2527_B ITB.pdf
PDF 6 MB Posted
- Attached to
- 2527-B: Kedron Dam Intake Telescoping Valve
- Solicitation number
- PE-65600-NONST-2025-000000120
- Issued by
- Douglas County, Georgia
About this file
This is an Invitation to Bid (ITB 2527-B) issued by Fayette County, Georgia for the installation of a telescoping valve at the Lake Kedron Dam intake structure. The project involves installing a telescoping valve with scum baffle, custom fabricated elbow and spool, bracing, and hand operator at the Lake Kedron Dam, a Category 1 earthen embankment dam located at 616 Wingspread in Peachtree City. A mandatory pre-bid conference will be held on Monday, February 24th, 2025 at 9:30 a.m. at 616 Wingspread in Peachtree City. Questions are due by February 27, 2025 at 3:00 p.m., and bids must be received by March 4, 2025 at 3:00 p.m. at the Purchasing Department.
The project requires bidders to provide all permits, materials, equipment, mobilization, commercial diving certifications, and labor needed. Specific requirements include installation of SS 10-inch stainless steel spool, support brackets, operating stem and guide brackets, valve operator and spool extension, and handwheel extension. A bid bond of 5% of the total bid amount is required, and the successful bidder must provide performance and payment bonds each equal to 100% of the contract value. The project includes a fixed $5,000 contingency allowance. The contractor must maintain specified insurance coverage including $1,000,000 general liability and automobile liability insurance. A minimum 1-year warranty is required on all work provided.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6' -6
1' -6
3"
2' -1
0"
8"
MIN.
3"
2' -0
LAKE KEDRON NORMAL POOL 835.00
1. CONTRACTOR TO VERIFY ALL DIMENSIONS PRIOR TO ORDERING EQUIPMENT AND MATERIALS. NOTIFY FAYETTE COUNTY
WATER SYSTEM (FCWS) OF ANY DISCREPANCIES.
2. CONTRACTOR TO COORDINATE WITH FCWS DURING CONSTRUCTION TO PREVENT DISRUPTIONS TO NORMAL OPERATIONS OF RAW WATER STRUCTURE. PROJECT TO BE COMPLETED WITHOUT LOWERING THE NORMAL OPERATING LEVEL OF LAKE
KEDRON.
3. CONTRACTOR TO COORDINATE WITH VALVE MANUFACTURER TO PROVIDE A SPOOL OR ACTUATOR EXTENSION TO ELEVATE
THE HANDWHEEL OPERATOR CENTERLINE 2'-10" ABOVE THE RAW WATER STRUCTURE FFE.
4. CONTRACTOR TO VERIFY THAT THE HANDWHEEL OPERATOR WILL NOT COME IN CONFLICT WITH EXISTING ELECTRICAL AND INSTRUMENTATION. CONTRACTOR TO CORE INTO EXISTING STRUCTURE USING METHODS TO PREVENT SIGNIFICANT DAMAGE TO THE BUILDING EXTERIOR. CORE SHALL NOT EXCEED MORE THAN 2 INCHES IN DIAMETER GREATER THAN THE HANDWHEEL OPERATING STEM. CONTRACTOR SHALL SEAL THE OPERATING STEM WALL PENETRATION AT THE OPINION OF THE
MANUFACTURE AND APPROVED BY FCWS.
5. ALL PIPING SHALL BE 304 SS SCH 80 UNLESS NOTED OTHERWISE.
6. CONNECT TO EXISTING 10” ORIFACE WITH FABRICATED SS LONG RADIUS 90-DEGREE BEND. 90-DEGREE BEND SHALL BE FABRICATED WITH 24"x24"X1" 304 SS PLATE. SEE DETAIL. CONTRACTOR SHALL SUBMIT FABRICATION SHOP DRAWINGS AND
SPECIFICATIONS TO FCWS FOR APPROVAL BEFORE FABRICATION.
7. TELESCOPING VALVE SHALL BE PROVIDED BY ONE OF THE FOLLOWING MANUFACTURERS, COMPLETE WITH A SHOP DRAWING
AND SPECIFICATION, SIGNED AND SEALED BY A LICENSED PROFESSIONAL FCWS:
A. TRUMBULL MANUFACTURING, INC.
B. TROY VALVE
C. OR FCWS APPROVED EQUAL
TELESCOPING VALVE SHALL CONSIST OF THE FOLLOWING:
SLIP TUBE:
A. MATERIAL SHALL BE 304 SS
B. SLIP TUBE TOP CONFIGURATION SHALL BE PLAIN END
C. SCUM BAFFLE SHALL BE 304 SS
FLANGED CONNECTION:
TELESCOPING VALVE SHALL BE FABRICATED SO AS TO BE ABLE TO BE CONNECTED TO A 125# FLANGE
RACK & PINION:
A. THE OPERATOR SHALL BE SAFETY-LOCK AND SELF-LOCKING RISING STEM
B. A CLEAR STEM COVER W/ TRAVEL SCALE SHALL BE PROVIDED FOR THE TRAVEL RACK
FLOOR STAND AND OPERATOR:
A. OPERATOR SHALL BE HAND WHEEL, NON-RISING STEM
B. FLOOR STAND SHALL BE CAST DUCTILE IRON EPOXY COATED
TELESCOPING VALVE SHALL ALLOW FOR 6.2 FT OF TRAVEL
SCUM BAFFLE:
MAXIMUM OUTSIDE DIAMETER = 18"
SUPPORT BRACKET AND ANCHORING:
TO BE SUPPLIED AT MANUFACTURER'S RECOMMENDATION AND APPROVED BY FCWS. MANUFACTURE SHALL SUPPLY BRACKET TO SUPPORT THE FLOOR STAND AND OPERATOR, THE 10" PIPE SPOOL AND PROVIDE STEM GUIDE BRACKETS AS NECESSARY.
SUPPORTS SHALL BE 304 SS
ANCHOR BOLT SHALL BE SUPPLIED BY THE CONTRACTOR. SEE "NOTE 8" .
8. CONCRETE ADHESIVE ANCHORS:
ADHESIVE ANCHORS SHALL CONSIST OF THREADED RODS ANCHORED INTO HARDENED CONCRETE USING AN ADHESIVE SYSTEM.
PRODUCTS AND MANUFACTURERS: PROVIDE ONE OF THE FOLLOWING:
A. HIT-RE 500-V3 INJECTION EPOXY ADHESIVE ANCHORING SYSTEM, BY HILTI FASTENING SYSTEMS, INC.
B. SET-3G HIGH STRENGTH EPOXY ADHESIVE, BY SIMPSON STRONG-TIE COMPANY, INC.
C. OR FCWS APPROVED EQUAL.
ADHESIVE:
ADHESIVE SYSTEM SHALL USE TWO-COMPONENT ADHESIVE MIX.
EPOXY ADHESIVES SHALL COMPLY WITH PHYSICAL REQUIREMENTS OF ASTM
C881/C881M, TYPE IV, GRADE 2 AND 3, CLASS A, B, AND C, EXCEPT GEL TIMES.
ADHESIVES SHALL HAVE A CURRENT EVALUATION REPORT BY ICC EVALUATION SERVICE FOR USE IN BOTH CRACKED AND
UNCRACKED CONCRETE WITH SEISMIC RECOGNITION FOR SDC A THROUGH F AS TESTED AND ASSESSED IN ACCORDANCE
WITH ICC-ES AC308 WHICH INCORPORATES THE REQUIREMENTS OF ACI 355.4-11.
ANCHOR:
A. PROVIDE CONTINUOUSLY THREADED, AISI TYPE 316 STAINLESS STEEL ADHESIVE ANCHOR ROD. THREADED RODS SHALL
COMPLY WITH THE CONCRETE ADHESIVE ANCHOR MANUFACTURER’S SPECIFICATIONS AS INCLUDED IN THE ICC SERVICE EVALUATION REPORT FOR THE ANCHOR SUBMITTED. NUTS SHALL HAVE SPECIFIED PROOF LOAD STRESSES EQUAL TO OR GREATER THAN THE MINIMUM TENSILE STRENGTH OF THE STAINLESS STEEL THREADED ROD USED. PROVIDE ASTM
A194/A194M, GRADE 8S (NITRONIC 60) STAINLESS STEEL NUTS WHERE REQUIRED.
B. STAINLESS STEEL THREADED ROD SHALL COMPLY WITH DUCTILITY REQUIREMENTS OF ACI 350 APPENDIX D OR ACI 318
CHAPTER 17.
UNLESS APPROVED BY FCWS, DO NOT USE POWER-ACTUATED FASTENERS OR OTHER TYPES OF BOLTS AND FASTENERS NOT
SPECIFIED.
HIGH DRAWDOWN LEVEL: 831.20 HWL 831.20
LWL 825.00
LAKE KEDRON NORMAL POOL 835.00
EXISTING INTAKE
STRUCTURE
FFE 845.75
2-FT HANDWHEEL EXTENSION
SEE NOTE 4
SUPPORT BRACKET
SEE NOTE
SPOOL OR OPERATOR EXTENSION
SEE NOTE 3
TELESCOPING VALVE
WITH SCUM BAFFLE.
SEE NOTE 7
SUPPORT BRACKET
SEE NOTE
TOP SPOOL FLANGE
ELEVATION: 824.31
FFE 845.75
10" 304 STAINLESS STEEL
PIPE SPOOL
GENERAL NOTES
EXISTING 10"
DUCTILE IRON
WALL PIPE
2'-0"
CLEARANCE (TYP.)
24" x 24" x 1"
304 SS PLATE
2"
2"
24" x 24" x 1"
304 SS PLATE
24" x 24"
RUBBER (SBR) -
FULL FACE GASKET
NOTE:
ALL STAINLESS STEEL MANUFACTURING
SHALL CONFORM TO AWS D1.6/D1.6M
STEM GUIDE
BRACKET
NOTE:NOTE:
CONTRACTOR TO COORDINATE WITH
MANUFACTURER TO ENSURE NO
CONFLICT WITH THE SUPPORT
BRACKET AND THE SCUM BAFFLE.
NOTIFY FCWS OF ANY
DISCREPANCIES OR CHANGES TO
WATER LEVEL OPERATING RANGE.
FLANGE CONNECTION AND
GASKETS TO BE SUPPLIED BY
THE VALVE MANUFACTURER
EXISTING CENTERLINE
ELEVATION: 816.42
STEM GUIDE
BRACKET
LOW DRAWDOWN LEVEL: 825.00
EXISTING TIMBER
FRAMED BUILDING WITH
PLYWOOD SIDING
FLANGE x FLANGE CONNECTION
WITH 316 SS BOLTS AND
RUBBER (SBR) FULL FACE GASKET
10" 304 STAINLESS STEEL
90° LONG RADIUS BEND,
SEE NOTE 6
1'-4 5/8"
1" 316 SS ANCHOR BOLTS
DRILL AND EPOXY WITH 6"
EMBEDMENT,
TYPICAL 12 PLACES
SCALE: 1" = 1'-0"
SCALE: 3/4" = 1'-0"
SCALE: 3/4" = 1'-0"SCALE: 1/2" = 1'-0"
(12) BOLT HOLES FOR
1" 316 SS BOLTS
AT 6" O.C.
AutoCAD SHX Text User:BJACKSON Spec:AUS-NCSMOD File:C:\USERS\BJACKSON\ARCADIS\FAYETTE CO FCWS - CAD\LAKE KEDRON EFFLUENT STRUCTURE MODIFICATIONS.DWG Scale:1:1 SavedDate:1/13/2025 Time:11:15 Plot Date: Jackson, Brad; 1/13/2025; 11:24 ; Layout:LAYOUT1
AutoCAD SHX Text
FAYETTE COUNTY, GEORGIA
AutoCAD SHX Text
FAYETTE COUNTY WATER SYSTEM
AutoCAD SHX Text
2839 PACES FERRY ROAD SUITE 900, ATLANTA, GA 30339
AutoCAD SHX Text
TE: 770-431-8666 WWW.ARCADIS.COM
AutoCAD SHX Text
245 MCDONOUGH RD FAYETTEVILLE, GA 30214
AutoCAD SHX Text C-01
AutoCAD SHX Text A
AutoCAD SHX Text C-01
AutoCAD SHX Text B
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
JANUARY 2025
AutoCAD SHX Text
AutoCAD SHX Text
ARCADIS U.S., INC.
AutoCAD SHX Text 30226846
AutoCAD SHX Text
CONSULTANTS
AutoCAD SHX Text
SEALS
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
COPYRIGHT:
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
OF
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
CLIENT PROJ. NO.:
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
PROJECT STATUS:
AutoCAD SHX Text
BAR IS ONE INCH ON UNREDUCED DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
FAYETTE COUNTY WATER SYSTEM (FCWS) LAKE KEDRON INTAKE STRUCTURE MODIFICATIONS
AutoCAD SHX Text C-01
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
E. VAN DEVENTER
AutoCAD SHX Text
B. JACKSON
AutoCAD SHX Text
M. DIAZ
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text A
AutoCAD SHX Text C-01
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text B
AutoCAD SHX Text C-01
AutoCAD SHX Text
SECTION- EXISTING INTAKE STRUCTURE
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 6'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 3'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 3'
AutoCAD SHX Text 2'
AutoCAD SHX Text C-01
AutoCAD SHX Text C
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text C
AutoCAD SHX Text C-01
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text C-01
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
AutoCAD SHX Text C-01
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text 1/13/2025
AutoCAD SHX Text
EMV
| DOC012925-01292025124625.pdf |
| 2024.01.13 Arcadis_Lake Kedron Effluent Structure Modifications FINAL.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .