25260062BTL__Rebid__Exhibit_B__Price_Schedule__Revised.pdf
PDF 126 KB Posted
- Solicitation number
- 25260062B – TL - Rebid
- Issued by
- Seminole County, Florida
About this file
This is a Price Schedule document from the School Board of Seminole County (SBSC) in Florida for the Athletic Field Maintenance, Fertilization, and Pest Control rebid contract opportunity. The document outlines twenty-two line items for which bidders must provide pricing, encompassing a comprehensive range of turf maintenance and pest control services. Services include fertilizer application, herbicide and pesticide applications, nematode control using Curfew or approved equivalent products, cultural and spike aeration, verticutting, top dressing, overseeding with rye grass, sod replacement in both economy and premium grades, field renovations, infield clay renovation, mound renovations for baseball and softball fields, warning track installations, sports field mowing, aerification and recycling services, turf maintenance, top drain work, and hourly rates for sprinkler head testing and inspection. The document notes that the SBSC reserves the right to negotiate with the awarded proposer(s) to add or remove fields as determined by the board. No specific response dates, due dates, site visit information, or award dates are provided in this price schedule document.
The price schedule requires bidders to enter unit pricing for each service line item without specifying minimum quantities or contract duration. Special attention is required for Item 5 (Nematode Control), which mandates that proposers offering alternative products to Curfew must submit specification sheets and provide at least one reference demonstrating application on athletic fields, with manufacturer verification of approval for such use. The document includes signature and identification blocks for authorized vendor representatives, including spaces for name, title, vendor name, date, and phone number. No set-asides, incumbent information, funding sources, or specific pricing guidance is detailed in this document, as it functions solely as a blank pricing template for bidder response.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE - Revised
The Seminole County School Board reserves the right to negotiate with the awarded proposer(s) to add or remove fields as determined by the SBSC.
ITEM DESCRIPTION UNIT OF MEASURE PRICE
1. Fertilizer Application Per acre, Per each treatment $ __________
2. Herbicide Application Per acre, Per each treatment $ __________
3. Pesticide Application Per acre $ __________
4. Slit application of Chipco or equivalent Per acre $ __________
5. Nematode Control – Curfew or equivalent * Per acre $ __________
* NOTE: If you are proposing an alternative to the Curfew product, you must include specification sheets on the product, including the method of application. At least one of your references must include the application of this product on an athletic field. Please verify with the manufacturer that the product is approved for this use.
6. Cultural Aeration Per acre, Per each treatment $ __________
7. Spike Aeration Per acre $ __________
8. Verticutting Per acre $ __________
9. Top dressing includes sand and application Per cubic yard $ __________
10. Overseeding with rye grass includes seed and application Per Acre $ _________
11. Sod Replacement (Economy) Per Square Foot $ __________
12. Sod Replacement (Premium) Per Square Foot $ __________
13. Field Renovations Per Square Foot $ __________
14. Infield Clay Renovation including Duraedge Per Field $ __________
15. Mound Renovations for Baseball/Softball Fields Per Mound $ __________
16. Warning Track Installations Per Square Foot $ __________
17. Top Dressing including Command Per Cubic Yard $ __________
18. Sports Field Mowing Per Acre $ __________
19. Aerification/Recycling Services Per Acre $ __________
20. Turf maintenance Per Acre $___________
21. Top Drain Work Per Linear Foot $___________
22. Hourly rate for testing, inspecting, making minor adjustments, and marking of sprinkler heads Per Hour $__________
NAME (TYPED OR PRINTED) TITLE
SIGNATURE VENDOR NAME
DATE PHONE NUMBER
File details come from the government source that posted it. Updated .