25147 - Replacement of (2) HVAC Systems at Fire Station 1.pdf
PDF 239 KB Posted
- Attached to
- Replace HVAC System at Fire State #1
- Solicitation number
- 25147
- Issued by
- Bradley County, Tennessee
About this file
This is a project specification document for the Tennessee Fire Station 1 HVAC system replacement project. The scope requires the contractor to furnish all labor, materials, equipment, permits, and supervision necessary to remove two existing 5-ton HVAC systems and install two new, complete, code-compliant 5-ton heat pump systems at Fire Station 1. The project involves the removal and replacement of identical capacity units, ensuring that the facility maintains its climate control capabilities throughout the transition. No specific response dates, due dates, site visit requirements, bidders' meetings, award dates, or contract term information is detailed in the provided document excerpt.
The document does not specify pricing terms, set-asides, incumbent contractor information, current environmental conditions affecting the work, or detailed funding requirements and sources. Additional information regarding budget allocation, funding mechanisms, and any other relevant procurement terms would be contained in the associated state and local contract opportunity documentation or supplementary bidding materials not included in this file summary.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCELLENCE IN SERVICE - QUALITY OF LIFE
www.cityofalcoa-tn.gov
REQUEST FOR PROPOSAL
The City of Alcoa will be accepting sealed proposals for the Replacement of (2) 5-Ton HVAC Systems at Fire Station
#1 until 2:00 p.m., Thursday, December 17th at the office of the Alcoa Purchasing Agent, 223 Associates, Blvd., Alcoa, Tennessee, 37701.
Proposals may be submitted via U.S. Mail / UPS / FedEx, etc., hand delivered, or e-mailed to coasealedbid@cityofalcoa-tn.gov. Regardless of the mode, the Bidder shall be responsible for the early delivery of their proposal. Mailed or hand-delivered proposals should be in a sealed envelope and labeled “Replacement of
HVAC Unit at Fire Station #1 RFB 25147, Proposal Enclosed”. The subject line of e-mailed proposals shall state the same. Proposals received after the deadline will be unopened and discarded.
Proposals shall be addressed to:
City of Alcoa Purchasing
Attn. Ashley Hardyn, Purchasing Manager
223 Associates Blvd.
Alcoa, TN 37701
All purchases are F.O.B. City of Alcoa, TN.
The City reserves the right to accept or reject any proposal, to accept a proposal containing variations from these specifications if the proposal so merits, to negotiate proposal with the lowest bidder prior to acceptance, and to accept partial proposals. Proposals must be submitted on the form issued by the City and must be completed (in ink) and signed accordingly.
The City of Alcoa reserves the right to waive any formality in any solicitation, to reject any or all proposals, and to accept the best proposal for the City as determined by City Officials. The City also reserves the right not to enter into any contract as a result of this RFB.
Questions regarding this solicitation may be directed to Ashley Hardyn, Purchasing Manager, via telephone (865)
380-4822 or e-mail ahardyn@cityofalcoa-tn.gov. Any questions regarding this RFB shall be submitted no later than
48 hours prior to the proposal deadline.
This solicitation has been developed in accordance with Title VI of the Civil Rights Act of 1964 which provides that no person shall, on the grounds of race, sex, age, national origin, or disabling condition, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.
Thank you in advance for your interest in doing business with the City of Alcoa.
Sincerely, Purchasing Agent
City of Alcoa Purchasing
223 Associates Blvd., Alcoa, Tennessee 37701 (865) 380-4700 FAX (865) 380-4797 mailto:coasealedbid@cityofalcoa-tn.gov
City of Alcoa
RFB #25147
11/18/26
CITY OF ALCOA
INSTRUCTIONS TO PROPOSERS
Proposal Evaluation
In addition to the proposal amount, additional factors will be considered as an integral part of the proposal evaluation process, including, but not limited to:
A. The Vendor’s experience, reputation, efficiency, judgment, and integrity.
B. The quality, availability and adaptability of the requested products or services.
C. The Vendor’s ability to provide future maintenance and/or services.
D. Any other applicable factors as the City determines necessary and appropriate (which may be requested by the city prior to award).
Award of Contract
The City holds the right, in its judgment, to award the contract to the vendor(s) which it feels is in the best interest of the City. If a contract is to be awarded, the Contractor/Vendor selection shall be based in whole or in part on the evaluation noted above. No submittal shall be withdrawn for a period of sixty (60) days subsequent to the opening of proposals without the consent of the City of Alcoa.
Laws, Permits and Regulations
The Contractor shall comply with all State and Local laws, ordinances, regulations and requirements applicable to work hereunder. If the Contractor ascertains at any time that any requirement of this Contract is at variance with applicable laws, ordinances, regulations, or other requirements, she/he shall promptly notify the City of Alcoa in writing.
Cancellation of Award
The City reserves the right to cancel the award of any contract at any time before the execution of such contract by all parties without any liability against the City. The Vendor is advised that if in the event appropriated funds are legitimately unavailable for this product in successive fiscal years, such purchase orders resulting from this proposal are null and void.
Cooperative Purchasing
Unless stated otherwise, vendor agrees that it shall be permissible for other governments in Tennessee to purchase these items or services at the same price. Freight charges can be adjusted to reflect differences in delivery costs.
Iran Divestment Act
By submission of this proposal, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint proposal each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to§ 12-12-106.
RFB #25147
11/18/26
REPLACEMENT OF (2) 5-TON HVAC SYSTEMS
LOCATED AT 2010 N. WRIGHT RD., ALCOA, TN 37701
GENERAL SCOPE AND SPECIFICATIONS
1. SCOPE OF WORK
• Scope Overview: Furnish all labor, materials, equipment, permits, and supervision required to remove two (2) existing 5-ton HVAC systems and install two (2) new, complete, code-compliant
5-ton heat pump systems.
• Removal & Legal Disposal: Disconnect, remove, and legally dispose of all existing designated indoor and outdoor HVAC equipment.
• Refrigerant Compliance: All new equipment must utilize current EPA-approved low-GWP A2L refrigerant (R-454B or equivalent approved low-GWP refrigerant) and include factory-installed refrigerant leak detection sensors and mitigation control boards where required by current mechanical code.
• Site Walk: Bidders MUST attend a MANDATORY pre-bid site walkthrough to verify electrical panel capacities, equipment locations, crane/rigging access, and ductwork connections.
A. System 1: 5-Ton Split Heat Pump System (3-Phase)
• Outdoor Heat Pump: Furnish and install one (1) new 5-ton (60,000 BTU) outdoor split-system heat pump, 208/230V, 3-Phase, set level on existing pad and secured per local wind-load code.
• Indoor Air Handler: Furnish and install one (1) new AHRI-matched 5-ton indoor air handler configured to match the existing airflow orientation (upflow, downflow, or horizontal) and electrically compatible with the building's power supply.
• Auxiliary Electric Heat: Furnish and install one (1) factory-approved 15 kW electric resistance heater kit with integral circuit breaker(s) inside the new indoor air handler.
• Refrigerant Piping: Install new insulated copper refrigerant line sets sized per manufacturer specifications (or flush, pressure-test, and certify existing line sets for A2L refrigerant compatibility) with new filter driers.
B. System 2: 5-Ton Packaged Heat Pump System (Single-Phase)
• Packaged Unit: Furnish and install one (1) new 5-ton (60,000 BTU) self-contained packaged heat pump, 208/230V, Single-Phase, utilizing R-454B refrigerant.
• Auxiliary Electric Heat: Furnish and install one (1) factory-approved 15 kW electric resistance heater kit (Single-Phase) inside the packaged unit.
• Mounting & Curb/Pad: Set, level, and securely anchor the packaged unit
RFB #25147
C. Ductwork, Electrical & Controls (Both Systems)
• Ductwork Transitions: Fabricate and install custom sheet-metal supply and return duct transitions to connect both new units to existing ductwork, sealing all joints and seams
• Electrical Connections: Furnish and install new weatherproof outdoor disconnect switches, indoor service disconnects (as required by code), and liquid-tight flexible electrical whips sized to each unit's nameplate Minimum Circuit Ampacity (MCA) and Maximum
Overcurrent Protection (MOCP).
• Thermostats: Supply and/or reconnect thermostats and connect to existing or new low-voltage control wiring.
D. Testing, Permits & Warranties
• Permits & Inspections: Contractor shall obtain and pay for all required local mechanical and electrical permits and pass final municipal inspection prior to final payment.
• Startup & Commissioning: Perform full manufacturer startup procedures on both systems, including refrigerant charge verification, airflow verification, and electrical performance .
• Warranties: Provide a minimum one (1) year contractor labor and workmanship warranty, alongside standard manufacturer warranties (minimum 5-year parts and 5-to-10-year compressor warranty for commercial applications).
**Scope of work is subject to change based on the recommendations of bidders during the pre-bid meeting
MANDATORY PRE-BID MEETING
Meeting will be held at City of Alcoa Fire Station #1 located at 2010 N. Wright Rd., Alcoa, TN 37701.
Meeting will start promptly at 10am on Thursday, December 3rd.
2. CONTRACTOR RESPONSIBILITIES
The Contractor will be required to perform all work listed above. Contractor will clean up the work site at the end of each day. Contractor will be responsible for all job site safety. The Contractor will be responsible for any damages or claims incurred because of this work. Contractor is responsible for installing all materials per factory instructions as to not void any warranties on materials. Contractor will be responsible for providing proof of insurance.
3. SCHEDULE
Work is to be performed Monday-Friday between the hours of 7am and 5pm.
PROPOSAL SCHEDULE
Lump Sum
System 1: 5-Ton Split Heat
Pump System (3-Phase)
System 2: 5-Ton Packaged
Heat Pump System (Single-
Phase)
Company Name
Company Address
Bidder’s Authorized Representative (Please Print)
Representative’s Signature
Date Telephone
This document was drafted or reviewed in part using artificial intelligence (AI) tools and verified by staff prior to publication.
File details come from the government source that posted it. Updated .