SIDEWALK DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE PRIOR TO ACCEPTANCE OF COMPLETED IMPROVEMENTS.
27. THE CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS IN WRITING A MINIMUM OF 48 HOURS PRIOR TO ANY UTILITY SHUT OFF OR CLOSURE OF DRIVEWAYS. THE NOTICES MUST HAVE CONTRACTOR'S PHONE NUMBER AND NAME OF CONTACT PERSON, AND EMERGENCY PHONE NUMBER FOR AFTER-HOURS CALLS.
CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING LOCAL ACCESS TO ALL DRIVEWAYS.
28. CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING CLEANLINESS ON ALL LOCAL ROADWAYS AFFECTED
BY HIS CONSTRUCTION.
29. AS A CONDITION FOR QUALIFYING FOR FINAL PAYMENT THE CONTRACTOR WILL FURNISH UPON COMPLETION OF THE PROJECT, 1 SET OF AS-CONSTRUCTED DRAWINGS PER SECTION 105.02 OF THE PROJECT SPECIAL
PROVISIONS AND CDOT STANDARD SPECIFICATIONS.
30. [INTENTIONALLY LEFT BLANK]
31. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF CONSTRUCTION AND/OR TOES OF SLOPE AS SHOWN ON THE PLANS. ANY DISTURBANCE BEYOND THESE
LIMITS SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR AT HIS EXPENSE.
CONSTRUCTION ACTIVITIES, IN ADDITION TO NORMAL CONSTRUCTION PROCEDURES, SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF LITTER, AND ANY OTHER ACTION WHICH WOULD INCLUDE CLEARING AND GRUBBING, AND LANDSCAPE RESTORATION LUMP SUM ITEMS SHALL BE BID TO INCLUDE ALL AREAS DISTURBED DURING CONSTRUCTION, WHETHER WITHIN OR OUTSIDE THE LIMITS OF
CONSTRUCTION.
32. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL SUBSURFACE DRAINAGE AND GROUNDWATER ENTERING THE PROJECT AREA. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DEWATERING, IF NEEDED, AT NO ADDITIONAL COST TO THE PROJECT. DEWATERING METHODS
SHALL BE APPROVED BY THE CITY.
33. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVING ALL LAND MONUMENTS. MONUMENTS DISTURBED DURING CONSTRUCTION ACTIVITY SHALL BE RESET AT NO ADDITIONAL COST TO THE PROJECT.
THE RESETTING OF MONUMENTS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A REGISTERED LAND SURVEYOR. THE CONTRACTOR SHALL FILE MONUMENT RECORDS WITH THE BOARD OF REGISTRATION OF
PROFESSIONAL ENGINEERS AND LAND SURVEYORS FOR ALL LAND MONUMENTS RESET DURING
CONSTRUCTION.
34. [INTENTIONALLY LEFT BLANK]
35. HMA AND PCCP PAVEMENT SHALL NOT BE SUBJECT TO INCENTIVE PAYMENTS FOR SMOOTHNESS BUT SHALL BE SUBJECT TO ROADWAY SMOOTHNESS EVALUATION BY 10-FOOT STRAIGHTEDGE AND CORRECTIVE WORK PER SUBSECTION 105.07 (a) 2 OF THE CURRENT CDOT SPECIFICATIONS.
36. PCCP ACCEPTANCE SHALL UTILIZE COMPRESSIVE STRENGTH CRITERIA.
TRAFFIC CONTROL
1. THE CONTRACTOR SHALL PREPARE AND PRESENT HIS/HER METHOD FOR HANDLING CONSTRUCTION ZONE
TRAFFIC TO THE CITY FOR APPROVAL AT THE PRE-CONSTRUCTION MEETING.
2. SUBSEQUENT CHANGES TO THE TRAFFIC CONTROL PLAN AND SEQUENCE OF WORK REQUESTED BY THE CONTRACTOR SHALL BE SUBMITTED FOR APPROVAL 72 HOURS PRIOR TO IMPLEMENTATION OF THE REVISED
PLAN.
3. TRAFFIC CONTROL PLAN SHALL ADDRESS SPECIFIC PHASES OF CONSTRUCTION AND BE DRAWN TO SCALE OR DIMENSIONED. TRAFFIC PLANNING WILL BE DIRECTED TO THE SAFETY OF THE CONSTRUCTION FORCE AS
WELL AS THE SAFE AND EXPEDITIOUS MOVEMENT OF TRAFFIC.
4. WORK WITHIN CITY ROW THAT REQUIRES A LANE CLOSURE MAY PROCEED BETWEEN THE HOURS OF 7:00 AM AND 5:00 PM ON LOCAL STREETS, AND BETWEEN THE HOURS OF 8:30 AM AND 3:30 PM ON COLLECTOR, ARTERIAL, AND HIGH VOLUME LOCAL STREETS AS DETERMINED IN WRITING BY THE CITY.
5. WORK WITHIN ROADWAY AREAS IS ALSO SUBJECT TO THE TIME RESTRICTIONS STATED IN SPECIAL PROVISION SECTION 108.04 OF THE PROJECT SPECIFICATIONS. ALL WORK WITHIN CDOT ROW SHALL BE ADDITIONALLY RESTRICTED AS STATED IN SECTION 108.04 AND PER THE APPLICABLE CDOT PERMIT ISSUED
FOR THE PROJECT.
6. TRAFFIC CONTROL DURING CONSTRUCTION SHALL COMPLY WITH THE LATEST EDITION OF THE FHWA'S
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AND OTHER DOCUMENTS DETAILED IN THE
SPECIFICATIONS.
7. MINIMUM TEMPORARY LANE WIDTH SHALL BE TEN (10) FEET, UNLESS OTHERWISE APPROVED IN WRITING BY
THE CITY.
8. PROVISIONS FOR PEDESTRIAN TRAFFIC SHALL BE MADE FOR ALL PHASES OF CONSTRUCTION.
UTILITIES
1. THE CONTRACTOR IS RESPONSIBLE TO EXCAVATE AND LOCATE ALL EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. ALL EXPLORATORY EXCAVATIONS SHALL OCCUR FAR ENOUGH IN ADVANCE TO PERMIT ANY NECESSARY RELOCATION TO BE MADE WITH MINIMAL DELAYS TO THE PROJECT. UNLESS A PAY ITEM HAS BEEN INCLUDED FOR EXPLORATORY EXCAVATIONS (POTHOLING), ALL EXPLORATORY EXCAVATIONS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. LACK OF THE CITY TO INCLUDE A POTHOLING PAY ITEM SHALL NOT PRECLUDE THE CONTRACTOR FOR PERFORMING ALL NECESSARY EXPLORATORY EXCAVATIONS.
THE CONTRACTOR SHALL NOT BE COMPENSATED FOR ANY DELAY DUE TO UTILITY CONFLICTS.
2. ALL UTILITY RELOCATES WILL BE PERFORMED BY THE OWNING UTILITY COMPANY DURING THE COURSE OF
THE PROJECT, UNLESS A SEPARATE PAY ITEM IS PROVIDED.
3. UTILITY LOCATIONS SHOWN ON THE PLAN ARE PLOTTED TO THE BEST INFORMATION AT TIME OF DESIGN.
UTILITY LOCATIONS SHOWN ON THE PLANS ARE FOR DESCRIPTIVE PURPOSES ONLY. THE CONTRACTOR IS REQUIRED TO CONTACT THE PROPER UTILITY COMPANY AND/OR UTILITY LOCATE COMPANY PRIOR TO CONSTRUCTION. LOCATION OF ALL UTILITIES, WHETHER SHOWN ON THE PLANS OR NOT, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY DAMAGES TO EXISTING UTILITIES CAUSED BY THE CONTRACTOR, OR ANY OF HIS SUBCONTRACTORS, SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR FOR ALL
REPAIRS AT HIS EXPENSE.
4. THE CONTRACTOR SHALL CONTACT THE COLORADO 811 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. CALL 800-922-1987.
5. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT ALL UTILITIES
TO COORDINATE SCHEDULES.
6. STORM SEWER PIPE SHALL BE PVC, SDR-35, OR RCP AS SPECIFIED ON DRAWINGS.
7. ALL STORM STRUCTURES TO BE CAST IN PLACE UNLESS OTHERWISE APPROVED IN WRITING BY THE CITY.
8. THIS PROJECT DOES NOT QUALIFY AS A SUBSURFACE UTILITY ENGINEERING-REQUIRED PROJECT AS DEFINED UNDER CRS 9-1.5-102 (6.8). AS SUCH, A SUBSURFACE UTILITY ENGINEERING (SUE) INVESTIGATION WAS NOT COMPLETED FOR THIS PROJECT. ANY DEPICTIONS, DESCRIPTIONS, OR ACCOUNTS OF UTILITIES ARE FOR INFORMATIONAL PURPOSES ONLY, AND SHALL NOT BE CONSIDERED INCLUSIVE, EXHAUSTIVE, OR
ACCURATE.
9. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SUBSECTION 105.11 OF THE STANDARD SPECIFICATIONS CONCERNING UTILITIES AND THE UTILITY SPECIFICATION FOR THIS PROJECT. THE PHYSICAL FEATURES WITHIN THE LIMITS OF THE PROJECT HAVE BEEN SHOWN BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL FEATURES, INCLUDING ALL UNDERGROUND AND ABOVE GROUND UTILITIES PRIOR TO BEGINNING ANY WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ALL UTILITY INFORMATION. FOR UTILITY CONSTRUCTION COORDINATION, THE CONTRACTOR SHALL CONTACT COLORADO 811 AT PHONE NO. 811.
10. THE CONTRACTOR SHALL COMPLY WITH ARTICLE 1.5 OF TITLE 9, CRS (“EXCAVATION REQUIREMENTS”) WHEN EXCAVATING OR GRADING IS PLANNED IN THE AREA OF UNDERGROUND UTILITY FACILITIES. THE CONTRACTOR SHALL NOTIFY ALL AFFECTED UTILITIES AT LEAST TWO (2) BUSINESS DAYS, NOT INCLUDING THE DAY OF NOTICE, PRIOR TO COMMENCING SUCH OPERATIONS. THE CONTRACTOR SHALL CONTACT COLORADO 811 AT PHONE NO. 811 OR 1-800-922-1987 TO HAVE LOCATIONS OF COLORADO 811 REGISTERED LINES LOCATED BY MEMBER COMPANIES. ALL OTHER UNDERGROUND FACILITIES SHALL BE LOCATED BY CONTACTING THE RESPECTIVE OWNER. UTILITY SERVICE LATERALS SHALL BE LOCATED PRIOR TO
BEGINNING EXCAVATION OR GRADING.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND COORDINATING WITH THE APPROPRIATE UTILITY REPRESENTATIVES TO BE ONSITE DURING POTHOLING. THE CONTRACTOR SHALL REFER TO THE
UTILITY PLANS AND/OR SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
12. IT IS ESTIMATED THAT 8 HOURS OF 203-01597 POTHOLING WILL BE REQUIRED ON THIS PROJECT.
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
ENVIRONMENTAL
1. MIGRATORY BIRDS MAY NEST ON STRUCTURES WHERE WORK WILL OCCUR. THE CONTRACTOR SHALL CONDUCT ALL WORK ON STRUCTURES IN A MANNER THAT DOES NOT RESULT IN THE TAKING OF MIGRATORY BIRDS PROTECTED BY THE MIGRATORY BIRD TREATY ACT (MBTA). IF WORK ON STRUCTURES WILL OCCUR DURING THE PRIMARY BREEDING SEASON, APRIL 1 TO AUGUST 31, CDOT'S REVISION OF SECTION 240 PROTECTION OF MIGRATORY BIRDS SHALL BE FOLLOWED. NO WORK SHALL OCCUR WITHIN 50 FEET OF AN ACTIVE NEXT, AT ANY TIME, UNLESS THE CONTRACTOR RECEIVES WRITTEN APPROVAL FROM THE PROJECT
ENGINEER.
2. THE CONTRACTOR MUST ASCERTAIN IF AN AIR POLLUTION EMISSION NOTICE (APEN) IS REQUIRED TO BE SUBMITTED TO THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT'S (CDPHE) AIR POLLUTION CONTROL DIVISION (APCD) FOR THIS OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING THE APEN AND OBTAINING SAID PERMIT, IF REQUIRED. THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS OF THE APEN AND ANY PERMITS ISSUED BY APCD FOR THIS PROJECT. THE CONTRACTOR SHALL CONTROL FUGITIVE DUST THROUGH IMPLEMENTATION OF SECTIONS 107.24, 209, AND 250 OF CDOT'S
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AND APPLICABLE CDPHE
REQUIREMENTS
THE FOLLOWING BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED DURING CONSTRUCTION:
* MAINTAIN ENGINES AND EXHAUST SYSTEMS ON CONSTRUCTION EQUIPMENT AND VEHICLES IN GOOD WORKING ORDER. PROHIBIT TAMPERING WITH EQUIPMENT TO INCREASE HORSEPOWER OR DISABLING EMISSION CONTROL DEVICES. EQUIPMENT IS SUBJECT TO INSPECTION BY THE PROJECT MANAGER TO
ENSURE MAINTENANCE IS CONDUCTED REGULARLY.
* PROHIBIT UNNECESSARY IDLING OF CONSTRUCTION EQUIPMENT AND VEHICLES.
* LOCATE STAGING AREAS AND STATIONARY CONSTRUCTION EQUIPMENT/DIESEL ENGINES AS FAR AS
POSSIBLE FROM RESIDENCES AND OTHER SENSITIVE RECEPTORS.
* COVER, WET, COMPACT, OR USE CHEMICAL STABILIZATION TO CONTROL DUST FROM DISTURBED AREAS
AND EXCAVATED MATERIALS DURING CONSTRUCTION. MINIMIZE DISTURBED AREAS, PARTICULARLY
DURING DRY WEATHER CONDITIONS, AND USE WIND BARRIERS AS APPROPRIATE.
* CONTROL SOIL/SEDIMENT AT POINTS OF INGRESS/EGRESS AND USE VACUUM STREET SWEEPERS TO
REMOVE SOIL TRACKED ONTO ADJACENT ROADWAYS.
3. THIS PROJECT DOES NOT ANTICIPATE THE NEED TO RELOCATE ANY FIRE HYDRANTS, BUT IF IT IS NECESSARY
TO RELOCATE, THE FOLLOWING APPLIES:
AT LEAST 8 PAINT SAMPLES REVEALED HIGH LEVELS OF LEAD CONTENT. LEAD-BASED PAINT WAS DETECTED IN THE PAINT SCREENED ON TWO FIRE HYDRANTS AND THEIR RESPECTIVE CAPS, TWO ELECTRICAL ACCESS BOXES, A LIGHT POST FOUNDATION, AND A POST COMPONENT. THE CONTRACTOR SHALL REVIEW THE ISA PREPARED BY ERO CONSULTANTS AND RECYCLE/REMOVE THOSE PAINTED ITEMS IN ACCORDANCE WITH
CDOT 250 SPEC, IN PARTICULAR SECTION 250.04.
4. BEFORE DEMOLISHING ANY STRUCTURES OR REMOVING UTILITY LINES, THE CONTRACTOR SHALL DETERMINE THE PRESENCE OR ABSENCE OF ACMS IF NOT PREVIOUSLY IDENTIFIED. IF ASBESTOS IS
PRESENT, THE CONTRACTOR SHALL CONDUCT ABATEMENT IN ACCORDANCE WITH SECTION 250 -
ENVIRONMENTAL, HEALTH, AND SAFETY MANAGEMENT OF THE CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, THE AIR QUALITY CONTROL COMMISSION'S REGULATION 8, AND RELEVANT OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION AND OTHER STATE AND FEDERAL REQUIREMENTS.
5. CONTAMINATED SOIL IS NOT ANTICIPATED TO BE ENCOUNTERED AS PART OF THIS PROJECT. HOWEVER, IF CONTAMINATION IS ENCOUNTERED DURING CONSTRUCTION ACTIVITIES, WORK SHALL STOP IMMEDIATELY, AND THE PROCEDURES OUTLINED IN SECTION 250 - ENVIRONMENTAL, HEALTH, AND SAFETY MANAGEMENT OF THE CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION SHALL BE FOLLOWED.
6. CONTRACTOR'S RESPONSIBILITIES FOR COMPLIANCE WITH LOCAL NOISE ORDINANCES DURING
CONSTRUCTION / NIGHT WORK
THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AGENCY(S) NOISE ORDINANCES AND/OR OTHER RESTRICTIONS APPLICABLE TO NIGHTTIME CONSTRUCTION ACTIVITIES FOR PROJECTS WITHIN THE LOCAL MUNICIPAL COVERAGE AREAS. PROJECTS FALLING WITHIN UNINCORPORATED AREAS OF A COUNTY WILL BE GOVERNED BY COUNTY CODE. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL AGENCY(S) AND/OR CDOT FOR ALL NECESSARY NOISE EXEMPTIONS OR NOTICES, NOISE PERMIT VARIANCES, AND APPROVALS TO DO NIGHT WORK AS REQUIRED. IF LOCAL AGENCY NIGHTTIME NOISE RESTRICTIONS DO NOT EXIST AND THERE ARE NOISE SENSITIVE RECEPTORS IN THE PROJECT AREA, THE APPROVALS TO DO NIGHTTIME WORK SHALL BE APPROVED THROUGH THE CDOT ENGINEER. STANDARD NOISE CONTROLS AND BEST MANAGEMENT PRACTICES
FOR REDUCING EQUIPMENT AND CONSTRUCTION ACTIVITY NOISE
LEVELS SHALL BE UTILIZED IN ALL CASES AND WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
CONSISTENTLY EMPLOY WHEN WORKING IN NOISE SENSITIVE AREAS AFTER 7:00 P.M.
FOR THIS PROJECT, THE CONTRACTOR IS REQUIRED TO REVIEW AND UNDERSTAND ALL LOCAL AGENCY ORDINANCES WITH PROJECT APPLICABLE NIGHT RESTRICTIONS. WHEN CONDITIONS APPLY, THE CONTRACTOR SHALL SUBMIT A NIGHTTIME NOISE ORDINANCE MEMORANDUM(S) TO ALL JURISDICTIONAL LOCAL AUTHORITIES.
THIS MEMORANDUM SHALL REQUEST CONSTRUCTION NOISE EXEMPTIONS FOR NIGHT WORK OPERATIONS (AT LEAST TWO WEEKS PRIOR TO THE PROPOSED NIGHT WORK START DATE) WHERE CONSTRUCTION WORK IS
SCHEDULED BETWEEN THE HOURS OF 7:00 P.M. AND 7:00 A.M.
THE FOLLOWING INFORMATION SHOULD BE INCLUDED IN THE EXEMPTION REQUEST SUBMITTALS AND
SENT TO THE CITY/COUNTY ENGINEER: (1) REQUESTING ENTITY,
(2) CONTACT PERSON AND PHONE NUMBER, (3) LOCATION OF THE WORK, (4) REASONS NIGHT WORK IS BEING
REQUESTED, (5) TYPE OF ACTIVITIES PROPOSED TO OCCUR AT NIGHT,
(6) EQUIPMENT PROPOSED TO BE USED AT NIGHT, (7) START AND END DATE PROPOSED,
(8) TOTAL NUMBER OF NIGHTS WORK IS PROPOSED TO OCCUR.
ALL NIGHTTIME CONSTRUCTION ACTIVITIES SUBJECT TO NOISE LEVEL RESTRICTIONS CANNOT BEGIN UNTIL THE NECESSARY DOCUMENTATION AND NOTIFICATIONS HAVE BEEN APPROVED BY THE LOCAL AGENCY AUTHORITY, (ENVIRONMENTAL CONTINUED)
THE CDOT ENGINEER AND/OR THE REGION'S NOISE SPECIALIST. ALL EXEMPTION
REQUESTS AND PERMITTING REQUIREMENTS WILL NOT BE PAID FOR SEPARATELY, BUT WILL BE INCLUDED IN
THE WORK.
GENERAL PAY ITEM NOTES
THE FOLLOWING ITEMS ARE REQUIRED:
ITEM NO. 240-00000 WILDLIFE BIOLOGIST 40 (HOUR)
ITEM NO. 240-00010 REMOVAL OF NESTS 40 (HOUR)
ITEM NO. 620-00020 SANITARY FACILITY 1 (EACH)
ITEM NO. 625-00000 CONSTRUCTION SURVEYING 1 (LS)
ITEM NO. 626-00000 MOBILIZATION 1 (LS)
ITEM NO. 626-01103 PUBLIC INFORMATION MANAGEMENT (TIER III) 1 (LS)
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
Inlets (Section 604) and all other structures assigned a structure number
Field verify sign post locations, elevations, and lengths before fabrication.
Light pole locations and elevations Signal pole locations and elevations
Lighting (Section 613) and Traffic Control Devices (Permanent) (Section 614)
Slope and Ditch Paving (Section 507) Deck grades at Girder 10th or "n" th point locations and elevations Bridge expansion joint(s) alignment and grade (longitudinal and transverse)
Substructure As-constructed survey required for Bridges (Subsection 601 .12) and Overhead signs (S-614-50)
Structural concrete form locations Wingwall skew angles/offsets Abutment/Pier locations, alignment, and elevations Footing locations, alignment, and elevations Caisson locations and elevations (Section 503) Piling locations and cut off elevations (Section 502) Concrete Box Culverts (Section 603) w/ Headwalls and Wingwalls (Section 601) Structure Excavation limits (Section 206)
Major Structures - Overhead Signs (Section 614), Concrete Box Culverts, Bridges -
Other:
Erosion Bales Silt Fence
Riprap (Temp) Erosion Logs
Seeding (Temp) Erosion Control (Section 208)
Striping (Temp) Striping (Perm)
Other:
Symbols
Pavement Marking (Section 627)
Other:
Rock
As Staked Earthwork Quantities (See General Notes)
Seeding (Section 212)
Planting (Section 214)
Other:
Mulching (Section 213)
Landscaping Top Soil (Section 207)
Site Grading Embankment
Erosion Control (Perm) Other:
Other:
Borrow
Delineators (Section 612)
Sign locations
Temporary Permanent
Temporary
Sound Barrier Other:
Permanent
Other:
Fencing (Section 607)
Grid
A complete passing Base Line report (completed within 6 months prior to the start of the project)
Excavation and Embankment (Section 203) Excavation
Reset Items (Section 210) Removal Limits (Section 202)
Muck Stripping Unclassified
Slope Staking
Verify or Determine existing topography Clearing and Grubbing Limits (Section 201)
Verify or Determine existing grades and alignments
An instrument calibration Certification (completed within 6 months prior to the start of the project)
Interval SpecialGrade
Other:
Seal Coat or Chip Seal (Section 409)
Prime Coat, Tack Coat & Rejuvenating Agent (Section 407)
Heating & Scarifying Treatment
Miscellaneous
Drop inlets -alignment and grades (Section 604)
Aggregate Base Course (Section 304)
HMA - Hot Mix Asphalt (Section 403)
PMBB - Plant Mix Bituminous Base
Storm Sewer Sanitary Sewer
Concrete Box Culverts w/ Headwalls and Wingwalls Culverts w/ Headwalls and Wingwalls (Section 601)
Structure Excavation limits (Section 206)
Treated Subgrade
Signalization
New Bridge
SURVEY WORK TO BE PERFORMED BY OTHERS:
Other:
New Roadway Construction Bridge Replacement Bridge Widening
Major Reconstruction
Asphalt Overlay Concrete Overlay Minor Widening
Safety Improvement
Manholes (Section 604)
Irrigation Water
Pipes (Section 603)
Slope and Ditch Paving (Section 507) Minor Structures
Culverts (Section 603)
Riprap (Perm) (Section 506)
Other:
Sidewalk (Section 608)
The information marked is either contained on the plans or is available from the Engineer.
* Specify the information format, ie., plan sheet, computer disk, computer printout, or other.
TYPE OF PROJECT
Landscaping
Vertical Control
Original Terrain Data Other:
Roadway Alignment
Horizontal Control
Format *
Roadway Elements
Retaining Walls
Curb and Gutter (Section 609)
Guard Rail (Section 606)
Other:
Concrete (Section 412)
Reconditioning
Other:
Pavements
Untreated Subgrade Roadway Bases
Signal pole locations and elevations (Temp)
(Y/N) Interval
** A Tabulation of Survey Monuments may be provided on the plans.
Right of Way (Temp Staking by P.L.S. Only)
Monumentation (Section 629)
All Easements (Temp Staking by P.L.S. Only) Tangent Interval Interval
Curve Offset Special
Replace the specified existing monuments:
Reference the specified existing monuments:
Right of Way Land corners, Aliquot corners Easements
Control
Light pole locations and elevations (Temp) Sign Locations (Temp) Other:
Temporary Lighting and Construction Traffic Control Devices (Section 630)
Grid Grade Special (Y/N)
R oa dw ay
B as es
Pa ve me nts
Gu tte r Cu rb
Ex ca va tio n E mb an km en t
(Y/N)(Y/N)
Property Pin Ties
Major Structures Minor Structures Slope Staking Grading Horizontal Alignment
Vertical Control (i.e. Benchmarks) Horizontal Control (Primary & Secondary)
Other Fieldbook(s):
One fieldbook for each work category shown on this sheet
TO ESTABLISH GEOMETRIC CONTROL FOR THE CONSTRUCTION OF THIS
PROJECT, THE DEPARTMENT HAS PROVIDED THE FOLLOWING INFORMATION:
WORK PERFORMED BY THE CONTRACTOR'S SURVEYOR UNDER SECTION 625:
GENERAL NOTES:
Herbicide (Section 217)
Y
N/A
N/A
NOTE: All 629 items shall include adequate research, calculations, and evaluations Locate monuments. It is estimated hours are required.
1. Unless indicated otherwise on this Survey Tabulation Sheet, all survey work and staking intervals shall be done in accordance with the latest edition of the CDOT Survey Manual.
2. Adequate information for establishing lines, grades, and locations for all work items have been specified on the plans. Any additional information required to stake the item or element shall be generated by the Contractor's surveyor.
3. The Contractor's surveyor shall provide an estimate of the man-hours necessary to complete the work items indicated on this sheet. A copy of this sheet, with the estimated man-hours written on the blank line to the left of the specified items, shall be submitted with the Survey Schedule to the Engineer 5 days prior to the Presurvey Conference - Construction Survey.
4. Stakes and Monuments which are damaged or destroyed by the progress of construction shall be replaced by the Contractor at no additional cost to the Department.
The Contractor shall furnish an As Staked (or 3D Design Modeling Electronic Files) Earthwork Quantity report to the Engineer prior to completion of twenty percent (20%) of the planned earthwork in any phase as per the CDOT Survey Manual. A printed copy of the As Staked (or 3D Design Modeling Electronic Files) Earthwork data report and a computer disk with that information on it, in the specified format shall be submitted to the Engineer. The Contractor shall field verify original ground cross sections at a maximum 500 feet intervals.
6. Prior to beginning work on any subsequent operation, such as placing base course or paving, the Contractor shall certify in writing to the Engineer that the final grade is within specified tolerance.
7. The Contractor's surveyor shall perform all field surveying and calculations necessary to tie plan grades into field grades.
8. The Contractor shall coordinate construction staking on the project with any utility work.
10. The Contractor's surveyor shall submit the following fieldbooks to the Engineer:
Offset Special
Grid Special (Y/N)
Special Interval Offset
Overlay Stationing
Left Interval Interval
Center Interval
Right
St ati on ing
Potholing
9. Fieldbooks shall contain daily records of points set and or measurements observed. The information recorded shall contain: date, crew members' names, point no., description, staking information, and sketches. If the survey information is collected electronically, information recorded shall be provided to the Project Engineer in a hard copy format that is intuitive, clear and related to the supplemental information recorded in the field books. All linear surveys, such as slope stakes and blue tops, shall have the station and offset information related to the measured information. Non-linear surveys such as structures staking shall have sketches relating electronic information, such as point numbers, to the sketch.
of evidence for monuments to be set.
(Y/N)
5.
Permanent Water Quality BMP (Section 208)
3D Design Modeling Electronic Files
Establish and Maintain Project Centerline or Engineer Approved Offset Line(s) Verification and Maintenance of Horizontal and Vertical Control
All required Instrument Calibrations
11. The Contractor's surveyor shall submit the following (prior to surveying on the project) to the Engineer:
Curb Ramps
Plan PDF Plan PDF Plan PDF
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
SUBGRADE NOTE:
SUBGRADE MATERIAL:
SUBGRADE SHALL CONSIST OF NATURAL EXISTING MATERIALS WITH A CLASSIFICATION OF A-2-6 OR LOWER FOR A MINIMUM OF 1 FOOT BELOW PAVEMENT SECTION. IF MATERIALS CLASSIFYING HIGHER THAN A-2-6 ARE ENCOUNTERED AT SUBGRADE, THAT MATERIAL SHOULD BE SUB-EXCAVATED A MINIMUM OF 1 FOOT BELOW PAVEMENT SECTION AND REPLACED WITH COMPACTED STRUCTURAL FILL CLASSIFYING AS A-2-6 OR LOWER
COMPACTION AND MOISTURE TREATMENT OF SUBGRADE:
ACCEPTABLE EXISTING MATERIAL SHALL BE THOROUGHLY PLOWED AND WELL MIXED TO A DEPTH OF 12 INCHES BELOW PAVEMENT SECTION. REWORKED NATURAL MATERIALS AS WELL AS IMPORTED MATERIALS SHALL HAVE A MOISTURE CONTENT WITHIN 2 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT. SOILS THAT CLASSIFY BETWEEN A-1 AND A-2-5 SHOULD BE COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR AND ALL OTHER ACCEPTABLE SOILS SHOULD BE COMPACTED TO AT LEAST 95% OF THE
STANDARD PROCTOR. AT MINIMUM ALL SUBGRADE SHALL HAVE AN R-VALUE OF 20.
WR CURB INLET (TRIPLE)
ù GRATE ELEV.
2" CLEAR
INVERT ELEV.
SECTION A-A
9'-2 1/2"
SLOPE FLOOR
TO OUTLET
8"
BOTH DIRECTIONS
IS 5' OR GREATER
#4 @ 8" O.C. WHEN H
H IS LESS THAN 5'
#4 @ 1'-0" O.C. WHEN
8" H IS LESS THAN 5'.2'-0"
NOT TO SCALE
MONOLITHICALLY IF
INLET MAY BE FORMED
8" 3"
(S
EE
P
LA
N S)
6"
8"
2" CLEAR
A
OF FLOW
DIRECTION
10'-6 1/2"
3" 8"2"
PLAN
B
3' -4
A
B
8"
3" MIN.
GROUT
NOT TO SCALE
WR CURB INLET (TRIPLE)
SECTION B-B
NOT TO SCALE
WR CURB INLET (TRIPLE)
H (V
AR
IE
S)
H (V
AR
IE
S) (S
EE
P
LA
N
S)
HOOP REBAR 2- #503
AROUND PIPE
PENETRATIONS
GENERAL NOTES:
1. CONCRETE SHALL BE CLASS B.
2. CAST-IN-PLACE CONCRETE WALLS SHALL BE FORMED
ON BOTH SIDES.
3. STEPS SHALL BE PROVIDED WHEN INLET DIMENSION "H"
EXCEEDS 3'-6" AND SHALL BE IN ACCORDANCE WITH
AASHTO M 199.
4. ALL INLETS SHALL BE CONSTRUCTED ON GRADE PER
DESIGN PROFILE.
#4 @ 1'-0" O.C.
WHEN H IS
LESS THAN 5'
#4 @ 8" O.C.
WHEN H IS 5'
OR GREATER
BOTH
DIRECTIONS
SPACING FOR
STEPS SHALL
BE 16"
INVERT
ELEVATION
SLOPE FLOOR
TO OUTLET
INVERTED
60# RAIL
BETWEEN
FRAMES
CITY OF WHEAT RIDGE
STANDARD CURB INLET
FRAME, TYPE "V" GRATE &
CURB BOX. GRATE SHALL
BE NEENAH FOUNDARY
R-3067V OR DEETER
FOUNDARY 2047. (OR
APPROVED EQUAL)
STATION/OFFSET
LOCATION
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
PATTERNED CONCRETE DETAIL
1. PATTERN: WINDSOR COBBLE PATTERN BY BRICKFORM OR APPROVED EQUAL
2. COLOR: BRICK RED, CONCRETE COLOR TO BE FULL DEPTH OR APPROVED EQUAL.
COLORING AGENT SHALL BE INTEGRAL TO THE CONCRETE MIXTURE.
3. SEALING AGENT: BRICKFORM MASTERSEAL OR APPROVED EQUAL
4. RELEASE AGENT: BRICKFORM RA-600 LIGHT GREY OR APPROVED EQUAL
5. PATTERNED CONCRETE WILL BE PAID FOR AS PAY ITEM 610-00020
5 14" TYP.
1 4"
T
YP
6" THICKNESS
INLET TYPE 16 (TRIPLE) DETAIL
CONCRETE COLLAR DETAIL
01/28/2025
S
PP
P
P
PT
S
D
D
P
TT
PP
D
TVP
P P P
P
PP
P
P
T
P
D D
P
PP
D P P P
P
S
TS
S
P
P
P TS
TS
P
ECB
D
D
S
D
P
FO
FO
FO
FO
FO
FO
FO
FO
FO
P
CULVERT
24" CMP IE=5532.29
W
W
W
W
Y
Y
Z
Z
I
Y
Y
N
Z
A
X
W W
W W
W W
W
E
T
9+35 10+00 15+00 20+00 25+00 30+00 33+50N90°00'00"E
2415.00'
POB
9+35.00
HCL 32ND AVE
N:703019.44 E:100120.40
POE
33+50.00
HCL 32ND AVE
N:703019.44 E:102535.40
HCL 32ND AVE
32ND AVE
YO
U
N G
FI
EL
D S
T
XE
N
O N
S T
W R
IG
H
T C
T
W R
IG
H
T
ST
W
AR
D C
T W
AR
D
R D
W R
IG
H
T C
T
ZI
N
N
IA
C T
C
LE
AR
C
R
EE
K D
R
I-7
W B
O N
R
AM
P
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
Feet 0 200 400
TS
P
ECB
D
S
FO
FO
FO
P
O P
O P
OP
OP W 32ND AVE
ZINNIA ST
ZINNIA ST
N ZINNIA CT
ZINNIA CT
OP
OP
OP
OP
OP
OP OP
OP OP
OP OP
OP
9+35 10+00 11+00 12+00 13+00 14+00
ZI
N
N
IA
C T
N Z
IN
N
IA
C
T
ZI
N
N
IA
S T
C
LE
AR
C
R
EE
K D
R
32ND AVE
EX ROW (TYP)
HCL 32ND AVE
BEGIN REMOVAL OF ASPHALT MAT (PLANING)
STA: 9+39.87
END REMOVAL OF ASPHALT MAT (PLANING)
STA: 13+23.86
STA: 11+71.67
35.06' L
STA: 12+01.83
35.26' L
WV
WV WV
ADJUST VALVE BOX
(CMWC
BY OTHERS)
STA: 11+55.54
17.57' R
ADJUST VALVE BOX
(CMWC
BY OTHERS)
STA: 11+96.65
14.67' L
ADJUST VALVE BOX
(CMWC
BY OTHERS)
STA: 12+19.48
17.57' R
CITY BOUNDARY (TYP)
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
M
AT
C H
LI
N
E
ST
A
+0
Feet 0 40 80
NOTE:
1. ALL STRIPING REMOVALS WITHIN ASPHALT PLANING AREAS ARE ASSUMED TO BE
PART OF THE WORK. ALL OTHER STRIPING REMOVALS TO BE PAID FOR AS
202-00250 REMOVAL OF PAVEMENT MARKING
2. CONTRACTOR TO REMOVE ASPHALT UP TO EDGE OF PAVEMENT. ANY ABUTTING
CONCRETE PAVEMENT OR CONCRETE CURB AND GUTTER DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED AT THE EXPENSE AND RESPONSIBILITY OF
THE CONTRACTOR.
3. LOCATIONS OF VALVE BOXES AND MANHOLES ARE APPROXIMATE AND ARE TO BE
FIELD VERIFIED
LEGEND
REMOVAL OF ASPHALT MAT (PLANING)
P
D D
P
P TS
D
P
FO
W 32ND AVE
OP
OP
OP
OP
16+00 17+00 18+00 19+00 20+00
32ND AVE
I70 W B O
N
RAM
P
HCL 32ND AVE
EX ROW (TYP)
PROTECT MEDIAN IN PLACE
PROTECT EXISTING
RAMP LANDING
IN PLACE
END REMOVAL OF ASPHALT MAT (PLANING)
STA: 19+86.94
BEGIN REMOVAL OF ASPHALT MAT (PLANING)
STA: 15+11.25
BEGIN REMOVAL OF ASPHALT MAT
STA: 15+71.04
25.61' R
END REMOVAL OF ASPHALT MAT
STA: 17+90.10
27.00' R
BEGIN REMOVAL OF CURB
BEGIN REMOVAL OF MEDIAN COVER
STA: 15+75.86
14.20' R
END REMOVAL OF CURB
END REMOVAL OF MEDIAN COVER
STA: 17+96.20
0.62' L
STA: 17+58.08
27.08' R
STA: 16+99.44
26.51' R
STA: 15+71.15
9.29' R
STA: 16+72.57
2.78' L
BEGIN REMOVAL OF CURB AND GUTTER
BEGIN REMOVAL OF MEDIAN COVER
STA: 17+47.53
61.71' R
END REMOVAL OF CURB AND GUTTER
END REMOVAL OF SIDEWALK
STA: 20+45.28
69.01' REND REMOVAL OF CURB AND GUTTER
STA: 17+56.33
72.43' R
BEGIN REMOVAL OF ASPHALT MAT
STA: 17+54.85
78.89' R
BEGIN REMOVAL OF CURB AND GUTTER
STA: 17+57.83
76.17' R
REMOVAL OF INLET
STA: 19+97.18
46.66' R
PROTECT EXISTING
SIGNAL POLE AND TRAFFIC
EQUIPMENT IN PLACE
2'
BEGIN REMOVAL OF
CONCRETE PAVEMENT
STA: 19+87.34
36.40' R
PROTECT EXISTING
MANHOLE IN PLACE
END REMOVAL OF MEDIAN COVER
STA: 18+15.92
50.50' R
BEGIN REMOVAL OF SIDEWALK
STA: 17+68.52
65.19' R
REMOVAL OF CONCRETE CURB RAMP
STA: 17+50.23
68.73' R
ADJUST MANHOLE
STA: 19+35.12
42.74' R
WV
ADJUST VALVE BOX
(CMWC
BY OTHERS)
STA: 17+77.90
22.97' R
WV
ADJUST VALVE BOX
(CMWC
BY OTHERS)
STA: 18+86.55
30.22' L
ADJUST MANHOLE
STA: 16+39.43
41.28' R.
PROTECT EX. RETAINING
WALL IN PLACE
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
M
AT
C H
LI
N
E
ST
A
+0
M
AT
C H
LI
N
E
ST
A
+5
Feet 0 40 80
LEGEND
REMOVAL OF SIDEWALK
REMOVAL OF MEDIAN COVER
REMOVAL OF ASPHALT MAT
REMOVAL OF ASPHALT MAT (PLANING)
REMOVAL OF CONCRETE PAVEMENT
REMOVAL OF CONCRETE CURB RAMP
SAWCUT
NOTE:
1. ALL STRIPING REMOVALS WITHIN ASPHALT PLANING AREAS ARE ASSUMED TO BE
PART OF THE WORK. ALL OTHER STRIPING REMOVALS TO BE PAID FOR AS
202-00250 REMOVAL OF PAVEMENT MARKING
2. CONTRACTOR TO REMOVE ASPHALT UP TO EDGE OF PAVEMENT. ANY ABUTTING
CONCRETE PAVEMENT OR CONCRETE CURB AND GUTTER DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED AT THE EXPENSE AND RESPONSIBILITY OF
THE CONTRACTOR.
3. CURB & GUTTER AND CONCRETE PAVEMENT TO BE REMOVED TO NEAREST JOINT
4. LOCATIONS OF VALVE BOXES AND MANHOLES ARE APPROXIMATE AND ARE TO BE
FIELD VERIFIED.
TT
PP
D
TVP
P P P
P
PP
P
T
P
PP
D P P P
FO
W 32ND AVE
YOUNGFIELD ST
W W
W W
W W
W W
E
21+00 22+00 23+00 24+00 25+00
32ND AVE
YO
U
N G
FI
EL
D S
T
HCL 32ND AVE
EX ROW (TYP)
BEGIN REMOVAL OF ASPHALT MAT (PLANING)
STA: 23+46.86
0.00'
END REMOVAL OF
CONCRETE PAVEMENT
STA: 20+53.41
67.62' R
D
ADJUST MANHOLE
STA: 25+54.73
6.42' L.
(XCEL ENERGY
BY OTHERS)
D
ADJUST MANHOLE
STA: 24+21.47
18.86' R.
CITY BOUNDARY (TYP)
Sheet
Project No./Code
Phone: 720.946.0969 Denver Colorado 80202
1600 Broadway Street Suite 800
Vert. Scale: N/A
Sheet Revisions
M
AT
C H
LI
N
E
ST
A
+5
M
AT
C H
LI
N
E
ST
A
+0
Feet 0 40 80
LEGEND
REMOVAL OF ASPHALT MAT (PLANING)
REMOVAL OF CONCRETE PAVEMENT
NOTE:
1. ALL STRIPING REMOVALS WITHIN ASPHALT PLANING AREAS ARE ASSUMED TO BE
PART OF THE WORK.