This is Addendum #1 to Bid-2523, a construction contract opportunity issued by Kenosha County, Wisconsin for the Brighton Dale Links Storage Facility project. The addendum modifies the original bid documents and introduces three project alternates: Alternate #1 for new finishes and hollow metal door installation at the existing cold storage pole building; Alternate #2 for installation of a new fire alarm system for both new and existing buildings; and Alternate #3 for bringing power to the existing cold storage building west of the project site. Bids are due Wednesday, October 9, 2025 at 1:00 pm at the Kenosha County Purchasing Division located at 1010 56th Street, Second Floor, Kenosha, WI 53140. A pre-bid conference was held on September 17, 2025, with an attendee sign-in sheet included. The addendum clarifies specifications regarding exterior steel gauge (26 ga), door specifications (non-insulated, no glass sections), concrete types and thicknesses, lighting reuse requirements, and fire alarm system scope. The general contractor must indicate the number of days required to complete the project and note any final items delayed by weather conditions on the revised bid offer form. October 2nd is identified as the deadline for any additional addenda.

The revised bid offer form requires vendors to provide pricing for the base bid covering all labor and materials per bid terms, conditions, and specifications, plus separate line items for the three alternates. Contractors must also specify lead time to begin work in days after notice to proceed and lead time to complete work in days after work begins, as well as confirm whether work will be complete in 2025 or spring 2026. A bid bond is required. Kenosha County is exempt from federal excise and Wisconsin sales taxes under Wisconsin Statutes 77.54(9a)(b), with CES number 008-1020421892-06. The project involves detailed electrical work including new 200-amp and 100-amp panels, lighting fixtures with specific technical specifications, and comprehensive fire alarm requirements including addressable detectors, manual pull stations, and audio-visual notification devices meeting ADA compliance standards.

View the file

Other files

File Type Posted
2523 Bid Documents.pdf PDF
Vendor Responsibility Form Construction.pdf PDF
2523 Specifications.pdf PDF
2523 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kenosha County Brighton Dale Links Storage Facility - Bid-2523

ADDENDUM # 1

September 25, 2025

BIDS DUE: WEDNESDAY, October 9, 2025 at 1:00 pm Local Time, at the Kenosha County Purchasing Division located at 1010 56th Street, Second Floor Kenosha, WI 53140 at that time Bids will be opened publicly for consideration by the Owner.

To all Contract Bidders of record.

This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents.

Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

This Addendum consists of (2) written pages, (1) Revised Bid Offer Form, (1) Sign in sheet and (1) attached Drawing Sheet E201.

ADDED SPECS OR SCOPE OF WORK

1. NEW ALTERNATE #3

I. Provide cost to bring power to existing cold storage building west of the project, as noted on the attached electrical sheet E201 Electrical Power and Lighting Plans. See Revised Bid Offer Form

2. CLARIFICATIONS FOR ALTERNATE #2

I. See attached sheet showing the requirements of the fire alarm.

3. List of Alternates:

I. Alternate #1 – New finishes of existing building II. Alternate #2 – New Fire Alarm of new and existing buildings

III. Alternate #3 – New power for existing west building

QUESTIONS AND ANSWERS

1. For Alternate #1, are we re-using the existing lights or are we installing new ones? If new, what model?

a. The existing lights are going to be re-used. It will be the contractor’s responsibility to remove and re-install at the same locations.

2. Can you please clarify the scope for Alternate #2, Fire Alarm System? What is expected and way of operation?

a. See attached sheet E201 with the added notes in relation to the Fire Alarm.

3. Typical post frame buildings are 29 ga or 26 ga steel. They are calling for 24 gauge.

Please confirm what gauge steel.

a. Exterior panels shall be 26 ga as indicated on specs.

-2-

4. Is the work slated for Spring 2026 and is there a deadline for completion?

a. The hope is that the building will be completed as soon as possible. General Contractor shall indicate how many days will be required to complete the project on the Revised Bid Offer Form, and if there are any final items that would be delayed due to weather conditions.

5. Bid form states Alternate #2 is for the new fire alarm system. Spec Section 09 67 23 - Epoxy Resinous Flooring indicates Alternate No. 2 - Add to Base Bid - New Storage Facility. Shall there be a separate line item for the Base Bid?

a. Disregard Note and spec section 06 67 23. There will be no Epoxy Flooring in this project.

Alternate #2 is for the fire alarm as noted on the plans and bid form.

6. Spec Section 28 31 00 indicates Alternate #3 for the Fire Detection and Alarm. Can you please confirm Bid Offer Form Alternate numbering?

a. Spec section 28 31 00 Fire Alarm Detection and Alarm should read Alternate #2, as indicated on plans and bid form, not Alternate #2 as indicated on specs.

7. Concrete Type C is 8." Stoop slab detail 3/S201 shows a 5" thick stoop slab but also indicates Concrete Type. Can you please confirm which is the correct one?

a. The concrete slab for the storage facility and the concrete apron in front of the OH Doors shall be Concrete Type ‘C’. Disregard the concrete type note on detail 3/S201. The concrete stoop (just the stoop) can be a 5” slab as noted.

8. The drawings state the buildings are for cold storage, and say non insulated doors, but the specifications say insulated doors. Which shall I bid?

a. Door shall be non-insulated as noted on plans.

9. Will you and the architect accept voluntary alternates for door manufacturers?

Please clarify specs @ 2.1 "materials" A-9: calls for doors to have full glass sections "as shown on exterior elevations." Exterior elevations show no glass.

a. We are open to other door manufacturers, as long as they are equal or exceed requirements indicated on specs. Contractor shall submit the door manufacturer information for approval prior purchasing or contracting the door.

b. There is no glass on doors. Disregard note on spec indicating full glass door section.

10. In specifications, section 09 67 23 – Epoxy Resinous Flooring indicates as an alternate #2

– Add to Base Bid. Alternate #2 is already scheduled for New Fire alarm system, do we add an Alternate #3 or will there be an Addendum to cover a new bid sheet or this item.

a. See previous response. There is no alternate for epoxy flooring, Alternate # 2 is for the fire alarm and new Alternate #3 is to bring power to the existing west building.

1) Will there be any additional addendum items coming out?

a. October 2nd will be the last Addendum if there are any additional items.

ATTACHED REVISED PLANS

1. Sign-in sheet from September 17, 2025 walk-through.

2. Sheet - E201 Electrical Power and Lighting Plans.

KENOSHA COUNTY BID #2523

WISCONSIN PAGE 1 OF 1

ATTACHMENT C

REVISED BID OFFER FORM

Vendor:____________________________________________________________________________

Base Bid:

Base Bid: Provide all labor and materials to complete all work per bid terms, conditions, and specifications.

Alternate Bids:

Alternate 1: Install new finishes and hollow metal door at existing cold storage pole building as described on Sheet A204. Amount added to Base Bid.

Alternate 2: Installation of a new fire alarm system for both the new building and the existing storage building. Amount added to Base Bid.

Alternate 3: Cost to bring power to existing cold storage building west of the project, as noted on the attached electrical sheet E201 Electrical Power and Lighting Plans.

Amount added to Base Bid.

Lead time to begin work is __________ days after notice to proceed.

Lead time to complete work is __________ days after work begins.

Will work be complete in 2025 or completed in Spring 2026? _________________________________

Bid Bond (Required) is included? Yes_____ No______

Kenosha County is exempt from Federal Excise and Wisconsin Sales Taxes, 77.54(9a)(b) WI Stats.

Kenosha County’s CES number is 008-1020421892-06.

SB-1

SB-1

SB-2

SB-2

SB-A SB-A

SB-B SB-B

A203

A203

A202

A202

A202

A202

A203

A203

NEW 200 AMP

PANEL "A"

A-01

A-01

A-01

A-02

A-02 A-02 A-03 A-03 A-03

A-04

A-04

A-04A-05A-05A-05

OH Door A-10/12/14

OH Door A-11/13/15

SB-100.2

OH

SB-100B

SB-100.1

OH

SB100.A

ALTERNATE #3

NEW 1-1/2" CONDUIT TO EXISTING

BUILDING TO THE WEST SIDE.

CONDUIT TO BE INSTALLED

FOLLOWING THE EXISTING ROAD.

(300 LF APPROX.)

NEW 1-1/2" CONDUIT FOR

FUTURE 100 AMP SERVICE

CAP END FOR FUTURE CONNECTION.

FEEDER LINE BY POWER

UTILITY COMPANY (FROM

ELEC. TRANSFORMER)

NEW ELECTRIC METER

BY UTILITY COMPANY

SB-1 SB-2

SB-A

SB-B

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

D1 A-06

D1 A-06

D1 A-06

D1 A-08

D1 A-06

D1 A-06

D1 A-06

D1 A-06

D1 A-06

D1 A-06

D1 A-08

D1 A-08

D1 A-08

D1 A-08

D1 A-08

WP1

A-07

WP2

A-06

WP2

A-09

WP1

A-09

WP1

A-07

WP1

A-09

WP1

A-07

WP1

A-07

WP1

A-07

WP1

A-07

WP1

A-07

WP1

A-07

EML1

A-06

(26 00 00) EM LIGHT REMOTE HEAD

(26 00 00) EM LIGHT REMOTE HEAD

EML1

A-06 2

.0

.9

LIGHT FIXTURES SCHEDULE

TAG MOUNTING VOLTAGE LOAD MAKE DESCRIPTION MODEL

D1 SUSPENDED MVOLT 76 VA LITHONIA LED High Bay 12,000 Lumes w/Integral 360 deg motion sensing control IBG 12000LM SEF WD MV 40K 80CRI LAOZU

WP1 WALL MVOLT 18 W LITHONIA LED Wall Pack w/ Bi-Level motion sensor WDGE2 LED P3 80CRI 40K VF MVOLT SRM PIRH1FC3V

WP2 WALL MVOLT 22.8W LITHONIA LED Wall Pack w/ Photocel WDGE1 LED P2 80CRI 40K VF MVOLT SRM PE

EML1 WALL MVOLT 3W LITHONIA LED Emergency Light / Exit Combo ECRG H0 DQ M6 120/277V 4W w/ ERE Remote Headlamps

(ERE W T SQ WP)

UTILITY PADMOUNT

COORDINATE WITH UTILITY

CONTRACTOR TO INCLUDE

CONCRETE BASE IN

ACCORDANCE WITH UTILIY

REQUIREMENTS

120/240V 1ph

M

SERVICE CONDUCTORS BY UTILITY

PNL 'A' 200

amp 120/240 V

1 ph / 3W

SERVICE GROUND: (2)

TWO 10' GROUND ROD,

WATER PIPE, ALL #6

TC

PE

PE

EXTERIOR LIGHTS

EXTERIOR LIGHTS

2" C W/3 -#3/0, #6 gr

ALTERNATE #3

PNL 'B' 100 amp

120/240 V 1 ph / 3W

SERVICE GROUND: (1)

ONE 8' GROUND ROD,

WATER PIPE, ALL #6

1-1/2" C W/3 - #1/0, #8 gr

ALTERNATE #3

NEW 1-1/2" CONDUIT TO EXISTING

BUILDING TO THE WEST SIDE.

CONDUIT TO BE INSTALLED

FOLLOWING THE EXISTING ROAD.

(300 LF APPROX.)

ALTERNATE #3

NEW SUB PANEL 'B' INSIDE

BUILDING

(CONNECTED TO PANEL 'A')

PANEL 'A'

EXISTING BUILDING

CONDUIT TO ELECTRIC

TRANSFORMER

kuenyarch.com ©2025 Kueny Architects L.L.C. - All Rights Reserved

PLAN NORTH

SCALE: As indicated

E201Kenosha County - Brighton Dale Links Storage Facility - Bid-2523

September 3, 2025

Electrical - Power - Lighting Plans & Fire Alarm Notes

830 248th Ave, Kansasville, WI 53139

Addendum #1 September 25, 2025

1/8" = 1'-0"1 Electric Floor Plan

1/8" = 1'-0"2 Lighting Plan

1/2" = 1'-0"3 Electrical Riser

WIRE SIZE SCHEDULE

WIRE SIZES FOR BRACH CIRCUITS OF 100' LENGTH OR LESS SHALL BE:

20A BREAKER - #12 CU

25-35A BREAKER - #10 CU

40-50A BREAKER - # 8 CU

55-65A BREAKER - # 6 CU

LARGER AS LISTED BY NEC OR AS SHOWN BY RISER

BRANCH CIRCUITS OF 101-200' IN LENGTH SHALL USE ONE LARGER SIZE OF WIRE (IE. A CIRCUIT 150' IN LENGTH WITH

A 20A BREAKER SHALL USE #10)

BRANCH CIRCUITS OF GREATER THAN 200' IN LENGTH SHALL USE TWO LARGER SIZES OF WIRE (IE. A CIRCUIT 275' IN

LENGTH WITH A 20A BREAKER SHALL USE # 8)

1" = 30'-0"4 Alternate #3 - New Power to Existing Building

FIRE ALARM CONTROL PANEL (FACP)

DIGITAL ADDRESSABLE TYPE, CAPABLE OF UP TO 50 DEVICES IN BASE FORM.

MICROPROCESSOR BASED CONTROL. GRAPHIC DISPLAY, AUTOMATIC DRIFT

COMPENSATION, ADJUSTABLE SENSOR SENSITIVITY. ONE MAN WALK TEST.

UP/DOWNLOAD PC COMPATIBLE. 1000 EVENT HISTORY LOGGING. POSITIVE

ALARM SEQUENCE. CODED SIGNALING. NETWORKABLE. ADA IN-RUSH

TOLERANT SIGINAL CIRCUITS. ALARM VERIFICATION. SIGNAL SILENCE INHIBIT.

LCD PROMPTED OPERATION AND PROGRAMMING. DEFAULT ALARM MODE.

POWER LIMITED 10 CIRCUITS. INCLUDE NECESSARY RELAY OUTPUT

MODULES AND SIGNAL NOTIFICATION CONTROL PANELS. PROVIDE WITH

BATTERY BACKUP, SIZED ACCORDING TO NFPA BATTERY CALCULATION,

SEALED LEAD ACID TYPE CABINET. FURNISH 120V AC POWER. TEST AND

VERIFY ALL OPERATIONS. COORDINATE ALL REQUIRED APPROVALS WITH

LOCAL AUTHORITIES. PROVIDE ALL PROGRAMMING, STARTUP, AND OWNER

TRAINING. REFERENCE FIRELITE ES-50X

COMMUNICATION.

IN ACCORDANCE WITH LOCAL REGULATIONS, THE NEW FACP SHALL HAVE

ANY APPROPRIATE COMMUNICATION MODULE SATISFYING ALL CITY

REQUIREMENTS. ARRANGE AND CONNECT COMMUNICATIONS, COMPLETE

AND READY TO USE. CONTRACTOR SHALL PAY ALL FEES ASSOCIATED WITH

ESTABLISHING COMMUNICATION. 3RD PARTY MONITORING COMPANY TO BE

ADS OR EQUAL APPROVED BY OWNER.

NAC PANELS

FURNISH 120V AC POWER. FIRELITE OR EQUAL WITH BACKUP BATTERIES.

ADDRESSABLE DETECTORS

REFERENCE FIRELITE 365 SERIES OR EQUAL

ADDRESSABLE SMOKE DETECTORS

FIRELITE OR EQUAL. FURNISH AND INSTALL ONE ATE EACH AIR HANDLING

UNIT OVER 2,000 CFM

ADDRESSABLE MANUAL PULL STATIONS

REFERENCE FIRELITE BG-12 OR EQUAL

AUDIO-VISIAL DEVISES

ADA COMPLIANT. CONTRACTOR TO FIELD EVALUATE, SELECT CANDELA AND

DECIBLES AS APPROPRIATE. FOR FINISHED AREAS MOUNTING MAY BE WALL

OR CEILING GRID. UNFINSIHED LOW BAY AREAS MAY BE WALL OR PENDANT

MOUNTED. HIGH BAY AREAS MAY BE PENDANT MOUNTED AT 20’ AFF OR

LOWER. SHOW MOUNTING HEIGHT ON SHOP DRAWINGS. REFERENCE

FIRELITE.

OTHER DEVICES

AS INDICATED ON PLANS, FIRELITE OR EQUAL.

ALTERNATE MUNUFACTURER EQUIPMENT, AS LISTED IN THE SPECIFICATIONS

ARE ACCEPTABLE, PROVIDED REMOTE DEVICES AND FACP ARE OF THE

MANUFACTURE.

GENERAL FIRE ALARM NOTES:

CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE COMPLIANTE AND

USABLE SYSTEM. CONSISTENT WITH THE INTENT AND SCOPE INDICATED BY

THESE PLANS. FA DEVICES, COMPONENTS , OR RELATED WHICH ARE NOT

CALLED OUT BY THESE PLANS ARE NECESSARY TO MAKE THE SYSTEM

COMPLETE AND COMPLIANT, SHALL BE INCLUDED AT NO EXTRA COST TO THE

OWNER.

1. SIMPLEX, SIEMENS, EST. HARRINGTON AND GAMEWELL SYSTEMS ARE

APPROVED FIRE ALARM SYSTEMS. HORNS SHALL BE TEMPORAL.

2. LCD DISPLAY TO SHOW LOCATION AND TYPE OF DEVICE INITIATING

THE ALARM.

3. STROBE INTENSITY (CD) TO BE SELECTED/SET BY CONTRACTOR.

ADJUST IN FIELD AS NECESSARY.

4. FOR ALL AIR HANDLING UNITS, INCLUDE SMOKE DETECTORS AND

REMOTE STATION.

5. DETECTORS SHALL BE LOCATED IN DIRECT AIR FLOW OR CLOSER

THAN 3’ FROM ANY SUPPLY DIFFUSER OR RETURN OPENING.

FIRE ALARM REQUIREMENTS

EC SHALL CONNECT ALL NEW FIRE ALARM DEVICES TO NEW FACP.

E.C. SHALL DESIGN, DETAIL AND FURNISH COMPLETE AND USABLE FIRE

ALARM SYSTEM THAT COMPLIES WITH ALL LOCAL AND NATIONAL CODES.

NEW REMOTE DEVICES SHALL INCLUDE HORN STROBE UNITS, PULL

STATIONS, ZONE IDENTIFICATION DEVICES, AND SMOKE DETECTORS. ALL

NEW DEVICES SHALL BE ADDRESSABLE AND FULLY COMPATIBLE SYSTEM.

F.A. CONTRACTOR SHALL ALLOW FOR UP TO 5 ADDITIONAL REMOTE DEVICES

FROM THAT SHOWN OR DESCRIBED BY THESE DOCUMENTS. IF ADDITIONAL

DEVICES ARE REQUIRED BY AUTHORITY HAVING JURISDICTION, THE FIVE

AFORMENTIONED SHALL BE INSTALLED AT NO ADDITIONAL COST.

WIRING SHALL PLENUM CABLE TYPE IF REQUIRED, WITH EMT CONDUIT IN

CONCEALED LOCATIONS SUCH AS WALL CAVITIES, OR ANY SURFACE

MOUNTED (EXPOSED) DEVICES BELOW 10’ AFF.

EC SHALL PREPARE AND SEE TO APPOVAL ALL SUBMISSIONS BY AUTHORITY

HAVING JURISDICTION. THIS INCLUDES, BUT NOT LIMITED TO, SHOP

DRAWINGS, BATTERY CALCULATION, CUT SHEETS, ETC. PROVIDE

SUPERVISORY SERVICE AS REQUIRED BY AUTHORITY HAVING JURISDICTION.

FIRE ALARM - NOTES & REQUIREMENTS