2510 DCTV Bid Specifications.pdf
PDF 5 MB Posted
- Attached to
- Renovations to the Dartmouth DCTV
- Solicitation number
- BD-26-1257-DEP14-DEP14-131296
- Issued by
- Bristol County, Massachusetts
About this file
Renovations to the Dartmouth DCTV – Bid Specifications
This is a construction bid document and prevailing wage schedule issued by the Town of Dartmouth, Massachusetts for exterior renovations to the Dartmouth DCTV building located at 247 Russells Mills Road, South Dartmouth, MA 02748. The project scope includes exterior siding and trim replacement, roof reshingling, sheathing replacement, concrete patching and repair, site regrading, railing replacement/installation, roof overhang installation, and painting. The project is estimated to require approximately three months for completion while maintaining access to the occupied building. A non-mandatory pre-bid conference is scheduled for Wednesday, July 22, 2026, at 9:00 AM at the project site. Electronic bids for filed sub-bidders are due by 1:00 PM local time on Wednesday, August 5th, 2026, with general contractor bids due by 1:00 PM on Thursday, August 13th, 2026. All bids must be submitted electronically in PDF format to Peter Chasse at pchasse@dartmouthma.gov and cc'd to Christine Shea at christines@brewsterthornton.com. The successful bidder must provide a proposed construction schedule for approval, and construction is intended to commence immediately following award.
The estimated construction cost is $400,000, and general contractors must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction with certification for a contract amount no less than the estimated construction cost. A 5% bid bond is required, with bids payable to the Town of Dartmouth. Filed sub-bidders are required for painting work (Section 09 0009) and must submit DCAMM Certificates of Eligibility and Subcontractor Update Statements with their bids. The successful general contractor must furnish 100% performance bonds and 100% labor and materials payment bonds. Three alternates are included: elimination of roof overhang scope, substitution of white cedar shingles for red cedar shingles, and installation of one basement dehumidifier. All work is subject to Massachusetts prevailing wage requirements under MGL c.149, with wage rates established by the Department of Labor Standards effective through the project duration. Materials and equipment are exempt from sales tax under MGL c.64(H), 6(f). Bids remain valid for 45 days after opening, and the awarding authority reserves the right to reject any or all bids and waive informalities in bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2510 Dartmouth DCTV-Addendum 1.pdf | ||
| Bid Drawings.pdf | ||
| 2510 Dartmouth DCTV-Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
Renovations to the Dartmouth DCTV 247 Russells Mills Road
South Dartmouth, MA 02748
Construction Documents April 17, 2026
Brewster Thornton Group Architects, LLP BTGA Job No. 2510
247 Russells Mills Road, South Dartmouth, MA 02748
Construction Documents April 17, 2026
BTGA Project #2510 TABLE OF CONTENTS Brewster Thornton Group Architects, LLP SECTION 00 0110 - 1
SECTION 00 0110
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
Section 00 0000 Cover Section 00 0110 Table of Contents Section 00 1113 Invitation to Bid Section 00 4100 Form for General Bid Section 00 4102 Form for Filed Sub-Bid Section 00 4200 Bid Bond Form Section 00 4396 Company Information Section 00 4519 Non-Collusion Affidavit Section 00 4520 Affidavit of Compliance Section 00 5200 Owner-Contractor Agreement Section 00 5404 Statement of Tax Compliance Section 00 5405 Statement of OSHA Training Compliance Section 00 6100 Performance Bond Section 00 6200 Payment Bond Section 00 7200 General Conditions of the Contract Section 00 7346 Weekly Payroll Records and Statement of Compliance Section 00 7347 Massachusetts Weekly Certified Payroll Report Form
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 1000 Summary Section 01 2000 Price and Payment Procedures Section 01 2200 Unit Prices Section 01 2300 Alternates Section 01 2500 Substitution Procedures Section 01 3000 Administrative Requirements Section 01 3005 Prevailing Wage Rates Section 01 3100 Project Management and Coordination Section 01 3200 Construction Progress Documentation Section 01 3216 Construction Progress Schedule Section 01 4000 Quality Requirements Section 01 4117 Utilities Notification Section 01 4200 References Section 01 5000 Temporary Facilities and Controls Section 01 5100 Temporary Utilities Section 01 6000 Product Requirements Section 01 6200 Substitution Request Form Section 01 7000 Contract Closeout Section 01 7300 Execution Section 01 7400 Construction Waste Management Section 01 7700 Closeout Procedures Section 01 7800 Closeout Submittals Section 01 7839 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
Section 02 4119 Selective Demolition
BTGA Project #2510 TABLE OF CONTENTS Brewster Thornton Group Architects, LLP SECTION 00 0110 - 2
DIVISION 03 - CONCRETE
Section 03 0130 Maintenance of Concrete
DIVISION 05 - METALS
Section 05 5000 Metal Fabrications
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
Section 06 1000 Rough Carpentry Section 06 1600 Sheathing Section 06 2013 Exterior Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 07 2119 Open-Cell Spray Foam Insulation Section 07 3113 Asphalt Shingles Section 07 3129 Wood Shingles Section 07 6200 Sheet Metal Flashing Section 07 7123 Gutters and Downspouts Section 07 9200 Joint Sealants
DIVISION 09 – FINISHES
Section 09 0009 Painting - Filed Sub-Bid Required Section 09 9100 Painting (part of Work of Section 09 0009 - Filed Sub-Bid)
END OF SECTION
BTGA Project #2510 INVITATION TO BID Brewster Thornton Group Architects, LLP SECTION 00 1113 - 1
SECTION 00 1113
INVITATION TO BID
The Town of Dartmouth invites sealed bids for the renovation to the Dartmouth DCTV Building located at 247 Russells Mills Road, South Dartmouth, MA 02748 in accordance with Contract Documents prepared by Brewster Thornton Group Architects, LLP in Providence, Rhode Island.
General Project Description:
The Project will consist of an exterior renovation to the existing Dartmouth DCTV building, including reshingling of the exterior walls, sheathing replacement, trim replacement, patching and repairing of concrete, site regrading, railing replacement/installation, roof overhang installation, and painting.
The construction delivery method is Design-Bid-Build. Construction is estimated to take approximately 3 months to complete. This is an occupied building during construction and access must be maintained. The awarded General Contractor will be required to provide a proposed schedule for approval and inclusion in the construction contract.
This project will not be required to meet any additional third-party certifications, such as LEED, Green Globes, WELL, etc.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED
BY THE AWARDING AUTHORITY. BIDS MUST BE:
• Submitted to: Peter Chasse at the Town of Dartmouth: pchasse@dartmouthma.gov and cc’d Christine Shea at the Brewster Thornton Group Architects:
christines@brewsterthornton.com
• Emails must have the subject line; “Dartmouth DCTV-Bid (company name)”
• Bids must be in PDF format.
• The official time of submission will be the timestamp on the receiver's email.
• Bids will be opened and recorded (not opened publicly). A bid tally will be provided upon request.
Please allow time for a complete review of all bids and required paperwork.
Availability of Bidding Documents: Electronic copies of the Bid Documents may be obtained starting Monday, July 13, 2026 by emailing the contacts listed above. Addenda will be issued to only those who have contacted the Owner/BTGA listed above directly for the bid documents.
Documents are made available to all bidders in electronic form at no cost. Bidders desiring hard copies shall be solely responsible for all costs related to the printing and shipping of hard copy documents.
The Bidding Documents may be viewed at the office of Peter Chasse, by appointment only. Bidders must email Mr. Chasse to set up an appointment. His office is located on site at 247 Russells Mills Road, Dartmouth, MA. These physical documents may not be removed from the site.
Planholder List: The Awarding Authority will maintain the bidders/planholders list as required by M.G.L.
c.149 §44B. This list may be requested by the contacts listed above at any time.
Pre-Bid Conference: A non-mandatory pre-bid conference will be held on (Wednesday), July 22, at (9
am) local time at the Dartmouth DCTV Building, 247 Russells Mills Road, South Dartmouth, MA 02748.
Brewster Thornton Group Architects, LLP SECTION 00 1113 - 2
Preparation and Submission of Electronic Bids: All required Bid Forms must be completed and submitted in unrestricted PDF formatted files. The Bidder must fill-in all required fields and signatures either digitally or manually (print, fill-in, and scan to PDF). It is also the Bidder’s responsibility to ensure that their submitted bid is 100% true, complete, and accurate. It is the Bidder’s responsibility to confirm that their bid has been submitted successfully. Timely submission shall be the full responsibility of the Bidder. It is also the Bidder’s responsibility to ensure that their submitted bid is 100% true, complete, and accurate.
Bidding procedures and award of Contract are subject to the provisions of the General Laws of the Commonwealth of Massachusetts (MGL), including but not limited to c.149, §44A to §44J inclusive;
applicable sections of MGL c.30.
Certification for General Contractors: General Contract Bidder shall be certified by the Division of Capital Asset Management and Maintenance (DCAMM) for the following category of work and for a contract dollar amount which is not less than the estimated construction of this Project.
• Certification Category: General Building Construction
• Estimated Construction Cost: $400,000
Filed Sub-Bidders: Under the provisions of Massachusetts General Law, c.149, bidding will be open to all Filed Sub-bidders who are certified by the Division of Capital Asset Management (DCAMM) for their trade.
Each Filed Sub-bidder must submit with its bid a copy of the Certificate of Eligibility from the Division of Capital Asset Management and Maintenance (DCAMM) and a completed Subcontractor Update Statement, with its bid. Filed Sub-bidders failing to submit with their Bids, both the Certificate of Eligibility and Update Statement, will be rejected for failure to comply with statutory bidding requirements.
Filed Sub-Bids will be required for the Work of the following Classes of Work (trades):
• PAINTING as specified under Section 09 0009 - Filed Sub-Bid Requirements.
Alternates: Each Bidder shall acknowledge Alternates by entering the dollar amount and selecting the “Add” or “Subtract” option next to the Alternate listed in the corresponding space on the bid form. If an Alternate does not involve a change in dollar value, the Bidder shall so indicate a “0” for the dollar value of that Alternate and by selecting the “Add” option. The Low Bidder will be determined on the basis of the sum of the Base Bid and the accepted Alternates.
Addenda: Addenda, if issued, will be emailed to the bidders on record as having received the Bid Documents. Hard copies of addenda will not be mailed or faxed. It shall be the sole responsibility of the Contractor to ascertain the existence of any and all addenda.
If a bid is submitted prior to an Addendum being issued, the Bidder must review the addendum, retract the bid, acknowledge all addenda, and re-submit the bid. If a Bidder fails to acknowledge all addenda their bid may be rejected by the Awarding Authority.
Withdrawal of Bids (Before Opening of Bids): Any bid may be withdrawn (retracted) prior to the designated deadline emailing the contact listed above. Upon retracting, the Bidder will receive an e-mail confirming receipt of the retraction. It is the Bidder’s responsibility to review and confirm that their bid has been retracted successfully.
Questions: Questions shall be received via email to Peter Chasse at the Town of Dartmouth:
pchasse@dartmouthma.gov and cc Christine Shea at the Brewster Thornton Group Architects:
christines@brewsterthornton.com by no later than 1:00PM local time, Friday, July 24, 2026.
Receipt of Sub-Bids: ELECTRONIC BIDS will be received by Peter Chasse at the Town of Dartmouth:
pchasse@dartmouthma.gov and cc Christine Shea at the Brewster Thornton Group Architects:
Brewster Thornton Group Architects, LLP SECTION 00 1113 - 3 christines@brewsterthornton.com on behalf of the Awarding Authority to the contract listed above until 1:00PM local time, Wednesday, August 5th, 2026, at which time all bids will be opened and recorded.
Official time is that of Awarding Authority at location of bid receipt; no late bids will be accepted. Agents acting on behalf of the Awarding Authority will issue Filed Sub-Bid results in an addendum to all planholders.
Receipt of General Bids: ELECTRONIC BIDS will be received by Peter Chasse at the Town of Dartmouth:
pchasse@dartmouthma.gov and cc Christine Shea at the Brewster Thornton Group Architects:
christines@brewsterthornton.com on behalf of the Awarding Authority to the contract listed above until 1:00PM local time, Thursday, August 13th, 2026, at which time all bids will be opened and recorded. Sub-bids will be issued in an addendum. General Contractors are responsible for including sub-bid costs in their bids. Official time is that of Awarding Authority at location of bid receipt; no late bids will be accepted.
Sales Tax: Materials, equipment and supplies to be used on this project are exempt from sales tax to the extent provided by MGL c.64(H), §6(f). Bidders should not include taxes in figuring or in references to any bid.
Wages: The minimum wages to be paid to mechanics, apprentices, teamsters, chauffeurs, and laborers on the Project shall be established by the Prevailing Wage Schedule, as determined by the Commissioner of Labor and Industries, pursuant to the provisions of MGL c.149, §25 to §27D. The schedule is attached, following this section.
Bid Bond: A 5% bid bond is required for this project. All General Bid and Filed Sub-bid proposals shall be accompanied by a bid deposit in an amount not less than five percent (5%) of the value of their bid. Bid deposits, payable to the “Town of Dartmouth” shall be in the form of either a BID BOND, or a CERTIFIED TREASURER’S CHECK issued by a responsible bank or trust company. Cash and company checks are not acceptable. Submitted Bid Bonds shall be:
A. With a surety company qualified to do business in the Commonwealth of Massachusetts and satisfactory to Owner;
B. Conditional upon the faithful performance by the principal of the agreements contained in the Bid; and
C. Submitted to the Town of Dartmouth Select Board Office at 400 Slocum Road, Dartmouth, MA and a copy submitted with your E-Bid.
Performance, Labor, and Materials Bonds: A one hundred percent (100%) Performance Bond and a one hundred percent (100%) Labor and Materials Payment Bond will be required from the successful General Contract Bidder.
Contract Award: Upon receipt of bids, the Awarding Authority will determine whether the apparent low bidder is responsible and can be awarded the Contract.
The Awarding Authority will reject bids when required to do so by the above-referenced General Laws. In addition, the Awarding Authority reserves the right to waive any informalities in bidding and to reject any and all general bids if it deems it in the public interest to do so.
All bids shall remain in effect for 45 days (Saturdays, Sundays, and legal holidays excluded) after opening.
Successful bidders shall agree to commence work and complete the Work in accordance with the dates set forth in the Bid Documents. An agreed upon schedule must be provided by the tentatively awarded low bidder for acceptance by the Awarding Authority. The intent is to start construction immediately.
END OF SECTION
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Dartmouth City/Town: DARTMOUTH
Contract Number:
Description of Work: Replace exterior siding and trim on history building.
Job Location: 247 Russells Mills Road
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
ASBESTOS WORKER (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (SOUTHERN MASS)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.91 $10.90 $9.75 $9.21 $0.00 $71.77ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.35 $10.90 $9.75 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Page 2 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
2/1/2026 $67.95 $12.84 $15.57 $8.02 $0.00 $104.38
8/1/2026 $70.15 $12.84 $15.57 $8.02 $0.00 $106.58
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (NEW BEDFORD) 2/1/2027 $71.55 $12.84 $15.57 $8.02 $0.00 $107.98
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Page 3 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $50.40 $10.90 $9.75 $9.80 $0.00 $80.85CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.90 $10.90 $9.75 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.25 $10.90 $9.75 $9.80 $0.00 $79.70CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $50.75 $10.90 $9.75 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.58 $10.90 $9.75 $9.80 $0.00 $80.03CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.08 $10.90 $9.75 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.98 $12.84 $15.57 $8.02 $0.00 $70.41
2 60.00 $40.77 $12.84 $15.57 $8.02 $0.00 $77.20
3 70.00 $47.57 $12.84 $15.57 $8.02 $0.00 $84.00
4 80.00 $54.36 $12.84 $15.57 $8.02 $0.00 $90.79
5 90.00 $61.16 $12.84 $15.57 $8.02 $0.00 $97.59
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $35.08 $12.84 $15.57 $8.02 $0.00 $71.51
2 60.00 $42.09 $12.84 $15.57 $8.02 $0.00 $78.52
3 70.00 $49.11 $12.84 $15.57 $8.02 $0.00 $85.54
4 80.00 $56.12 $12.84 $15.57 $8.02 $0.00 $92.55
5 90.00 $63.14 $12.84 $15.57 $8.02 $0.00 $99.57
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
3/1/2026 $50.85 $11.08 $11.47 $8.50 $0.00 $81.90
9/1/2026 $52.10 $11.08 $11.47 $8.50 $0.00 $83.15
CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts) 3/1/2027 $53.35 $11.08 $11.47 $8.50 $0.00 $84.40
10/1/2025 $27.37 $7.38 $4.47 $1.00 $0.00 $40.22CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.47 $7.38 $4.47 $1.00 $0.00 $41.32
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.88 $11.08 $0.00 $1.73 $0.00 $35.69
2 45.00 $22.88 $11.08 $0.00 $1.73 $0.00 $35.69
3 55.00 $27.97 $11.08 $0.00 $3.40 $0.00 $42.45
4 55.00 $27.97 $11.08 $0.00 $3.40 $0.00 $42.45
5 70.00 $35.60 $11.08 $11.41 $5.10 $0.00 $63.19
6 70.00 $35.60 $11.08 $11.41 $5.10 $0.00 $63.19
7 80.00 $40.68 $11.08 $11.44 $6.80 $0.00 $70.00
8 80.00 $40.68 $11.08 $11.44 $6.80 $0.00 $70.00
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26
2 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26
3 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14
4 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14
5 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06
6 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06
7 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00
8 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80
2 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80
3 65.00 $17.79 $7.38 $0.00 $1.00 $0.00 $26.17
4 70.00 $19.16 $7.38 $0.00 $1.00 $0.00 $27.54
5 75.00 $20.53 $7.38 $3.80 $1.00 $0.00 $32.71
6 80.00 $21.90 $7.38 $3.80 $1.00 $0.00 $34.08
Page 5 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
1/1/2026 $53.24 $13.35 $16.43 $7.78 $1.80 $92.60
7/1/2026 $54.49 $13.35 $16.43 $7.78 $1.80 $93.85
1/1/2027 $55.94 $13.35 $16.43 $7.78 $1.80 $95.30
7/1/2027 $57.29 $13.35 $16.43 $7.78 $1.80 $96.65
CEMENT MASONRY/PLASTERING
PLASTERERS AND CEMENT MASONS LOCAL 534
Plasterers and Cement Masons - Zone 1
1/1/2028 $58.64 $13.35 $16.43 $7.78 $1.80 $98.00
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
7 85.00 $23.26 $7.38 $3.80 $1.00 $0.00 $35.44
8 90.00 $24.63 $7.38 $3.80 $1.00 $0.00 $36.81
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
2 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
3 65.00 $18.51 $7.38 $0.00 $1.00 $0.00 $26.89
4 70.00 $19.93 $7.38 $0.00 $1.00 $0.00 $28.31
5 75.00 $21.35 $7.38 $3.80 $1.00 $0.00 $33.53
6 80.00 $22.78 $7.38 $3.80 $1.00 $0.00 $34.96
7 85.00 $24.20 $7.38 $3.80 $1.00 $0.00 $36.38
8 90.00 $25.62 $7.38 $3.80 $1.00 $0.00 $37.80
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $26.62 $13.35 $16.43 $0.00 $0.00 $56.40
2 60.00 $31.94 $13.35 $16.43 $7.78 $1.80 $71.30
3 65.00 $34.61 $13.35 $16.43 $7.78 $1.80 $73.97
4 70.00 $37.27 $13.35 $16.43 $7.78 $1.80 $76.63
5 75.00 $39.93 $13.35 $16.43 $7.78 $1.80 $79.29
6 80.00 $42.59 $13.35 $16.43 $7.78 $1.80 $81.95
7 90.00 $47.92 $13.35 $16.43 $0.00 $0.00 $77.70
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.25 $13.35 $16.43 $0.00 $0.00 $57.03
Page 6 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $60.61 $17.05 $13.35 $3.25 $0.00 $94.26CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.09 $17.05 $13.35 $3.25 $0.00 $95.74
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
2 60.00 $32.69 $13.35 $16.43 $7.78 $1.80 $72.05
3 65.00 $35.42 $13.35 $16.43 $7.78 $1.80 $74.78
4 70.00 $38.14 $13.35 $16.43 $7.78 $1.80 $77.50
5 75.00 $40.87 $13.35 $16.43 $7.78 $1.80 $80.23
6 80.00 $43.59 $13.35 $16.43 $7.78 $1.80 $82.95
7 90.00 $49.04 $13.35 $0.00 $7.78 $0.00 $70.17
Apprentice to Journeyworker Ratio: 1:5
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 7 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 2
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
Page 8 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $78.11 $10.08 $11.62 $12.67 $0.00 $112.48 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $51.97 $10.08 $11.62 $12.67 $0.00 $86.34 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
9/1/2025 $52.25 $12.25 $14.86 $3.75 $0.00 $83.11ELECTRICIAN
ELECTRICIANS LOCAL 223
ELECTRICIANS LOCAL 223
9/1/2026 $54.72 $12.50 $15.56 $4.00 $0.00 $86.78
Apprentice: ELECTRICIAN
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $20.90 $12.25 $0.63 $0.00 $0.00 $33.78
2 45.00 $23.51 $12.25 $0.71 $0.00 $0.00 $36.47
3 50.00 $26.13 $12.25 $0.78 $0.00 $0.00 $39.16
4 55.00 $28.74 $12.25 $6.61 $2.50 $0.00 $50.10
5 60.00 $31.35 $12.25 $7.21 $2.50 $0.00 $53.31
6 65.00 $33.96 $12.25 $7.82 $2.50 $0.00 $56.53
7 70.00 $36.58 $12.25 $8.41 $2.50 $0.00 $59.74
8 75.00 $39.19 $12.25 $9.02 $2.50 $0.00 $62.96
Apprentice: ELECTRICIAN
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $21.89 $12.50 $0.66 $0.00 $0.00 $35.05
2 45.00 $24.62 $12.50 $0.74 $0.00 $0.00 $37.86
3 50.00 $27.36 $12.50 $0.82 $0.00 $0.00 $40.68
Page 9 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
1/1/2026 $77.26 $16.38 $11.06 $10.70 $0.00 $115.40ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $80.55 $16.48 $11.16 $11.00 $0.00 $119.19
1/1/2026 $54.08 $16.38 $11.06 $10.07 $0.00 $91.59ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2026 $41.91 $10.90 $9.75 $9.21 $0.00 $71.77FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.35 $10.90 $9.75 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Apprentice: ELECTRICIAN
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 55.00 $30.10 $12.50 $6.92 $2.75 $0.00 $52.27
5 60.00 $32.83 $12.50 $7.54 $2.75 $0.00 $55.62
6 65.00 $35.57 $12.50 $8.18 $2.75 $0.00 $59.00
7 70.00 $38.30 $12.50 $8.81 $2.75 $0.00 $62.36
8 75.00 $41.04 $12.50 $9.43 $2.75 $0.00 $65.72
Apprentice to Journeyworker Ratio: 2:3
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $38.63 $0.00 $0.00 $0.00 $0.00 $38.63
2 55.00 $42.49 $16.38 $11.06 $10.70 $0.00 $80.63
3 65.00 $50.22 $16.38 $11.06 $10.70 $0.00 $88.36
4 70.00 $54.08 $16.38 $11.06 $10.70 $0.00 $92.22
5 80.00 $61.81 $16.38 $11.06 $10.70 $0.00 $99.95
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $40.28 $0.00 $0.00 $0.00 $0.00 $40.28
2 55.00 $44.30 $16.48 $11.16 $11.00 $0.00 $82.94
3 65.00 $52.36 $16.48 $11.16 $11.00 $0.00 $91.00
4 70.00 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
5 80.00 $64.44 $16.48 $11.16 $11.00 $0.00 $103.08
Page 10 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
5/1/2026 $54.40 $16.55 $13.35 $3.25 $0.00 $87.55
11/1/2026 $55.69 $16.55 $13.35 $3.25 $0.00 $88.84
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $57.12 $16.55 $13.35 $3.25 $0.00 $90.27
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $56.02 $16.55 $13.35 $3.25 $0.00 $89.17
11/1/2026 $57.32 $16.55 $13.35 $3.25 $0.00 $90.47
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $58.77 $16.55 $13.35 $3.25 $0.00 $91.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $26.28 $16.55 $13.35 $3.25 $0.00 $59.43
11/1/2026 $27.04 $16.55 $13.35 $3.25 $0.00 $60.19
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $27.89 $16.55 $13.35 $3.25 $0.00 $61.04
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
9/1/2025 $52.25 $12.25 $14.86 $3.75 $0.00 $83.11FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 223
ELECTRICIANS LOCAL 223
9/1/2026 $54.72 $12.50 $15.56 $4.00 $0.00 $86.78
For apprentice rates see "Apprentice- ELECTRICIAN"
9/1/2025 $52.25 $12.25 $14.86 $3.75 $0.00 $83.11FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONING
ELECTRICIANS LOCAL 223
ELECTRICIANS LOCAL 223
9/1/2026 $54.72 $12.50 $15.56 $4.00 $0.00 $86.78
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
6/1/2026 $47.55 $17.05 $13.35 $3.25 $0.00 $81.20FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $48.73 $17.05 $13.35 $3.25 $0.00 $82.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $29.21 $10.90 $9.75 $9.21 $0.00 $59.07FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.90 $9.75 $9.21 $0.00 $59.07
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
3/1/2026 $59.24 $10.33 $11.47 $8.80 $0.00 $89.84
9/1/2026 $60.74 $10.33 $11.47 $8.80 $0.00 $91.34
FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE I
3/1/2027 $62.24 $10.33 $11.47 $8.80 $0.00 $92.84
Apprentice: FLOORCOVERER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $26.66 $10.33 $0.00 $1.76 $0.00 $38.75
2 45.00 $26.66 $10.33 $0.00 $1.76 $0.00 $38.75
3 55.00 $32.58 $10.33 $0.00 $3.52 $0.00 $46.43
4 55.00 $32.58 $10.33 $0.00 $3.52 $0.00 $46.43
5 70.00 $41.47 $10.33 $11.47 $5.28 $0.00 $68.55
6 70.00 $41.47 $10.33 $11.47 $5.28 $0.00 $68.55
Page 11 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $44.73 $11.20 $8.40 $6.05 $0.00 $70.38
6/1/2027 $46.73 $11.60 $8.55 $6.60 $0.00 $73.48
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 1333
GLAZIERS LOCAL 1333
6/1/2028 $48.73 $12.00 $8.70 $7.20 $0.00 $76.63
Apprentice: FLOORCOVERER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
7 80.00 $47.39 $10.33 $11.47 $7.04 $0.00 $76.23
8 80.00 $47.39 $10.33 $11.47 $7.04 $0.00 $76.23
Apprentice: FLOORCOVERER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
2 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
3 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
4 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
5 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
6 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
7 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
8 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
Apprentice Notes
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $22.37 $11.20 $8.40 $6.05 $0.00 $48.02
2 56.25 $25.16 $11.20 $8.40 $6.05 $0.00 $50.81
3 62.50 $27.96 $11.20 $8.40 $6.05 $0.00 $53.61
4 68.75 $30.75 $11.20 $8.40 $6.05 $0.00 $56.40
Page 12 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
5 75.00 $33.55 $11.20 $8.40 $6.05 $0.00 $59.20
6 81.25 $36.34 $11.20 $8.40 $6.05 $0.00 $61.99
7 87.50 $39.14 $11.20 $8.40 $6.05 $0.00 $64.79
8 93.75 $41.93 $11.20 $8.40 $6.05 $0.00 $67.58
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $23.37 $11.60 $8.55 $6.60 $0.00 $50.12
2 56.25 $26.29 $11.60 $8.55 $6.60 $0.00 $53.04
3 62.50 $29.21 $11.60 $8.55 $6.60 $0.00 $55.96
4 68.75 $32.13 $11.60 $8.55 $6.60 $0.00 $58.88
5 75.00 $35.05 $11.60 $8.55 $6.60 $0.00 $61.80
6 81.25 $37.97 $11.60 $8.55 $6.60 $0.00 $64.72
7 87.50 $40.89 $11.60 $8.55 $6.60 $0.00 $67.64
8 93.75 $43.81 $11.60 $8.55 $6.60 $0.00 $70.56
Apprentice to Journeyworker Ratio: 3:1
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.66 $0.00 $0.00 $0.00 $0.00 $32.66
2 60.00 $35.63 $17.05 $13.35 $3.25 $0.00 $69.28
3 65.00 $38.60 $17.05 $13.35 $3.25 $0.00 $72.25
4 70.00 $41.57 $17.05 $13.35 $3.25 $0.00 $75.22
5 75.00 $44.54 $17.05 $13.35 $3.25 $0.00 $78.19
6 80.00 $47.50 $17.05 $13.35 $3.25 $0.00 $81.15
7 85.00 $50.47 $17.05 $13.35 $3.25 $0.00 $84.12
8 90.00 $53.44 $17.05 $13.35 $3.25 $0.00 $87.09
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
Page 13 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - B
4/1/2026 $44.93 $15.25 $13.63 $6.15 $2.24 $82.20
For apprentice rates see "Apprentice- SHEET METAL WORKER"
9/1/2025 $52.25 $12.25 $14.86 $3.75 $0.00 $83.11HVAC (ELECTRICAL CONTROLS)
ELECTRICIANS LOCAL 223
ELECTRICIANS LOCAL 223
9/1/2026 $54.72 $12.50 $15.56 $4.00 $0.00 $86.78
For apprentice rates see "Apprentice- ELECTRICIAN"
HVAC (TESTING AND BALANCING - AIR)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - B
4/1/2026 $44.93 $15.25 $13.63 $6.15 $2.24 $82.20
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
PLUMBERS & PIPEFITTERS LOCAL 51
PLUMBERS & PIPEFITTERS LOCAL 51
8/25/2025 $55.24 $10.80 $16.80 $4.60 $0.00 $87.44
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC MECHANIC
PLUMBERS & PIPEFITTERS LOCAL 51
PLUMBERS & PIPEFITTERS LOCAL 51
8/25/2025 $55.24 $10.80 $16.80 $4.60 $0.00 $87.44
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
HYDRAULIC DRILLS
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27HYDRAULIC DRILLS (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $33.46 $0.00 $0.00 $0.00 $0.00 $33.46
2 60.00 $36.50 $17.05 $13.35 $3.25 $0.00 $70.15
3 65.00 $39.54 $17.05 $13.35 $3.25 $0.00 $73.19
4 70.00 $42.58 $17.05 $13.35 $3.25 $0.00 $76.23
5 75.00 $45.62 $17.05 $13.35 $3.25 $0.00 $79.27
6 80.00 $48.66 $17.05 $13.35 $3.25 $0.00 $82.31
7 85.00 $51.71 $17.05 $13.35 $3.25 $0.00 $85.36
8 90.00 $54.75 $17.05 $13.35 $3.25 $0.00 $88.40
Apprentice to Journeyworker Ratio: 1:6
Page 14 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
9/1/2025 $54.31 $14.75 $9.52 $10.09 $0.00 $88.67INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (SOUTHERN MASS)
9/1/2026 $57.38 $14.75 $9.52 $10.09 $0.00 $91.74
IRONWORKER/WELDER
IRONWORKERS LOCAL 37
IRONWORKERS LOCAL 37
3/16/2021 $42.46 $7.70 $12.10 $5.00 $0.00 $67.26
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.16 $14.75 $9.27 $5.05 $0.00 $56.23
2 60.00 $32.59 $14.75 $9.32 $6.05 $0.00 $62.71
3 70.00 $38.02 $14.75 $9.37 $7.06 $0.00 $69.20
4 80.00 $43.45 $14.75 $9.42 $8.07 $0.00 $75.69
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $28.69 $14.75 $9.27 $5.05 $0.00 $57.76
2 60.00 $34.43 $14.75 $9.32 $6.05 $0.00 $64.55
3 70.00 $40.17 $14.75 $9.37 $7.06 $0.00 $71.35
4 80.00 $45.90 $14.75 $9.42 $8.07 $0.00 $78.14
Apprentice to Journeyworker Ratio: 1:4
Apprentice: IRONWORKER/WELDER
Effective Date: 3/16/2021
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 70.00 $29.72 $7.70 $12.10 $5.00 $0.00 $54.52
2 75.00 $31.85 $7.70 $12.10 $5.00 $0.00 $56.65
3 80.00 $33.97 $7.70 $12.10 $5.00 $0.00 $58.77
4 85.00 $36.09 $7.70 $12.10 $5.00 $0.00 $60.89
5 90.00 $38.21 $7.70 $12.10 $5.00 $0.00 $63.01
6 95.00 $40.34 $7.70 $12.10 $5.00 $0.00 $65.14
Apprentice to Journeyworker Ratio: 1:4
Page 15 of 30Wage Request Number: 20260618150638Issue Date: 06/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $41.66 $10.90 $9.75 $9.11 $0.00 $71.42
12/1/2026 $43.10 $10.90 $9.75 $9.11 $0.00 $72.86
6/1/2027 $44.55 $10.90 $9.75 $9.11 $0.00 $74.31
12/1/2027 $46.00 $10.90 $9.75 $9.11 $0.00 $75.76
6/1/2028 $47.50 $10.90 $9.75 $9.11 $0.00 $77.26
LABORER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.00 $10.90 $9.75 $9.11 $0.00 $78.76
6/1/2026 $41.66 $10.90 $9.75 $9.21 $0.00 $71.52LABORER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.10 $10.90 $9.75 $9.21 $0.00 $72.96
Apprentice: LABORER
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.00 $10.90 $9.75 $9.11 $0.00 $54.76
2 70.00 $29.16 $10.90 $9.75 $9.11 $0.00 $58.92
3 80.00 $33.33 $10.90 $9.75 $9.11 $0.00 $63.09
4 90.00 $37.49 $10.90 $9.75 $9.11 $0.00 $67.25
Apprentice: LABORER
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.86 $10.90 $9.75 $9.11 $0.00 $55.62
2 70.00 $30.17 $10.90 $9.75 $9.11 $0.00 $59.93
3 80.00 $34.48 $10.90 $9.75 $9.11 $0.00 $64.24
4 90.00 $38.79 $10.90 $9.75 $9.11 $0.00 $68.55
Apprentice to Journeyworker Ratio:…