This Addendum 2 to the Dartmouth DCTV renovation project modifies the bidding documents for the Town of Dartmouth's exterior renovation work at 247 Russells Mills Road, South Dartmouth, Massachusetts. The addendum, issued August 3, 2026, adds unit pricing line items for plywood underlayment replacement (per square foot), additional trim replacement above called-out scope (per linear foot), and 2x6 pressure-treated framing replacement at termite-damaged areas (per linear foot). The document reissues the bid forms to include unit price information and provides a right-sized drawing set at 24x36 inches, with alternative access via Dropbox link. A questions and answers section clarifies project scope, including confirmation that electrical fixtures are to be removed and new ones installed only in select locations; band board replacement is localized to rotted sections on the east elevation addition; ramp railings (not the ramp itself) are to be replaced; a full-time superintendent is not required, only during active construction; the project duration is three months; hazardous materials testing was completed in 2017 with window caulking found free of asbestos, though contractors must assume all exterior paint contains lead; and a Heavy-Duty Dehumidifier Model H-12683 from ULINE is specified for Alternate 3. The addendum also incorporates a Limited Asbestos Building Materials Inspection Report dated January 15, 2017, which documents identified asbestos-containing materials including air cell and grey pipe insulation with chrysotile content and contaminated soil in the basement and kitchen crawl spaces, with recommendations for proper removal by licensed asbestos contractors.
The updated bid forms require contractors to acknowledge receipt of Addendum 2 and provide a total proposed contract price along with costs for three alternates (elimination of roof overhang scope, substitution of white cedar for red cedar shingles, and basement dehumidifier installation) and unit pricing for the three newly specified line items. General bidders must include sub-bids for painting work (Section 09 0009) and certify they have been in business under their present name, have not failed to complete awarded work, and can provide three recent historic restoration projects of similar nature. Sub-bidders must certify OSHA 10-hour safety training completion for all employees, comply with prevailing wage requirements, and provide evidence of similar recent project experience. The documents require performance and payment bonds equal to the contract price and establish a bona fide bid certification under penalty of perjury, with bidders further certifying they are not debarred from public construction work under Massachusetts General Laws.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2510 Dartmouth DCTV-Addendum 1.pdf | ||
| Bid Drawings.pdf | ||
| 2510 DCTV Bid Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovations to the Dartmouth DCTV 247 Russells Mills Road, South Dartmouth, MA 02748
Addendum 2 August 3, 2026
BTGA Project #2510 ADDENDUM 2 Brewster Thornton Group Architects, LLP SECTION 09 0000 - 1
ADDENDUM 2
1.01 GENERAL
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated 04/17/26. Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.
This Addendum consists of 2 pages plus the following:
1. Hazardous Material Testing Report
2. Section 00 4100 Form for General Bid.
3. Section 00 4102 Form for Filed Sub-Bid.
4. Right-sized drawing set (24x36).
1.02 CHANGES TO THE PROJECT MANUAL
1. Section 01 2200 Unit Prices – Part 3.1: Add “C. Linear foot cost to replace 2x6 PT framing at possible termite-damaged areas.”
2. Replace Section 00 4100 Form for General Bid to include Unit price information.
3. Replace Section 00 4102 Form for Filed Sub-Bid to include Unit price information.
1.03 CHANGES TO THE DRAWINGS
1. Drawings have been reissued with this addendum at their appropriate size (24”x36”). If there are still issues viewing the drawings at the intended scale, please download directly from the link below:
https://www.dropbox.com/scl/fo/kbfpbp6khsmn1tanjta26/AFKAWHfb0HYyUu3id7GKphM?rlkey=k kl723dtsskf571slddf4gaxh&st=hxdk9bp7&dl=0
1.04 QUESTIONS AND ANSWERS
1. Question: Electrical Fixtures: Please clarify the project scope for electrical fixtures. Are new fixtures to be furnished and installed as part of this contract? More specifically, are the existing fixtures that are being removed being reinstalled with new fixtures? More specifically, do the side entry doors get new lights on each side?
Answer: The existing light fixtures are to be removed and disposed of, per D201 and D202, Demolition Exterior Elevations. New light fixtures are to be furnished and installed in select locations only, per A201 Exterior Elevations (above the front door) and 8/A502 Typical Roof Overhang (in the new roof overhangs).
2. Question: Band Board Replacement: Please confirm whether the band board is to be replaced as part of the project. If replacement is required, please identify the locations and extent of the work.
Answer: The upper band trim is largely to remain. Replacement is localized to the rotted section on the East elevation addition, as noted on 2/A201.
3. Question: Ramp Reconstruction: Please confirm whether the existing ramp is to be rebuilt. If so, please provide the required scope, dimensions, and any applicable accessibility requirements.
Addendum 2 August 3, 2026
BTGA Project #2510 ADDENDUM 2 Brewster Thornton Group Architects, LLP SECTION 09 0000 - 2
Answer: No, the intent is not to replace the ramp itself. The railings in this location are to be replaced. Any gaps in the ramp due to the removal of the existing railing system and installation of the new system should be patched in kind.
4. Question: Full-Time Superintendent: Please confirm whether a full-time on-site superintendent is required for the duration of the project or only during active construction operations.
Answer: A full-time superintendent is not required. The superintendent is only required to be on site while active construction is being completed by their own workforce or subcontractors.
5. Question: Project Duration: Please confirm the anticipated project timeline. The specifications reference approximately three (3) months; please verify that this is the required contract duration.
Answer: Three (3) months is the assumed project duration for this scope of work.
6. Question: Hazardous Materials: Please confirm whether a hazardous materials inspection and/or survey (including asbestos, lead paint, mold, etc., if applicable) has been completed. If available, please provide the report for contractor review.
Answer: Hazardous material testing was completed in 2017. Window caulking was found not to contain asbestos. Given lead paint testing was not completed at that time, the contractor should assume all exterior paint contains lead and utilize proper safety equipment/protocols for its removal.
7. Question: Is there a set number of days for Time of Completion for this project? Can't seem to find it within the specifications. Please Advise.
Answer: 3 months.
8. Question: Alternate 3, is there a BOD and work plan for the dehumidifier? Only indicates to install 1 dehumidifier and connect to sump. Does the dehumidifier need to be wired back to the circuit breaker, is there an available outlet near the sump? Please Advise.
Answer: BOD: ULINE Heavy-Duty Dehumidifier, Model No: H-12683.
9. Question: There's unit pricing indicated for this project, upon reviewing the Unit Pricing spec. Is there predetermined unit pricing for the two schedules? If not, is there a Unit pricing form to fill out for bid submission? Please Advise
Answer: No, there is no predetermined price. The unit line items have been updated in the bid forms.
END DOCUMENT
LIMITED ASBESTOS BUILDING MATERIALS INSPECTION REPORT
COMMUNITY TELEVISION BUILDING BASEMENT
247 RUSSELLS MILLS ROAD
DARTMOUTH, MASSACHUSETTS 02748
PREPARED FOR:
MR. PETER CHASSE
DARTMOUTH COMMUNITY TELEVISION
247 RUSSELLS MILLS ROAD
DARTMOUTH, MASSACHUSETTS 02748
PREPARED BY:
ATC GROUP SERVICES, LLC
500 WEST CUMMINGS PARK, SUITE 3750
WOBURN, MASSACHUSETTS 01801
ATC PROJECT 6000002570
January 15, 2017
Asbestos Inspection, Community Television Building, Dartmouth, MA
ATC Project No. 6000002570
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY
1.1 ASBESTOS
2.0 ASBESTOS CONTAINING MATERIALS SURVEY
2.1 SAMPLING METHODOLOGY
2.2 ASBESTOS-CONTAINING MATERIALS
Table 1: Summary of Identified Asbestos-Containing Materials Table 2: Summary of Non Asbestos-Containing Materials
2.3 ANALYTICAL METHOD
2.4 CONSIDERATION FOR HIDDEN MATERIALS
2.5 RECOMMENDATIONS
APPENDICES
APPENDIX A: ASBESTOS BULK SAMPLE ANALYSIS RESULTS BY PLM
1.0 EXECUTIVE SUMMARY
ATC Group Services, LLC (ATC) was retained by Mr. Peter Chasse to perform an asbestos building materials survey in support of the upcoming renovation project at the Community Television Building Basement, which is located at 247 Russells Mills Road, in Dartmouth, Massachusetts. The inspection was performed in accordance with ATC Proposal 060-2016-0445.
ATC’s scope of work for the asbestos materials building inspection included a limited survey for asbestos-containing materials (ACM). As a part of this inspection, ATC performed a limited asbestos inspection in representative interior areas of the basement and crawl space areas, to the degree feasible. In addition, ATC performed an inspection of the exterior basement window areas. ATC did not perform an inspection of roofing areas, foundation wall areas below grade, or any other areas of the building not included in the scope of work for this survey.
1.1 Asbestos
Section 2.0 discusses the ACM survey and sampling methodology. This survey involved a visual inspection, inventory, and bulk sampling of suspect ACM, including locating and quantifying the identified ACM. ATC inspected representative interior and exterior basement areas as a part of this inspection. In addition, ATC performed an inspection of the exterior basement window areas. ATC did not perform an inspection of roofing areas, foundation areas below grade, or any other areas of the building not included in the scope of work for this survey.
The asbestos survey was performed by a Massachusetts Division of Labor Standards (DLS)-certified Asbestos Inspector Logan Fitzgerald (AI-900711) on December 29, 2016. A total of twenty-eight (28) samples of suspect ACM were collected with twenty-four (24) analyzed to determine asbestos content. The ATC inspector performed both the visual inspection and bulk sampling in the building according to methods outlined in the U.S. Environmental Protection Agency (EPA) guidance document titled, "Guidance for Controlling Asbestos-Containing Materials in Buildings" (Document No. 560/5-85/024). The Polarized Light Microscopy (PLM) bulk sample analytical results are included in Appendix A.
Limitations
Our professional services have been performed, our findings obtained and our recommendations prepared in accordance with customary principles and practices in the field of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated.
Environmental evaluations are limited in the sense that conclusions and recommendations are developed and information obtained from limited research and secondary sources. Except as set forth in this report, ATC has made no independent investigations as to the accuracy or completeness of the information derived from the secondary sources and personal interviews and has presumed that such information was accurate and complete.
This report is intended for the sole use of Dartmouth Community Television. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations found therein, is at risk of said user.
CERIFICATION OF RESULTS
This report has been prepared for the exclusive use of Dartmouth Community Television. Photocopying of this document by parties other than those designated by Dartmouth Community Television, or use of this document for purposes other than intended, is prohibited.
Respectfully submitted this 15th day of January, 2017
Sincerely, ATC Group Services, LLC
Logan Fitzgerald Asbestos Inspector for ATC Group Services, LLC Cell: 774-273-0571 Email: logan.fitzgerald@atcassociates.com
Bryan Thompson Division Manager, Building Sciences For ATC Group Services, LLC Direct Line: 781-404-1375 Email: bryan.thompson@atcassociates.com mailto:logan.fitzgerald@atcassociates.com mailto:bryan.thompson@atcassociates.com
2.0 ASBESTOS CONTAINING MATERIALS SURVEY
2.1 Sampling Methodology
The survey was performed by Mr. Logan Fitzgerald, a Massachusetts DLS-certified Asbestos Inspector (License No. AI-900711), on December 29, 2016. Bulk samples, representing individual homogenous areas of suspect materials, were collected in a randomly distributed manner, in accordance with the methods outlined below.
Building materials generally exist in the form of thermal systems insulation (TSI), surfacing materials, and miscellaneous materials. The following generally illustrates the sampling strategy employed by ATC where feasible:
(a) Surfacing materials - In a randomly distributed manner, collect bulk samples of surfacing materials, representative of each homogeneous area, and not assumed to be ACM.
(1) Collect at least three (3) bulk samples from each homogeneous area that is less than or equal to 1,000 square feet (ft2).
(2) Collect at least five (5) bulk samples from each homogeneous area that is greater than 1,000 ft2, but less than or equal to 5,000 ft2.
(3) Collect at least seven (7) bulk samples from each homogeneous area that is greater than 5,000 ft2.
(b) Thermal systems insulation -
(1) In a randomly distributed manner, collect at a minimum, three (3) bulk samples of thermal systems insulation material, representative of each homogeneous area, and not assumed to be ACM.
(2) Collect, at a minimum, one (1) bulk sample of patched thermal systems insulation, representative of each homogenous area, and not assumed to be ACM, providing the section of patch was less than six (6) linear or square feet.
(3) Collect, at a minimum, three (3) representative bulk samples of each insulated mechanical system not assumed to be ACM, including, but not limited to cementitious material used on pipe fittings such as tees, elbows, or valves.
Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.
(4) Bulk samples are not required to be collected from any homogeneous area where the accredited asbestos inspector has determined that the thermal systems insulation is a non-suspect material (i.e., fiberglass, foam glass, rubber, or any other non-ACM).
(c) Miscellaneous materials - Collect, at a minimum, two (2) representative bulk sample of each miscellaneous material not assumed to be ACM, including, but not limited to ceiling tiles, floor tiles, associated floor tile mastic, roofing materials, waterproofing, etc.
Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.
2.2 Asbestos-Containing Materials
ATC conducted the asbestos survey in representative areas, including accessible interior and exterior areas throughout the Basement, located at 247 Russells Mills Road, in Dartmouth, Massachusetts. In consideration that the building is scheduled for renovation, ATC performed limited exploratory renovation, to the degree feasible, in representative interior locations of the basement to identify the presence of hidden ACM. ATC did not perform an ACM inspection of any roofing material. Note that ATC did not survey any materials located outside of the basement and kitchen crawl space.
The following table presents a list of the identified, confirmed ACMs and assumed ACMs in the buildings.
Note: ACM is defined by the MA DEP as any material or product containing one percent or greater asbestos by weight.
Table 1: Summary of Identified Asbestos-Containing Materials Community Television Building Basement
247 Russells Mills Road, Dartmouth, Massachusetts
Location Material Estimated Quantity Result
Basement
Basement Crawl Space Air Cell Pipe Insulation1 700 ln ft 70% Chrysotile
Contaminated Soil2 3,000 sq ft 70% Chrysotile
Room on Left Side of Kitchen Grey Pipe Insulation 70 ln ft 50% Chrysotile
Room on the Right Side of Kitchen Air Cell Pipe Insulation 40 ln ft 70% Chrysotile
Kitchen Crawl Space Grey Pipe Insulation3 50 ln ft 5% Chrysotile
5% Amosite
Contaminated Soil2 500 sq ft 5% Chrysotile 5% Amosite
Ln ft – Linear Feet sq ft – Square Feet
1 The air cell pipe insulation was found to contain asbestos. The material is located on pipes within the crawl space and has become deteriorated and debris from this material is located throughout the soil floor.
ATC has provided an assumed quantity for this material based on observations throughout the representative crawl space area.
2 The soil in the crawl space is contaminated with asbestos containing pipe insulation. ATC recommends that as a part of the abatement project in this area that two (2) inches of top soil will need to be removed.
ATC has provided an assumed quantity of this material based on observations throughout the representative crawl space area.
3 The pipe insulation was found to contain asbestos. The material is located on pipes within the kitchen crawl space and has become deteriorated and debris from this material is located throughout the soil floor.
The kitchen crawl space is a separate area from the crawl space located in the basement. ATC has provided an assumed quantity for this material based on observations throughout representative kitchen crawl space area.
The following table presents a list of suspect materials in the building that were determined not to contain asbestos, based upon laboratory analysis of samples.
Table 2: Summary of Non Asbestos-Containing Materials Community Television Building Basement
247 Russells Mills Road, Dartmouth, Massachusetts
Material Sample Location(s) Grey Ceiling Plaster
Entry Room, Room on the Right
White Skim Coat Associated with Grey Ceiling Plaster
Grey Wall Plaster Orange Skim Coat Associated with
Grey Wall Plaster Grey Plaster Below Stairs Left Room
Masonry Caulking White Window Caulking Associated with
2’ x 4’ Window Exterior Basement Window White Window Caulking Associated with
1’ x 2’ Window
2.3 Analytical Method
Bulk samples of suspect materials were analyzed by Asbestos Identification Laboratory, of Woburn, Massachusetts (AIL) using the EPA approved method (EPA/600R-93/116) for polarized light microscopy with dispersion staining (PLM/DS), using the visual estimation technique for asbestos quantification. By using the PLM/DS method, a trained microscopist is able to identify and distinguish between asbestos group minerals and other fibrous materials such as cellulose (paper), mineral (rock), wood or glass fiber.
The quantity of each of these substances is estimated on a weight basis and recorded as a percent. Only the asbestos content, if any, is recorded in the bulk sample ‘Report of Analysis’ (Appendix A). If a material contains 1% asbestos or greater, it is considered to be asbestos-containing material. Upon client request, or at the recommendation of the analyst, the ‘Point Counting Method’ may be used to verify the presence/absence of asbestos when a sample contains less than 10% asbestos by visual estimate.
AIL is certified by the Massachusetts DLS (certification #AA000208) to perform all types of asbestos analysis. AIL, is also accredited by the EPA National Voluntary Laboratory Accreditation Program (NVLAP).
The PLM/DS analytical method is modeled after 40 CFR Part 763, Subpart F, Appendix A: "Interim Method for the Determination of Asbestos in Bulk Insulation Samples."
2.4 Consideration for Hidden Materials
ATC’s scope of work for the asbestos materials building inspection included a limited survey for asbestos-containing materials. As a part of this inspection, ATC performed a limited asbestos inspection in representative interior areas of the basement and crawl space areas, to the degree feasible. In addition, ATC performed an inspection of the exterior basement window areas. ATC did not perform an inspection of roofing areas, foundation wall areas below grade, or any other areas of the building not included in the scope of work for this survey.
Note that ATC did not disassemble mechanical equipment or electrical gear that may have suspect ACM internal components.
ATC recommends that if a suspect material has not been positively identified, but is similar in mode of occurrence or physical properties as other identified ACM, it should be considered asbestos containing.
Only through further sampling and analysis should a suspect material be identified as non-asbestos.
2.5 Recommendations
ATC recommends that all identified ACM that may be impacted in the future be properly removed and disposed by a Massachusetts-licensed Asbestos Contractor prior to disturbance.
ATC recommends that precautions be taken to prevent unauthorized disturbance of ACM identified in this report.
APPENDIX A
ASBESTOS BULK SAMPLE ANALYSIS RESULTS BY PLM
Batch: 18730
165 New Boston St., Ste 227 Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Bryan Thompson, Thank you Bryan Thompson for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project .
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.
Work Received:
2017-01-03
2016-12-29
DCTV Public Access Basement- Dartmouth, MA
Bryan Thompson ATC Group Services, Woburn 500 West Cummings Park Suite 3750 Woburn, MA 01801 2016-12-29
Project Number:
Project Name:
January 03, 2017
Date Sampled:
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Work Analyzed:
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Work Received:
2017-01-03
2016-12-29
DCTV Public Access Basement- Dartmouth, MA
Bryan Thompson ATC Group Services, Woburn 500 West Cummings Park Suite 3750 Woburn, MA 01801 2016-12-29
Project Number:
Project Name:
January 03, 2017
Date Sampled:
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Work Analyzed:
Asbestos % Material Color Non-Asbestos % Location FieldID
LabID gray Non-Fibrous 100
208584
1A Entry RoomGrey Ceiling Plaster None Detected gray Non-Fibrous 100
208585
1B Room on the RightGrey Ceiling Plaster None Detected gray Non-Fibrous 100
208586
1C Room on the RightGrey Ceiling Plaster None Detected white Non-Fibrous 100
208587
2A Entry RoomWhite Skim Coat Assoc w/ Grey Ceiling Plaster
None Detected white Non-Fibrous 100
208588
2B Room on the RightWhite Skim Coat Assoc w/ Grey Ceiling Plaster
None Detected white Non-Fibrous 100
208589
2C Room on the RightWhite Skim Coat Assoc w/ Grey Ceiling Plaster
None Detected gray Non-Fibrous 100
208590
3A Entry RoomGrey Wall Plaster None Detected gray Non-Fibrous 100
208591
3B Room on the RightGrey Wall Plaster None Detected gray Non-Fibrous 100
208592
3C Room on the RightGrey Wall Plaster None Detected orange Non-Fibrous 100
208593
4A Entry RoomOrange Skim Coat Assoc w/ Grey Wall Plaster
None Detected orange Non-Fibrous 100
208594
4B Entry RoomOrange Skim Coat Assoc w/ Grey Wall Plaster
None Detected orange Non-Fibrous 100
208595
4C Entry RoomOrange Skim Coat Assoc w/ Grey Wall Plaster
None Detected gray Non-Fibrous 100
208596
5A Below StairsGrey Plaster None Detected gray Non-Fibrous 100
208597
5B Below StairsGrey Plaster None Detected
Page 1 of 2Tuesday 03 January
Asbestos % Material Color Non-Asbestos % Location FieldID
LabID gray Non-Fibrous 100
208598
6A Left RoomMasonry Caulking None Detected gray Non-Fibrous 100
208599
6B Left RoomMasonry Caulking None Detected
Detected Chrysotile 70 gray Non-Fibrous 30
208600
7A Crawl SpaceWhite Air Cell Pipe Insulation
208601
7B Crawl SpaceWhite Air Cell Pipe Insulation
Not Analyzed
Detected Chrysotile 50 gray Non-Fibrous 50
208602
8A Left RoomGrey Pipe Insulation
208603
8B Left RoomGrey Pipe Insulation Not Analyzed
Detected Chrysotile 70 gray Non-Fibrous 30
208604
9A Room on the Right SideGrey Air Cell Pipe Insulation
208605
9B Room on the Right SideGrey Air Cell Pipe Insulation
Not Analyzed
Detected Chrysotile 5 Amosite 5 gray Cellulose 70 Non-Fibrous 20
208606
10A Kitchen Crawl SpaceGrey Pipe Insulation
208607
10B Kitchen Crawl SpaceGrey Pipe Insulation Not Analyzed multi Non-Fibrous 100
208608
11A Basement WindowWhite Window Caulking Assoc w/ 2x4 Basement Window
None Detected multi Non-Fibrous 100
208609
11B Basement WindowWhite Window Caulking Assoc w/ 2x4 Basement Window
None Detected white Non-Fibrous 100
208610
12A Basement WindowWhite Window Caulking Assoc w/ 1x2 Basement Window
None Detected white Non-Fibrous 100
208611
12B Basement WindowWhite Window Caulking Assoc w/ 1x2 Basement Window
None Detected
Analyzed by: 18730Batch:
Page 2 of 2Tuesday 03 January End of Report
Addendum 2: August 3, 2026
BTGA Project #2510 FORM FOR GENERAL BID Brewster Thornton Group Architects, LLP SECTION 00 4100 - 1
SECTION 00 4100
FORM FOR GENERAL BID
To the Awarding Authority:
A. The Undersigned proposes to furnish all labor and materials required for the Renovation to the Dartmouth DCTV at 247 Russells Mills Road, South Dartmouth, MA 02748, in accordance with the accompanying plans and specifications prepared by Brewster Thornton Group Architects, LLP for the contract price specified below, subject to additions and deductions according to the terms of the specifications.
B. This bid includes the following addenda:
Addendum 1, dated ___________________
Addendum 2, dated ___________________
C. The total proposed contract price is ____________________________dollars ($________________).
For Alternate No. 1 (Eliminate the roof overhang scope at exterior doors):
Subtract $_______________
For Alternate No. 2 (Replace red cedar shingles with white cedar shingles):
Subtract $_______________
For Alternate No. 3 (Install one (1) dehumidifier in the basement):
Add $_______________
D. Unit Pricing:
Cost for plywood underlayment replacement:
$_____________ per Square Foot.
Cost of additional trim replacement (above what is called out on the documents):
$___________ per Linear Foot.
Cost to replace 2x6 PT framing at possible termite-damaged areas:
$___________ per Linear Foot.
E. The subdivision of the proposed contract work is as follows:
Item 1. Work of the general contractor, being all work other than that covered by Item 2.
SUB-TOTAL OF ITEM 1 WORK: $
Addendum 2: August 3, 2026
BTGA Project #2510 FORM FOR GENERAL BID Brewster Thornton Group Architects, LLP SECTION 00 4100 - 2
Item 2. Sub-bids as follows:
Section No. Subtrade
Name of Sub-Bidder Amount
09 0009 Painting $
TOTAL OF ITEM 2: $
The undersigned agrees that each of the above-named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in Item 1 of this bid.
The undersigned agrees that if he is selected as general contractor, he will promptly confer with the awarding authority on the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid, the total contract price being adjusted to conform thereto.
F. The undersigned offers the following information as evidence of the contractor’s qualifications to perform the work as bid upon according to all the requirements of the plans and specifications:
1. Have been in business under present business name __________ years.
2. Ever failed to complete any work awarded? __________________
3. List at least three recent historic restoration projects of a similar nature:
Building Owner Architect Contract Amount
G. The undersigned agrees that, if he is selected as general contractor, he will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price;
provided, however, that if there is more than 1 surety company, the surety companies shall be jointly and severally liable.
The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said
Addendum 2: August 3, 2026
BTGA Project #2510 FORM FOR GENERAL BID Brewster Thornton Group Architects, LLP SECTION 00 4100 - 3 course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.
The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
Date ____________________
(Name of General Bidder)
By ___________________________________________________
(Name of Person Signing Bid and Title)
(Business Address)
(City and State)
END OF FORM
Addendum 2: August 3, 2026
BTGA Project #2510 FORM FOR FILED SUB-BID Brewster Thornton Group Architects, LLP SECTION 00 4102 - 1
SECTION 00 4102
FORM FOR FILED SUB-BID
The undersigned proposes to furnish all labor and materials required for completing, in accordance with the hereinafter described plans, specifications, and addenda prepared by Brewster Thornton Group Architects, LLP for the Renovations to the Dartmouth DCTV, located at 247 Russells Mills Road, South
Dartmouth, MA 02748 for one of the following sections of work:
Section 09 0009
A. This bid includes the following addenda:
Addendum 1, dated ___________________
Addendum 2, dated ___________________
Addendum 3, dated ___________________
B. The total proposed sub-contract price is _________________________dollars ($________________).
For Alternate No. 1 (Eliminate Roof Overhangs):
Subtract $_______________
For Alternate No. 2 (Replace red cedar shingles with shite cedar shingles):
Subtract $_______________
For Alternate No. 3 (Install one (1) dehumidifier in the basement):
Add $_______________
C. Unit Pricing:
Cost for plywood underlayment replacement:
$_____________ per Square Foot.
Cost of additional trim replacement (above what is called out on the documents):
$___________ per Linear Foot.
Cost to replace 2x6 PT framing at possible termite-damaged areas:
$___________ per Linear Foot.
Brewster Thornton Group Architects, LLP SECTION 00 4102 - 2
D. This Sub-Bid
May be used by any General Bidder Except:
May only be used by the following General Bidders:
[To exclude general bidders, insert “X” in one box only and fill in blank following that box. Do not answer C if no general bidders are excluded.]
E. The undersigned agrees that, if he is selected as a sub-bidder, they will, within 5 days, Saturdays, Sundays and legal holidays excluded, after presentation of a subcontract by the general bidder selected as the general contractor, execute with such general bidder a subcontract in accordance with the terms of this sub-bid, and contingent upon the execution of the general contract, and, if requested so to do in the general bid by the general bidder, who shall pay the premiums therefor, or if prequalification is required pursuant to section 44D3/4, furnish a performance and payment bond of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority, in the full sum of the subcontract price.
F. The names of all persons, firms, and corporations subcontracting to the undersigned as part of the work:
Name Class of Work Bid Price
G. The undersigned agrees that the above list of bids to the undersigned represents bona fide bids based on the hereinbefore described plans, specifications and addenda and that, if the undersigned is awarded the contract, they will be used for the work indicated at the amounts stated, if satisfactory to the awarding authority.
H. The undersigned further agrees to be bound to the general contractor by the terms of the hereinbefore described plans, specifications, including all general conditions stated therein, and addenda, and to assume toward him all the obligations and responsibilities that he, by those documents, assumes toward the owner.
I. The undersigned offers the following information as evidence of the contractor’s qualifications to perform the work as bid upon according to all the requirements of the plans and specifications:
1. Have been in business under present business name __________ years.
2. Ever failed to complete any work awarded? __________________
3. List one or more recent buildings with names of general contractor and architect on which you served as a subcontractor for work of similar characteristics as required for the above-named building:
Brewster Thornton Group Architects, LLP SECTION 00 4102 - 3
Building Architect General Contractor Contract Amount
J. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards of subcontracts subject to section 44F.
The undersigned further certifies under penalties of perjury that this sub-bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
Date: __________________
(Name of Sub-bidder)
By: ______________________________________________________ (Title and Name of Person Signing Bid)
(Business Address)
END OF FORM
BREWSTER THORNTON
GROUP ARCHITECTS, LLP
PROJECT NUMBER
PROJECT NAME
RENOVATIONS TO THE
ARCHITECT
CLIENT
TOWN OF DARTMOUTH
317 IRON HORSE WAY
SUITE 202
PROVIDENCE, RI 02908
BREWSTERTHORNTON.COM
401 . 861 . 1600
LOCUS MAP : NTS
247 RUSSELLS MILLS ROAD
DARTMOUTH, MA 02748
PROJECT ISSUE
DARTMOUTH COMMUNITY MEDIA
STRUCTURAL
ENGINEERS
E2 ENGINEERS
2532 MAIN ST
SUITE 206
CONCORD, MA 01742
DARTMOUTH DCTV
247 RUSSELLS MILLS RD, SOUTH DARTMOUTH, MA 02748
DARTMOUTH DCTV
BID DOCUMENTS
BTGA #2510
04/17/26
AREA OF
WORK
R U
S S E L L S M
IL
L S R
D
ELM
STR
EET
G E O
R G
E S
T
T H E R E S A S
T
A R R O
W H E A D L
N
RUSSELLS MILLS RD
U T
IC
A
L N
RUSSELLS M
ILLS R
D
U T
IC
A
L N
SEM
INOLE RD
MISHAWUM DR
SAGAMORE DR
DRAWING LIST
SHEET SHEET NAME
GENERAL
G000 COVER SHEET
G001 COMMON ABBR., GENERAL LEGEND, AND NOTES
G002 EXISTING PHOTOS / SCOPE
G003 EXISTING PHOTOS / SCOPE
DEMOLITION
D201 DEMOLITION EXTERIOR ELEVATION
D202 DEMOLITION EXTERIOR ELEVATION
ARCHITECTURAL
A100 ROOF PLAN AND SITE PLAN
A201 EXTERIOR ELEVATIONS
A202 EXTERIOR ELEVATIONS
A501 DETAILS
A502 DETAILS
christines NJG Stamp MA
COMMON ABBREVIATIONS
ABV ABOVE
A/C AIR CONDITION
ACC. ACCESS(IBLE)
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITY ACT
ADDL ADDITIONAL
ADJ. ADJUSTABLE (OR) ADJACENT
A/E ARCHITECT/ENGINEER
A.S.F ABOVE SUBFLOOR
A.F. ABOVE FLOOR
A.F.F. ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AL./ALUM. ALUMINUM
ALT. ALTERNATE
ANOD. ANODIZED
ARCH. ARCHITECT(URAL)
A.P. ACCESS PANEL
APP. APPROXIMATE
APT APARTMENT
APPROX. APPROXIMATE
ASI ARCHITECT’S SUPPLEMENTAL
INSTRUCTION
AUTO. AUTOMATIC
AUX. AUXILIARY
BAS BUILDING AUTOMATION SYSTEM
BD BOARD
BDRM BEDROOM
BFE BOTTOM OF FROST ELEVATION
BITUM. BITUMINOUS
BLDG BUILDING
BLW BELOW
BSMT BASEMENT
BOTT. BOTTOM
B.O.F BOTTOM OF FOOTING
B.O. BLOW OFF VENT
BLKG BLOCKING
BIT. BITUMEN OR BITUMENOUS
BLUEBD BLUEBOARD
(VENEER PLASTER BASE)
BRK BRICK
BRZ BRONZE
BTWN BETWEEN
CAB. CABINET
C.F.M.F. COLD-FORMED METAL FRAMING
CG COLUMN GRID
C.L. CENTER LINE
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLG CEILING
CLR CLEAR(ANCE)
C.J. CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL. COLUMN
COMP. COMPRESS(ED), (ION). (IBLE)
CONC. CONCRETE
CONST. CONSTRUCTION
CONT. CONTINU(E), (OUS)
COORD. COORDINATE
CPT CARPET
CPR COPPER
C.T. CERAMIC TILE
C.U.H. CABINET UNIT HEATER
DBL DOUBLE
DEMO DEMO(LISH), (LITION)
DEG DEGREES
DET. DETAIL
D.F. DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DISP. DISPOSE
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
DWGS DRAWINGS
DX DUPLEX
EA. EACH
EL. ELEVATION
ELEC. ELECTRIC(AL)
ELEV. ELEVATOR
EMER. EMERGENCY
EMS EMERGENCY MANAGEMENT
SYSTEM
E.J. EXPANSION JOINT
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EV EXHAUST VENT
EX. EXISTING
EXIST. EXISTING
EXG EXISTING
EXT. EXTERIOR
O.C. ON CENTER
O.H. OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
ORIG. ORIGINAL
OHD OVERHEAD
OZ. OUNCE
PCC PRE-CAST CONCRETE
PERP PERPENDICULAR
PL PLATE
PLAM PLASTIC LAMINATE
PNL PANEL
PNT PAINT
PPL PEOPLE
PTD PAINTED
PR PAIR
PREP PREPARATION
P.T. PRESSURE TREATED
PTN PARTITION
PWD PLYWOOD
P.V. PLUMBING VENT
Q.T. QUARRY TILE
R# RADIUS
R RISER
R.B. RESILENT BASE
RCP REFLECTED CEILING PLAN
R&D REMOVE & DISPOSE
R.D. ROOF DRAIN
RE: REFER TO
REF. REFER
REFR REFRIGERATOR
REQ. REQUIRE(D)
RES. RESILIENT
REV. REVISION
R.H. RIGHT HAND
RM ROOM
R.O. ROUGH OPENING
RWB RUBBER WALL BASE
SCHED. SCHEDULE
SD SIDE
SECT. SECTION
SF SQUARE FEET
SF SUB FLOOR
S.GASKET SMOKE GASKET
SGL SAFETY GLASS
SHT SHEET
SHTH SHEATHING
SIM. SIMILAR
SPEC. SPEC (-IFIED) (-IFICATION)
SRL SUBMITTAL REVIEW LETTER
SQ. SQUARE
S.S. STAINLESS STEEL
S.S.M. SOLID SURFACE MATERIAL
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STOR. STORAGE
STL STEEL
STRUCT. STRUCTURAL
SUSP. SUSPEND(ED)
SYS. SYSTEM
T TREAD
T&G TONGUE AND GROOVE
TEL. TELEPHONE
TEMP TEMPORARY
TGL TEMPERED GLASS
THK THICK(NESS)
THRESH THRESHOLD
T.O. TOP OF ________________
T.O.F. TOP OF FOOTING
T.O.S. TOP OF SHELF
T.O.W. TOP OF WALL
TS TUBE STEEL
TSTAT THERMOSTAT
TYP. TYPICAL
TZ TERRAZZO
U.H. UNIT HEATER
U.N.O. UNLESS NOTED OTHERWISE
V.A.T. VINYL ASBESTOS TILE
VCT VINYL COMPOSITION TILE
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
V.R. VAPOR RETARDER
W/ WITH
W.C. WATER CLOSET
WD WOOD
WDW WINDOW
WSU WATERPROOF SHINGLE UNDERLAYMENT
WWF WELDED WIRE FABRIC
Z.C.C. ZINC COATED COPPER
@ AT
& AND
F.A. FIRE ALARM
F.A.R. FLOOR AREA RATIO
F.C.U. FAN COIL UNIT
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FGL FIBERGLASS
FIN. FINISH
FIN.CLG FINISH CEILING
FIN.FLR FINISH FLOOR
FIN.SCH FINISH SCHEDULE
FIXT. FIXTURE
FLR. FLOOR
FLUOR. FLUORESCENT
FND. FOUNDATION
F.O. FACE OF _____________
F.P. FIRE PROTECTION
F.RATING FIRE RATING
FR FIRE RETARDANT
FRP FIBERGLASS REINFORCED
PLASTIC
FT FEET
FTG FOOTING
FURN. FURNITURE
GA GAGE/GAUGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS
GLAM GLUE LAMINATED BEAM
GLZ GLAZING
GWB GYPSUM BOARD
HC HANDICAP
HDF HIGH DENSITY FIBERBOARD
HM HOLLOW METAL
HDW HARDWARE
HRW HARDWARE
HOR. HORIZONTAL
HR HOUR
HT HEIGHT
IN. INCHES
INCL. INCLUDE(D),(ING)
INFO. INFORMATION
INSUL. INSULATION
INT. INTERIOR
J.C. JANITOR’S CLOSET
J-BOX JUNCTON BOX
JT JOINT
K.B. KNOX BOX
KIT. KITCHEN
LAB. LABORATORY
LAV. LAVATORY
LB POUND(S)
LCC SEE Z.C.C.
L.E.D. LIGHT EMITTING DIODE
LF LIGHT FIXTURE
L.H. LEFT HAND
LIB. LIBRARY
LIN LINOLEUM
LKR LOCKER
LVL LAMINATED VENEER LUMBER
LOC. LOCATION
LVR LOUVER
LVT LUXURY VINYL TILE
MACH. MACHINE
MAS. MASONRY
MAT. MATERIAL
MAX. MAXIMUM
MCT MARMOLEUM COMPOSITION TILE
MECH. MECHANICAL
MED. MEDIUM
MEMB MEMBRANE
MDF MEDIUM DENSITY FIBERBOARD
MIL MILLIMETER
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
M.R. MOISTURE RESISTANT
MTL METAL
N.A. NOT APPLICABLE
NAT. NATURAL
N.C. NOISE CRITERIA
N.I.C. NOT IN CONTRACT
NKL NICKEL
NOM. NOMINAL
NO NUMBER
NR NOT RATED
N.R.C. NOISE REDUCTION COEFFICIENT
N.T.S. NOT TO SCALE
(USE OF PUNCTUATION IS OPTIONAL)
1. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS IN EFFECT AT THE PROJECT SITE.
2. DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS.
3. THE CONTRACTOR SHALL REPORT ANY AND ALL DISCREPANCIES TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING.
4. ALL DIMENSIONS OF NEW WORK ARE TO THE FACE OF CONCRETE AND MASONRY, AND THE CENTER OF METAL STUDS AND FRAME OPENINGS
U.N.O.
5. DIMENSIONS NOTED TO EXISTING PLANES SHALL REFER TO THE FINISHED SURFACE OF THE EXISTING WALL, FLOOR, OR CEILING PLANE, UNLESS
NOTED OTHERWISE.
6. ALL ITEMS OF WORK ARE TO BE NEW UNLESS NOTED AS EXISTING.
7. CONTRACTOR SHALL VERIFY ALL DOOR AND WINDOW DIMENSIONS IN FIELD BEFORE PURCHASE.
8. TYPICAL CONSTRUCTION IS INDICATED THROUGHOUT THE PROJECT. REPEATED SIMILAR GRAPHIC REPRESENTATION IS SUFFICIENT. NOTE AT
EACH OCCURRENCE IS NOT REQUIRED.
9. ALL ITEMS DETAILED IN SECTION ARE CONTINUOUS UNLESS NOTED OTHERWISE.
10. FASTENERS, ADHESIVES AND OTHER SYSTEM COMPONENTS TYPICALLY REQUIRED ARE NOT CONSISTENTLY NOTED OR DETAILED. ONLY
UNIQUE CONDITIONS ARE ILLUSTRATED. PROVIDE ALL ITEMS REQUIRED TO SAFELY SECURE, ATTACH OR STABILIZE ALL WORK AS RECOMMENDED
BY IT'S MANUFACTURER, AS REQUIRED BY CODE OR NECESSARY FOR THE ASSEMBLY'S PROPER PERFORMANCE WHETHER OR NOT DETAILED.
11. ALL DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND MUST BE USED AS A SET FOR COMPLETE CONSTRUCTION INFORMATION.
12. IT SHALL BE THE DUTY OF THE CONTRACTOR TO REQUEST FROM THE ARCHITECT ALL NECESSARY INTERPRETATION OF THE CONTRACT
DOCUMENTS.
13. DRAWINGS ARE FOR ILLUSTRATIVE PURPOSES ONLY AND MAY NOT SHOW ALL DEMOLITION WORK REQUIRED TO COMPLETE THE CONTRACT
WORK.
14. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. DRAWINGS INDICATE APPROXIMATE LOCATION OF FIELD CONDITIONS. VERIFY IN FIELD.
16. DRAWINGS INDICATE SCOPE OF WORK. ACTUAL EXTENT OF WORK TO BE DETERMINED BY FIELD OBSERVATION.
17. DIMENSIONS AND ELEVATIONS INDICATED ON THE DRAWINGS IN REFERENCE TO EXISTING STRUCTURES ARE THE BEST AVAILABLE DATA
OBTAINABLE BUT ARE NOT GUARANTEED BY THE OWNER AND THE OWNER WILL NOT BE RESPONSIBLE FOR THEIR ACCURACY. THE CONTRACTOR
SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS, GRADES, LINES, LEVELS, OR OTHER CONDITIONS OF LIMITATIONS AT THE SITE TO AVOID
CONSTRUCTION ERRORS. IF ANY WORK IS PERFORMED BY THE CONTRACTOR OR ANY OF HIS SUB-CONTRACTORS PRIOR TO ADEQUATE
VERIFICATION OF APPLICABLE DATA, ANY RESULTANT EXTRA COST FOR ADJUSTMENT OF WORK AS REQUIRED TO CONFORM TO EXISTING
LIMITATIONS SHALL BE ASSUMED BY THE CONTRACTOR WITHOUT REIMBURSEMENT OR COMPENSATION BY THE OWNER.
18. OMISSION FROM THE DRAWINGS AND SPECIFICATIONS OF ITEMS WHICH OBVIOUSLY ARE NEEDED TO PROPERLY PERFORM THE WORK, SUCH AS
ATTACHMENTS, BOLTS, HANGERS, ETC., SHALL NOT RELIEVE THE CONTRACTOR FROM FURNISHING AND INSTALLING THEM.
19. IT IS INTENDED THAT ALL DIMENSIONS AND FIGURES ON THE DRAWINGS SHALL AGREE. THE CONTRACTOR SHALL CONFIRM THEM BEFORE
STARTING THE WORK AND SHALL REPORT IN WRITING ALL DISCREPANCIES TO THE ARCHITECT FOR ADJUSTMENT.
GENERAL NOTESGENERAL LEGEND
NAME
EL. ELEVATION
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION
BENCHMARK ELEVATION
SPOT ELEVATION
ROOM NAME AND MARK
DOOR MARK
WALL TYPE
WINDOW TYPE
KEY NOTE
A#
A#
EXISTING PARTITION
REVISION#
DETAIL KEY
A#
PHOTO SYMBOL
CONCRETE
RIGID INSULATIONCONCRETE BLOCK
BRICK
DISTURBED EARTH
ENGINEERED WOOD (MDF, HDF,
ETC.)
PLASTIC/PVC
PLYWOOD
RUBBLE
WOOD
ASPHALT SHINGLES
GLASS, VERTICAL SURFACE
GLASS, SPECIALTY
MARBLE/ GRANITE
STEEL/METAL
WOOD SHINGLES
CULTURED STONE
BATT INSULATION
L.O.C.
LIMITS OF CONSTRUCTION
GYPSUM WALLBOARD
ACCESSORY/ FURNITURE /
SPECIALTY EQUIPMENT MARK
REVISION CLOUD
PROJECT NORTH SYMBOL
(DASHED INDICATES TRUE NORTH)
COLUMN GRID LINE
NEW CONSTRUCTION
DETAIL
A#
NEW PARTITION
X
DETAIL CALLOUT
A#
A#
DISCLAIMER: HATCH PATTERN SCALE ADJUSTS BY DRAWING SCALE. SEE OTHER DESIGN DISCIPLINES FOR
ADDITIONAL LEGEND & SCHEDULE INFORMATION.
A# EXISTING CONSTRUCTION
UNDISTURBED EARTH
NORTH
X
X
X
ROOM NAME
SHEET
JOB NO. DATE
ISSUE :
SHEET TITLE
/2
/2
:2 :1
P
M
G001
COMMON
ABBR.,
GENERAL
LEGEND, AND
NOTES
R E
N O
V A
T
IO
N S
T O
T H
E
D A
R T
M O
U T
H D
C T
V R
U S
S E
L L
S M
IL
L
S R
D S
O U
T H
D A
R T
M O
U T
H M
A
04/17/26
BID DOCUMENTS
NO. REVISION DESCRIPTION DATE
UP
SHEET
JOB NO. DATE
ISSUE :
SHEET TITLE
/2
/2
:2 :1
P
M
G002
EXISTING
PHOTOS /
SCOPE
R E
N O
V A
T
IO
N S
T O
T H
E
D A
R T
M O
U T
H D
C T
V R
U S
S E
L L
S M
IL
L
S R
D S
O U
T H
D A
R T
M O
U T
H M
A
04/17/26
BID DOCUMENTS
NO. REVISION DESCRIPTION DATE
1. REMOVE AND REPLACE EXTERIOR CEDAR SHINGLE SIDING AND UNDERLAYMENT. REMOVE AND REPLACE ALL ROTTED
SHEATHING BEHIND SHINGLES.
2. REMOVE AND REPLACE IN KIND ALL ROTTED WOOD TRIM WITH PAINTED COMPOSITE MATERIAL AS INDICATED ON
ELEVATIONS.
3. REMOVAL VEGETATIVE GROWTH AROUND THE BUILDING, TYPICAL.
6. REGRADE AT FOUNDATION WALLS AT SOUTH AND EAST ELEVATIONS AND INSTALL WATERTABLE TRIM BAND AT ALL SIDES.
8. REPAIR STEPS AT AREAS OF DECAY PER DRAWINGS.
5. INSTALL EXTENDED SPLASH BLOCKS AT ALL DOWNSPOUT LOCATIONS. REMOVE ABANDONED UNDREGROUND DOWNSPOUT
CONNECTIONS.
4. REPLACE EXISTING WINDOW TRIM, TYPICAL OF ALL LOCATIONS.
7. REPAIR FOUNDATION AT AREAS OF DECAY PER DRAWINGS.
NOTE: PHOTOS INDICATE GENERAL CONDITIONS AND SPECIFIC SCOPE. FULL SCOPE OF WORK IS INDICATED ON OTHER SHEETS.
EXISTING KEY PLAN
SHEET
JOB NO. DATE
ISSUE :
SHEET TITLE
/2
/2
:2 :1
P
M
G003
EXISTING
PHOTOS /
SCOPE
R E
N O
V A
T
IO
N S
T O
T H
E
D A
R T
M O
U T
H D
C T
V R
U S
S E
L L
S M
IL
L
S R
D S
O U
T H
D A
R T
M O
U T
H M
A
04/17/26
BID DOCUMENTS
10. REPLACE METAL GRATE AND REPAIR WINDOW WELL. 11. REPLACE EXTERIOR LIGHTING AS NOTED ON DRAWINGS. ALL MECHANICAL, ELECTRICAL, PLUMBING WORK TO BE DONE
DESIGN/BUILD.
12. SAND, PATCH, AND REPAINT BEADBOARD PORCH CEILING. 14. REMOVE ABANDONED OIL PIPING AND PATCH FOUNDATION WALLS.13. INSTALL ROOFS OVER SIDE DOORS. (ALTERNATE)
14. INSTALL DEHUMIDIFIERS AT BASEMENT. (ALTERNATE)
NO. REVISION DESCRIPTION DATE
NOTE: PHOTOS INDICATE GENERAL CONDITIONS AND SPECIFIC SCOPE. FULL SCOPE OF WORK IS INDICATED ON OTHER SHEETS.
9. INSTALL HANDRAILS AT STAIRS.
EXISTING KEY PLAN
16. SOUTH ELEVATION 17. EAST ELEVATION
15. WEST ELEVATION
EXISTING VENT TO
REMAIN
R&D ABANDONED OIL
CONNECTION PIPING
REMOVE AND REINSTALL
UTILITY BOXES AS
NEEDED TO COMPLETE
WORK, TYPICAL
R&D MAILBOX
REMOVE AND REINSTALL UTILITY BOXES AS
NEEDED TO COMPLETE WORK, TYPICAL.
R&D LIGHT FIXTURES, TYP.
R&D WOOD TRIM AND
PANELS
R&D WOOD ALL WINDOW
TRIM. TYPICAL OF THREE (3)
LOCATIONS
R&D METAL AREAWAY
GRATE
R&D HOSEBIB IN
ITS ENTIREY R&D ABANDONED DRAIN PIPES IN
THEIR ENTIRETY, TYPICAL OF ALL
LOCATIONS, ALL SIDES
R&D PAINTED TRIM
BOARD. DECKING
TO REMAIN.
SCRAPE, PATCH, AND PREP
ALL TRIM FOR REPAINTING.
REMOVE AREAS OF ROTTED
TRIM AS NEEDED, TYPICAL OF
ALL PAINTED TRIM, ALL SIDES
REMOVE, PROTECT, AND
REINSTALL GUTTERS AND
DOWNSPOUTS REQUIRED FOR
TRIM REPLACEMENT/PAINTING
WORK, TYPICAL.
R&D ABANDONED CABELING
AND DISH
REMOVE AND REINSTALL
ELECTRICAL CONDUITS AS
NEEDED TO COMPLETE WORK.
REMOVE ALL ABANDONDED MEP
R&D WOOD TRIM AND
PANELS
R&D VINES GROWING
AGAINST THE BUILDING IN
THEIR ENTIRETY, TYPICAL OF
ALL LOCATIONS, ALL SIDES
R&D STAIR RAILINGS IN THEIR
ENTIRETY. SALVAGE ROUND
HANDRAIL FOR REINSTALLATION.
R&D SPLASH BLOCK,
TYPICAL
R&D TRIM
BOARD AT ALL
WINDOWS AND
DOORS, ALL
ELEVATIONS
R&D ALL
WINDOW SILLS,
TYPICAL OF ALL
WINDOWS ON
ALL ELEVATIONS
R&D TRIM BOARD
R&D TRIM IN ITS
ENTIRETY, TYPICAL ALL
WINDOWS AND DOORS
R&D WINDOW TRIM.
WINDOW TO REMAIN
EXISTING
WINDOWS AND
DOORS TO
REMAIN ELECTRICAL CONDUIT.
REMOVE AND REINSTALL AS
NEEDED TO COMPLETE WORK
REMOVE ABANDONED
OIL PIPING.
ELECTRICAL METER
TO REMAIN.
DEMOLITION NOTES
1. PROVIDE TEMPORARY SUPPORT DURING REMOVAL OF ANY AND ALL STRUCTURAL
ELEMENTS.
2. PROTECT ALL AREAS ADJACENT TO OR AFFECTED BY WORK DURING CONSTRUCTION.
PROVIDE DUST CONTAINMENT FOR ALL WORK AREAS.
3. CLEAN WORK AREA AND AREAS AFFECTED BY CUTTING AND PATCHING OPERATIONS.
4. PATCH WALLS & CEILING AT DEMO'D AREAS TO MATCH EXISTING ADJACENT SURFACES.
5. CAP ALL ABANDONED PLUMBING LINES AND ELECTRICAL OUTLETS.
6. ALL PORTIONS OF THE BUILDING TO BE REMOVED SHALL BE LEGALLY DISPOSED OF
OFF-SITE UNLESS DIRECTED OTHERWISE.
7. PRECAUTIONS AND TEMPORARY SHORING SHALL BE PLACED TO MAINTAIN THE
INTEGRITY OF THE EXISTING STRUCTURE THROUGHOUT DEMOLITION AND MASONRY
WORK.
8. CONTRACTOR IS RESPONSIBLE FOR CONTACTING DIG SAFE AND ANY OTHER
AUTHORITIES HAVING JURISDICTION PRIOR TO THE START OF DEMOLITION. COMPLY
WITH GOVERNING CODES AND REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR
OBTAINING ALL NECESSARY PERMITS REQUIRED TO COMPLETE THE WORK.
9. PROVIDE WEATHER TIGHT TEMPORARY PROTECTION FOR ALL OPENINGS IN EXTERIOR
WALLS, ROOF, AND AT WINDOW AND DOOR HEADS.
10. SHOULD SUSPECTED HAZARDOUS MATERIALS BE ENCOUNTERED, CONTRACTOR
SHALL NOTIFY ARCHITECT AND OWNER IMMEDIATELY.
11. PROVIDE CUTTING AND PATCHING WORK TO PROPERLY COMPLETE THE WORK OF THE
PROJECT, COMPLYING WITH PROJECT REQUIREMENTS FOR: a.) STRUCTURAL WORK; b.)
MECHANICAL WORK; c.) VISUAL REQUIREMENTS, INCLUDING DETAILING AND
TOLERANCES.
12. DO NOT CUT AND PATCH IN A MANNER THAT WOULD RESULT IN A FAILURE OF THE
WORK TO PERFORM AS INTENDED, DECREASE ENERGY PERFORMANCE, INCREASE
MAINTENANCE, DECREASE OPERATION LIFE, OR DECREASE SAFETY PERFORMANCE.
13. MATCH EXISTING MATERIALS FOR CUTTING AND…