This document is Addendum One for Kenosha County's Request for Bid (RFB) #2515 for the Kenosha County Center DPW Elevator Repair project. The addendum provides clarification on two key points: the estimated project budget is $75,000, and the county confirms the elevator jack will be specified for the current 8' rise instead of the originally planned 14' 2" additional travel distance. The county explicitly states they will never build an addition on that side of the building, thus approving the shorter jack specification. The addendum includes revised drawings for the DPW elevator repair, which show the correct travel distance of 8'-0" from the lower level to the upper level.
The document appears to be part of a larger bid process for an elevator repair project, with a focus on technical specifications and precise measurements. The addendum serves to provide official confirmation and documentation of design modifications, ensuring bidders have the most current information for their proposals. By releasing this addendum, Kenosha County is maintaining transparency in the procurement process and providing clear guidance to potential contractors about the specific requirements of the elevator repair project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB #2515 Addendum One Page 1 of 1
Yes.
Questions & Answers:
Q1. What is the estimated budget?
A. The estimated budget is $75,000.
Q2. The original jack was speced to have another 14' 2" of travel to it for future additions. So, what that means is that the jack cylinder goes a lot farther in the ground than expected. So, does the county want to retain that 14' 2" of additional jack for future rise or should we spec the new jack for the current 8' of rise? The future rise is doable but if there is no need for it.
A. We will never build an addition on that side of the building. The County is OK with the proposed 8’ jack.
Attachments:
Please see the following attachments:
Revised Drawings for DPW Elevator Repair
Please see attached revised drawing for the DPW elevator repair. This revised drawing shows the correct travel distance of the elevator (distance from lower level to upper level) of 8’-0”.
End Addendum 1
KENOSHA COUNTY
RFB #2515 ADDENDUM ONE DATED 7/23/2025
Kenosha County Center DPW Elevator Repair
WORK AREA
7 5/8" 6'-1" 7 5/8"
Elev-1.0
/8
/8
/8
SCOPE OF WORK
REMOVE & REPLACE EXISTING
ELEVATOR CYLINDER
LEVEL 1
0'-0"
LEVEL 2
15'-2"
SCOPE OF WORK
REMOVE & REPLACE
EXISTING ELEV. CYLINDER
EXISTING ELEV. PIT
EXISTING ELEV. DOOR
TO REMAIN
Lower Level
-8'-0"
"1
1.0KUENY ARCHITECTS, LLC
10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103
SITE MAP GENERAL NOTES
1. All concrete to test 4000 psi in 28 days.
2. Verify all dimensions, access, utilities and working conditions in the field.
3. Conform to all applicable codes, ordinances and safety standards.
4. Obtain and pay for all required permits and fees.
5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the Specifications.
6. No concrete to be poured without Architect's prior review.
7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.
8. Leave site clean, neat and free of debris at all times.
9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.
10. Guard against interfering with Owner's operations.
11. These Drawings contain no provisions or procedures for on-site safety.
Each Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.
12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
MATERIAL INDICATIONS
DRAWING LEGEND
New or Required Point Elevation
Existing Point Elevation
Existing Contours
New or Required Contours
A Grid Lines
3.1 Building Section
Wall Section
Room/Space Number
Door Number
SHEET INDEX
Earth Backfill
Rigid Insulation
Concrete Block
Aluminum
Lumber (Rough)
Steel
Sand Fill
Concrete
Finished Wood
Stone Fill
Plywood
Batt Insulation
4.1
Room 1
101 Interior Elevation
Detail Section
5.1
7.1
CONSULTANTS
5.1
Detail Number
Page Number
Exterior Elevation
2.1
1 Wall Tag
+ 100.0
+ 100.0
+ 100.0
+ 100.0
Kenosha County DPW Elevator Bid #2515 Kenosha County Center
19600 75th St, Bristol, WI 53104
June 26, 2025
Kenosha County DPW Elevator Bid #2515 Kenosha County Center
ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100
(262) 857-8101 Pleasant Prairie, Wisconsin 53158 Architect of Record - Jon P. Wallenkamp
1" = 40'-0"1 2025 - Elevator - Existing Plan
1/4" = 1'-0"2 Enlarged Plan
1/4" = 1'-0"3 Elevator Section
ARCHITECTURAL
Elev-1.0 Title Sheet - Plans & Details
ADDENDUM #1
| (02) Kenosha County Center_Elevator Plan_AD1 - BID PLAN - 2025.07.16.pdf |
| Sheets |
| Elev-1.0 - Title Sheet - Plans & Details |