About this file
This is an architectural drawing set for the Kenosha County Department of Public Works (DPW) Elevator Bid #2515, located at the Kenosha County Center in Bristol, Wisconsin. The project involves removing and replacing the existing elevator cylinder while maintaining the existing elevator doors and pit. The drawings, prepared by Kueny Architects, LLC, are dated June 26, 2025, and provide detailed plans, sections, and site information for the elevator renovation project. The scope of work specifically focuses on replacing the elevator cylinder at Level 1, with careful preservation of existing elevator infrastructure.
The document includes comprehensive site notes and specifications, emphasizing precise field verification, code compliance, and contractor responsibilities. Key requirements include obtaining necessary permits, ensuring concrete strength of 4000 psi, maintaining site cleanliness, and coordinating with all trades and owner representatives. The drawings provide technical details about elevation, dimensions, and construction requirements, with specific instructions about underground utility location and safety protocols. The project appears to be a targeted infrastructure improvement for the Kenosha County government facility, with an emphasis on careful, methodical renovation of the existing elevator system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK AREA
8" 8'-4" 8"
Elev-1.0
SCOPE OF WORK
REMOVE & REPLACE EXISTING
ELEVATOR CYLINDER
LEVEL 1
0'-0"
LEVEL 2
15'-2"
R
.O
R
.O
EXIST ELEVATOR
TO REMAIN
SCOPE OF WORK
REMOVE & REPLACE
EXISTING ELEV. CYLINDER
EXISTING ELEV. PIT
EXISTING ELEV. DOOR
TO REMAIN
EXISTING ELEV. DOOR
TO REMAIN
6'-0"
F
IE
L D
V E
R
IF
Y
1.0KUENY ARCHITECTS, LLC
10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103
SITE MAP GENERAL NOTES
1. All concrete to test 4000 psi in 28 days.
2. Verify all dimensions, access, utilities and working conditions in the field.
3. Conform to all applicable codes, ordinances and safety standards.
4. Obtain and pay for all required permits and fees.
5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the Specifications.
6. No concrete to be poured without Architect's prior review.
7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.
8. Leave site clean, neat and free of debris at all times.
9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.
10. Guard against interfering with Owner's operations.
11. These Drawings contain no provisions or procedures for on-site safety.
Each Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.
12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
MATERIAL INDICATIONS
DRAWING LEGEND
New or Required Point Elevation
Existing Point Elevation
Existing Contours
New or Required Contours
A Grid Lines
3.1 Building Section
Wall Section
Room/Space Number
Door Number
SHEET INDEX
Earth Backfill
Rigid Insulation
Concrete Block
Aluminum
Lumber (Rough)
Steel
Sand Fill
Concrete
Finished Wood
Stone Fill
Plywood
Batt Insulation
4.1
Room 1
101 Interior Elevation
Detail Section
5.1
7.1
CONSULTANTS
5.1
Detail Number
Page Number
Exterior Elevation
2.1
1 Wall Tag
+ 100.0
+ 100.0
+ 100.0
+ 100.0
Kenosha County DPW Elevator Bid #2515 Kenosha County Center
19600 75th St, Bristol, WI 53104
June 26, 2025
Kenosha County DPW Elevator Bid #2515 Kenosha County Center
ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100
(262) 857-8101 Pleasant Prairie, Wisconsin 53158 Architect of Record - Jon P. Wallenkamp
1" = 40'-0"1 2025 - Elevator - Existing Plan
1/4" = 1'-0"2 Enlarged Plan
1/4" = 1'-0"3 Elevator Section
ARCHITECTURAL
Elev-1.0 Title Sheet - Plans & Details
| Sheets |
| Elev-1.0 - Title Sheet - Plans & Details |