About this file
This is a set of architectural drawings and specifications from Kueny Architects for the Kenosha County Detention Center (KCDC) Additional Stand-Alone Housing project, Bid #2505, located at 4777 88th Ave in Kenosha, WI. The project involves the installation of prefabricated modular housing units, with a base bid for two Maynard Homes (2-bedroom) by Champion and an alternate bid for one Maynard (2-bedroom) and one Thrifty (1-bedroom) unit by Champion. The project includes site preparation, foundation work, utility connections, exterior modifications, and installation of ramps, stairs, and skirting. The drawings are dated January 23, 2025.
The plans detail specific construction requirements including 4000 PSI concrete foundations, new 4" sanitary lines, 1" water main connections, 6" drain tiles for downspouts, and cement board siding installations. The modular units will be set at elevation 688.67 on a prepared gravel base at elevation 686.00. The site work includes grading, utility connections to existing infrastructure, and installation of silt fencing for erosion control. Exterior finishes include James Hardie cement board panels and siding in specified colors, Owens Corning architectural roof shingles in Pacific Wave, and treated wood ramps and railings for accessibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2505 Bid Documents.pdf | ||
| 2505 Specifications.pdf | ||
| Vendor Responsibility Form Construction.pdf | ||
| 2505 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0KUENY ARCHITECTS, LLC
10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103
SITE MAP GENERAL NOTES
1. All concrete to test 4000 psi in 28 days.
2. Verify all dimensions, access, utilities and working conditions in the field.
3. Conform to all applicable codes, ordinances and safety standards.
4. Obtain and pay for all required permits and fees.
5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the
Specifications.
6. No concrete to be poured without Architect's prior review.
7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.
8. Leave site clean, neat and free of debris at all times.
9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.
10. Guard against interfering with Owner's operations.
11. These Drawings contain no provisions or procedures for on-site safety. Each Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.
12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
MATERIAL INDICATIONS
DRAWING LEGEND
New or Required Point Elevation
Existing Point Elevation
Existing Contours
New or Required Contours
A Grid Lines
3.1 Building Section
Wall Section
Room/Space Number
Door Number
SHEET INDEX
Earth Backfill
Rigid Insulation
Concrete Block
Aluminum
Lumber (Rough)
Steel
Sand Fill
Concrete
Finished Wood
Stone Fill
Plywoo d Batt Insulation
4.1
Room Name
101A Interior Elevation
Detail Section
5.1
7.1
CONSULTANTS
5.1
Detail Number
Page Number
Exterior Elevation
2.1 # Wall Tag
+ 100.0
+ 100.0
+ 100.0
+ 100.0
OH Door Number
OH
101A
Kenosha County
KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
4777 88th Ave, Kenosha, WI 53144
01.23.2025
Kenosha County KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
A1.0 Title Sheet
ARCHITECTURAL
A101 Architectural Site Plan
A102 Utility Site Plan
A201 Floor & Foundation Plan
A202 Exterior Elevations
KCDC - Modular Home 4777 88th Ave, Kenosha, WI 53144
ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100
(262) 857-8101 Pleasant Prairie, Wisconsin 53158 Architect of Record - Jon P. Wallenkamp
687688
GV
GV
686.00
686.29
685.89
685.30689.76
685.76
688.54688.78
688.89
687.88
687.21 686.96 686.94 686.92 686.92
688.02688.50
687.74
687.45
687.29 687.32
687.49
687.75
687.96DY
H 687.48 687.98
687.69
687.52687.50
687.66
687.92
687.69
687.63687.56
687.54
687.71687.83
688.00687.73
687.06 687.88
687.93
687.88687.30
686.83
686.21 686.91
686.88
WV
686.78
685.97 686.04
686.00
686.05
686.24
686.94
687.39
687.72
687.08
686.31
685.97
685.95 685.92
685.93
685.99
685.86
686.34
687.01
687.69
687.93 687.67
686.82
686.28
686.04
685.73
685.70685.56685.71686.01
686.00
686.38
686.66
686.60
S
S
W WW W
W WW W W W W W W
W
W
W
S S
S S
S S
G
G
G
G
G
G
G
G G
G G
G
G GG G G G
E EE E E
E E E
E
E
E
E
E E silt siltsilt silt silt silt silt s ilt s ilt silt siltsilt silt silt silt silt silt s ilt si lt greenspace silt siltsilt silt silt silt silt s ilt s ilt silt siltsilt silt silt silt silt silt s ilt si lt
" D
T " D
T 6" DT 6" DT6" DT 6" DT 6" DT 6" DT 6" DT 6" DT
D T
D T
6" DT 6" DT6" DT 6" DT 6" DT 6" DT 6" DT 6" DT
6" DT
6" DT
Existing Storage Building
Existing Storage Building
EXISTING
DETENTION
FACILITY
PROPOSED MODULAR UNITS
PROPOSED GRAVEL APRON
#1 #2 #3
FUTURE ADDITIONAL
MODULAR UNIT
52' - 0" 10' - 0" 52' - 0" 10' - 0" 52' - 0"
EXISTING ACCESS ROAD TO REMAIN
EXISTING SANITARY CATCH BASIN
A101
A101
6" COMPACTED STONE
BASE BID
(2) MAYNARD HOMES (2-BED ROOM) BY
CHAMPION (06 10 00)
ALTERNATE
(1) MAYNARD (2-BED ROOM) AND (1)
THRIFTY (1-BED ROOM) BY CHAMPION
(06 10 00)
686.00
685.71
EXCESS
FABRIC
GEOTEXTILE
FABRIC
2FLOW DIRECTION
ANCHOR STAKE
MIN. 18" LONG
TIEBACK BETWEEN FENCE
POST AND ANCHOR
SILT
FENCE
FLOW DIRECTION
GEOTEXTILE
FABRIC ONLY
BACKFILL & COMPACT
TRENCH WITH
EXCAVATED SOIL
FLOW
D
IR
ECTIO
N
MAY BE REQUIRED IN UNSTABLE SOILS
3'-0" MAX.
3'-0" MAX.
3'-0" MAX.
3'-0" MAX.
FLOW
FOLD
3" MAX.
GEOTEXTILE
FABRIC
SUPPORT CORD
NOTE:*
NOTE: ADDITIONAL POST DEPTH OR TIE BACKS
GENERAL NOTES
SILT FENCE
TRENCH DETAILSILT FENCE TIE BACK
TWIST METHOD
HOOK METHOD
FLOW DIRECTION
FLOW DIRECTION
2'-0" MIN.
1'-0" MIN.
WOOD POST
WOOD POST
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
JOINING TWO LENGTHS OF SILT FENCE
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
WOOD POST
WOOD POST
(WHEN ADDITIONAL SUPPORT REQUIRED)
WOOD POSTS
LENGTH 3'-4'
20" DEPTH
IN GROUND
ATTACH THE FABRIC TO THE
POSTS WITH WIRE STAPLES OR
WOODEN LATH AND NAILS
8'-0" POST
SPACING
ALLOWED
IF A WOVEN
GEOTEXTIL
E
FABRIC IS
USED.
HORIZONTAL BRACE REQUIRED WITH 2" X 4"
WOODEN FRAME OR EQUIVALENT AT
TOP OF POSTS.
TRENCH SHALL BE A MINIMUM OF 4" WIDE & 6" DEEP
TO BURY AND ANCHOR THE
GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT
TRENCH AND BACKFILL & COMPACT
TRENCH WITH EXCAVATED SOIL.
SILT FENCE TO EXTEND ACROSS THE TOP OF THE PIPE.
CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE
BY CUTTING
LENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY USE ONE OF
THE FOLLOWING
TWO METHODS; A) OVERLAP THE END POSTS AND TWIST, OR
ROTATE, AT LEAST
180 DEGREES, B) HOOK THE END OF EACH SILT FENCE LENGTH.
WOOD POSTS SHALL BE A MINIMUM SIZE OF 1" X 1" OF OAK OR HICKORY.
PROPOSED MODULAR UNITS
PROPOSED GRAVEL APRON
#1 #2 #3
FUTURE ADDITIONAL
MODULAR UNIT LOCATION
52' - 0" 10' - 0" 52' - 0" 10' - 0" 52' - 0"
- REGRADE AS NEEDED.
- RESEED ALL AFFECTED AREAS
6" DRAIN TILE. ALL DOWNSPOUTS
SHALL DISCHARGE TO EXISTING POND.
kuenyarch.com ©2025 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
SCALE: As indicated
A101Kenosha County - KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
01.23.2025
Architectural Site Plan
4777 88th Ave, Kenosha, WI 53144
3 Silt Fence Details
1" = 40'-0"1 Enlarged Grading Plan
1" = 20'-0"2 Landscaping Plan
S
S
S S
S S
S S
S
S SS S S
W WW W
W WW W W W W W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
S S
S S
S S
G
G
G
G
G
G
G
G G
G G
G
G GG G G G
E E
E E
E E
E E
E EE E E
E E E
E
E
E
E
E E
W WW W W W
S S
S SS S S
silt siltsilt silt silt silt silt s ilt s ilt silt siltsilt silt silt silt silt silt s ilt si lt
685.89
686.88
WV
686.78
685.97 686.04
686.00
686.05
686.24
686.31
685.97
685.95 685.92
685.93 685.99
685.86
686.34 686.28
686.04
685.73
685.70
686.00
686.38
686.66
686.60
S S
S S
SS S S
W W
W W
W W
W W
W
E E
E E
E
W WW W W W
S
S SS S S
" D
T " D
T 6" DT 6" DT6" DT 6" DT 6" DT 6" DT 6" DT 6" DT
D T
D T
6" DT 6" DT6" DT 6" DT 6" DT 6" DT 6" DT 6" DT
6" DT
6" DT
Existing Storage Building
Existing Storage Building
EXISTING
DETENTION
FACILITY
PROPOSED
MODULAR UNITS
PROPOSED
GRAVEL APRON
#1 #2 #3
FUTURE ADDITIONAL
MODULAR UNIT
A102
Existing Storage Building
PROPOSED MODULAR UNITS
PROPOSED GRAVEL APRON
PROPOSED UTILITY CONNECTION
#1 #2 #3
FUTURE ADDITIONAL MODULAR UNIT
NEW 4" SANITARY LINE
NEW 1" MAIN WATER LINE
CONNECT NEW SANITARY LINE TO
EXISTING SANITARY CATCH BASIN
6" DRAIN TILE. ALL DOWNSPOUTS SHALL
DISCHARGE TO EXISTING POND.
BASE BID
(2) MAYNARD HOMES (2-BED ROOM) BY
CHAMPION (06 10 00)
ALTERNATE
(1) MAYNARD (2-BED ROOM) AND (1) THRIFTY
(1-BED ROOM) BY CHAMPION (06 10 00)
686.00
685.56685.71 MATCH EXISTING GRADE
GRAVEL = 686
HOME LVL = 688.67
kuenyarch.com ©2025 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
SCALE: As indicated
A102Kenosha County - KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
01.23.2025
Utility Site Plan
4777 88th Ave, Kenosha, WI 53144
1" = 40'-0"1 Enlarged Grading Plan
1" = 20'-0"2 Enlarged Grading Plan
685 690
WVE
E
E
A202
A202
A202 bedroom closet bathroom bedroom hall closet mech kitchen/drining
A201
52' - 0"
H1
H4
HA HB HC HD HE HF HG HH HJ
H2
H3
/4
/2
/4
35' - 3 7/8"
17' - 3 3/4" 3' - 6" 15' - 0"
/4
5' - 0"
1" / 1'-0" 1" / 1'-0" (max. slope)
(06 10 00) TREATED WOOD RAMP & RAILING
(06 10 00) TREATED WOOD
STAIRS & RAILING
(06 10 00) TREATED WOOD
DECKING
A201
5' - 0"
COMPACTED GRAVEL
(06 10 00) TREATED WOOD
STAIRS & RAILING
A202
A202
A202
A202
A201
H1
H4
HA HB HC HD HE HF HG HH HJ
H2
H3
/4
/2
/4
2' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 2' - 0"
52' - 0"
A201
(03 30 00) 24"Ø SONOTUBE PIERS PER PLAN
- (5) #4 BARS w/ #3 TIES @ 12" O.C.. TYP. ALL
PIERS FOR THE HOUSE
TOP OF ALL PIERS @ 867.33
H1 H4H2 H3
F .V
13' - 4"
(03 30 00) 24"Ø SONOTUBE PIERS PER PLAN
- (4) #4 BARS w/ #3 TIES @ 12" O.C.
F
IE
L D
V E
R
IF
Y
A201
A201
LVL = 686
LVL = 688.67
LVL = 682
TOP OF PIERS AT
867.33 (TYP.)
H4
(06 10 00) 2x4 @ 16" O.C.
(06 10 00) 1/2" TREATED
PLYWOOD WITH TYVEK
BUILDING WRAPPING PAPER
CEMENT BOARD SIDING BY GC.
(06 10 00) TIES @ 48" OC.
F
IE
L D
V E
R
IF
Y
/4
P
R E
-M A
N U
F A
C T
U R
E D
H O
M E
P E
R S
P E
C S
6" COMPACTED GRAVEL
CEMENT BOARD SIDING
BY C.G.
(06 10 00) COMPLETE SKIRT TO
BE INSTALLED AROUND HOME.
LVL = 686
LVL = 688.67
PROPOSED MODULAR UNITS
#1 #2
BASE BID
(2) MAYNARD HOMES (2-BED ROOM) BY
CHAMPION (06 10 00)
ALTERNATE
(1) MAYNARD (2-BED ROOM) AND (1) THRIFTY
(1-BED ROOM) BY CHAMPION (06 10 00)
686.00
685.56685.71 MATCH EXISTING GRADE
GRAVEL = 686
HOME LVL = 688.67
kuenyarch.com ©2025 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
SCALE: As indicated
A201Kenosha County - KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
01.23.2025
Floor & Foundation Plan
4777 88th Ave, Kenosha, WI 53144
1/4" = 1'-0"1 Enlarged Floor Plan
6 New Modular Home - 3D View
1/4" = 1'-0"2 Home - Foundation Plan
1/4" = 1'-0"3 Typ. Section - NS 3/4" = 1'-0"4 Typ. Skirting Detail
1" = 20'-0"5 Exit Route
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
(07 60 00) ALUMINUM DOWNSPOUTS
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
(06 10 00) CEMENT BOARD PANELS
(06 10 00) ARCHITECTURAL CEMENT
BOARD SIDING AND TRIM
INSULATED DOUBLE HUNG
WINDOWS
(06 10 00) TREATED WOOD
(STAINED AND SEALED)
EXTERIOR RAMPS, LANDING,
STEPS AND RAILING
H1H4 H2H3
(06 10 0) 48" WIDE REMOVABLE SECTION
TO ACCESS BELOW THE HOUSE
H A
N D
R A
IL
G U
A R
D R
A
IL
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
LVL 686.00
LVL 687.33
TYP.
4' - 0"
A201
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
(07 60 00) ALUMINUM DOWNSPOUTS
(06 10 00) CEMENT BOARD PANELS
(06 10 00) ARCHITECTURAL CEMENT
BOARD SIDING AND TRIM
(06 10 00) TREATED WOOD
(STAINED AND SEALED)
EXTERIOR RAMPS, LANDING,
STEPS AND RAILING
H1 H4H2 H3
(06 10 00) 48" WIDE REMOVABLE SECTION
TO ACCESS BELOW THE HOUSE
(06 10 00) EXTERIOR GRADE WOOD RAMP
AND RAILING
H A
N D
R A
IL
G U
A R
D R
A
IL
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
LVL 686.00
LVL 687.33
A201
ARCHITECTURAL SHINGLES
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
(07 60 00) ALUMINUM DOWNSPOUTS
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
(06 10 00) CEMENT BOARD PANELS
(06 10 00) CEMENT BOARD PANELS
(06 10 00) ARCHITECTURAL CEMENT
BOARD SIDING AND TRIM
(06 10 00) TREATED WOOD (STAINED AND
SEALED) RAMP, GUARD AND HAND RAILING
A201
HAHBHCHDHEHFHGHHHJ
B Y
G C
C O
M P
L E
T E
S K
IR
T
IN
G
P R
E -M
A N
U F
H O
M E
M A
Y N
A R
D B
Y C
H A
M P
IO
N
(06 10 00) 4x4 TREATED WOOD
POSTS. MIN EMBED 36"
(06 10 00) EXTERIOR WOOD DECKING OVER
2x10'S
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
LVL 686.00
LVL 687.33
A201
ARCHITECTURAL SHINGLES
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
(07 60 00) ALUMINUM DOWNSPOUTS
ARCHITECTURAL SHINGLES
(07 60 00) ALUMINUM DOWNSPOUTS
(07 60 00) ALUMINUM GUTTERS AND
DOWNSPOUTS
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
PREFINISHED VINYL FASCIA
BOARDS BY PRE-MANUF. HOME
CONTRACTOR
(06 10 00) CEMENT BOARD PANELS
(06 10 00) CEMENT BOARD PANELS
(06 10 00) ARCHITECTURAL CEMENT
BOARD SIDING AND TRIM
(06 10 00) ARCHITECTURAL CEMENT
BOARD SIDING AND TRIM
INSULATED DOUBLE HUNG
WINDOWS BY PRE-MANUF. HOME
CONTRACTOR
(06 10 00) TREATED WOOD (STAINED AND
SEALED) RAMPS, LANDING, STEPS AND
RAILING
A201HA HB HC HD HE HF HG HH HJ
A201
B Y
G C
C O
M P
L E
T E
S K
IR
T
IN
G
P R
E -M
A N
U F
H O
M E
M A
Y N
A R
D B
Y C
H A
M P
IO
N
(06 10 00) 4x4 WOOD POSTS (MIN EMBED 36")
4' - 0"
TYP.
4' - 0"4' - 0"
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
(07 60 00) DOWNSPOUTS TO
DISCHARGE TO A 6" DRAIN TILE
LVL 686.00
LVL 687.33
(06 10 00) STAIRS OPPOSITE ON REAR SIDE OF
HOUSE #2. REFER TO DETAIL 5/A201
1/4" = 1'-0"3 North Elevation
1/4" = 1'-0"4 South Elevation
1/4" = 1'-0"1 East Elevation
1/4" = 1'-0"2 West Elevation kuenyarch.com ©2025 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
SCALE: 1/4" = 1'-0"
A202Kenosha County - KCDC - Additional Stand-Alone Housing Kenosha Detention Center - Bid # 2505
01.23.2025
Exterior Elevations
4777 88th Ave, Kenosha, WI 53144
JamesHardie - CEMENT BOARD PANELS https://www.jameshardie.com/product-catalog/exterior-siding-products/hardie-panel-siding/smooth/statement-collection-colors/?color=iron-gray
JamesHardie - CEMENT BOARD LAP SIDING https://www.jameshardie.com/product-catalog/exterior-siding-products/hardie-plank-lap-siding/select-cedarmill/statement-collection-colors/?color=light-mist
JamesHardie - CEMENT TRIM BOARDS WHITE HOUSE
Owens Corning - ARCHITECTURAL ROOF SHINGLES https://www.owenscorning.com/en-us/roofing/shingles/trudefinition-duration-designer?
color=pacific-wave
Pacific Wave
BUILDING MATERIAL SCHEDULE - REFERENCE
IMPORTANT
1- CONTRACTOR TO REMOVE EXISTING SIDING FROM PRE-MANUFACTURED HOME.
2- REPLACE ANY BUILDING WRAPPING PAPER SECTION DAMAGED DURING THE PROCESS OF REMOVING THE
EXISTING SIDING AS NEEDED.
3- INSTALL NEW CEMENT BOARD SIDING. ALL CEMENT BOARD SIDING, TRIM, AND SKIRTING AROUND THE HOME
SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY (06 10 00)
| Sheets |
| A1.0 - Title Sheet |
| A101 - Architectural Site Plan |
| A102 - Utility Site Plan |
| A201 - Floor & Foundation Plan |
| A202 - Exterior Elevations |
File details come from the government source that posted it. Updated .