The file's text, extracted by GovTribe without its formatting.
Statement of Requirements Attachment J.1
NOAA Class C
Attachment J.1 Statement of Requirements
DRAFT (Industry Day Copy)
Revision -
YYY XX, 2025 Solicitation No.
1XXXXXXXXX
DISTRIBUTION STATEMENT A: Approved for public release; distribution approval from NOAA is required.
Table of Contents
| Table of Contents | 1 |
| 000 GENERAL REQUIREMENTS | 16 |
| 042 GENERAL ADMINISTRATIVE REQUIREMENTS | 16 |
| 042.a Equivalent Equipment | 16 |
| 042.b Definitions | 16 |
| 042.c Effective Issue | 22 |
| 045 CARE OF THE SHIP | 23 |
| 045.a Hull Protection During Outfitting | 23 |
| 070 GENERAL REQUIREMENTS FOR CONSTRUCTION | 23 |
| 070.a General | 23 |
| 070.b Regulatory Body Requirements | 25 |
| 070.c Principal Characteristics | 26 |
| 070.c.1 Draft | 26 |
| 070.c.2 Speed, Range and Endurance | 26 |
| 070.c.3 Zero Discharge Operations | 27 |
| 070.c.4 Propulsion | 27 |
| 070.d Maneuverability | 27 |
| 070.e Seakeeping | 28 |
| 070.f Ship Arrangement and Spaces | 28 |
| 070.f.1 General | 28 |
| 070.f.2 Accommodation Spaces | 29 |
| 070.f.3 Deck Heads | 29 |
| 070.f.4 Recreation / Leisure Facilities | 30 |
| 070.f.5 Food Service Spaces | 30 |
| 070.f.6 Medical Space | 30 |
| 070.f.7 Utility Spaces | 30 |
| 070.f.8 Offices | 30 |
| 070.f.9 Machinery Control Station | 30 |
| 070.f.10 Pilot House, Chart Area, and Aft Conning Station | 30 |
| 070.f.11 Damage Control Lockers | 31 |
| 070.f.12 Workshops | 31 |
| Engineer’s Workshop | 31 |
| Bosun’s Workshop | 31 |
| Electronic Technician’s (ET) shop | 32 |
| 070.f.13 Laboratories and Scientific Working Areas | 32 |
| Fish Lab | 32 |
| Wet Lab | 32 |
| 070.f.14 Other Mission Spaces | 32 |
| Staging Area | 32 |
| Marine Mammal Observation Stations | 32 |
| Scientific Van Site | 33 |
| Aft Working Deck | 33 |
| Side Sampling Station | 33 |
| Uncrewed Aerial Operations (UAO) Deck Space | 34 |
| Transducer Room | 34 |
| Transceiver Room | 34 |
| 070.f.15 Stowage Requirements | 34 |
| Special Stowage Facilities | 34 |
| HAZMAT Locker | 34 |
| Foul Weather Gear and Miscellaneous Stowage | 34 |
| Linen Locker(s) | 34 |
| Cleaning Gear Locker | 34 |
| Dive Locker | 35 |
| Oil and Hazardous Substance (OHS) Spill Response Kit Stowage | 35 |
| Shore Power Cable Stowage | 35 |
| Storerooms | 35 |
| Paint/Chemical Storeroom | 35 |
| Scientific Stores | 35 |
| Bosun’s Storeroom | 35 |
| Deck Gear Locker | 35 |
| Mooring Line Stowage | 35 |
| Frozen, Chilled, and Dry Provisions Stores | 35 |
| Repair Parts Stores | 36 |
| Ship’s Stores and Galley General Stores | 36 |
| General Bulk Stores | 36 |
| Engineer’s Consumable Stores | 36 |
| Uncrewed Systems Spares Repair Locker | 36 |
| Rotational Crew Stowage. | 36 |
| Stores Landing Area | 36 |
| 070.g Electromagnetic Environmental Effects | 37 |
| 070.h Operating Environment | 39 |
| 070.i General Requirements for Equipment, Machinery and Materials | 39 |
| 070.j Workmanship | 40 |
| 071 ACCESS | 40 |
| 073 NOISE, VIBRATION AND RESILIENT MOUNTINGS | 41 |
| 073.a General | 41 |
| 073.b Mechanical Vibration | 41 |
| 073.c Sonar Self Noise | 41 |
| 073.d Underwater Radiated Noise | 43 |
| 075 THREADED FASTENERS | 44 |
| 078 MATERIALS | 44 |
| 079 STABILITY | 45 |
| 079.a General | 45 |
| 079.b Equalization of Tanks | 45 |
| 080 ACCESS FOR MAINTAINABILITY OF EQUIPMENT AND MACHINERY | 45 |
| 096 WEIGHT CONTROL | 46 |
| 096.a General | 46 |
| 100 HULL STRUCTURE | 50 |
| 100.a General | 50 |
| 100.b Special Structural Requirements | 50 |
| 100.c Operational and Environmental Loads | 50 |
| 111 SHELL AND SUPPORTING STRUCTURE | 51 |
| 111.a Ice Strengthening | 51 |
| 111.b Impact Loads | 51 |
| 111.c Bulwarks (Continuous with Shell) | 52 |
| 114 SHELL APPENDAGES | 52 |
| 114.a General | 52 |
| 114.b Bilge Keels | 52 |
| 114.c Skeg | 52 |
| 115 STANCHIONS | 52 |
| 130 DECKS | 52 |
| 131 WORKING DECKS | 53 |
| 133 DECK FITTINGS AND TIE DOWNS | 53 |
| 150 BULWARKS (NON-CONTINUOUS WITH SHELL) | 54 |
| 160 SPECIAL STRUCTURES | 54 |
| 160.a Centerboard | 54 |
| 162 STACKS | 56 |
| 170 HULL STRUCTURAL CLOSURES | 56 |
| 171 MAST AND FLAGSTAFF | 56 |
| 171.a General | 56 |
| 171.b Main Mast | 57 |
| 171.c Fore Mast | 57 |
| 172 FOUNDATIONS | 58 |
| 200 PROPULSION PLANT | 58 |
| 200.a General | 58 |
| 202 MACHINERY CENTRALIZED CONTROL SYSTEMS (MCCS) | 59 |
| 202.a General | 59 |
| 202.b Data Acquisition System | 61 |
| 202.c Software | 61 |
| 202.d System Architecture | 62 |
| 202.e Systems Monitoring and Control | 62 |
| 202.f Uninterruptible Power Supplies (UPS) | 65 |
| 202.g Condition Based Monitoring | 65 |
| 233 DIESEL ENGINES | 67 |
| 233.a General | 67 |
| 233.b Instruments, Controls, and Accessories | 67 |
| 233.c Local Instruments, Controls and Alarms | 69 |
| 235 ELECTRIC PROPULSION | 69 |
| 235.a Azimuthing Propulsors | 69 |
| 252 MAIN CONTROL STATION | 70 |
| 256 MACHINERY COOLING WATER SYSTEMS | 70 |
| 256.a Diesel Engine Jacket Water System | 70 |
| 256.b Main Cooling Water System | 70 |
| 259 DIESEL ENGINE COMBUSTION AIR AND EXHAUST SYSTEMS | 71 |
| 262 LUBRICATION SYSTEMS | 71 |
| 300 GENERAL REQUIREMENTS FOR ELECTRIC PLANT AND CABLING | 72 |
| 300.a General | 72 |
| 300.b Installation Practices | 73 |
| 302 MOTORS AND ASSOCIATED EQUIPMENT | 73 |
| 303 ELECTRIC POWER GENERATION | 75 |
| 304 EMERGENCY GENERATORS | 75 |
| 305 BATTERIES & SERVICE FACILITIES | 75 |
| 306 POWER CONVERSION EQUIPMENT | 76 |
| 306.a Propulsion and Bow Thruster Variable Speed Drives | 76 |
| 306.b 12/24 Volt DC Power | 76 |
| 306.c Uninterruptible Power Supply (UPS) Units | 76 |
| 307 GENERAL REQUIREMENTS FOR ELECTRIC POWER DISTRIBUTION SYSTEMS | 77 |
| 307.a Ship Service Power Systems | 77 |
| 307.a.1 120 VAC Receptacles | 77 |
| 307.a.2 240 VAC Receptacles | 79 |
| 307.a.3 480 VAC Receptacles | 79 |
| 307.b Scientific Power System | 79 |
| 307.c Scientific UPS | 81 |
| 307.d Bridge UPS | 82 |
| 307.e Shore Power | 82 |
| 322 SCIENCE WIREWAYS | 83 |
| 324 SWITCHBOARDS AND PANELS FOR ELECTRIC POWER AND LIGHTING | 84 |
| 330 REQUIREMENTS FOR LIGHTING SYSTEMS | 84 |
| 330.a General | 84 |
| 330.b Lighting Control | 85 |
| 330.c Interior lighting | 86 |
| 330.d Deck Lighting | 86 |
| 330.e Floodlights | 87 |
| 400 GENERAL REQUIREMENTS FOR ELECTRONICS SYSTEMS | 87 |
| 400.a General Requirements | 87 |
| 400.b Safety | 87 |
| 400.c Installation | 87 |
| 400.d Cable Designations and Marking | 88 |
| 400.e Cable Testing | 88 |
| 402 GENERAL CYBERSECURITY REQUIREMENTS FOR ELECTRONICS SYSTEMS | 89 |
| 403 GENERAL REQUIREMENTS FOR NAVIGATION, COMMUNICATIONS, AND MISSION ELECTRONICS | 89 |
| 405 ANTENNAS | 90 |
| 420 DYNAMIC POSITIONING SYSTEM (DPS) AND AUTOPILOT | 90 |
| 420.a Dynamic Positioning System | 90 |
| 420.b DPS Manual Mode | 92 |
| 420.c DPS Autopilot Mode | 92 |
| 420.d DPS Automatic Control Mode | 92 |
| 420.e Independent Autopilot | 92 |
| 421 NON-ELECTRICAL AND NON-ELECTRONIC NAVIGATION AIDS | 93 |
| 421.a Pelorus Stands | 93 |
| 421.b Clinometers | 93 |
| 421.c Magnetic Compass | 93 |
| 421.d Barometer | 94 |
| 422 NAVIGATION LIGHTS, SIGNAL LIGHTS, AND SEARCHLIGHTS | 94 |
| 423 ELECTRICAL AND ELECTRONIC NAVIGATION SYSTEMS | 94 |
| 423.a Global Positioning System | 94 |
| 423.b Gyrocompass Systems | 95 |
| 423.c Ship’s Whistle | 96 |
| 423.d Bell System | 96 |
| 424 ELECTRONIC NAVIGATION SYSTEMS, ACOUSTIC | 96 |
| 424.a Ship’s Depth Finding System | 96 |
| 424.b Speed Log System | 97 |
| 426 SCIENTIFIC ELECTRONIC SYSTEMS (SES) | 97 |
| 426.a SES Systems | 98 |
| 426.b Master Clock System | 98 |
| 427 SHIPBOARD AND SCIENTIFIC COMPUTER SYSTEM (SCS) NETWORKS | 98 |
| 427.a Shipboard Network Cables | 99 |
| 427.b SCS Network Cables | 102 |
| 432 TELEPHONE SYSTEMS | 104 |
| 432.a Sound-Powered Telephone System | 104 |
| 432.b Dial Telephone System | 105 |
| 433 PUBLIC ADDRESS SYSTEM | 107 |
| 434 ENTERTAINMENT SYSTEM | 108 |
| 436 ELECTRICAL ALARM, SAFETY AND WARNING SYSTEMS | 109 |
| 436.a Fire Alarm System | 109 |
| 436.b General Alarm System | 109 |
| 436.c In Port Alarm and Monitoring System | 109 |
| 436.d Bridge Navigational Watch and Alarm System | 110 |
| 438 INTEGRATED BRIDGE SYSTEM (IBS) | 110 |
| 439 CLOSED CIRCUIT TELEVISION SYSTEM | 110 |
| 441 EXTERIOR COMMUNICATION SYSTEM | 112 |
| 463 NAVIGATION SYSTEM AND SCIENTIFIC ELECTRONIC SYSTEM (SES) ALIGNMENT | 114 |
| 463.a Definition and Realization of Reference Frame | 114 |
| 463.b Monumentation of Reference Frame | 115 |
| 463.c Installation Alignment | 116 |
| 463.d Measurement of Component Position and Rotation | 117 |
| 463.e Additional Survey Points, Offsets, and Markings | 117 |
| 480 SCIENTIFIC INSTRUMENTATION | 119 |
| 494 SCIENTIFIC METEOROLOGICAL SYSTEMS | 119 |
| 500 GENERAL REQUIREMENTS FOR AUXILIARY SYSTEMS | 119 |
| 503 PUMPS | 119 |
| 503.a General | 119 |
| 503.b Special Requirements | 119 |
| 503.b.1 Centrifugal Pumps | 119 |
| 503.b.2 Rotary Pumps | 120 |
| 503.b.3 Vertical Pumps | 120 |
| 503.b.4 System Pumps | 120 |
| 504 INSTRUMENTS AND INSTRUMENT BOARDS | 120 |
| 504.a General | 120 |
| 504.b Tank Level Indicators | 121 |
| 504.c Thermometers | 121 |
| 504.d Pressure Gauges | 122 |
| 504.e Flowmeters | 122 |
| 504.f Instrument Boards | 122 |
| 505 PIPING | 123 |
| 505.a General | 123 |
| 505.b Velocities | 123 |
| 505.c Valves | 124 |
| 505.d Materials | 124 |
| 505.e Installation | 128 |
| 506 VENTS, SOUNDING AND OVERFLOW ARRANGEMENTS | 129 |
| 506.a General | 129 |
| 506.b Vents and Overflows | 129 |
| 506.c Soundings | 130 |
| 507 MACHINERY AND PIPING SYSTEM DESIGNATION AND MARKING | 130 |
| 508 INSULATION FOR MACHINERY AND PIPING | 131 |
| 509 THERMAL INSULATION AND ACOUSTIC ABSORPTIVE TREATMENT FOR DUCTS AND TRUNKS | 131 |
| 512 HEATING, VENTILATION AND AIR CONDITIONING (HVAC) | 132 |
| 512.a General | 132 |
| 512.b Design Criteria | 132 |
| 512.c Air Conditioning Systems | 133 |
| 512.d Heating Systems | 134 |
| 512.e Ventilation Systems | 135 |
| 512.f Machinery Space Ventilation | 137 |
| 514 CONDENSATE COLLECTION | 138 |
| 516 REFRIGERATION SYSTEMS | 138 |
| 516.a General | 138 |
| 516.b Air Conditioning Plants | 138 |
| 516.c Refrigerant Split Units Type A/C Units | 139 |
| 516.d Chilled Water Type A/C Units | 139 |
| 516.e Ship Service Refrigeration Plants | 139 |
| 516.f Ultra-Low Temperature Scientific Freezer | 140 |
| 521 FIREMAIN SYSTEM | 141 |
| 521.a General | 141 |
| 521.b Specific Requirements | 141 |
| 524 SEAWATER SERVICE SYSTEM | 141 |
| 524.a Uncontaminated Scientific Seawater System | 141 |
| 524.c Washdown Facilities | 147 |
| 528 PLUMBING, DECK DRAINS AND VENTS | 147 |
| 528.a General | 147 |
| 528.b Interior Deck Drains | 148 |
| 528.b.1 Special Interior Deck Drains | 148 |
| 528.c Weather Deck Drains | 149 |
| 528.d Traps and Cleanouts | 150 |
| 528.e Plumbing Drains and Vents | 150 |
| 529 BILGE AND BALLAST SYSTEMS | 151 |
| 529.a Bilge Drainage | 151 |
| 529.a.1 Bilge Stripping System | 151 |
| 529.b Ballasting/Deballasting | 152 |
| 529.c Ballast Water Management System | 152 |
| 529.c.1 General | 152 |
| 529.c.2 Type and Location of BWMS Equipment | 152 |
| 529.c.3 Testing | 152 |
| 531 FRESHWATER PRODUCTION SYSTEM | 153 |
| 531.a General | 153 |
| 531.b Freshwater Production Capacities | 153 |
| 531.c Reverse Osmosis Units | 153 |
| 532 FRESHWATER SERVICE SYSTEM | 153 |
| 532.a Chilled Water System | 153 |
| 532.b Centralized Freshwater Cooling System | 154 |
| 533 POTABLE WATER SYSTEM | 154 |
| 533.a General | 154 |
| 533.b Potable Water Distribution | 155 |
| 533.c Cold Potable Water System | 155 |
| 533.d Hot Potable Water System | 156 |
| 533.e Disinfection and Filtration System | 156 |
| 533.e.1 Bromine | 156 |
| 533.e.2 UV | 156 |
| 533.f Miscellaneous Services | 157 |
| 534 MACHINERY AND COMPONENT DRAINS | 157 |
| 534.a General | 157 |
| 534.b Machinery Spaces | 157 |
| 541 FUEL FILL AND TRANSFER SYSTEM | 158 |
| 541.a General | 158 |
| 541.b Fuel Tanks | 158 |
| 541.c Fuel Oil Purification System | 159 |
| 541.d Fuel Transfer System | 159 |
| 541.e Fuel Service System | 159 |
| 541.f Rescue Boat and Work Boat Fueling System | 160 |
| 551 COMPRESSED AIR SYSTEMS | 160 |
| 551.a Ship Service and Starting Air | 160 |
| 551.b Diver’s Air System | 162 |
| 552 PCO2 SYSTEM | 162 |
| 555 FIRE EXTINGUISHING SYSTEMS | 167 |
| 555.a Fixed Fire Extinguishing System | 167 |
| 555.b Water Mist System | 167 |
| 555.c Galley Extinguishing Systems | 167 |
| 555.d ESS Battery Room Fire Extinguishing System | 168 |
| 556 HYDRAULIC POWER TRANSMISSION SYSTEMS | 169 |
| 556.a General | 169 |
| 556.b Design | 169 |
| 556.c Hydraulic Fluid | 169 |
| 556.d Hydraulic Tanks | 170 |
| 561 STEERING SYSTEMS | 170 |
| 565 ROLL STABILIZATION SYSTEM | 170 |
| 568 BOW THRUSTER | 171 |
| 572 DUMBWAITER | 171 |
| 573 WEIGHT AND MISSION HANDLING SYSTEMS | 171 |
| 573.a General | 171 |
| 573.b Design Requirements | 172 |
| 573.d Main Crane | 172 |
| 573.e Stores Crane | 173 |
| 573.f Fish Handling and Mission Equipment | 173 |
| 573.f.1 Stern Gantry | 173 |
| 573.f.2 Gallows | 175 |
| 573.f.3 Trawl Ramp | 176 |
| 573.f.4 Trawl Way | 177 |
| 573.f.5 Trawl Door Stowage | 177 |
| 573.f.6 Trawl Winches | 177 |
| 573.f.7 Net Reel | 177 |
| 573.f.8 Other Trawl Winches | 178 |
| 573.f.9 Trawling System Controls | 178 |
| 573.f.10 Fish Handling System | 179 |
| 573.f.11 Long Lining System | 179 |
| 573.g Hydrographic Winches | 179 |
| 573.h CTD Handling Gear | 181 |
| 573.i Handling Gear Operating Controls | 183 |
| 581 ANCHOR STOWAGE AND HANDLING | 183 |
| 582 MOORING AND TOWING FITTINGS | 184 |
| 582.a General | 184 |
| 582.b Panama Canal Chocks | 184 |
| 582.c Bitts | 184 |
| 582.d Chocks | 184 |
| 582.e Lines and Hawsers | 184 |
| 582.f Emergency Towing Fittings | 185 |
| 583 BOATS, BOAT HANDLING AND STOWAGE | 185 |
| 583.a Fast Rescue Boat | 185 |
| 583.b Work Boat | 185 |
| 583.c Work Boat Davit/s | 185 |
| 593 POLLUTION CONTROL SYSTEMS | 186 |
| 593.a General | 186 |
| 593.b Greywater | 186 |
| 593.c Sewage Systems | 186 |
| 593.c.1 General | 187 |
| 593.c.2 Sewage Treatment Plant | 187 |
| 593.c.3 Multi-gas detection and alarm system | 188 |
| 593.c.4 Sewage Treatment Locker | 189 |
| 593.d Solid Waste | 189 |
| 593.e Food Waste Management System | 189 |
| 593.f Air Emissions | 190 |
| 593.g Oil Pollution Systems | 190 |
| 600 GENERAL REQUIREMENTS FOR OUTFITTING AND FURNISHINGS | 191 |
| 600.a Color Scheme | 191 |
| 600.b Furniture Construction and Installation | 191 |
| 602 HULL DESIGNATION AND MARKING | 192 |
| 602.a General | 192 |
| 602.b Warning, Caution, Operating and Instruction Plates | 193 |
| 602.c Space Labels | 193 |
| 602.d Deck Fitting Labels | 193 |
| 602.e Lifting Gear Labels | 193 |
| 602.f Anchor Chain Markings | 193 |
| 602.g Historical Data Plate | 194 |
| 602.h Ship’s Name | 194 |
| 602.i Name Boards | 194 |
| 602.j Bow Designator and Logo | 194 |
| 602.k IMO Number and Home Port | 194 |
| 603 DRAFT MARKS | 194 |
| 603.a General | 194 |
| 603.b Calculative Draft Marks | 195 |
| 603.c Appendage Draft Marks | 195 |
| 603.d Other Hull Markings | 195 |
| 603.e Navigation and SES Alignment Hull Markings | 196 |
| 604 LOCKS, KEYS, AND TAGS | 196 |
| 604.a. General | 196 |
| 604.b Locks | 196 |
| 604.c Grouping of Locks | 197 |
| 604.d Numbering of Keys | 197 |
| 611 HULL FITTINGS | 197 |
| 611.a Eyebolts | 197 |
| 611.b Padeyes | 197 |
| 612 LIFERAILS, LIFELINES AND STANCHIONS | 198 |
| 612.a General | 198 |
| 612.b Liferails and Handrails | 198 |
| 612.c Lifelines | 198 |
| 612.d Portable Guard Rails | 198 |
| 612.e Storm Rails and Hand Grabs | 198 |
| 612.f Machinery Space Railings | 199 |
| 613 FLAG HOISTS, FABRIC COVERS AND CURTAINS | 199 |
| 613.a Covers | 199 |
| 613.b Curtains | 199 |
| 613.c Flag Hoists | 200 |
| 613.d Dressing Lines | 200 |
| 621 NON-STRUCTURAL BULKHEADS AND PARTITIONS | 200 |
| 621.a General | 200 |
| 621.b Joiner Bulkheads and Linings | 200 |
| 621.c Ceilings | 200 |
| 621.d Toilets and Shower Spaces | 201 |
| 622 FLOORPLATES, GRATINGS, LADDERS, HANDRAILS, AND HANDGRABS | 201 |
| 622.a Floor Plates | 201 |
| 622.b Anchor Chain Locker Deckings and Bulkheads | 201 |
| 622.c Ladders | 202 |
| 622.c.1 General | 202 |
| 622.c.2 Inclined Ladders | 202 |
| 622.c.3 Vertical Ladders | 202 |
| 622.d Gangway | 202 |
| 624 DOORS, HATCHES, SCUTTLES AND MANHOLE COVERS | 203 |
| 624.a General | 203 |
| 624.b Doors | 203 |
| 624.b.1 Interior Joiner Doors | 203 |
| 624.b.2 Weathertight Doors | 204 |
| 624.c Hatches and Scuttles | 204 |
| 624.d Manhole Covers | 204 |
| 625 WINDOWS, FIXED PORTLIGHTS AND AIRPORTS | 205 |
| 625.a General | 205 |
| 625.b Windows | 205 |
| 625.c Fixed Portlights and Airports | 206 |
| 631 PAINTING | 206 |
| 631.a General | 206 |
| 631.b Materials | 207 |
| 631.c Surface Preparation | 208 |
| 631.d Electrical Equipment | 209 |
| 631.e Other Surfaces | 209 |
| 633 CATHODIC PROTECTION AND MARINE GROWTH PREVENTION | 209 |
| 633.a Impressed Current Cathodic Protection System | 209 |
| 633.b Marine Growth Prevention (MGP) System | 210 |
| 634 DECK COVERING | 210 |
| 634.a General | 210 |
| 634.b Polyurethane Deck Covering | 211 |
| 634.c Vinyl Composition Deck Covering | 211 |
| 634.d Carpeting | 211 |
| 634.e Safety Treads and Non-skid Coatings | 211 |
| 634.f Electric Grade Flooring | 212 |
| 635 INSULATION | 212 |
| 635.a General | 212 |
| 635.b Thermal Insulation | 212 |
| 635.c Acoustic Insulation | 212 |
| 635.d Antisweat Insulation | 213 |
| 635.e Vapor Barriers | 213 |
| 637 SHEATHING | 213 |
| 637.a General | 213 |
| 637.b Sanitary Sheathing | 213 |
| 637.c Protective Sheathing | 213 |
| 638 THERMAL INSULATION FOR REFRIGERATED SPACES | 213 |
| 638.a Insulation | 213 |
| 638.b Grating | 214 |
| 640 REQUIREMENTS FOR ACCOMMODATION SPACES | 214 |
| 640.a General | 214 |
| 640.b Accommodation Spaces | 214 |
| 644 SANITARY SPACES, FIXTURES AND ACCESSORIES | 215 |
| 644.a General | 215 |
| 644.b Toilets | 216 |
| 644.c Lavatories | 216 |
| 644.d Showers | 217 |
| 644.h Toilet/Shower (T/S) Spaces | 217 |
| 644.i Emergency Wash Stations | 217 |
| 644.i.1 General Requirements | 217 |
| 644.i.2 Plumbed Emergency Showers and Eyewash Stations. | 217 |
| 644.j Emergency Escape Breathing Device (EEBD) | 218 |
| 645 RECREATION / LEISURE FACILITIES | 218 |
| 645.a Lounge | 218 |
| 645.b Gym | 219 |
| 650 SERVICE SINKS | 219 |
| 651 FOOD SERVICE SPACES | 219 |
| 651.a General | 220 |
| 651.b Scullery | 223 |
| 652 MEDICAL SPACE | 223 |
| 655 LAUNDRY ROOM | 224 |
| 661 SHIP’S OFFICE | 225 |
| 662 MACHINERY CONTROL FURNISHINGS | 226 |
| 663 PILOT HOUSE, CHART AREA, AND AFT CONNING STATION | 226 |
| 663.a Chart Area | 227 |
| 663.c Aft Conning Station (ACOS) | 228 |
| 664 DAMAGE CONTROL LOCKERS | 229 |
| 664.a General | 229 |
| 664.b Individual Requirements | 229 |
| 665 WORKSHOPS | 229 |
| 665.a Engineer’s Workshop | 229 |
| 665.b Bosun’s Workshop | 231 |
| 665.c ET Shop | 232 |
| 667 LABORATORIES | 233 |
| 667.a General | 233 |
| 667.a.1 Cabinetry and Furnishings | 234 |
| 667.b Dry Lab | 234 |
| 667.c Wet/Chemistry Lab | 234 |
| 667.c.1 Fume Hood | 235 |
| 667.d Fish Lab | 236 |
| 668 Other Mission Spaces | 236 |
| 668.a Marine Mammal Observation Station | 236 |
| 668.b Scientific Van Site | 236 |
| 668.c Scientific Server Room | 237 |
| 237 |
| 237 |
| 670 STOWAGE REQUIREMENTS | 237 |
| 671 SPECIAL STOWAGE | 238 |
| 671.a Immersion Suit Stowage | 238 |
| 671.b Foul Weather Gear and Miscellaneous Stowage | 238 |
| 671.c Linen Locker(s) | 238 |
| 671.d Cleaning Gear Locker | 238 |
| 671.g Dive Gear Locker | 238 |
| 671.h Oil and Hazardous Substance (OHS) Spill Response Kit Stowage | 239 |
| 671.j Shore Power Cable Stowage | 239 |
| 672 STOREROOMS | 239 |
| 672.a General | 239 |
| 672.b Bosun’s Storeroom | 240 |
| 672.c Deck Gear Locker | 240 |
| 672.d Frozen, Chill, and Dry Provisions Stores | 240 |
| 672.e Galley Reefer Stowage | 241 |
| 672.f Repair Parts Storeroom(s) | 241 |
| 672.g Ship’s Stores, Galley General Stores, and General Bulk Stowage Storerooms | 241 |
| 672.h Engineer’s Consumables Stores | 242 |
| 672.i Mooring Line Stowage | 242 |
| 672.j Electronics Storeroom | 242 |
| 672.k Rotational Crew Stowage | 242 |
000 GENERAL REQUIREMENTS
042 GENERAL ADMINISTRATIVE REQUIREMENTS
This Statement of Requirements (SOR) describes the performance requirements for design and construction of a Class C Fisheries/Coastal Sciences Vessel having a primary mission of assessing living marine resources (trawl capable) and a secondary capability of charting and mapping for National Oceanic and Atmospheric Administration (NOAA). These vessels are designed with top-level requirements to support the management of fisheries, protected species, and marine protected areas.
This SOR does not include a complete statement of all Regulatory Body requirements necessary to satisfy the classification and certification requirements of Section 070 and United States Regulatory Bodies. The Contractor shall ensure that all such Regulatory Body requirements are met.
042.a Equivalent Equipment Where equipment is specified herein by manufacturer’s name, make, or model number, the manufacturer’s specifications and performance characteristics are included by reference in Attachment J.5 Equipment Salient Characteristics. The Contractor may propose equivalents to these equipment selections for Government approval by submitting an Equipment Equivalency Request.
When lesser dimensions and weights, or superior performance, acoustic characteristics, service, material, and maintenance characteristics are demonstrable and are to the advantage of the ship’s function and mission, the equivalent item may, with Government approval, be acceptable, provided specified requirements are met.
042.b Definitions
| ABS |
| American Bureau of Shipping. |
| accommodation space(s) |
| as defined in ABS HAB(WB) |
| ADCP |
| Acoustic Doppler Current Profiler. |
| AHRS |
| Attitude Heading Reference System |
| AIS |
| Automatic Identification System. |
| ANSI |
| American National Standards Institute. |
| ANTS |
| Acoustic Navigation and Tracking System |
| 'Area' or 'net area' |
| Unless otherwise defined, means the available arrangeable area. |
| ’As approved,’ ’to approve’, |
| The approval by, the requirements of, or the selection of the Government. Additionally, the terms ’approved’ and ’required’ may also mean approved |
| ‘approved’, ’as required’, ’required’, and ’as selected’ |
| or required by a Regulatory Agency or Regulatory Body. Wherever these terms are used without further qualification, it is the approval, decision, or direction of the ConRep or Regulatory Bodies, as appropriate, that is required. Where an item is required to be submitted for approval, work shall not proceed, except at the sole risk of the Contractor, until notification of approval is received. In the event the subject item is not approved, rationale will be provided, and subject effort shall not proceed until such time as a satisfactory and mutually agreeable resolution has been resubmitted and approved. Where the Contractor desires to deviate from the requirements of the contract, compliance with the Configuration Management clause (C-7) of the contract is required. |
| ASHRAE |
| American Society of Heating, Refrigeration, and Air Conditioning Engineers. |
| ASME |
| American Society of Mechanical Engineers. |
| ASTM |
| American Society for Testing and Materials. |
| BERP |
| Bolted Equipment Removal Plate. |
| Blackwater |
| Wastewater from toilets, bidets, or other sanitary fixtures used to collect or clean human waste. Includes bath, sink, and scupper drains from ship's medical space. |
| CCTV |
| Closed Circuit Television. |
| CFE |
| Contractor-Furnished Equipment. |
| CFR |
| Code of Federal Regulations. |
| “co-located” spaces |
| The requirements of the spaces, locations or compartments identified as “co-located” may be combined into a single space. All requirements of both spaces must be met. |
| COLREGS or 72 COLREGS |
| The International Rules formalized by the Convention on the International Regulations for Preventing Collisions at Sea, 1972, and subsequent amendments, as applicable. |
| Construction |
| The construction of the ship to meet the requirements identified in this SOR. |
| Construction Representative or ConRep |
| The Government’s on-site representative for construction or its designated representative. |
| Contractor |
| The firm that holds the prime Contract with the Government for design and construction of the ship. |
| CRES |
| Corrosion Resistant Steel, as specified in Section 078. |
| CTD |
| Conductivity, Temperature, and Depth. |
| DAU |
| Data Acquisition Unit. |
| DEF |
| Diesel Emission Fluid. |
| DIM |
| Distributed Isolation Material. |
| DPS |
| Dynamic Positioning System. |
| ECDIS |
| Electronic Chart Display and Information System. |
| EMI |
| Electromagnetic Interference. |
| EPLA |
| Electric Plant Load Analysis. |
| ESS |
| Energy Storage System. |
| ET |
| Electronics Technician. |
| FCC |
| Federal Communications Commission. |
| FDA |
| Food and Drug Administration. |
| First Tier and Sub-tier References |
| Any referenced document which is directly cited for use or application by an identifying number or name in this SOR is a first tier reference for each particular use or application for which it is so cited. Any document which is cited in a first tier reference, or in a document referenced therein, is a sub-tier reference. A document which is a sub-tier reference in one application may also be a first tier reference in another application when it is cited directly. |
| Good Marine Quality |
| Constructed of materials unaffected by moisture, sea spray, extremes of temperature, and other hazards of the marine environment, and has been designed and constructed to perform its intended function in the marine environment conditions, plus the dynamic motions and cyclic loads imparted in a marine environment. The item shall further be designed and constructed for ease and safety of operation under dynamic conditions and shall require minimum maintenance. |
| Government |
| The United States Government. |
| GPS |
| Global Positioning System. |
| Greywater |
| Wastewater from baths, sinks, washing machines, or galley. Does not include blackwater or bath, sink, scupper drains from ship's medical space. |
| HPU |
| Hydraulic Power Unit. |
| HVAC |
| Heating, Ventilation and Air Conditioning. |
| IACS |
| International Association of Classification Societies |
| IBS |
| Integrated Bridge System. |
| IEEE |
| Institute of Electrical and Electronics Engineers. |
| Immediate access |
| The space, location or compartment shall be within the same main transverse watertight subdivision, be located on the same deck and share a common boundary through which the space can be accessed via no more than a single intervening door from the referenced location. The intervening door shall be non-tight unless one of the spaces is exterior to the shell of the ship (weather deck). |
| IMO |
| International Maritime Organization. |
| IMU |
| Inertial Measurement Unit. |
| Independent Tank |
| Independent tanks are freestanding tanks. The tank boundaries are not common to the ship’s structure so that the loads on the tank are independent from hull girder loading. Independent tanks are permanently affixed to the vessel and are not intended for removal from the vessel. |
| INMARSAT |
| An international telecommunication company. |
| ISO |
| International Standards Organization. |
| LED |
| Light Emitting Diode. |
| LVDC-DIST |
| Low Voltage Direct Current - Distribution. |
| Machinery Space |
| Machinery space shall include those defined by Regulatory Bodies, and shall also include the following as applicable: Main Machinery Room, auxiliary machinery rooms, thruster rooms, Winch Rooms, Pump Rooms, Steering Gear Room, Incinerator Room, Sewage Treatment Room, Refrigeration Machinery Room, HVAC Machinery Room, and Emergency Generator Room. |
| MARPOL |
| The International Convention for the Prevention of Pollution from Ships. |
| MCC |
| Main Control Console. |
| MCCS |
| Machinery Centralized Control System. |
| MCR |
| Maximum Continuous Rating. |
| MCS |
| Main Control Station. |
| MEPC |
| Marine Environmental Protection Committee. |
| MRB |
| Master Reference Block. |
| NEMA |
| National Electrical Manufacturers Association. |
| NFPA (Fire) |
| National Fire Protection Association |
| NFPA (Fluid) |
| National Fluid Power Association |
| NIBS |
| Navigational Integrated Bridge System. |
| NMEA |
| National Marine Electronics Association. |
| NOAA |
| National Oceanic and Atmospheric Administration. |
| NVIC |
| USCG Navigation and Vessel Inspection Circular. |
| NVR |
| Network Video Recorder. |
| OSHA |
| Occupational Safety and Health Administration. |
| OBWHT |
| Oily Bilge Water Holding Tank. |
| ORST |
| Oil Residue Sludge Tank. |
| Owner |
| The United States Government or its authorized representative. |
| pCO2 |
| Partial pressure of carbon dioxide. |
| PLC |
| Programmable Logic Controller. |
| "Provide", and "provide and install" |
| To provide all services, labor, materials, systems or equipment to accomplish a requirement. This includes test equipment. |
| Ready access |
| The space, location or compartment shall be within the same main transverse watertight subdivision, no more than one deck away and with no more than two intervening doors from the referenced location. |
| Regulatory Body |
| Includes ABS, USCG, FDA, USPHS, OSHA, FCC, and any other industry or Government agency which oversees the construction of the ship, or component or assembly, as required by Federal law. |
| Regulatory Body Requirements or Regulatory Requirements |
| Those regulations and interpretations issued by cognizant Federal or international agencies, and the rules and requirements of the American Bureau of Shipping. |
| SAE |
| Society of Automotive Engineers. |
| Sea state |
| When the term ‘sea state’ is used within this document, STANAG 4194 definitions shall apply. Each sea state has an upper and lower limit for the significant wave height and wind speed. If the performance requirement is stated as “in” or “through” a sea state, the performance requirement shall be met through the upper limit of that sea state. |
| SCC |
| Ship Control Console. |
| SCR Unit |
| Selective Catalytic Reduction Unit |
| SCS |
| Scientific Computer System. |
| SES |
| Scientific Electronic Systems |
| Sewage |
| Wastewater from toilets, which likely contains pathogens, and can also contain greywater and STP effluent. |
| SLA |
| Service Life Allowance. |
| SNAME |
| Society of Naval Architects and Marine Engineers. |
| SOLAS |
| International Convention for Safety of Life at Sea. |
| SOR |
| Statement of Requirements. |
| "Space and weight" or "reserve space and weight" |
| Space, weight and support service reservations shall be provided. Space and weight items shall be incorporated in design analyses and used in the design and selection of service system components and installation. |
The intent of each space and weight reservation is that the vessel be ready for installation of the equipment at delivery. The design shall account for any/all associated impacts by incorporating reservations such as: space, weight, buoyancy, power (capacity, configuration and segregation), cableway, space ventilation, space drainage, control interfaces, cooling system, and noise impacts. The vessel shall have the capability to carry ballast to compensate for uninstalled equipment, for which space and weight are required.
Support services for space and weight items shall be terminated within the compartment affected, ductwork shall be sized for load, and water and air piping shall be terminated on the interior side of compartment bulkheads unless otherwise specified. Electrical service for space and weight items shall be carried to the intended power distribution panel or load center.
| SSAS |
| Ship Security Alert System |
| SSDG |
| Ship Service Diesel Generator |
| SSPC |
| Steel Structures Painting Council |
| STANAG |
| NATO Standardization Agreement |
| STP |
| Sewage Treatment Plant. |
| THD |
| Total Harmonic Distortion. |
| TLI |
| Tank Level Indicator. |
| Tonne |
| Metric ton (1,000 kilograms). |
| UNOLS |
| University National Oceanographic Laboratory System. |
| UPS |
| Uninterruptible Power System. |
| USBL |
| Ultra-Short Baseline |
| USCG |
| United States Coast Guard. |
| USPHS |
| United States Public Health Service, US Department of Health and Human Services. |
| USSG |
| United States Steel Gauge. |
| VCHT |
| Vacuum, Collection, Holding, and Transfer (system). |
| VOIP |
| Voice Over Internet Protocol. |
| VSAT |
| Very Small Aperture Terminal. |
| WERP |
| Welded Equipment Removal Plates. |
| Wherever Practicable |
| Means that the requirement shall be affected where feasible. |
| Zero-Discharge |
| Zero-Discharge for the purpose of this document and respective attachments is defined as the retention of all fluids (except for machinery cooling water, water rejected from water making plant, and condensate), solids, food waste, and ash. |
To ensure commonality of understanding, unless otherwise defined above, any word used in the SOR shall be construed according to its definition in Webster's Third New International Dictionary, Unabridged.
042.c Effective Issue Where industry standards or Government Specifications are referenced, the issue or revision in effect at the time of Phase II Contract award shall apply, unless a specific revision is called out as part of the reference. The ABS Rules for Building and Classing Marine Vessels in effect at the time of Phase II contract award are applicable to this contract.
Where manufacturer's type, model, or other commercial designation is referred to herein, the characteristics in effect on the date of submission of the Contractor’s final proposal shall apply. Where computer operating systems, model numbers, or other commercial design actions have been superseded since submission of the Contractor’s final proposal, new model numbers or designations may be utilized, provided the equipment salient characteristics associated with the new designation are the same as, or superior, to those associated with the superseded designation, as defined by the Equivalent Equipment requirements of Section 042.a.
045 CARE OF THE SHIP
045.a Hull Protection During Outfitting The potential of the hull shall be held in the range of -800mV to -859 mV (silver - silver chloride cell) in order to provide protection against corrosion of the hull. In freshwater locations the Contractor shall maintain a hull potential of in the range of -750 mV to - 900 mV (silver - silver chloride cell) during the time the ship is afloat. The cathodic protection system shall be compatible with the underwater paint system applied.
070 GENERAL REQUIREMENTS FOR CONSTRUCTION
070.a General The ship, equipment, fittings, and workmanship shall be of good marine quality. The ship, equipment, and fittings shall be designed and constructed in accordance with ASTM F1332, Standard Practice for Use of SI (Metric) Units in Maritime Applications to the maximum extent practicable. The Human Engineering principles of ASTM F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment and Facilities, shall be followed for design of controls and indicators and for interfaces with machinery and gear handling systems, handrails, stairs, ladders, and any other outfitting included in ASTM 1166.
Mission capability, safety, reliability, environmental compliance, maintainability, and operational efficiency shall be of top priority during the vessel design process. Primary mission capabilities are stern trawling, capabilities for direct sampling of fish and zooplankton over the stern and side station, acoustic survey capabilities, and the capability to launch and recover a small boat in the open sea, and the ability to launch and recover vehicles and equipment over the stern. Life cycle cost shall be minimized through efficient hull design, equipment selection and efficient space layouts. The working environment conditions for personnel onboard with regard to safety, noise levels, human engineering, and interior climate are of critical importance and shall be considered during the design and construction phases. The hull design and drop keel (if used) shall ensure good performance of the acoustic sensors. Considerations shall be made to minimize harmful emissions, both gas and liquid, from the vessel’s machinery and hull.
The ship shall be mission capable through Sea State 5, including sensor capability and any small boat launch and recovery operations. The ship shall be capable of navigational operation for survival through Sea State 8.
Operations will be conducted in coastal and deep ocean areas. This vessel shall have the capability to conduct nearshore and off-shore, shallow draft, trawl based at sea data collection activities and be capable of supporting charting and surveying missions.
The ship shall be designed to operate and meet scientific requirements continuously (24 hours per day, 7 days per week) during a 21 day at sea deployment without sustaining a system failure that cannot be corrected at sea, or that degrades scientific capabilities.
Stern trawling operations will require the use of installed trawl winches, net reel, gallows and trawl way and the main crane. Launch and recovery of scientific equipment requires use of main crane, Side Sampling Station equipment and a stern gantry, as well as installed hydrographic winches.
Operations require shipboard data processing and sample analyses in the laboratory spaces, using scientific instrumentation and the data processing network (Scientific Computer System).
Table 070-1. Mission Operating Profiles
| Mission Elements |
| Operating Profile (Annual, Assuming 225 DAS) |
| Assessment and Management of Living Marine Resources (Primary) |
| Charting and Survey (Secondary) |
| Ocean Research (Other) |
| Survey of Marine Living Resources |
| Mammal Survey Missions |
| Hydrographic Survey Missions |
| Coastal Science and Assessment Missions |
| Oceanography Missions |
| Transit (in addition to missions) |
| Pier Side (shore power) |
| Total |
| Transit |
| 20 days @ 10 knots |
| 10 days @10 knots |
| 8 days @10 knots |
| 6 days @10 knots |
| 5 days @ 10 knots |
| 10 days @ 10 knots |
On Station (< 4 knots)
| 35 days @ 4 knots |
| 30 days @ 8 knots |
| 32 days @ 8 knots |
| 14 days @ 8 knots |
| 10 days @ 4 knots |
| Between Stations |
| 10 days @ 10 knots |
| Trawl/Tow |
| 25 days @ 4 knots with 25,000 bollard pull |
| Ocean Research |
| 10 days @ 10 knots |
10 days @ 10 knots
| Total Days |
| 100 |
| 40 |
| 40 |
| 20 |
| 25 |
| 10 |
| 130 |
| 235 |
070.b Regulatory Body Requirements The ship shall be designed, constructed and classed for unrestricted service under ABS Marine Vessel Rules with the following notations: ✠A1, ✠AMS, Ⓔ, ✠ACCU, ✠DPS-1, Ice Class ID, SFA(40), HAB(WB), BWT, CRC, NIBS, LVDC-DIST, and UWILD. The ship shall be issued a Statement of Voluntary Compliance (SOVC) to demonstrate compliance with MARPOL ANNEX IV and that the sewage treatment plant is certified under the provisions of IMO Resolution MEPC.227(64). A Register of Lifting Appliances shall be obtained.
The ship shall be constructed and certificated in accordance with 46 CFR Subchapter U, Oceanographic Research Vessels, and shall comply with applicable federal regulations. The ship shall be issued a Certificate of Inspection (COI) by the USCG. The Alternate Compliance Program shall not be utilized.
The Contractor shall provide the materials, equipment and outfit items required for the ship to operate in compliance with Regulatory Body requirements.
The Summer Load Line assignment shall correspond to a displacement of not less than full load plus Service Life Allowance (SLA).
The Contractor shall obtain and provide Panama Special Tonnage Certificate, International Load Line Certificate, Suez Canal Special Tonnage Certificates, United States and International Certificates of Admeasurement (using both regulatory and registry tonnages), Deratting Exemption, Certificate of Sanitary Construction by the US Food and Drug Administration, certificates of compliance with MARPOL and the following SOLAS certificates:
1. Cargo Ship Safety Construction Certificate.
2. Cargo Ship Safety Equipment Certificate.
3. Cargo Ship Safety Radio Certificate.
The ship shall be designed, constructed, outfitted, and documented such that the Government can obtain a SOLAS Safety Management Certificate, Safety Management Plan, Vessel Security Plan, International Ship Security Certificate, International Safety Management Code Certificate, and Ship Energy Efficiency Management Plan.
The most stringent combined requirements for air emissions of state (all) and local (all) regulations shall also apply. Engine International Air Pollution Prevention (EIAPP) certificates and an International Air Pollution Prevention (IAPP) certificate shall be provided to the Government.
Materials shall meet the requirements of SOLAS and IMO Resolution MSC.61(67) Adoption of The International Code for Application of Fire Test Procedures (the FTP Code).
The ship shall be equipped to satisfy Panama Canal Transit Regulations.
The Contractor shall obtain and provide GMDSS certification for infrequent Sea Area A4 operation as described in Section 441.
Design and installation of electrical and electronic systems shall be in accordance with IEEE Standard 45, IEEE Recommended Practice for Electric Installations on Shipboard, and with the requirements herein.
070.c Principal Characteristics 070.c.1 Draft The maximum navigational draft shall be no greater than 15 feet (4.5 m) (with any retractable appendages retracted) at the full load condition with SLA.
070.c.2 Speed, Range and Endurance At full load condition with SLA, the ship shall meet the speed requirements indicated in Table 070-2 at 85% MCR.
Table 070-2. Speed Requirements
| Transit Speed |
| 10 knots in calm seas with no trawl deployed, centerboard retracted |
| Survey Speed |
| TBD with centerboard fully extended |
| Midwater Trawl Speed |
| 5 knots in 4 m waves and 35 knot winds with a 100 kN trawl drag at best heading |
| Bottom Trawl Speed |
| 4 knots in 4 m waves and 35 knot winds with a 100kN trawl drag at all headings at 1000 fathoms trawl depth |
| Minimum Speed |
| 1 knot in calm water using main thrust; 0.1 knot in calm water using auxiliary thrust |
| Continuous Speed Range |
| From 0 knot to transit speed with transition from auxiliary to main thrust as appropriate |
The ship shall be capable of a minimum 5,500 nautical mile range at 10 knots through sea state 2 with headwinds at full load with SLA.
Endurance shall be at least 21 consecutive days.
Fuel rates shall be calculated in accordance with ISO 3046-1 and SNAME Technical and Research Bulletin 3-49, "Marine Diesel Power Plant Practices," using an assumed calorific value of 42,700 kilojoule/kilogram (kJ/kg). Fuel rates shall be calculated at full load with SLA in calm water, fair weather, and with a clean bottom.
Fuel capacity shall be provided for the most demanding of the operating profiles defined in Table 070-2. Fuel capacity required for each operating profile shall be calculated assuming calm water conditions. Fuel capacity shall be based on the 24-hour average electric load for each operating condition. The total fuel consumption shall be calculated based on the fuel rates associated with all fuel burning equipment and their expected operating periods. The required fuel load shall include a reserve fuel allowance of 10 percent. A tailpipe factor of 2.0 percent shall be applied to all tanks.
070.c.3 Zero Discharge Operations The ship shall be capable of zero-discharge operations for 7 days with the full complement onboard.
070.c.4 Propulsion The design shall consider the impacts on engine operation, maintenance and emissions, exhaust gas ingestion, water making capability, and other factors when on-station or moving at slow speeds for extended periods of time.
A LVDC electric distribution system shall be provided with an integrated diesel electric propulsion system. The prime movers shall permit continuous ship speed control from zero to maximum continuous ahead and astern speeds. The machinery control system shall maintain selected propulsor shaft speed within plus or minus 1 r/min under steady state conditions. The propulsion plant shall provide astern power as required by the regulatory bodies to meet maneuverability and station keeping requirements.
Diesel Fuel Marine, ASTM D975, Grade 2-D, S-15 shall be used by fuel burning equipment.
070.d Maneuverability Directional Stability - The ship shall be directionally stable at all speeds in all loading conditions. Directional stability shall be sufficient to meet maneuverability requirements while maximizing fuel economy.
Tactical Diameter - The ship shall be capable of achieving a tactical diameter of less than 3 ship lengths in either direction at trial speed, free route, at full load condition plus SLA in calm water, in fair weather with a clean bottom, without the use of the bow thruster with the centerboard (CB) (if applicable) extended.
The ship shall have the capability to rotate about midships at zero forward speed in seas up to 2.5 m significant wave height, in a 2.5 knot current and 30 knot wind with CB (if applicable) extended.
Low-Speed Maneuverability for Sampling and Retrieving Operations - The ship shall also be capable of turning 180 degrees to either direction within one ship length at 3 knots, in seas up to 2.5 m significant wave height, in a 2.5 knot current and 30 knot winds acting in the same direction with CB (if applicable) extended.
Zig Zag requirements - The average yaw overshoot angle from the second overshoot on shall be no more than ten degrees for a 10-10 zig-zag maneuver at all speeds at full load with CB (if applicable) extended.
Station Keeping for Sampling and Retrieving Operations – The ship shall be capable of maintaining a watch circle of one ship length diameter on best heading in 2.5 m significant wave height, 2 knot current, and 25 knot wind, with all environmental factors acting simultaneously, and with wind and waves from the same direction. The angle between the current and wind/waves may vary from 0 degrees to 180 degrees. The Bretschneider short crested spectrum shall be used, with modal periods of 7, 9, 11 and 13 seconds to be considered as a minimum with CB ?.
Precision Trackline - The ship and control systems shall have the ability to automatically and manually maintain track at a speed, through the water, between 3 knots and a speed corresponding to 100 percent MCR power in any direction over the bottom, in sea state 4 with a wind speed up to 30 knots and a current up to 2 knots, both from the same direction perpendicular to the trackline. The crab angle shall be considered the angle between the track and the centerline of the ship. The environmental angle shall be considered the angle between the track and the environment, such that when the environmental angle is zero, the environment is opposite the trackline heading. All ship speeds shall be speed through the water. A lateral trackline error shall not exceed +/- 10 meters. Precision trackline operations shall be performed with and without a tow and with CB (if applicable) retracted.
Slow Speed Trackline for Small Samplers and Towed Devices - The ship and control systems shall be capable of automatically and manually maintaining a trackline within 10 m with no restriction on crab angle at a speed of 1.0 knot, with a negligible towing resistance, in seas up to
2.5 m significant wave height, 3 knot current and 35 knot winds, for all environmental angles between 0 degrees and 180 degrees port and starboard with CB ?.
070.e Seakeeping The ship shall have an operability index of 1.0 through sea state five (2.5 m significant wave height).
Ship equipment and personnel are considered fully operable if the following criteria are met at full load displacement with SLA and at arrival without SLA:
1. Vertical accelerations less than 0.15 g (root mean squared (RMS)) at Main Deck amidships at deck edge.
2. Lateral accelerations less than 0.05 g (RMS) at Main Deck amidships at deck edge.
3. Roll less than 3 degrees (RMS)
4. Pitch less than 2 degrees (RMS) The ship shall be capable of launch and retrieval of rescue boats and Work Boat per Section 583.
A passive roll stabilization system shall be provided. The system shall be designed and sized to provide the required performance and effective stabilizing moments with the proper phase differences for all operating ship speeds from 0-Max speed. Section 565 provides additional requirements for the roll stabilization system.
Ship motions with respect to the design of structures shall be based on Section 100.c.
070.f Ship Arrangement and Spaces 070.f.1 General The ship shall be provided with properly equipped and outfitted enclosed and open spaces in order to allow the ship to accomplish all missions defined in Section 070.a. As a minimum, the spaces described in this section shall be provided.
Passage on the Main Deck, bow to stern, shall be unimpeded by weathertight or watertight doors, except that weathertight doors are permitted between interior and exterior spaces, and a watertight or weathertight door is permitted at the collision bulkhead. The vessel shall be designed with the bulkhead deck as the Main Deck aft of the collision bulkhead to permit this.
The Aft Working Deck and the Side Sampling Station shall be located on the same deck. Freeboard at the Aft Working Deck and the Side Sampling Station shall be as low as possible for safe launch and retrieval over-the-side/transom operations while also providing adequate freeboard and protection for safety of personnel on deck through Sea State 4 and meeting all regulatory requirements.
070.f.2 Accommodation Spaces For the purposes of this spec, accommodation areas also include service spaces such as mess rooms, laundry, and storerooms. Table 070-3 lists the requirements for the number of personnel that are in singles or doubles, and the minimum area requirement for the cabins.
Table 070-3 Berthing Space Requirements
Crew
| Officers |
| 3 |
| Officer-sized Single Stateroom with no attached Office |
| Licensed Mariners |
| 12 |
| Single Stateroom |
| Other Crew |
| 8 |
| Two Person Room |
Scientists
| Scientists |
| 12 |
| Two Person Room |
Total Crew and Scientists
| Total Persons in Singles |
| 15 |
| Total Persons in Doubles |
| 20 |
Staterooms with permanent berthing and T/S shall be provided to accommodate the full complement of 35 personnel in accordance with Section 640.
The ship is exempted from the ABS HAB requirement for adjoining day rooms for Senior Officers.
Each Stateroom shall have an attached T&S Unit. No more than four (4) crew may share a single Sanitary Space which is attached to up to two Staterooms.
Complement related facilities, services, lifesaving equipment, stores, and functions shall be based on a full complement of 35 persons.
070.f.3 Deck Heads At least one public sanitary space (deck head) shall be located per deck on the Main Deck and above. A deck head shall be located in the vicinity of the working areas (laboratories and Aft Working Deck), on the same deck, and accessible without the need to enter the weather. A deck head shall be provided on the Bridge Deck. A deck head shall be provided on the same deck and immediately aft of the galley and messroom. A deck head shall be provided on the same deck and immediately adjacent to the MCS.
Deck head spaces shall be outfitted as specified in Section 644.
070.f.4 Recreation / Leisure Facilities A Lounge and a Gym shall be provided. Each space shall be outfitted as specified in Section 645. The Lounge will also serve as a conference room onboard the vessel. The Lounge may be co-located and combined with the Messroom, as specified in Section 645.
070.f.5 Food Service Spaces The following food service spaces, outfitted as specified in Section 651, shall be provided:
1. Galley. The Galley shall include scullery facilities.
2. Messroom shall include the serving line and have immediate access to the Galley.
070.f.6 Medical Space A medical space with a Sanitary Space (T&S Unit) immediately accessible shall be provided, outfitted in accordance with Section 652.
070.f.7 Utility Spaces The following utility spaces shall be provided:
1. Trash Room , equipped as specified in Section 593
2. Incinerator Room, equipped as specified in Section 593
3. Laundry Room outfitted as specified in Section 655 The Trash Room and Incinerator Room shall be placed adjacent to each other.
The Laundry Room may be separated into multiple smaller Laundry facilities, each located on the same deck as Staterooms. The total outfitting requirement as defined in Section 655 must be met.
Additional utility spaces, such as fan rooms, vent trunks, refrigeration machinery spaces, battery locker, sewage treatment room, and fixed fire fighting equipment rooms, shall be provided as necessary to meet the requirements of this SOR.
070.f.8 Offices A Ship’s Office shall be provided and outfitted as specified in Section 661.
070.f.9 Machinery Control Station A Machinery Control Station shall have immediate access to the Main Machinery Room, and the space(s) containing the propulsion electric switchgear, converters, transformers and associated electric propulsion equipment, and shall be provided and outfitted as specified in Section 662.
070.f.10 Pilot House, Chart Area, and Aft Conning Station The Pilot House, Chart Area, and Aft Conning Station (ACOS) shall be provided and outfitted in accordance with Section 663. Ship control stations in the Pilot House shall be located at the Ship Control Console (SCC), with secondary stations at the port and starboard bridge wing control stations, and at the ACOS located centerline in the aft part of the bridge with clear visibility of back deck and fishing operations..
The Pilot House shall be located and arranged to ensure the following minimum visibility requirements:
1. The SCC will be located on the centerline of the ship, with a centerline window directly forward of the helm station, there will be clear visibility of the horizon on both the port and starboard sides from dead ahead to at least 22-½ degrees aft of the beam on each side as well as visibility of the horizon directly aft while standing at the SCC.
2. 360 degree visibility of the horizon to an observer free to move within the Bridge in an area bounded by lines 3000mm either side of the centerline.
3. The port and starboard bridge wings with control stations shall be located to permit unobstructed visibility from ahead to astern with a view of the waterline while standing at the control console from the bow to the stern.
This is the start of the file's text. The full file is on GovTribe.