25235 Nuabinway Garge Roof - Addendum 1.pdf
PDF 630 KB Posted
- Solicitation number
- RFQ-171-250000000571-2
- Issued by
- Livingston County, Michigan
About this file
This is an Addendum No. 1 issued by U.P. Engineers & Architects, Inc. for the Department of Technology, Management and Budget (DTMB) regarding the Naubinway Wildlife Garage Roof Replacement project located in Naubinway, Michigan. The addendum, dated August 14, 2025, modifies the original project specifications, including details for metal roof panels and roof framing. The project involves removing existing metal roofing and fiber board, exposing existing roof trusses, and installing new 5/8" OSB and 2x4 purlins on top of existing purlins, followed by 24-gauge metal roofing. A mandatory pre-bid walkthrough was conducted on August 6, 2025, at 1:00 PM, with attendees from UPEA, Ripman Construction, NK Environmental, and DTMB.
The addendum provides specific technical specifications for the architectural standing seam metal roofing, including 24-gauge prefinished steel sheets with 18-inch nominal width, a flat profile, and standing snap-interlocked seams. The DNR will remove trees and concrete culvert prior to construction. The roof framing plan details the installation of new purlins directly on top of existing purlins, with lap joints specifically instructed not to align. The revised roof detail includes additional components such as a new ice dam membrane, new metal drip edge, fully vented aluminum soffit, and metal fascia, with precise instructions for installation and sizing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0511 • 800-867-0511 • Fax: 906-635-0612
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc. www.UPEA.com
[M12-05333]
ADDENDUM NO. 1
TO THE
DTMB – Naubinway Wildlife Garage Roof Replacement (ISID) Naubinway, MI
ADDENDUM NO. 1 is issued August 14, 2025, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.
File No. 751/25235.ABG Naubinway Wildlife Garage Roof Replacement (ISID)
Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
GENERAL
1. See attached mandatory pre-bid walkthrough sign-in sheet.
2. The DNR will remove the trees and concrete culvert prior to construction.
SPECIFICATIONS
3. Specification Section 07 41 13 Metal Roof Panels
a. REMOVE 2.1; B: Metal Roof Panels and REPLACE with the following.
b. Architectural Standing Seam Metal Roofing:
i. Description: Factory-formed metal roofing panel system with concealed fasteners.
ii. Panels:
1) Steel Sheet:
a) Material: Prefinished.
b) Base Metal Thickness: 24 gauge
iii. Nominal Width: 18 inches
iv. Profile: Flat
v. Seams:
1) Type: Standing, snap interlocked.
2) Height: 1 inch
3) Color: As selected by Owner from manufacturer’s standard colors.
PLANS
4. Drawing Sheet A101: REVISE Keynote 1 to read: REMOVE EXISTING METAL
ROOFING AND FIBER BOARD TO EXPOSE EXISTING ROOF TRUSSES.
ROOF PURLINS. PURLINS SHALL REMAIN IN PLACE. INSTALL NEW 5/8”
OSB 2x4 PURLINS ON TOP OF EXISTING PURLINS, 5/8” OSB VERTICALLY
UP AND DOWN ROOF AND 26 GA METAL ROOFING.
a. Additional clarification for the note above provided on Drawing Sheets A1- A1 and A1-A2 attached to this Addendum.
5. REPLACE all references to 26 gauge metal with 24 gauge metal to reflect the information above.
END OF ADDENDUM NO. 1
Prepared by:
U.P. Engineers & Architects, Inc
A1 A101
B1 A101
EX
IS
TI
N
G R
O O
F
TR
U
SS
ES
'-0
" O .C
LAP JOINTS SHALL NOT ALIGN
EXISTING 2x4 PURLINS @ 2'-0" O.C.
INSTALL NEW 2x4 PURLINS DIRECTLY ON TOP
5/8" OSB UP
AND DOWN
ROOF AS
SHOWN
R
ID
G E
A1-A2
DATE: JOB No:DRAWN: DRAWING:
Houghton Iron Mountain Ishpeming Sault Ste. Marie Marinette 8-14-2025 M12-05333
NAUBINWAY FIELD OFFICE ROOF REPLACEMENT
JHR A1-A1
ROOF FRAMING PLAN
1/8" = 1'-0"1 ROOF FRAMING PLAN
N
EXISTING WALL
1' - 4" VIF
NEW FULLY
VENTED ALUM
SOFFIT
EXISTING ROOF TRUSSES TO REMAIN
NEW 5/8" OSB
NEW ICE DAM MEMBRANE
NEW 26 ga METAL ROOFING
NEW METAL
DRIP EDGE
NEW METAL
FASCIA ON
EXISTING SUB-
FASCIA AND
PURLINS. SIZE
SHALL BE AS
REQUIRED TO
COVER SUB-
FASCIA AND
PURLINS.
EXISTING 2x4 PURLINS TO REMAIN
NEW 2x4 PURLINS DIRECTLY ON TOP OF
EXISTING PURLINS. LAP JOINTS SHALL
NOT ALIGN.
THIS DETAIL SHALL REPRESENT BOTH
COLD STORAGE AND HEATED
STORAGE. INSULATION AND OTHER
INFORMATION BELOW TRUSS ON
HEATED STORAGE DETAIL SHALL
REMAIN.
DATE: JOB No:DRAWN: DRAWING:
Houghton Iron Mountain Ishpeming Sault Ste. Marie Marinette 8-14-2025 M12-05333
NAUBINWAY FIELD OFFICE ROOF REPLACEMENT
JHR A1-A2
ROOF DETAIL
1 1/2" = 1'-0"1 REVISED ROOF DETAIL
| Insert from: "M12-05333-DNR-NAUBINWAY ROOF-ADD 1 DWGS.pdf" |
| A1-A1 - ROOF FRAMING PLAN |
| A1-A2 - ROOF DETAIL |