25139.MDL Addendum 2.pdf
PDF 138 KB Posted
- Attached to
- 472/25139. ABG; Kinross C. F. - PA Upgrades
- Solicitation number
- RFQ 171 260000000460 3
- Issued by
- Michigan
About this file
This is an Addendum 2 document issued by the State of Michigan for contract opportunity 472/25139 ABG regarding Kinross C.F. - PA Upgrades. The addendum modifies the original solicitation terms and conditions for the project. The document serves to clarify, amend, or supplement information contained in the initial bid documents and becomes part of the binding contract agreement between the state and the selected contractor. Bidders are required to acknowledge receipt of this addendum as a condition of bid submission, and all terms outlined within supersede conflicting provisions in earlier documents.
The specific amendments contained in this addendum address modifications to project requirements, technical specifications, or administrative procedures established in the original solicitation. All prospective bidders must incorporate the addendum revisions into their proposals and confirm compliance with the updated terms. Failure to acknowledge receipt of Addendum 2 may result in bid rejection or non-responsiveness determinations. The addendum becomes effective upon issuance and applies to all bids submitted after the distribution date.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
9/25/2026
PROJECT NAME
Kinross Correctional Facility – Public Address System Upgrade
FILE NUMBER
472/25139.MDL
PROFESSIONAL
TowerPinkster
PROJECT DIRECTOR
Michael Lusk
BID OPENING DATE:
9/30/2026
ADDENDUM ITEMS:
Please Note: File number has changed from 472/25139.ABG to 472/25139.MDL. Please submit all bidding documents with the new file number.
Pre-bid RFI Questions:
1. Drawing M301 shows new exhaust fans within multiple telecom closets. The electrical drawings do not show these exhaust fans nor feeding them with any power or control. Are we to supply power and controls for these new exhaust fans?
Answer: The exhaust fans are added equipment in the IT closets and require power. Provide 120V circuit from the nearest electrical panel, based on the exhaust fans schedule on sheet M 301. See drawing keynotes and specifications for control details.
2. Spec section 27 5116 1.7.A Extra Materials asks for the bidder to include 10% for the owner to keep as attic stock. What specific material is required?
Answer: Attic stock materials shall include major components and equipment, including but not limited to speakers, amplifiers, control hardware, etc.
3. 120 calendar days is a tight window to complete this work in, do you know how many escorts the facility provide to support this project?
Answer: One (1) escort will be provided.
4. T402 through T405 show extension rack rework is required, but I cannot find a parts list. Are any new parts required in B1, D1, E1 and H1 comm room?
Answer: Part numbers are included in the State Standards attached to the specifications.
5. T402 through T405 show existing fiber relocated into the rack. Does this fiber need to be extended or is it long enough to reach the new location? What is the fiber cable type and what style fiber termination is required? Is there a required parts list for this?
http://www.michigan.gov/SIGMAVSS
Answer: Part numbers are included in the State Standards attached to the specifications.
6. The paging one line on T421 and T422 seems to be missing Valcom VE8004 paging gateways. These are necessary to connect to the QSC SPA amplifiers. Each gateway can support up to 4 zones of audio so depending on the zone needs of a building usually 1 gateway is enough. Please indicate how many paging zones are needed in each building.
Answer: For the purpose of bidding, assume all buildings will have four paging zones.
End of Addendum 2
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Marcelo Guassi - TowerPinkster DATE: 9/25/2026
APPROVED BY:
PROJECT DIRECTOR: Michael Lusk DATE: 9/25/2026