This is a Scope of Work and bidding document for the demolition of a two-story steel frame brick veneer building located at 2201 Crisp Drive at Clinton National Airport in Little Rock, Arkansas, issued by the Little Rock Municipal Airport Commission. The project involves the complete demolition of the structure, removal of related site appurtenances including sewer, gas, water, and electrical service feeds, capping of utilities, removal of fencing, and asphalt parking surface, all to be performed under a single prime contract. Sealed bids are due by 2:00 PM local time on Thursday, December 10, 2026, in the Administration Office at Clinton National Airport, 1 Airport Road, Little Rock, Arkansas 72202. A non-mandatory pre-bid conference will be held at 10:00 AM on Tuesday, November 24, 2026, at the same location, with an optional job site visit following the meeting. The work must be substantially completed within 90 consecutive calendar days from the date of written notice to proceed. Bid documents are available at https://vendors.planetbids.com/portal/39494/portal-home and through Southern Reprographics Plan Room.

Bidders must submit bid security of not less than 5% of the base bid amount in the form of a cashier's check or bid bond and must comply with Arkansas Code Annotated 17-25-101 regarding contractor licensing. The successful bidder will be required to execute a formal contract within 10 days of acceptance and provide performance and payment bonds equal to 100% of the contract price. Liquidated damages are assessed at $250 per calendar day for failure to achieve substantial completion and an additional $250 per day for failure to achieve final completion after the expiration of the contract time. The contract is governed by AIA Document A101-2017 for the Agreement Form and AIA Document A201-2017 for General Conditions, supplemented by specific supplementary conditions. All contractors and subcontractors must comply with applicable federal nondiscrimination requirements, OSHA excavation safety regulations for trenches exceeding five feet in depth, and all applicable Arkansas state and local laws. A $3,000 allowance is included for testing and inspecting services. The Little Rock Municipal Airport Commission has established a "Cone of Silence" prohibiting all communication with airport personnel, commission members, or consultants regarding the solicitation except during officially sponsored and publicly announced meetings, with violations potentially resulting in rejection of the bid.

View the file

Other files

File Type Posted
251300 - Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

FOR

2201 CRISP DRIVE DEMOLITION

CLINTON NATIONAL AIRPORT

LITTLE ROCK, ARKANSAS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION NO. TITLE

00 01 01 PROJECT TITLE PAGE

00 01 10 TABLE OF CONTENTS

00 11 16 INVITATION TO BID

00 21 13 INSTRUCTIONS TO BIDDERS

00 41 13 BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT)

References

00 43 13 BID SECURITY FORM

00 52 13 AGREEMENT FORM - STIPULATED SUM (SINGLE PRIME

CONTRACT)

AIA® A101™ - 2017, Standard Form of Agreement Between Owner and Contractor

00 61 13 PERFORMANCE AND PAYMENT BOND FORM

00 72 13 GENERAL CONDITIONS

AIA® A201™ - 2017, General Conditions of the Contract for Construction

00 73 00 SUPPLEMENTARY CONDITIONS

Appendix C: Mandatory Federal Provisions

00 73 19.13 OSHA GUIDELINES FOR TRENCH SAFETY

DIVISION 01 - GENERAL REQUIREMENTS

SECTION NO. TITLE

01 11 00 SUMMARY OF WORK

01 21 00 ALLOWANCES

01 33 00 SUBMITTAL AND SUBSTITUTION PROCEDURES

WD&D Substitution Form

01 45 23 TESTING AND INSPECTION SERVICES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 74 23 FINAL CLEANING

01 78 00 CLOSEOUT SUBMITTALS

CLINTON NATIONAL AIRPORT

CRISP DRIVE DEMOLITION: #25-018 00 01 10-1

DIVISION 02 - EXISTING CONDITIONS

SECTION NO. TITLE

02 41 13 SELECTIVE SITE DEMOLITION

02 41 19 SELECTIVE STRUCTURE DEMOLITION

DIVISION 05 - METALS

SECTION NO. TITLE

05 50 00 METAL FABRICATIONS

DIVISION 31 - EARTHWORK

SECTION NO. TITLE

31 00 00 EARTHWORK

31 25 00 EROSION AND SEDIMENTATION CONTROLS

CRISP DRIVE DEMOLITION: #25-018 00 01 10-2

DOCUMENT 00 11 16

INVITATION TO BID

1.01 Sealed bids for the demolition of a two-story steel frame, brick veneer building and related site appurtenances will be received until 2:00 PM, Local Time on Thursday, December 10, 2026, in the Administration Office, Clinton Conference Room, at the Clinton National Airport, 1 Airport Road, Little Rock, Arkansas, 72202, addressed to the attention of David Finnie, and then will be publicly opened and read aloud.

1.02 A non-mandatory pre-bid conference will be held at 10:00 AM on Tuesday, November 24, 2026, in the Administration Office, Clinton Conference Room, at the Clinton National Airport, 1 Airport Road, , Little Rock, AR 72202. Subcontractors are strongly encouraged to attend this meeting but are not required to attend. Following the meeting there will be a non-mandatory (optional) job site visit. The Owner reserves the right to schedule additional meetings.

1.03 The work includes offsite removal of structure, capping of related sewer, gas, water and electrical service feeds, fencing, and asphalt parking surface, all to be let under one prime contract.

1.04 Bid Security: A cashier's check or acceptable bidder's bond payable to the Owner in an amount not less than 5% of the base bid submitted must accompany each bid as a guarantee that, if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as may be required. If a Bid Bond is provided, the Bond must be signed by an authorized agent of the Bonding Company and the agent's power of attorney must be submitted with the Bid Bond.

1.05 Copies of drawings, specification and other proposed contract documents are on file and are open to inspection at the following places:

Wittenberg, Delony & Davidson, Inc.

Southern Reprographics Plan Room

1.06 Digital copies of the bid documents are available at:

https://vendors.planetbids.com/portal/39494/portal-home .

1.07 Bidders, sub-bidders, material suppliers and other interested parties are encouraged to obtain complete sets of Bid Documents from the Architect. Complete sets of Bid Documents should always be used in preparing bids. Neither the Owner nor Architect assumes responsibility for errors in bidding or misinterpretations of Bid Documents resulting from the use of incomplete sets of Bid Documents. The documents obtained through the Architect are considered the official version and take precedence if any discrepancies occur. The use of incomplete or inaccurate Bid Documents does not relieve the bidder of the obligation to perform all work related to his bid as detailed in a complete set of Bid Documents.

CLINTON NATIONAL AIRPORT

CRISP DRIVE DEMOLITION: #25-018 00 11 16-1

https://vendors.planetbids.com/portal/39494/portal-home https://clintonairport.gob2g.com/

1.08 All bidders shall conform to the requirements of Arkansas Code Annotated 17-25-101, Arkansas State Licensing Law for Contractors.

1.09 The Commission encourages the participation of small and veteran-owned business enterprises.

1.10 For purposes of this solicitation, all communication must be directed via the CNA Planet Bids portal. The Little Rock Municipal Airport Commission has imposed an absolute prohibition against any communication or contact with other Airport personnel, Commission member, or Consultant regarding the solicitation generally referred to as a "Cone of Silence." The prohibition begins with the publication of this solicitation document and remains in place through Commission selection. It ends after successful negotiations with the selected Company have concluded in an executed agreement. The prohibition is suspended only during Airport sponsored and publicly announced meetings conducted for clarification. A violation of this provision may result in a rejection of the solicitation response submitted by the offending Company.

1.11 The Owner reserves the right to waive any formalities in, or to reject any or all bids.

1.12 No bidder may withdraw his bid within 90 days after the date of the opening thereof.

1.13 Each bid must be submitted in a sealed envelope bearing, on the outside, the name of the bidder, their Arkansas Contractor License number, their address and the project name.

1.14 This publication was paid for by the Little Rock Municipal Airport Commission. The amount paid for this publication was $_______. (LEGAL AD PERSONNEL TO ENTER AMOUNT)

END OF DOCUMENT 00 11 16

CLINTON NATIONAL AIRPORT

CRISP DRIVE DEMOLITION: #25-018 00 11 16-2

mailto:duck@wddarchtects.com mailto:procurement@clintonairport.com

DOCUMENT 00 21 13

INSTRUCTIONS TO BIDDERS

PART 1 - GENERAL

1.01 DESCRIPTION OF BID

A. Base Bid: Work includes demolition of structures, including any slabs, foundations, and site improvements such as fences, driveways, curbs and gutters as shown on the Drawings and described herein, all to be let under one prime contract. Refer to Demolition Notes on the drawings.

B. Bid Documents: Bidders, sub-bidders, material suppliers and other interested parties are encouraged to obtain complete sets of Bid Documents from the Architect. Complete sets of Bid Documents should always be used in preparing bids. Neither the Owner nor Architect assumes responsibility for errors in bidding or misinterpretations of Bid Documents resulting from the use of incomplete sets of Bid Documents. The documents obtained through the Architect are considered the official version and take precedence if any discrepancies occur. The use of incomplete or inaccurate Bid Documents does not relieve the bidder of the obligation to perform all work related to his bid as detailed in a complete set of Bid Documents.

C. Refer to Document 00 11 16 - Invitation to Bid, Part 1.06: Bid Forms are to be submitted via the CNA portal “ https://vendors.planetbids.com/portal/39494/portal-home “.

1.02 EXAMINATION OF PREMISES

A. Before submitting his bid, Contractor will be held to have examined the premises and satisfied himself as to existing conditions under which he will be obligated to operate, or that will in any manner affect Work under this contract.

B. Bidder must inform himself fully of conditions relating to construction of project and employment of labor. Failure to do so does not relieve successful bidder of his obligation to furnish material and labor necessary to carry out provisions of his contract. Insofar as possible Contractor, in carrying out his Work, must employ such methods or means to avoid any interruption of or interference with Work of any other Contract.

1.03 CONTRACTOR'S LICENSE

A. Parties bidding on this Work must comply with all requirements and regulations of Contractor's License Law of the State of Arkansas, as set forth in Arkansas Code Annotated § 17-25-101 et. seq..

1.04 BID FORMS

A. Bids must be submitted on forms included in Document 00 41 13 of Project Manual.

Submit one copy.

CLINTON NATIONAL AIRPORT

CRISP DRIVE DEMOLITION: #25-018 00 21 13-1

B. Place Bid Documents in a sealed envelope and clearly label with words "Bid Documents". Show job name and number, name of bidder, Contractor's License Number, date and time of opening.

C. In case of discrepancy between written amounts shown by bidder and amounts in numerical figures on bid form, the amount written out rather than amount in numerical figures shall govern.

1.05 INTERPRETATIONS

A. No interpretation of plans, specifications or other bid documents will be made orally to any bidder. Requests for interpretation or clarification of Bid Documents must be made in writing addressed to Wittenberg, Delony & Davidson, Inc., ATTN: Gordon Duckworth, AIA, duck@wddarchitects.com.

1. TO BE GIVEN CONSIDERATION, REQUESTS FOR INTERPRETATION

MUST BE RECEIVED AT LEAST FIVE (5) WORKING DAYS PRIOR TO

DATE FIXED FOR OPENING OF BIDS.

B. Interpretations and supplemental information will be issued in the form of written addenda issued to prospective prime contract bidders. ADDENDA WILL NOT BE ISSUED WITHIN THREE (3) WORKING DAYS (72 hours) PRIOR TO DATE FIXED FOR OPENING OF BIDS. Failure of bidder to receive any addendum shall not relieve bidder from obligation under his bid as submitted. All addenda so issued shall become part of Contract Documents.

C. Should an error, inconsistency or omission be found in the Bid Documents after the Bid Opening, the Contractor will be deemed to have prepared his bid based upon the more costly or complex way of performing the Work or in accordance with the more stringent requirements.

D. Anything mentioned in the Specifications and not shown on the Drawings or shown on the Drawings and not mentioned in the Specifications is to have the same effect as if shown or mentioned in both.

E. Precedence IS NOT given to the Specifications over the Drawings or to Large Scale Drawings over Smaller Scale Drawings. All drawings and all specifications are complimentary and shall be viewed collectively when interpreting the Design Intent for the Project. The Architect is the sole judge and interpreter of Design Intent and his decision will be final and binding upon the General Contractor.

1.06 BID GUARANTY

A. Bid must be accompanied by bid guaranty of not less than five percent (5%) of the amount of bid, and at option of bidder may be cashiers check or bid bond secured by surety company and made payable to order of Owner. Bid guaranty shall insure execution of contract and furnishing of performance and payment bond or bonds by successful bidder.

CLINTON NATIONAL AIRPORT

CRISP DRIVE DEMOLITION: #25-018 00 21 13-2

mailto:arkytek@wddarchitects.com.

1. If a Bid Bond is provided, the Bond must be signed by an authorized agent of the Bonding Company and the agent's power of attorney must be submitted with the Bid Bond.

1.07 OPENING OF BIDS

A. At time and place fixed for opening of bids, every bid received within time fixed for receiving bids will be opened and publicly read aloud, unless the bid contains irregularities in statutory requirements. Failure of bidder to respond to statutory requirements listed on the bid form may result in the bid being declared non-responsive and the bid will not be read nor will the bid be considered for the purposes of awarding a Contract.

1.08 WITHDRAWAL OF BIDS PRIOR TO BID OPENING

A. Bids may be withdrawn on written or electronic request dispatched by bidder in time for delivery in normal course of business prior to time fixed for opening; provided, that written confirmation of any electronic withdrawal over signature of bidder is placed in the mail and postmarked prior to time set for bid opening. Negligence on the part of bidder in preparing his bid confers no right of withdrawal or modification of his bid after such bid has been opened.

1.09 QUALIFICATIONS OF BIDDER

A. Owner may make such investigations as he deems necessary to determine ability of bidder to perform Work, and bidder shall furnish to Owner all such information and data for this purpose Owner may request. Owner reserves right to reject bid of any bidder who has previously failed to perform properly, or to complete on time, contracts of similar nature; who is not in position to perform contract, or who has habitually and without just cause neglected payment of bills or otherwise disregarded obligations to subcontractors, materialmen, or employees.

1.10 POWER OF ATTORNEY

A. Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

1.11 LAWS AND REGULATIONS

A. Bidder's attention is directed to the fact that all applicable State laws, municipal ordinances, and rules and regulations of authorities having jurisdiction over construction of project shall apply to contract throughout, and they will be deemed to be included in contract the same as though written out in full.

1.12 BID FORMALITIES AND REJECTION OF BIDS

A. Owner reserves right to waive any formalities in a bid or to reject any or all bids.

CRISP DRIVE DEMOLITION: #25-018 00 21 13-3

1.13 CONDITIONAL BIDS

A. Conditional bids will not be considered.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF DOCUMENT 00 21 13

CRISP DRIVE DEMOLITION: #25-018 00 21 13-4

DOCUMENT 00 41 13

BID FORM - STIPULATED SUM (SINGLE PRIME CONTRACT)

CLINTON NATIONAL AIRPORT

2201 CRISP DRIVE DEMOLITION

Bid Date: December 10, 2026 Bid Time: 2:00 PM Little Rock, Arkansas WDD Project No.: 25-018 LIT Project No.: 251300

Proposal of (Hereinafter called "Bidder"): (Strike Out Following Inapplicable Items)

1. An Corporation, (State)

2. A Partnership, or

3. An Individual doing business as

To: Little Rock Municipal Airport Commission, 1 Airport Road, Little Rock, AR 72202.

Gentlemen: Bidder, in compliance with bid solicitation for 2201 Crisp Drive Demolition, Little Rock, Arkansas, having examined plans and specifications with related documents and site of the proposed Work, and being familiar with all conditions surrounding proposed project, including availability of materials and labor, hereby proposes to furnish labor, materials, and supplies, and construct project in accordance with Contract Documents, within time set forth therein, and at prices stated below. Prices are to cover all expenses incurred in performing Work required under Contract Documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before date specified in written "Notice to Proceed" and fully complete project within time stipulated in specifications.

Bidder acknowledges receipt of the following addenda:

No._____ Date:______________ No._____ Date:______________ No._____ Date:______________

No._____ Date:______________ No._____ Date:______________ No._____ Date:______________

BASE BID: Bidder agrees to perform all Work described in the Project Manual and shown on the

Drawings for the sum of

Dollars ($ ).

CRISP DRIVE DEMOLITION: #25-018 00 41 13-1

Bidder understands that Owner reserves right to reject any or all bids and to waive any formalities in the bidding. Bidder agrees bid shall be good and may not be withdrawn for period of ninety (90) days after scheduled closing time for receiving bids.

Upon receipt of written notice of acceptance of bid, Bidder will execute formal contract within ten (10) days and deliver Surety Bond or Bonds as required by Document 00 61 13.

Bid security attached in amount of 5% of base bid is to become property of Owner in event above contract and bond are not executed within time set forth above as liquidated damages and additional expenses to Owner.

By: Date:

(Typed Name)

Contractor License No.

(Signature)

(Title)

(Business Address)

(Seal - If bid is by a Corporation)

END OF DOCUMENT 00 41 13

CRISP DRIVE DEMOLITION: #25-018 00 41 13-2

DOCUMENT 00 41 13.02

REFERENCES

PROVIDE A MINIMUM OF THREE (3) REFERENCES

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

CRISP DRIVE DEMOLITION: #25-018 00 41 13.02-1

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

Name: Title:

(Typed Name)

Main Tel. No.

(Company)

Mobile Tel. No.

(Business Address)

Relationship:_________________________ (Email Address)

END OF DOCUMENT 00 41 13.02

CRISP DRIVE DEMOLITION: #25-018 00 41 13.02-2

DOCUMENT 00 43 13

BID SECURITY FORM

Date of Execution of this bond ______________________________________________________

Name and Address of Principle (Bidder) ______________________________________________________

Name and Address of Surety ______________________________________________________

Name and Address of Contracting Body ______________________________________________________

Amount of Bond, Bid Amount and Proposal Dated: ______________________________________________________

____________for_______________________________________

KNOW ALL MEN BY THESE PRESENTS, that we the PRINCIPLE above named and SURETY above named who is duly licensed to act as SURETY in the State of Arkansas, are held and firmly bound unto _________________________________________________________________________, a body corporate of the State of Arkansas, as Obligee, in the penal sum of five percent (5%) of the amount bid in the bid and proposal described in lawful money of the United States of America, for the payment of which well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such, that if the PRINCIPLE shall be awarded the contract for which the bid and proposal above described is submitted and shall execute the contract, give bond for the faithful performance of the contract, and give bond for the payment of all persons supplying labor and materials in the prosecution of the work provided for in said contract, within ten (10) days after the award of the same to the PRINCIPLE above named, then this obligation shall be null and void; but if the PRINCIPLE above named fails to so execute such contract and give performance bond and payment bond as required by Arkansas Code of 1987 (2024) Title 22 - PUBLIC PROPERTY (§§ 22-1-101–-22-10-505), Chapter 9 - PUBLIC WORKS (§§ 22-9- 101–-22-9-909), Subchapter 2 - AWARD OF CONTRACTS (§§ 22-9-201—22-9-214), Section 22-9- 203 - Public improvements generally - Award procedure - Definition, the Surety shall upon demand, forthwith pay the Obligee the amount of this bond set forth above.

CRISP DRIVE DEMOLITION: #25-018 00 43 13-1

IN WITNESS WHEREOF, the Principle above named and the Surety above named have executed this instrument under their several seals on the date set forth above.

WITNESS: ______________________________

Principle (Name of individual, and trade Name, partnership, corporation, or joint Venture)

(Proprietorship or Partnership)

BY (Seal)

TITLE______________________________

(Owner, Partner, Office held in Corporation, joint venture)

ATTEST

BY______________________________________ (Corporate Seal) (Corporation)

TITLE___________________________________

(Corporation Secretary or Assistant secretary Only)

Surety (Name of Surety Company)

WITNESS BY_________________________________

_________________________________________ TITLE Attorney in Fact

(Corporate Seal of Surety)

COUNTERSIGNED: (Address of Attorney in Fact)

Arkansas Licensed Resident Agent

CRISP DRIVE DEMOLITION: #25-018 00 43 13-2

END OF DOCUMENT 00 43 13

CRISP DRIVE DEMOLITION: #25-018 00 43 13-3

THIS PAGE LEFT INTENTIONALLY BLANK FOR DUPLEX PRINTING

CRISP DRIVE DEMOLITION: #25-018 00 43 13-4

DOCUMENT 00 52 13

AGREEMENT FORM - STIPULATED SUM (SINGLE PRIME CONTRACT)

PART 1 - GENERAL

1.01 AUTHORITY

A. The Agreement Form and Exhibit A, Insurance and Bonds, are an integral part of all sections of Project Manual. Their contents and provisions shall be carefully noted in performance of Work. Include this Agreement Form and Exhibit A in the bid documents for all building construction and renovation projects.

B. The Agreement Form is the legal instrument which is typically signed by an owner and a contractor subsequent to contract award. A legally binding contract is actually created when accepted, without qualification, the Contractor's bid. However it is this Agreement Form, which when subsequently signed by the parties, formalizes the Contract and confirms the Contractor's intention to be bound by its provisions.

1.02 GOVERNING STANDARD DOCUMENT

A. "Standard Form of Agreement Between Owner and Contractor", AIA Document A101

- 2017 of American Institute of Architects, 2017 Edition, Articles 1 through 9 inclusive, and AIA Document A101 - 2017 Exhibit A is hereby referenced and incorporated into these specifications and is to be used as the General Conditions for this contract.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF DOCUMENT 00 52 13

CRISP DRIVE DEMOLITION: #25-018 00 52 13-1

CRISP DRIVE DEMOLITION: #25-018 00 52 13-2

DOCUMENT 00 61 13

PERFORMANCE AND PAYMENT BOND FORM

PART 1 - GENERAL

1.01 CONTRACTOR'S GUARANTY BOND

A. Contractor shall furnish "Performance and Payment Bond" in amount equal to 100% of contract price, as security for faithful performance of this contract and for payment of all indebtedness for labor and materials furnished or performed in connection with this con-tract. Bond shall be written by surety company which has qualified and is authorized to do business in the State of Arkansas and must be executed by a resident or nonresident agent who is licensed by the Insurance Commissioner to represent surety company executing said bond and filing with said bond, his power of attorney as his authority.

Mere countersigning of a bond will not be sufficient. Bond shall be written in favor of Owner, and executed pursuant to terms of Arkansas Code Annotated §18-44-501 et seq., §18-44-503 et seq., §19-4-1401 et seq., and §22-9-401 et seq. The Surety guarantees that the Principal shall comply with Ark. Code Ann. §22-9-301 et seq. by payment and full compliance with all prevailing hourly wage contract provisions where the contract amount exceeds the amount provided by law. An original and two copies of bond must be furnished, with power of attorney attached to each. Bond must not be dated prior to date of the contract. Contractor shall file (not record) the original with the Clerk in the Circuit Court of the County in which Work to be performed is located. Contractor to pay all expenses incident the filing of bond. Remaining two copies should be certified by the Clerk to evidence filing of original, and these two copies submitted to Architect.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF DOCUMENT 00 61 13

CRISP DRIVE DEMOLITION: #25-018 00 61 13-1

CRISP DRIVE DEMOLITION: #25-018 00 61 13-2

DOCUMENT 00 72 13

GENERAL CONDITIONS

PART 1 - GENERAL

1.01 AUTHORITY

A. General Conditions and Supplementary Conditions are an integral part of all sections of Project Manual. Their contents and provisions shall be carefully noted in performance of Work.

1.02 GOVERNING STANDARD DOCUMENT

A. American Institute of Architects AIA Document A201 - 2017 Edition, General Conditions of the Contract for Construction, Articles 1 through 15 inclusive, is hereby referenced and incorporated into these specifications and is to be used as the General Conditions for this contract.

1.03 AMENDED PROVISIONS

A. Where any article or articles of above AIA General Conditions are supplemented by Supplementary Conditions, provisions of such articles shall remain in effect and supplementary provisions shall be considered as added thereto. Where any such article or part of such article is amended, voided or changed by Supplementary Conditions, provisions not specifically so amended, voided or changed shall remain in full effect.

Where provisions of Supplementary Conditions are at variance or conflict with provisions of the AIA General Conditions, Supplementary Conditions shall govern.

AIA General Conditions and Supplementary Conditions apply to all Work in every Division or Section of these Specifications.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF DOCUMENT 00 72 13

CRISP DRIVE DEMOLITION: #25-018 00 72 13-1

CRISP DRIVE DEMOLITION: #25-018 00 72 13-2

DOCUMENT 00 73 00

SUPPLEMENTARY CONDITIONS

PART 1 - GENERAL

1.01 REFERENCE DOCUMENT

A. These Supplementary Conditions are included as a part of the contract documents for this project to amend the provisions of the "General Conditions of the Contract for Construction", Document A201 of the American Institute of Architects, 2017 Edition, as required for this project. Reference herein to articles of the General Conditions refer to said Document A201.

1.02 PARAGRAPH 1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS,

AND OTHER INSTRUMENTS OF SERVICE

A. Revise subparagraph 1.5.1 as follows:

1.5.1 The Little Rock Municipal Airport Commission shall be deemed the owners of the respective Instruments of Service, including drawings and Specifications, and retain all common law, statutory, and other reserved rights, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with the Project is not to be construed as publication in derogation of the Little Rock Airport Commission’s reserved rights.

1.03 PARAGRAPH 1.7 DIGITAL DATA USE AND TRANSMISSION

A. Revise subparagraph 1.7 as follows:

1.7 The parties shall agree upon protocols governing the transmission and use of Instruments of Service or any other information or documentation in digital form. The parties will use AIA Document E203™-2013, Building Information Modeling and Digital Data Exhibit, to establish the protocols for the development, use, transmission, and exchange of digital data.

1.04 PARAGRAPH 1.8 BUILDING INFORMATION

A. Revise subparagraph 1.8 as follows:

1.8 Any use of, or reliance on, all or a portion of a building information model without agreement to protocols governing the use of, and reliance on, the information contained in the model and without having those protocols set forth in AIA Document E203™-2013, Building Information Modeling and Digital Data Exhibit, and the requisite AIA Document G202™-2013, Project Building Information Modeling Protocol Form, shall be at using or relying party’s sole risk and without liability to the other party and its contractors or consultants, CRISP DRIVE DEMOLITION: #25-018 00 73 00-1 the authors of, or contributors to, the building information model, and each of the agents and employees.

1.05 PARAGRAPH 2.2 EVIDENCE OF THE OWNER’S FINANCIAL ARRANGEMENTS

A. Delete subparagraphs 2.2.1, 2.2.2, 2.2.3, 2.2.4, and subsequently paragraph 2.2.

1.06 PARAGRAPH 2.3 INFORMATION AND SERVICES REQUIRED OF THE OWNER

A. Revise subparagraph 2.3.4 as follows:

2.3.4 The Owner via the Architect/Engineers shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work.

1.07 PARAGRAPH 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES

A. Add subparagraph 3.3.4 as follows:

"3.3.4 Contractor (1) shall review any specified construction or installation procedure (including those recommended by manufacturers); (2) shall advise the Architect

(a) if the specified procedure deviates from good construction practice, (b) if following the procedure will affect any warranties, including the Contractor's general warranty, or (c) of any objections the contractor may have to the procedure; and (3) to propose any alternative procedure which the Contractor will warrant."

1.08 PARAGRAPH 3.4 LABOR AND MATERIALS

A. Add Subparagraphs 3.4.4 as follows:

"3.4.4 All contractors and subcontractors engaged in the Owner/Contractor Agreement shall conform to the labor laws of the State in which Work is to be performed and the various acts amendatory and supplementary thereto; and to all other laws, ordinances and legal requirements applicable thereto."

1.09 PARAGRAPH 3.5 WARRANTY

A. Add subparagraph 3.5.3 as follows:

"3.5.3 The Contractor shall guarantee and warrant his and his subcontractor's work and materials (including the materials and work of suppliers of the Contract and his subcontractors) for a period of one year from the date of Substantial Completion. This Warranty shall be for a longer period on certain items if so designated in the Specifications. The foregoing one-year guaranty and warranty shall not in any way limit, restrict or affect the liability of the Contractor, or his

CRISP DRIVE DEMOLITION: #25-018 00 73 00-2

subcontractors, for indemnity as provided for in this Contract, nor shall it in any way shorten the period of limitation fixed by law for the filing of any action against the Contractor for enforcement of the or breach of any provision of the contract documents. Should the Contractor elect to use any of the equipment in the building during the construction period, he shall make arrangements with the subcontractor or supplier of the equipment for any extension of warranty of that equipment made necessary by such use. The Warranty period for such equipment to the Owner shall not be reduced by the use of equipment by the Contractor".

1.10 PARAGRAPH 3.7 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS

A. Revise subparagraph 3.7.2 as follows:

3.7.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to performance of the Work, including but not limited to FAA, TSA, DOT, and DOL.

1.11 PARAGRAPH 3.9 SUPERINTENDENT (Change to “SENIOR SUPERINTENDENT

AND PROJECT MANAGER”)

A. Revise subparagraph 3.9.1 as follows:

3.9.1 The Contractor shall employ a competent Project Manager and Superintendent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The Project Manager and Superintendent shall represent the Contractor, and communications given to either the Project Manager and Superintendent shall be as binding as if given to the Contractor.

B. Revise subparagraph 3.9.2 as follows:

3.9.2 The Contractor, as soon as practicable after award of the Contract, shall notify the Owner, through the Architect, of the name and qualifications a proposed Project Manager and Superintendent. Within 14 days of receipt of the information, the Architect may notify the Contractor, stating whether the Owner or the Architect (1) has reasonable objection to the proposed Project Manager or Superintendent or (2) requires additional time for review. Failure of the Architect to provide notice within the 14-day period shall constitute notice of no reasonable objection.

C. Revise subparagraph 3.9.3 as follows:

3.9.3 The Contractor shall not employ a proposed Project Manager or Superintendent to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not change the Project Manager or Superintendent without the owner’s consent, which shall not unreasonably be withheld or delayed.

CRISP DRIVE DEMOLITION: #25-018 00 73 00-3

1.12 PARAGRAPH 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

A. Add the following to subparagraph 3.12.5.1:

"3.12.5.1 Incomplete or poorly prepared shop drawings or other submittals will be returned to the Contractor to be revised or redrawn prior to resubmittal. The Contractor will hold the Architect and Owner harmless against claims for losses or injury caused by errors or omissions in the shop drawings or other submittals for the Work made by the Contractor, a subcontractor, any lower tier subcontractor, manufacturer, supplier or distributor."

B. Delete subparagraph 3.12.8 and substitute the following:

"3.12.8 The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect of such deviations in a separate writing or by submitting a separate written request for change at the time of submittal and the Architect has given written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect's approval thereof."

1.13 PARAGRAPH 3.18 INDEMNIFICATION

A. Delete subparagraph 3.18.1 and substitute the following:

3.18.1 Refer to AIA Document A101-2017, Exhibit A, Article A2.7 for the Indemnification clause applicable to this Agreement.

B. Delete subparagraph 3.18.2.

1.14 PARAGRAPH 4.2 ARCHITECT'S ADMINISTRATION OF THE CONTRACT

A. Add sub-subparagraph 4.2.4.1 as follows:

"4.2.4.1 Any direct communications between the Owner and the Contractor; or between the Contractor or Sub-contractors and the Architect's Consulting Engineers that affect the performance or administration of the Contract shall be made or confirmed in writing, with copies to the Architect, and any such communications that represent a modification of the Contract requirements will be documented appropriately. Any communications among the Architect and Subcontractors shall be confirmed in writing to the Contractor."

1.15 PARAGRAPH 7.2 CHANGE ORDERS

A. Delete subparagraph 7.2.1 and substitute the following:

CRISP DRIVE DEMOLITION: #25-018 00 73 00-4

"7.2.1 All requests for changes, additions or deductions, shall be submitted in a complete itemized breakdown acceptable to the Architect.

7.2.2 Wherein unit prices are stated in the contract, submit itemized break down showing each unit price and relative quantities.

7.2.3 The contractor shall present an itemized accounting together with appropriate supporting data for the purposes of considering additions or deductions.

Supporting data shall include but is not limited to the following:

.1 costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and worker or workmen’s compensation insurance;

.2 costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed;

.3 rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others;

.4 costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work; and

.5 additional costs of supervision and field office personnel directly attributable to the change.

.6 the value of all such additions and deductions shall then be computed as set forth in Paragraph 7.2.5.

7.2.4 The burden of proof of cost rests upon the Contractor. Contractor agrees that Owner or Owner's Representative shall have the right, at reasonable times, to inspect and audit the books and records of Contractor to verify the propriety and granting of such cost.

7.2.5 Compute requests for changes be they additions or deductions as follows:

.1 For work performed by the Contractor:

Net cost of material and delivery a State Sales Tax b Net Placing cost c W.C. Insurance Premium and FICA Tax d a+b+c+d Overhead and Profit, shall not exceed 12% x (a+b+c+d) e Allowable Bond Premium f

TOTAL COST (a+b+c+d)+e+f .2 Credit for work omitted shall be computed as outlined in 7.2.5.1 "a through e" except the contractor’s share of overhead and profit is 7%.

.3 For work performed by Subcontractors:

Subcontractors shall compute their work as outlined in 7.2.5.1 "a through e".

To the cost of that portion of the work (change) that is performed by the subcontractor, the general contractor shall add an overhead and profit change of five (5%) percent plus the allowable bond premium.

CRISP DRIVE DEMOLITION: #25-018 00 73 00-5

1.16 PARAGRAPH 8.4 LIQUIDATED DAMAGES (Add this heading under Article 8 -Time)

A. Add subparagraphs 8.4.1, 8.4.2 and 8.4.3:

8.4.1 The work is of prime importance to the prderly development of the airport and it is essential that the work be completed within the time specified in th Project Manual.

8.4.2 It is hereby agreed that the Owner will be entitled to damages for any failure on the part of the Contractor to complete the Work within the prescribed time limit. If the Contractor should fail to complete the Work as specified in the Project Manual, the Contractor shall be assessed the daily charge specified herein. All charges will be on a calendar day basis for each day that Substantial Completion and Final Completion are not accomplished after the expiration date of the Construction Contract time. This assessment, if any, will be deducted from payment due to the Contractor, not as a penalty, but as liquidated damages to the Owner caused by the failure to substantially complete the Work on time would be difficult to calculate.

8.4.3 The daily charge which will be assessed as liquidated damages pursuant to Section 8.3 of the General Conditions shall be:

Substantial Completion: $250 per day Final Completion: $250 per day

1.17 PARAGRAPH 9.2 SCHEDULE OF VALUES

A. Revise the first sentence:

9.2 Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the Contractor shall submit a schedule of values for approval to the Architect before the first Application for Payment, allocating the entire Contract Sum to the various portions of the Work.

1.18 PARAGRAPH 9.3 APPLICATIONS FOR PAYMENT

A. Revise the first sentence of subparagraph 9.3.1 and substitute the following:

"9.3.1 By the twenty-fifth (25th) calendar day of each month for work performed during that calendar, the Contractor shall submit to the Architect an itemized Application for Payment prepared in accordance with the schedule of values, if required under Section 9.2, for completed portions of the Work.”

1.19 PARAGRAPH 10.3 HAZARDOUS MATERIALS AND SUBSTANCES

A. Delete subparagraph 10.3.3

CRISP DRIVE DEMOLITION: #25-018 00 73 00-6

1.20 PARAGRAPH 11.1 CONTRACTOR’S INSURANCE AND BONDSS

A. Add subparagraph 11.1.6

“11.1.6 Contractor shall procure and maintain during the life of this contract Builder’s Risk or Course of Construction (COC) Insurance, or Installation Floater Policy, and any extended coverage which shall cover damage for the project.”

Amount: 100% of the total insurable value of contract sum of work.

1.21 PARAGRAPH 11.2 OWNER'S INSURANCE

A. Delete subparagraph 11.1.2, 11.2.1 and substitute the following:

"11.1.2 Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from date of commencement of the work until date of final payment and termination of any coverage required to be maintained after final payment. The insurance required shall be written for not less than the following, or greater if required by law:

.1 Workers' Compensation:

(a) State: Statutory

(b) Applicable Federal: Statutory

(c) Employers’ Liability: Per Accident: $100,000

Disease, Policy Limit: $500,000 Disease, Each Employee: $100,000.

.2 Commercial General Liability (including premises-operations); independent contractors protective; products and completed operations) as follows:

(a) Coverage should apply at each work site. Limits required as follows:

(1) General Aggregate: Per Project: $2,000,000 Completed Operations: Aggregate: $1,000,000 Personal Injury: $1,000,000 Each Occurrence Limit: $1,000,000

(2) Products and Completed Operations to be maintained for one year after final payment.

(3) Property Damage Liability Insurance will provide X, C, or U coverage as applicable.

(b) Comprehensive General Liability. Coverage provided will be on the Comprehensive General Liability form with the Broad Form General Liability Endorsement. Limits provided as follows:

(1) Combined Single Limit: $1,000,000 each occurrence and aggregate

(2) Products and Completed Operations to be maintained for one year after final payment.

(3) Property Damage Liability Insurance will provide X, C, or U coverage as applicable.

(4) Contractual Liability:

Bodily Injury: Combined Single Limit Property Damage: $1,000,000 Each Occurrence

CRISP DRIVE DEMOLITION: #25-018 00 73 00-7

(5) Personal Injury, with Employment Exclusion deleted:

Combined Single Limit $1,000,000 Each Occurrence

(6) Bodily Injury and Property Damage (Combined Single Limit) (any auto, including Owned, Hired and Non-Owned Autos):

Bodily Injury: Combined Single Limit Property Damage: $1,000,000 Each

Occurrence"

(7) Umbrella Liability: $1,000,000

B. Add sub-subparagraph 11.1.2.1 as follows:

"11.1.2.1 The performance-payment bond shall be in compliance with the laws of the State in which the Work is to be performed and as stipulated in Document 00 61 13, Performance and Payment Bond, of these specifications."

C. Add sub-subparagraphs 11.1.3.1 and 11.1.3.2 as follows:

"11.1.3.1 The Contractor shall furnish one copy of each certificate of insurance herein required for each copy of the agreement which shall specifically set forth evidence of all coverage required by subparagraphs 11.1.1 and 11.1.2. Furnish to the Owner copies of any endorsements that are subsequently issued amending coverage of limits."

"11.1.3.2 The Contractor shall not commence work under this contract until he has obtained all insurance with responsible insurance companies satisfactory to the Owner required under this article, and such insurance has been accepted by the Owner. Nothing in this article shall create any obligation on the part of the Architect to see that the specified insurance is maintained."

1.22 PARAGRAPH 11.2 OWNER’S INSURANCE

A. Delete subparagraphs 11.2.1, 11.2.2, and 11.2.3

1.23 PARAGRAPH 11.2 OWNER'S INSURANCE

A. Delete subparagraph 11.2.1 and substitute the following:

"11.2.1 The Contractor shall procure and maintain during the term of this contract, Owner's Protective Liability Insurance with an endorsement to the policy to include as additional insured, the Architect, with limits not less than $1,000,000 each occurrence and $1,000,000 in the aggregate for property damage liability."

CRISP DRIVE DEMOLITION: #25-018 00 73 00-8

B. Add subparagraph 11.2.2.1 as follows:

“11.2.2.1 Contractor shall procure and maintain during the life of this contract Builder’s Risk or Course of Construction (COC) Insurance, or installation Floater Insurance, and any extended coverage which shall cover damage for the project.”

1.24 PARAGRAPH 13.1 GOVERNING LAW

A. Revise the first sentence of subparagraph 13.1 as follows:

13.1 The Contract shall be governed by the law of the State of Arkansas where the the project is located, excluding that jurisdiction’s choice of law rules.

1.25 PARAGRAPH 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE

A. Delete subparagraph 14.3.2

1.26 PARAGRAPH 15.3 MEDIATION

A. Revise the first sentence of subparagraph 15.3.2

15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be administered by a mutually agreed upon Private Mediator.

B. Delete subparagraph 15.3.3

1.27 PARAGRAPH 15.4 DISPUTE RESOLUTION (in lieu of ARBITRATION)

A. Delete subparagraph 15.4.1 and add revised subparagraph 15.4.1:

15.4.1 Should any dispute arise between Owner and Contractor, both parties agree to enter into informal dispute resolution, which shall not extend beyond thirty (30) days from the date the written notice of dispute is received. The parties agree to use their best efforts to mediate any disputes and make every effort to obtain a mutually satisfactory resolution. However, nothing shall preclude either party from availing themselves of resolution through the circuit court of Pulaski County, Arkansas, in accordance with the laws of the State of Arkansas.

B. Delete subparagraph 15.4.1.1

CRISP DRIVE DEMOLITION: #25-018 00 73 00-9

C. Delete subparagraph 15.4.2 and add revised subparagraph 15.4.2:

15.4.2 The Contractor shall be liable and shall promptly reimburse Owner for any cost or expense incurred by Owner, including fees and expenses of its attorneys, Consultants and experts, as a result of (a) Contractor’s failure to perform in accordance with the terms of this Agreement; (b) breach of the warranties and guaranties set forth in this Agreement or any other applicable warranty or guaranty; or (c) any action taken by Owner to enforce the terms of this Agreement.

D. Delete subparagraph 15.4.3 and add revised subparagraph 15.4.3:

15.4.3 Unless otherwise agreed to in writing, Contractor shall, notwithstanding any dispute, proceeding or litigation (other than monetary exceeding $10,000), proceed forthwith in accordance with the Owner’s written decision and/or direction and shall constitute the services and maintain the progress of the assigned tasls or projects. The owner shall continue to make payments to Contractor to the extent that the sums due and owing the Contractors are not in dispute, in accordance with this Agreement.

E. Delete subparagraph 15.4.4 and add revised subparagraph 15.4.4:

15.4.4 All legal actions hereunder shall only be brought in the state or federal courts located in Pulaski County, Arkansas. The parties agree that Owner may hace sole discretion to waive any right to trial by jury and at their option have all legal actions tried, both as to factual and legal issues, by the court.

F. Delete subparagraphs 15.4.4.1, 15.4.4.2 and 15.4.4.3.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF DOCUMENT 00 73 00

CRISP DRIVE DEMOLITION: #25-018 00 73 00-10

Appendix C: Mandatory Federal Provisions – Non-AIP Projects

Civil Rights – General

Source:

• Title 49 USC § 47123

In all its activities within the scope of its airport program, the Contractor agrees to comply with pertinent statutes, Executive Orders, and such rules as identified in Title VI List of Pertinent Nondiscrimination Acts and

Authorities to ensure that no person shall, on the grounds of race, color, national origin, creed, sex, age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance.

This provision is in addition to that required by Title VI of the Civil Rights Act of 1964.

The above provision binds the Contractor and subcontractors from the bid solicitation period through the completion of the contract.

Civil Rights – Title VI Assurances

Source:

• Title 49 USC § 47123

• FAA Order 1400.11

Title VI Solicitation Notice

The Little Rock Municipal Airport Commission, in accordance with the provisions of Title VI of the Civil Rights

Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), 28 CFR § 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of the owner’s race, color, national origin, sex, creed, age, or disability in consideration for an award.

Title VI List of Pertinent Nondiscrimination Acts and Authorities

During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest

(hereinafter referred to as the “Contractor”) agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:

• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252) (prohibits discrimination on the basis of race, color, national origin);

• 49 CFR Part 21 (Non-discrimination in Federally-Assisted programs of the Department of

Transportation—Effectuation of Title VI of the Civil Rights Act of 1964) including amendments thereto;

• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. §

4601) (prohibits unfair treatment of persons displaced or whose property has been acquired because of

Federal or Federal-aid programs and projects);

• Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 CFR part 27 (Nondiscrimination on the Basis of

Disability in Programs or Activities Receiving Federal Financial Assistance);

• The Age Discrimination Act of 1975, as amended (42. U.S.C. § 6101 et seq.) (prohibits discrimination on the basis of age);

• Airport and Airway Improvement Act of 1982 (49 U.S.C. § 47123), as amended (prohibits discrimination based on race, creed, color, national origin, or sex);

• The Civil Rights Restoration Act of 1987 (P.L. 100-259) (broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and Section 504 of the

Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);

• Titles II and III of the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101, et seq) (prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities) as implemented by

U.S. Department of Transportation regulations…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .