25035604_RFB_West_Apron_Rehab.pdf
PDF 11 MB Posted
- Attached to
- Peter Prince Field West Apron Rehabilitation State and local contract opportunity
- Solicitation number
- 26-030
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This file consists of release for bid design drawings and specifications for the Peter Prince Field West Apron Rehabilitation project in Santa Rosa County, Florida. The project involves the comprehensive rehabilitation of approximately 13,500 square yards of apron pavement at Peter Prince Field, a public-use airport in Milton, Florida. The scope of work includes full-depth asphalt milling, base course preparation, placement of bituminous surface course, installation of 24 new aircraft tie-down anchors with concrete slabs, removal of existing tie-downs, pavement markings with reflective and non-reflective media, and sodding of disturbed areas totaling 400 square yards. A pre-bid meeting is scheduled for Wednesday, April 22, 2026, at 10:00 a.m. Central Time at AMS Flight School, 5600 N. Airport Road, Milton, Florida 32583. Questions concerning the request must be submitted through the Santa Rosa County e-Procurement Portal by 4:00 p.m. on Thursday, April 30, 2026. Sealed bids are due no later than 10:00 a.m. on Friday, May 15, 2026, submitted electronically through the County e-Procurement Portal. The contract includes five construction phases designed to maintain airport operations and taxiway accessibility throughout the project, with regular allowable daytime work hours from 7:00 a.m. to 6:00 p.m.
The bid documents establish comprehensive requirements for contractor quality control, erosion and pollution control, mobilization, safety and security protocols, and traffic maintenance as lump sum items, with unit pricing for asphalt milling (13,500 square yards), base course preparation (13,500 square yards), and bituminous surface course placement (3,300 tons of FDOT 334 material). The drawings and specifications require contractors to comply with Federal Aviation Administration regulations, maintain continuous airport security, coordinate with airport operations, and implement detailed phasing plans that minimize disruption to aircraft operations. No pricing information, incumbent contractor data, or contract award timeline is disclosed in the available materials. The Santa Rosa County Board of County Commissioners reserves the right to waive irregularities, reject any or all bids, and award based on determinations of the county's best interest, while encouraging participation from small businesses, minority-owned and women-owned businesses, and disadvantaged business enterprises without discrimination on the basis of race, color, religion, national origin, disability, sex, or age.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Peter_Prince_Field_West_Apron_Rehabilitation.pdf | ||
| Peter_Prince_Field_West_Apron_Rehabilitation.pdf | ||
| Peter_Prince_Field_West_Apron_Rehabilitation.pdf | ||
| 26-030_Draft_Contract.pdf | ||
| 26-030_Draft_Contract.pdf | ||
| 26-030_Draft_Contract.pdf | ||
| Release_for_Bid_Manual,_West_Apron_Rehabilitation,_3-25-2026.pdf | ||
| Release_for_Bid_Manual,_West_Apron_Rehabilitation,_3-25-2026.pdf | ||
| 25035604_RFB_West_Apron_Rehab.pdf | ||
| Release_for_Bid_Manual,_West_Apron_Rehabilitation,_3-25-2026.pdf | ||
| 25035604_RFB_West_Apron_Rehab.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RELEASE FOR BID DRAWINGS
DESIGN DRAWINGS FOR:
PETER PRINCE FIELD
SANTA ROSA COUNTY, FLORIDA
WEST APRON REHABILITATION
C O
VE
R
S H
EE
T
A N
D D
R A
W
IN
G
IN
D
EX
G-1
PETER PRINCE
FIELD
N.T.S.
North
N.T.S. N.T.S.
V I C I N I T Y M A P
N.T.S.
S I T E L O C A T I O N M A P
Map data ©2015 Google
PROJECT LOCATION
PREPARED FOR:PREPARED BY:
AVCON, INC.
CONTACT: JOHN COLIINS, P.E.
320 BAYSHORE DRIVE
NICEVILLE, FLORIDA 32578
PHONE: (850) 678-0050
SANTA ROSA COUNTY
6495 CAROLINE STREET
MILTON, FL 32570
PHONE: (850)983-1877
North
LATITUDE= N30°38'08.73"
LONGITUDE= W86°59'30.73"
TH
IS
D O
C U
M
EN
T C
O N
TA
IN
S
PR
IV
IL
EG
ED
A N
D P
R O
PR
IE
TA
R
Y
IN
FO
R
M A
TI
O
N , A
LL
O
F W
H
IC
H
IS
E
XP
R
ES
SL
Y
PR
O
VI
D
ED
B
Y A
VC
O
N , I
N C
FO
R U
SE
B
Y
TH
E
IN
TE
N
D
ED
R
EC
IP
IE
N T, A N
D F
O R
A S
PE
C
IF
IC
P U
R
PO
SE
W
IT
H O
U T
TH
E
EX
PR
ES
S
W R
IT
TE
N C
O N
SE
N
T O
F A
VC
O
N , I
N C
. A N
Y D
IS
TR
IB
U
TI
O
N , R
EP
R
O D
U C
TI
O
N , O
R O
TH
ER
U
SE
O F
TH
IS
D O
C U
M
EN
T, IN
W H
O
LE
O R
IN
P
A R
T, IS
S
TR
IC
TL
Y
PR
O H
IB
IT
ED
E N
G
IN
E E
R S
P
L A
N N
E R
S A
V C
O N
, I N
C
B A
YS
H
O R
E D
R
IV
E, S
U
IT
E A
N
IC
EV
IL
LE
, F
L
-2
O
FF
IC
E:
(8
) 6
-0
C O
R
PO
R A
TE
C
ER
TI
FI
C
A
TE
O F
A U
TH
O
R
IZ
A
TI
O N
N U
M B
ER
: 5 w w w .a vc on in c.
co m
SHEET
FEBRUARY 2026DATE:
2025.0356.04PROJECT NO:
V.C.L.APPROVED BY:
J.R.C.CHECKED BY:
M.A.B.DRAWN BY:
J.R.C.DESIGNED BY:
PR
EP
A R
ED
F
O R
PE
TE
R P
R
IN
C E
FI
EL
D
SA
N
TA
R O
SA
C
O U
N
TY
, F
LO
R
ID
A
TR
A N
SF
O
R M
IN
G
T O
D A
Y' S
ID
EA
S
IN
TO
T
O M
O R
R O
W 'S
R
EA
LI
TY
W
ES
T A
PR
O
N R
EH
A
B
IL
IT
A
TI
O
N
R
EV
IS
IO
N N
O
D A
TE
B
Y R
EL
EA
SE
F
O R
B
ID
D R
A W
IN
G
S
FBPR CERTIFICATE OF
AUTHORIZATION NO. 5057
JOHN COLLINS
FL LICENSE NO.: 75419
AutoCAD SHX Text N:\NICEVILLE-PROJECTS\356-SANTA ROSA COUNTY\2025.0356.04-WEST APRON REHABILITATION DESIGN\000 CAD\G-4 SAFETY AND SECURITY NOTES.DWG 3/25/2026 11:32 AM
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text G-1
AutoCAD SHX Text
COVER SHEET AND DRAWING INDEX
AutoCAD SHX Text G-2
AutoCAD SHX Text
SUMMARY OF QUANTITIES
AutoCAD SHX Text G-3
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text G-4
AutoCAD SHX Text
SAFETY AND SECURITY NOTES
AutoCAD SHX Text G-5
AutoCAD SHX Text
CONSTRUCTION HAUL ROUTE PLAN
AutoCAD SHX Text G-6
AutoCAD SHX Text
OVERALL CONSTRUCTION SAFETY AND PHASING PLAN
AutoCAD SHX Text G-7
AutoCAD SHX Text
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 1
AutoCAD SHX Text G-8
AutoCAD SHX Text
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 2
AutoCAD SHX Text G-9
AutoCAD SHX Text
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 3
AutoCAD SHX Text G-10
AutoCAD SHX Text
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 4
AutoCAD SHX Text G-11
AutoCAD SHX Text
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 5
AutoCAD SHX Text C-1
AutoCAD SHX Text
EXISTING CONDITIONS
AutoCAD SHX Text C-2
AutoCAD SHX Text
DEMO & EROSION CONTROL PLAN
AutoCAD SHX Text C-3
AutoCAD SHX Text
PAVEMENT PREPARATION PLAN
AutoCAD SHX Text C-4
AutoCAD SHX Text
GRADING & PAVING PLAN
AutoCAD SHX Text C-5
AutoCAD SHX Text
TIE-DOWN ANCHOR PLAN
AutoCAD SHX Text C-6
AutoCAD SHX Text
PAVEMENT DETAILS
AutoCAD SHX Text C-7
AutoCAD SHX Text
PAVEMENT MARKING & TIE-DOWN ANCHOR DETAILS
SU
M
M A
R Y
O F
Q U
A N
TI
TI
ES
G-2
TH
IS
D O
C U
M
EN
T C
O N
TA
IN
S
PR
IV
IL
EG
ED
A N
D P
R O
PR
IE
TA
R
Y
IN
FO
R
M A
TI
O
N , A
LL
O
F W
H
IC
H
IS
E
XP
R
ES
SL
Y
PR
O
VI
D
ED
B
Y A
VC
O
N , I
N C
FO
R U
SE
B
Y
TH
E
IN
TE
N
D
ED
R
EC
IP
IE
N T, A N
D F
O R
A S
PE
C
IF
IC
P U
R
PO
SE
W
IT
H O
U T
TH
E
EX
PR
ES
S
W R
IT
TE
N C
O N
SE
N
T O
F A
VC
O
N , I
N C
. A N
Y D
IS
TR
IB
U
TI
O
N , R
EP
R
O D
U C
TI
O
N , O
R O
TH
ER
U
SE
O F
TH
IS
D O
C U
M
EN
T, IN
W H
O
LE
O R
IN
P
A R
T, IS
S
TR
IC
TL
Y
PR
O H
IB
IT
ED
E N
G
IN
E E
R S
P
L A
N N
E R
S A
V C
O N
, I N
C
B A
YS
H
O R
E D
R
IV
E, S
U
IT
E A
N
IC
EV
IL
LE
, F
L
-2
O
FF
IC
E:
(8
) 6
-0
C O
R
PO
R A
TE
C
ER
TI
FI
C
A
TE
O F
A U
TH
O
R
IZ
A
TI
O N
N U
M B
ER
: 5 w w w .a vc on in c.
co m
SHEET
FEBRUARY 2026DATE:
2025.0356.04PROJECT NO:
V.C.L.APPROVED BY:
J.R.C.CHECKED BY:
M.A.B.DRAWN BY:
J.R.C.DESIGNED BY:
PR
EP
A R
ED
F
O R
PE
TE
R P
R
IN
C E
FI
EL
D
SA
N
TA
R O
SA
C
O U
N
TY
, F
LO
R
ID
A
TR
A N
SF
O
R M
IN
G
T O
D A
Y' S
ID
EA
S
IN
TO
T
O M
O R
R O
W 'S
R
EA
LI
TY
W
ES
T A
PR
O
N R
EH
A
B
IL
IT
A
TI
O
N
R
EV
IS
IO
N N
O
D A
TE
B
Y R
EL
EA
SE
F
O R
B
ID
D R
A W
IN
G
S
FBPR CERTIFICATE OF
AUTHORIZATION NO. 5057
JOHN COLLINS
FL LICENSE NO.: 75419
WEST APRON REHAB
ITEM NO. BID ITEM ITEM DESCRIPTION UNIT
1 C-100-1 CONTRACTOR QUALITY CONTROL PROGRAM LS 1
2 C-102-1 EROSION AND POLLUTION CONTROL LS 1
3 C-105-1 MOBILIZATION LS 1
4 C-106-1 SAFETY, SECURITY, AND MAINTENANCE OF TRAFFIC LS 1
5 P-101-1 FULL-DEPTH ASPHALT MILL SY 13,500
6 P-101-2 TIE-DOWN REMOVAL EA 24
7 P-152-1 EXCAVATION AND EMBANKEMENT LS 1
8 P-211-1 EXISTING BASE COURSE PREPARATION SY 13,500
9 FDOT 334 BITUNIMOUS SURFACE COURSE (76-22) TON 3,300
10 P-620-1 PAVEMENT MARKINGS WITH REFLECTIVE MEDIA, YELLOW SF 500
11 P-620-2 PAVEMENT MARKINGS WITHOUT REFLECTIVE MEDIA, BLACK SF 1,000
12 TD-1 NEW TIE-DOWN, COMPLETE EA 24
13 T-904-1 SODDING SY 400
N:\NICEVILLE-PROJECTS\356-SANTA ROSA COUNTY\2025.0356.04-WEST APRON REHABILITATION DESIGN\000 CAD\G-4 SAFETY AND SECURITY NOTES.DWG 3/25/2026 11:32 AM
TH
IS
D O
C U
M
EN
T C
O N
TA
IN
S
PR
IV
IL
EG
ED
A N
D P
R O
PR
IE
TA
R
Y
IN
FO
R
M A
TI
O
N , A
LL
O
F W
H
IC
H
IS
E
XP
R
ES
SL
Y
PR
O
VI
D
ED
B
Y A
VC
O
N , I
N C
FO
R U
SE
B
Y
TH
E
IN
TE
N
D
ED
R
EC
IP
IE
N T, A N
D F
O R
A S
PE
C
IF
IC
P U
R
PO
SE
W
IT
H O
U T
TH
E
EX
PR
ES
S
W R
IT
TE
N C
O N
SE
N
T O
F A
VC
O
N , I
N C
. A N
Y D
IS
TR
IB
U
TI
O
N , R
EP
R
O D
U C
TI
O
N , O
R O
TH
ER
U
SE
O F
TH
IS
D O
C U
M
EN
T, IN
W H
O
LE
O R
IN
P
A R
T, IS
S
TR
IC
TL
Y
PR
O H
IB
IT
ED
E N
G
IN
E E
R S
P
L A
N N
E R
S A
V C
O N
, I N
C
B A
YS
H
O R
E D
R
IV
E, S
U
IT
E A
N
IC
EV
IL
LE
, F
L
-2
O
FF
IC
E:
(8
) 6
-0
C O
R
PO
R A
TE
C
ER
TI
FI
C
A
TE
O F
A U
TH
O
R
IZ
A
TI
O N
N U
M B
ER
: 5 w w w .a vc on in c.
co m
SHEET
FEBRUARY 2026DATE:
2025.0356.04PROJECT NO:
V.C.L.APPROVED BY:
J.R.C.CHECKED BY:
M.A.B.DRAWN BY:
J.R.C.DESIGNED BY:
PR
EP
A R
ED
F
O R
PE
TE
R P
R
IN
C E
FI
EL
D
SA
N
TA
R O
SA
C
O U
N
TY
, F
LO
R
ID
A
TR
A N
SF
O
R M
IN
G
T O
D A
Y' S
ID
EA
S
IN
TO
T
O M
O R
R O
W 'S
R
EA
LI
TY
W
ES
T A
PR
O
N R
EH
A
B
IL
IT
A
TI
O
N
R
EV
IS
IO
N N
O
D A
TE
B
Y R
EL
EA
SE
F
O R
B
ID
D R
A W
IN
G
S
FBPR CERTIFICATE OF
AUTHORIZATION NO. 5057
JOHN COLLINS
FL LICENSE NO.: 75419
G
EN
ER
A
L N
O
TE
S
G-3
GENERAL NOTES:
AutoCAD SHX Text N:\NICEVILLE-PROJECTS\356-SANTA ROSA COUNTY\2025.0356.04-WEST APRON REHABILITATION DESIGN\000 CAD\G-4 SAFETY AND SECURITY NOTES.DWG 3/25/2026 11:32 AM
1. CONTRACTOR SHALL PROTECT ALL EXISTING LANDSCAPING, SIDEWALKS, PAVEMENTS, CURBS, AND SOD CONTRACTOR SHALL PROTECT ALL EXISTING LANDSCAPING, SIDEWALKS, PAVEMENTS, CURBS, AND SOD NOT SPECIFIED FOR REMOVAL IN THESE PLANS. ANY DAMAGE TO THE EXISTING IMPROVEMENTS SHALL BE RESTORED BY THE CONTRACTOR AT NO COST TO THE OWNER. UNLESS OTHERWISE SPECIFIED HEREIN. UNLESS OTHERWISE SPECIFIED, ALL WORK SHALL BE PERFORMED CONSISTENT WITH THE FOLLOWING SPECIFICATIONS: SANTA ROSA COUNTY, FDOT, AND FAA. THIS DESIGN HAS BEEN BASED UPON A FIELD SURVEY BY SOUTHERN SURVEY AND MAPPING CORPORATION, DATE: 12/15/2025. AVCON INC. MAKES NO ASSURANCES REGARDING THE ACCURACY OF SUCH SURVEY. 2. CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE SITE, INCLUDING ALL SURFACE AND SUB-SURFACE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE SITE, INCLUDING ALL SURFACE AND SUB-SURFACE CONDITIONS, THE WORK REQUIRED AND ALL OTHER CONDITIONS THAT MAY AFFECT THE SUCCESSFUL COMPLETION OF THE JOB PRIOR TO COMMENCEMENT OF WORK. 3. THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND PERMIT CONDITIONS BEARING ON THE CONDUCT OF THE WORK, AS DRAWN AND SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE DRAWINGS AND SPECIFICATIONS ARE AT VARIANCE THEREWITH, HE SHALL PROMPTLY NOTIFY THE ENGINEER, IN WRITING, AND ANY NECESSARY CHANGES SHALL BE ADJUSTED, AS PROVIDED IN THE AGREEMENT FOR CHANGES IN THE WORK. 4. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER AND THE ENGINEER FOR THE ACTS AND THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER AND THE ENGINEER FOR THE ACTS AND OMISSIONS OF CONTRACTOR'S EMPLOYEES AND ALL HIS SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES AND OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS WITH THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS WITH GOVERNMENTAL DEPARTMENTS, PUBLIC UTILITIES, PUBLIC CARRIERS, SERVICE COMPANIES, AND CORPORATIONS OWNING OR CONTROLLING ROADWAYS, RAILWAYS, WATER, SEWER, GAS, ELECTRICAL, TELEPHONE, AND TELEGRAPH, FACILITIES SUCH AS PAVEMENTS, TRACKS, PIPING, WIRES, CABLES, CONDUITS, POLES, GUYS, OR OTHER SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES CONNECTED THEREWITH THAT ARE ENCOUNTERED IN THE WORK IN ORDER THAT SUCH ITEMS MAY BE PROPERLY SUPPORTED, PROTECTED OR LOCATED. 6. UNLESS OTHERWISE SPECIFIED IN THE GENERAL CONDITIONS, ALL CONSTRUCTION IS TO BE GOVERNED UNLESS OTHERWISE SPECIFIED IN THE GENERAL CONDITIONS, ALL CONSTRUCTION IS TO BE GOVERNED BY THE PLANS, APPLICABLE PERMITS, AND SPECIFICATIONS HEREIN, AND ALL APPLICABLE FEDERAL, STATE AND LOCAL BUILDING AND SAFETY CODES, LAWS AND ORDINANCES. 7. PRIOR TO PERFORMING ANY WORK WITHIN ANY PUBLIC RIGHT-OF-WAY, CONTRACTOR SHALL DEVELOP PRIOR TO PERFORMING ANY WORK WITHIN ANY PUBLIC RIGHT-OF-WAY, CONTRACTOR SHALL DEVELOP AND IMPLEMENT A TRAFFIC CONTROL PLAN CONSISTENT WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" PUBLISHED BY THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION. 8. IN THE EVENT THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS HE SHALL IN THE EVENT THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS HE SHALL IMMEDIATELY NOTIFY THE OWNER OR OWNER'S AGENT. 9. CONTRACTOR SHALL PRESERVE AND PROTECT ALL PERMANENT REFERENCE MONUMENTS, PERMANENT CONTRACTOR SHALL PRESERVE AND PROTECT ALL PERMANENT REFERENCE MONUMENTS, PERMANENT CONTROL POINTS, PERMANENT BENCH MARKS AND PROPERTY CORNERS. IN THE EVENT THE MONUMENTS, POINTS OR MARKERS ARE DISTURBED THE CONTRACTOR SHALL EMPLOY A FLORIDA REGISTERED LAND SURVEYOR TO RESET OR REPLACE THEM. 10. THE OWNER, OWNER'S AGENT AND INSPECTORS OF APPLICABLE GOVERNMENT JURISDICTIONS, SHALL AT THE OWNER, OWNER'S AGENT AND INSPECTORS OF APPLICABLE GOVERNMENT JURISDICTIONS, SHALL AT ALL TIMES HAVE ACCESS TO THE WORK WHEREVER AND WHENEVER IT IS IN PREPARATION OR PROGRESS; AND THE CONTRACTOR SHALL PROVIDE PROPER FACILITIES FOR SUCH ACCESS AND FOR THE INSPECTION. 11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE ALL REASONABLE AND PRUDENT PRECAUTIONS TO IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE ALL REASONABLE AND PRUDENT PRECAUTIONS TO INSURE THAT ALL COMPLETED WORK, MATERIALS AND EQUIPMENT STORED ON SITE ARE SAFE AND SECURED FROM UNAUTHORIZED ACCESS OR USE. SUCH PRECAUTIONS MAY INCLUDE INSTALLATION OF SIGNS, FENCES, OR POSTING OF SECURITY GUARDS. 12. CONTRACTOR SHALL, AT ALL TIMES, UTILIZE ALL NORMALLY ACCEPTED AND REASONABLY EXPECTED CONTRACTOR SHALL, AT ALL TIMES, UTILIZE ALL NORMALLY ACCEPTED AND REASONABLY EXPECTED SAFETY PRACTICES AND COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND GUIDELINES PERTAINING TO SAFE UTILIZATION OF EQUIPMENT OR MATERIALS AS PUBLISHED BY MANUFACTURER. 13. PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO TUNNELS, DITCHES, STORMWATER PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO TUNNELS, DITCHES, STORMWATER PONDS, CANALS, ARTIFICIAL LAKES) CONTRACTOR SHALL INSTALL FENCES AND TAKE ALL OTHER REASONABLE AND PRUDENT STEPS TO ENSURE THAT ACCESS TO EXCAVATION BY UNAUTHORIZED PERSONNEL IS PREVENTED. 14. THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND SHALL THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND SHALL PROVIDE ALL REASONABLE PROTECTION TO PREVENT DAMAGE, INJURY OR LOSS TO: A. ALL EMPLOYEES ON THE WORK AND ALL OTHER PERSONS WHO MAY BE AFFECTED THEREBY; ALL EMPLOYEES ON THE WORK AND ALL OTHER PERSONS WHO MAY BE AFFECTED THEREBY; B. ALL THE WORK AND ALL MATERIALS AND EQUIPMENT TO BE INCORPORATED THEREIN, WHETHER IN ALL THE WORK AND ALL MATERIALS AND EQUIPMENT TO BE INCORPORATED THEREIN, WHETHER IN STORAGE ON OR OFF THE SITE, UNDER THE CARE, CUSTODY OR CONTROL OF THE CONTRACTOR OR ANY OF ITS SUBCONTRACTORS; AND C. OTHER PROPERTY AT THE SITE OR ADJACENT THERETO, INCLUDING TREES, SHRUBS, LAWNS, WALKS, OTHER PROPERTY AT THE SITE OR ADJACENT THERETO, INCLUDING TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAY, STRUCTURES AND UTILITIES NOT DESIGNATED FOR DEMOLITION IN THE COURSE OF CONSTRUCTION. D. CONTRACTOR SHALL MAINTAIN PUBLIC ACCESS ON PUBLIC ROADS AT ALL TIMES. CONTRACTOR SHALL MAINTAIN PUBLIC ACCESS ON PUBLIC ROADS AT ALL TIMES. 15. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY CODES AND WITH ALL APPLICABLE THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY CODES AND WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC, QUASI PUBLIC OR OTHER AUTHORITY HAVING JURISDICTION FOR THE SAFETY OF PERSONS OR PROPERTY OR FOR THEIR PROTECTION AGAINST DAMAGE, INJURY OR LOSS, OR DESIGNED TO PROTECT THE ENVIRONMENT. THE CONTRACTOR SHALL ERECT AND MAINTAIN, AS REQUIRED BY EXISTING CONDITIONS AND PROGRESS OF THE WORK, ALL REASONABLE SAFEGUARDS FOR SAFETY AND PROTECTION, INCLUDING POSTING DANGER SIGNS AND OTHER WARNINGS AGAINST HAZARDS, PROMULGATING SAFETY REGULATIONS AND NOTIFYING OWNERS AND USERS OF ADJACENT UTILITIES OF THE EXISTENCE OF HAZARDS AND OF THE SAFETY REGULATIONS. 16. ALL DAMAGE OR LOSS TO ANY PROPERTY REFERRED TO IN CLAUSES 14(B) AND 14(C) CAUSED IN ALL DAMAGE OR LOSS TO ANY PROPERTY REFERRED TO IN CLAUSES 14(B) AND 14(C) CAUSED IN WHOLE OR IN PART BY THE CONTRACTOR, A SUBCONTRACTOR, OR BY ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, SHALL BE REMEDIED BY THE CONTRACTOR, EXCEPT DAMAGE OR LOSS PROPERLY ATTRIBUTABLE SOLELY TO THE ACTS OR OMISSIONS OF THE OWNER, OR THE ENGINEER OR ANYONE EMPLOYED BY THEM, OR FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, AND NOT PROPERLY ATTRIBUTABLE IN WHOLE OR IN PART, TO THE FAULT OR NEGLIGENCE OF THE CONTRACTOR. 17. UNTIL FINAL ACCEPTANCE OF THE WORK BY OWNER, THE CONTRACTOR SHALL HAVE THE CHARGE AND UNTIL FINAL ACCEPTANCE OF THE WORK BY OWNER, THE CONTRACTOR SHALL HAVE THE CHARGE AND CARE OF AND SHALL BEAR THE RISK OF INJURY OR DAMAGE, LOSS OR EXPENSE TO ANY PART THEREOF, OR TO ANY MATERIALS STORED ON SITE, BY THE ACTION OF THE ELEMENTS OR FROM ANY OTHER CAUSE WHETHER ARISING FROM THE EXECUTION OR NON-EXECUTION OF THE WORK. THE CONTRACTOR SHALL REBUILD, REPAIR, RESTORE AND MAKE GOOD ALL INJURIES OR DAMAGES TO ANY PORTION OF THE WORK OCCASIONED BY ANY OF THE ABOVE CAUSES BEFORE FINAL ACCEPTANCE AND SHALL BEAR THE EXPENSES THEREOF. 18. THOSE PARTS OF WORK IN PLACE WHICH ARE SUBJECT TO DAMAGE BECAUSE OF OPERATIONS BEING THOSE PARTS OF WORK IN PLACE WHICH ARE SUBJECT TO DAMAGE BECAUSE OF OPERATIONS BEING CARRIED ON ADJACENT THERETO SHALL BE COVERED, BOARDED UP OR SUBSTANTIALLY ENCLOSED WITH ADEQUATE PROTECTION BY THE CONTRACTOR AT CONTRACTOR'S EXPENSE. 19. PERMANENT OPENINGS USED AS THOROUGHFARES FOR THE INTRODUCTION OF WORK AND MATERIALS PERMANENT OPENINGS USED AS THOROUGHFARES FOR THE INTRODUCTION OF WORK AND MATERIALS TO THE STRUCTURE SHALL HAVE HEADS, JAMBS, AND SILLS WELL BLOCKED AND BOARDED BY THE CONTRACTOR. OWNER RETAINS THE AUTHORITY, BUT ASSUMES NO DUTY, TO ESTABLISH STANDARDS OF PROTECTION, AND TO REVIEW THE EFFICIENCY OF PROTECTIVE MEASURES TAKEN BY THE CONTRACTOR. 20. ADEQUATE TRAFFIC CONTROL, BARRICADES, AND FLAGMAN SERVICES SHALL BE FURNISHED AND ADEQUATE TRAFFIC CONTROL, BARRICADES, AND FLAGMAN SERVICES SHALL BE FURNISHED AND MAINTAINED BY THE CONTRACTOR AT ALL POINTS WHERE CONVEYING EQUIPMENT ENGAGED ON THE WORK REGULARLY ENTERS ONTO OR CROSSES TRAFFIC-CARRYING ROADS. 21. THE CONTRACTOR SHALL COMPLY IN EVERY RESPECT WITH THE FEDERAL OCCUPATIONAL SAFETY AND THE CONTRACTOR SHALL COMPLY IN EVERY RESPECT WITH THE FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATIONS NOW OR HEREAFTER IN EFFECT UNDER SAID ACT, AND THE CONTRACTOR FURTHER AGREES TO COMPLY WITH ANY AND ALL APPLICABLE STATE LAWS AND REGULATIONS PERTAINING TO JOB SAFETY AND HEALTH. 22. THE CONTRACTOR SHALL PROTECT AND KEEP OWNER (INCLUDING THEIR AGENTS AND EMPLOYEES) THE CONTRACTOR SHALL PROTECT AND KEEP OWNER (INCLUDING THEIR AGENTS AND EMPLOYEES) FREE AND HARMLESS FROM ANY AND ALL LIABILITY, PUBLIC OR PRIVATE, PENALTIES, CONTRACTUAL OR OTHERWISE, LOSSES, DAMAGES, COSTS, ATTORNEY'S FEES, EXPENSES, CAUSES OF ACTION, CLAIMS OR JUDGMENTS RESULTING FROM THE FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AS AMENDED OR ANY RULE OR REGULATION PROMULGATED THEREUNDER OR OF ANY STATE LAWS OR REGULATIONS PERTAINING TO JOB SAFETY AND HEALTH ARISING OUT OF OR IN ANY WAY CONNECTED WITH THE PERFORMANCE OF WORK OR WORK TO BE PERFORMED UNDER THIS CONTRACT, AND CONTRACTOR SHALL INDEMNIFY OWNER FROM ANY SUCH CLAIMS, PENALTIES, SUITS OR ACTIONS, PUBLIC OR PRIVATE, ADMINISTRATIVE OR JUDICIAL, INCLUDING ATTORNEY'S FEES PAID OR INCURRED BY OR ON BEHALF OF OWNER, JOINTLY OR SEVERALLY, AND/OR THEIR AGENTS AND EMPLOYEES. THE CONTRACTOR FURTHER AGREES, IN THE EVENT OF A CLAIMED VIOLATION OF ANY FEDERAL OR STATE SAFETY AND HEALTH LAW OR REGULATION ARISING OUT OF OR IN ANY WAY CONNECTED WITH THE PERFORMANCE OF WORK OR WORK TO BE PERFORMED UNDER THIS CONTRACT, OWNER MAY IMMEDIATELY TAKE WHATEVER ACTION IS DEEMED NECESSARY BY OWNER TO REMEDY THE CLAIMED VIOLATION. ANY AND ALL COSTS OR EXPENSES PAID OR INCURRED BY OWNER IN TAKING SUCH ACTION SHALL BE BORNE BY CONTRACTOR, AND CONTRACTOR AGREES TO PROTECT, HOLD HARMLESS, AND INDEMNIFY OWNER AGAINST ANY AND ALL SUCH COSTS OR EXPENSES. 23. ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND LIKE ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND LIKE ITEMS USED IN THE WORK SHALL CONFORM TO APPLICABLE SAFETY CODES AND REGULATIONS OF ANY PUBLIC OR OTHER AUTHORITY HAVING JURISDICTION. IN THE EVENT OF CONFLICTING REQUIREMENTS, THE MORE STRINGENT INTERPRETATION OR REGULATION SHALL GOVERN. 24. THE CONTRACTOR SHALL IMPLEMENT THE PROPOSED EROSION CONTROL PLAN TO MINIMIZE EROSION AND THE CONTRACTOR SHALL IMPLEMENT THE PROPOSED EROSION CONTROL PLAN TO MINIMIZE EROSION AND ENSURE FUNCTIONING OF STORMWATER MANAGEMENT SYSTEM DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL PROVIDE AS-BUILTS ENSURING THE STORMWATER MANAGEMENT SYSTEM IS OPERATING AS DESIGNED. 25. CONTRACTOR AND ITS SUBCONTRACTORS SHALL USE, HANDLE, TRANSPORT, AND DISPOSE OF ALL CONTRACTOR AND ITS SUBCONTRACTORS SHALL USE, HANDLE, TRANSPORT, AND DISPOSE OF ALL HAZARDOUS MATERIALS (AS DEFINED PARAGRAPH 32) IN COMPLIANCE WITH ALL PRESENT FEDERAL, STATE AND LOCAL ENVIRONMENTAL, HEALTH OR SAFETY LAW, INCLUDING, BUT NOT LIMITED TO, ALL SUCH STATUTES, REGULATIONS, RULES, ORDINANCES, CODES, AND RULES OF COMMON LAW. 26. CONTRACTOR FURTHER AGREES THAT CONTRACTOR AND ITS SUBCONTRACTORS SHALL NOT CAUSE THE CONTRACTOR FURTHER AGREES THAT CONTRACTOR AND ITS SUBCONTRACTORS SHALL NOT CAUSE THE DISCHARGE, RELEASE OR DISPOSAL OF ANY HAZARDOUS MATERIAL CREATED BY ITS WORK ON OR ABOUT THE JOB SITE. IN THE EVENT OF ANY SPILL, RELEASE, OR ANY OTHER REPORTABLE OCCURRENCE, CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENTAL AGENCY AND SHALL TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE THE DELETERIOUS EFFECT OF SUCH SPILL ON PERSONS OR PROPERTY. 27. CONTRACTOR AND ITS SUBCONTRACTORS SHALL, UPON COMPLETION OF PERFORMANCE OF ALL DUTIES CONTRACTOR AND ITS SUBCONTRACTORS SHALL, UPON COMPLETION OF PERFORMANCE OF ALL DUTIES UNDER THIS CONTRACT, REMOVE ALL SUPPLIES, MATERIALS, AND WASTE CONTAINING AND HAZARDOUS MATERIAL FROM THE JOB SITE. CONTRACTOR SHALL BEAR FULL FINANCIAL RESPONSIBILITY, AS BETWEEN THE PARTIES OF THIS CONTRACT, FOR THE COMPLIANCE OF CONTRACTOR AND ITS SUBCONTRACTORS WITH THE PROVISIONS OF THIS PARAGRAPH 34. 28. CONTRACTOR AGREES TO INDEMNIFY, DEFEND, PROTECT, AND HOLD THE OWNER HARMLESS FROM AND CONTRACTOR AGREES TO INDEMNIFY, DEFEND, PROTECT, AND HOLD THE OWNER HARMLESS FROM AND AGAINST ANY CLAIMS INCLUDING, WITHOUT LIMITATION, ACTUAL ATTORNEY'S FEES AND ANY COSTS OF INVESTIGATION, SOILS TESTING, GOVERNMENTAL APPROVALS, REMEDIATION AND CLEAN-UP ARISING OUT OF OR IN ANY WAY CONNECTED WITH THE FAILURE OF CONTRACTOR OR ITS SUBCONTRACTORS, OR THEIR AGENTS, EMPLOYEES, OFFICERS, OR REPRESENTATIVES, TO COMPLY WITH THE TERMS OF THIS SECTION. 29. SHOULD CONTRACTOR OR ITS SUBCONTRACTORS DISCHARGE, RELEASE, OR DISPOSE OF ANY HAZARDOUS SHOULD CONTRACTOR OR ITS SUBCONTRACTORS DISCHARGE, RELEASE, OR DISPOSE OF ANY HAZARDOUS MATERIAL ON OR ABOUT THE JOB SITE IN VIOLATION OF THIS PARAGRAPH, CONTRACTOR SHALL IMMEDIATELY SO INFORM OWNER IN WRITING. IN THE EVENT OF ANY SPILL, RELEASE OR ANY OTHER REPORTABLE OCCURRENCE, CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENTAL AGENCY AND SHALL TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE THE DELETERIOUS EFFECT OF SUCH SPILL ON PERSONS OR PROPERTY. 30. IN THE EVENT CONTRACTOR OR ITS SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY PIPELINE, IN THE EVENT CONTRACTOR OR ITS SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY PIPELINE, UNDERGROUND STORAGE TANK, OR OTHER CONTAINER, OF ANY KIND, THAT MAY CONTAIN A HAZARDOUS MATERIAL, OR ENCOUNTER MATERIAL REASONABLY BELIEVED TO BE A HAZARDOUS MATERIAL, CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO OWNER IN WRITING. 31. IF CONTRACTOR OR ITS SUBCONTRACTORS DO NOT COMPLY WITH THE HAZARDOUS MATERIAL IF CONTRACTOR OR ITS SUBCONTRACTORS DO NOT COMPLY WITH THE HAZARDOUS MATERIAL REQUIREMENTS, OWNER MAY, BUT IS NOT OBLIGATED TO, GIVE WRITTEN NOTICE OF VIOLATION TO CONTRACTOR. SHOULD CONTRACTOR OR ITS SUBCONTRACTORS FAIL TO COMPLY WITH THE REQUIREMENTS OF THIS PARAGRAPH WITHIN TWENTY-FOUR (24) HOURS FROM THE TIME OWNER ISSUES SUCH WRITTEN NOTICE OF NONCOMPLIANCE OR WITHIN THE TIME OF AN ABATEMENT PERIOD SPECIFIED BY ANY GOVERNMENTAL AGENCY, WHICHEVER PERIOD IS SHORTER, CONTRACTOR SHALL BE IN MATERIAL DEFAULT OF THIS CONTRACT. 32. "HAZARDOUS MATERIAL" MEANS ANY SUBSTANCE: "HAZARDOUS MATERIAL" MEANS ANY SUBSTANCE: A. THE PRESENCE OF WHICH REQUIRES INVESTIGATION OR REMEDIATION UNDER ANY PRESENT FEDERAL, THE PRESENCE OF WHICH REQUIRES INVESTIGATION OR REMEDIATION UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, ORDINANCE, RULE, CODE, ORDER, ACTION, POLICY OR COMMON LAW, OR B. WHICH IS OR BECOMES DEFINED AS A "HAZARDOUS WASTE," "HAZARDOUS SUBSTANCE," POLLUTANT WHICH IS OR BECOMES DEFINED AS A "HAZARDOUS WASTE," "HAZARDOUS SUBSTANCE," POLLUTANT OR CONTAMINANT UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, RULE OR ORDINANCE OR AMENDMENTS THERETO INCLUDING, WITHOUT LIMITATION, THE COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (42 U.S.C. SECTIONS 9601 ET SEQ.) AND/OR THE RESOURCE CONSERVATION AND RECOVERY ACT (42 U.S.C. SECTIONS 6901 ET SEQ.), OR C. WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, MUTAGENIC, OR OTHERWISE HAZARDOUS AND IS REGULATED BY ANY GOVERNMENTAL AUTHORITY, AGENCY, DEPARTMENT, COMMISSION, BOARD, AGENCY OR INSTRUMENTALITY OF THE UNITED STATES, THE STATE IN WHICH THE PREMISES ARE LOCATED OR ANY POLITICAL SUBDIVISION THEREOF, OR D. THE PRESENCE OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON THE PRESENCE OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON THE PREMISES OR TO ADJACENT PROPERTIES OR POSES OR THREATENS TO POSE A HAZARD TO THE HEALTH OR SAFETY OF PERSONS ON OR ABOUT THE PREMISES, OR E. WHICH CONTAINS GASOLINE, DIESEL FUEL, OR OTHER PETROLEUM HYDROCARBONS, OR WHICH CONTAINS GASOLINE, DIESEL FUEL, OR OTHER PETROLEUM HYDROCARBONS, OR F. WHICH CONTAINS POLYCHLORINATED BIPHENYL (PCBS), ASBESTOS, LEAD OR UREA FORMALDEHYDE WHICH CONTAINS POLYCHLORINATED BIPHENYL (PCBS), ASBESTOS, LEAD OR UREA FORMALDEHYDE FOAM INSULATION. 33. THE EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD LOCATE ALL THE EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD LOCATE ALL EXISTING UTILITIES AS TO SIZE, LOCATION, AND ELEVATION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY AND ALL CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 34. IF ANY TESTING, INSPECTION OR APPROVAL REVEAL DEFECTIVE WORK, CONTRACTOR SHALL NOT BE IF ANY TESTING, INSPECTION OR APPROVAL REVEAL DEFECTIVE WORK, CONTRACTOR SHALL NOT BE ALLOWED TO RECEIVE ANY ASSOCIATED COSTS AND THE OWNER SHALL BE ENTITLED TO DEDUCT FROM THE CONTRACT PRICE, BY ISSUING A CHANGE ORDER, OWNER'S COSTS ARISING OUT OF THE DEFECTIVE WORK, INCLUDING COSTS OF REPEATED PROCEDURES, COMPENSATION FOR ENGINEER'S AND DESIGN ENGINEER'S SERVICES AND OTHER RELATED COSTS.
SA
FE
TY
A
N D
SE
C
U R
IT
Y
N O
TE
S
G-4
SAFETY NOTES: SECURITY NOTES:
CONSTRUCTION BARRICADE DETAIL TH
IS
D O
C U
M
EN
T C
O N
TA
IN
S
PR
IV
IL
EG
ED
A N
D P
R O
PR
IE
TA
R
Y
IN
FO
R
M A
TI
O
N , A
LL
O
F W
H
IC
H
IS
E
XP
R
ES
SL
Y
PR
O
VI
D
ED
B
Y A
VC
O
N , I
N C
FO
R U
SE
B
Y
TH
E
IN
TE
N
D
ED
R
EC
IP
IE
N T, A N
D F
O R
A S
PE
C
IF
IC
P U
R
PO
SE
W
IT
H O
U T
TH
E
EX
PR
ES
S
W R
IT
TE
N C
O N
SE
N
T O
F A
VC
O
N , I
N C
. A N
Y D
IS
TR
IB
U
TI
O
N , R
EP
R
O D
U C
TI
O
N , O
R O
TH
ER
U
SE
O F
TH
IS
D O
C U
M
EN
T, IN
W H
O
LE
O R
IN
P
A R
T, IS
S
TR
IC
TL
Y
PR
O H
IB
IT
ED
E N
G
IN
E E
R S
P
L A
N N
E R
S A
V C
O N
, I N
C
B A
YS
H
O R
E D
R
IV
E, S
U
IT
E A
N
IC
EV
IL
LE
, F
L
-2
O
FF
IC
E:
(8
) 6
-0
C O
R
PO
R A
TE
C
ER
TI
FI
C
A
TE
O F
A U
TH
O
R
IZ
A
TI
O N
N U
M B
ER
: 5 w w w .a vc on in c.
co m
SHEET
FEBRUARY 2026DATE:
2025.0356.04PROJECT NO:
V.C.L.APPROVED BY:
J.R.C.CHECKED BY:
M.A.B.DRAWN BY:
J.R.C.DESIGNED BY:
PR
EP
A R
ED
F
O R
PE
TE
R P
R
IN
C E
FI
EL
D
SA
N
TA
R O
SA
C
O U
N
TY
, F
LO
R
ID
A
TR
A N
SF
O
R M
IN
G
T O
D A
Y' S
ID
EA
S
IN
TO
T
O M
O R
R O
W 'S
R
EA
LI
TY
W
ES
T A
PR
O
N R
EH
A
B
IL
IT
A
TI
O
N
R
EV
IS
IO
N N
O
D A
TE
B
Y R
EL
EA
SE
F
O R
B
ID
D R
A W
IN
G
S
FBPR CERTIFICATE OF
AUTHORIZATION NO. 5057
JOHN COLLINS
FL LICENSE NO.: 75419
1. AIRPORT OPERATIONS - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE AIRPORT OPERATIONS - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE OPERATIONS - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE OPERATIONS - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE - THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE THE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE CONTRACTOR SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE SHALL APPOINT SAFETY OFFICERS IN ACCORDANCE APPOINT SAFETY OFFICERS IN ACCORDANCE APPOINT SAFETY OFFICERS IN ACCORDANCE SAFETY OFFICERS IN ACCORDANCE SAFETY OFFICERS IN ACCORDANCE OFFICERS IN ACCORDANCE OFFICERS IN ACCORDANCE IN ACCORDANCE IN ACCORDANCE ACCORDANCE ACCORDANCE WITH THE PROJECT MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND THE PROJECT MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND THE PROJECT MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND PROJECT MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND PROJECT MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND MANUAL. THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND THE CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND CONTRACTOR SHALL ALSO ACQUAINT ALL SUPERVISORS AND SHALL ALSO ACQUAINT ALL SUPERVISORS AND SHALL ALSO ACQUAINT ALL SUPERVISORS AND ALSO ACQUAINT ALL SUPERVISORS AND ALSO ACQUAINT ALL SUPERVISORS AND ACQUAINT ALL SUPERVISORS AND ACQUAINT ALL SUPERVISORS AND ALL SUPERVISORS AND ALL SUPERVISORS AND SUPERVISORS AND SUPERVISORS AND AND AND EMPLOYEES WITH THE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE WITH THE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE WITH THE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE THE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE THE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE ACTIVITIES OF PETER PRINCE FIELD AND OPERATIONS THAT ARE OF PETER PRINCE FIELD AND OPERATIONS THAT ARE OF PETER PRINCE FIELD AND OPERATIONS THAT ARE PETER PRINCE FIELD AND OPERATIONS THAT ARE PETER PRINCE FIELD AND OPERATIONS THAT ARE PRINCE FIELD AND OPERATIONS THAT ARE PRINCE FIELD AND OPERATIONS THAT ARE FIELD AND OPERATIONS THAT ARE FIELD AND OPERATIONS THAT ARE AND OPERATIONS THAT ARE AND OPERATIONS THAT ARE OPERATIONS THAT ARE OPERATIONS THAT ARE THAT ARE THAT ARE ARE ARE INHERENT AT THIS ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AT THIS ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AT THIS ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO THIS ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO THIS ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO ACTIVE AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AIRPORT AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO AND SHALL CONDUCT CONSTRUCTION ACTIVITIES TO SHALL CONDUCT CONSTRUCTION ACTIVITIES TO SHALL CONDUCT CONSTRUCTION ACTIVITIES TO CONDUCT CONSTRUCTION ACTIVITIES TO CONDUCT CONSTRUCTION ACTIVITIES TO CONSTRUCTION ACTIVITIES TO CONSTRUCTION ACTIVITIES TO ACTIVITIES TO ACTIVITIES TO TO TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON TRAFFIC REQUIREMENTS AND GUIDELINES ON TRAFFIC REQUIREMENTS AND GUIDELINES ON REQUIREMENTS AND GUIDELINES ON REQUIREMENTS AND GUIDELINES ON AND GUIDELINES ON AND GUIDELINES ON GUIDELINES ON GUIDELINES ON ON ON SAFETY SPECIFIED IN THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD SPECIFIED IN THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD SPECIFIED IN THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD IN THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD IN THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD THE PROJECT MANUAL AND AS SPECIFIED BY THE FIELD PROJECT MANUAL AND AS SPECIFIED BY THE FIELD PROJECT MANUAL AND AS SPECIFIED BY THE FIELD MANUAL AND AS SPECIFIED BY THE FIELD MANUAL AND AS SPECIFIED BY THE FIELD AND AS SPECIFIED BY THE FIELD AND AS SPECIFIED BY THE FIELD AS SPECIFIED BY THE FIELD AS SPECIFIED BY THE FIELD SPECIFIED BY THE FIELD SPECIFIED BY THE FIELD BY THE FIELD BY THE FIELD THE FIELD THE FIELD FIELD FIELD REPRESENTATIVE AND THE FAA. 2. VEHICLE IDENTIFICATION - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE VEHICLE IDENTIFICATION - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE IDENTIFICATION - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE IDENTIFICATION - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE - ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE VEHICLES THAT ARE AUTHORIZED TO OPERATE VEHICLES THAT ARE AUTHORIZED TO OPERATE THAT ARE AUTHORIZED TO OPERATE THAT ARE AUTHORIZED TO OPERATE ARE AUTHORIZED TO OPERATE ARE AUTHORIZED TO OPERATE AUTHORIZED TO OPERATE AUTHORIZED TO OPERATE TO OPERATE TO OPERATE OPERATE OPERATE ON THE AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER THE AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER THE AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER ABOVE THE VEHICLE A 3' X 3' OR LARGER ABOVE THE VEHICLE A 3' X 3' OR LARGER THE VEHICLE A 3' X 3' OR LARGER THE VEHICLE A 3' X 3' OR LARGER VEHICLE A 3' X 3' OR LARGER VEHICLE A 3' X 3' OR LARGER A 3' X 3' OR LARGER A 3' X 3' OR LARGER 3' X 3' OR LARGER 3' X 3' OR LARGER X 3' OR LARGER X 3' OR LARGER 3' OR LARGER 3' OR LARGER OR LARGER OR LARGER LARGER LARGER ORANGE AND WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS AND WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS AND WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS FLAG, EACH CHECK BEING 1' SQUARE. COMPANY DECALS EACH CHECK BEING 1' SQUARE. COMPANY DECALS EACH CHECK BEING 1' SQUARE. COMPANY DECALS CHECK BEING 1' SQUARE. COMPANY DECALS CHECK BEING 1' SQUARE. COMPANY DECALS BEING 1' SQUARE. COMPANY DECALS BEING 1' SQUARE. COMPANY DECALS 1' SQUARE. COMPANY DECALS 1' SQUARE. COMPANY DECALS SQUARE. COMPANY DECALS SQUARE. COMPANY DECALS COMPANY DECALS COMPANY DECALS DECALS DECALS WITH NOT LESS THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY NOT LESS THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY NOT LESS THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY LESS THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY LESS THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY THAN 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY 6" LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY LETTERS MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY MAY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY BE SUBSTITUTED FOR FLAGS ON SUPERVISORY SUBSTITUTED FOR FLAGS ON SUPERVISORY SUBSTITUTED FOR FLAGS ON SUPERVISORY FOR FLAGS ON SUPERVISORY FOR FLAGS ON SUPERVISORY FLAGS ON SUPERVISORY FLAGS ON SUPERVISORY ON SUPERVISORY ON SUPERVISORY SUPERVISORY SUPERVISORY VEHICLES AND LIGHT TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS AND LIGHT TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS AND LIGHT TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS LIGHT TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS LIGHT TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS TRUCKS. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS OPERATING IN THE ACTIVE AIRPORT OPERATIONS OPERATING IN THE ACTIVE AIRPORT OPERATIONS IN THE ACTIVE AIRPORT OPERATIONS IN THE ACTIVE AIRPORT OPERATIONS THE ACTIVE AIRPORT OPERATIONS THE ACTIVE AIRPORT OPERATIONS ACTIVE AIRPORT OPERATIONS ACTIVE AIRPORT OPERATIONS AIRPORT OPERATIONS AIRPORT OPERATIONS OPERATIONS OPERATIONS AREA (AOA) DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING (AOA) DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING (AOA) DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING DARKNESS SHALL BE EQUIPPED WITH A FLASHING DARKNESS SHALL BE EQUIPPED WITH A FLASHING SHALL BE EQUIPPED WITH A FLASHING SHALL BE EQUIPPED WITH A FLASHING BE EQUIPPED WITH A FLASHING BE EQUIPPED WITH A FLASHING EQUIPPED WITH A FLASHING EQUIPPED WITH A FLASHING WITH A FLASHING WITH A FLASHING A FLASHING A FLASHING FLASHING FLASHING YELLOW DOME - TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY DOME - TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY DOME - TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY - TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY - TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY ON TOP OF THE VEHICLE AND OF SUCH INTENSITY ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TOP OF THE VEHICLE AND OF SUCH INTENSITY TOP OF THE VEHICLE AND OF SUCH INTENSITY OF THE VEHICLE AND OF SUCH INTENSITY OF THE VEHICLE AND OF SUCH INTENSITY THE VEHICLE AND OF SUCH INTENSITY THE VEHICLE AND OF SUCH INTENSITY VEHICLE AND OF SUCH INTENSITY VEHICLE AND OF SUCH INTENSITY AND OF SUCH INTENSITY AND OF SUCH INTENSITY OF SUCH INTENSITY OF SUCH INTENSITY SUCH INTENSITY SUCH INTENSITY INTENSITY INTENSITY TO CONFORM TO LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES. 3. GROUND CONTROL - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS GROUND CONTROL - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS CONTROL - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS CONTROL - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS - NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS NO CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS CONTRACTOR VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS VEHICLES OR EQUIPMENT SHALL ACCESS OR CROSS OR EQUIPMENT SHALL ACCESS OR CROSS OR EQUIPMENT SHALL ACCESS OR CROSS EQUIPMENT SHALL ACCESS OR CROSS EQUIPMENT SHALL ACCESS OR CROSS SHALL ACCESS OR CROSS SHALL ACCESS OR CROSS ACCESS OR CROSS ACCESS OR CROSS OR CROSS OR CROSS CROSS CROSS ACTIVE RUNWAYS, TAXIWAYS, OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT RUNWAYS, TAXIWAYS, OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT RUNWAYS, TAXIWAYS, OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT TAXIWAYS, OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT TAXIWAYS, OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT OBJECT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT FREE AREAS AND APPROACH CLEAR ZONES EXCEPT AT AREAS AND APPROACH CLEAR ZONES EXCEPT AT AREAS AND APPROACH CLEAR ZONES EXCEPT AT AND APPROACH CLEAR ZONES EXCEPT AT AND APPROACH CLEAR ZONES EXCEPT AT APPROACH CLEAR ZONES EXCEPT AT APPROACH CLEAR ZONES EXCEPT AT CLEAR ZONES EXCEPT AT CLEAR ZONES EXCEPT AT ZONES EXCEPT AT ZONES EXCEPT AT EXCEPT AT EXCEPT AT AT AT THOSE LOCATIONS SHOWN ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE LOCATIONS SHOWN ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE LOCATIONS SHOWN ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE SHOWN ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE SHOWN ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE ON THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE SAFETY DURING CONSTRUCTION PLAN. ACCESS ONTO THE DURING CONSTRUCTION PLAN. ACCESS ONTO THE DURING CONSTRUCTION PLAN. ACCESS ONTO THE CONSTRUCTION PLAN. ACCESS ONTO THE CONSTRUCTION PLAN. ACCESS ONTO THE PLAN. ACCESS ONTO THE PLAN. ACCESS ONTO THE ACCESS ONTO THE ACCESS ONTO THE ONTO THE ONTO THE THE THE EXISTING APRON SHALL BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON APRON SHALL BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON APRON SHALL BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON SHALL BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON SHALL BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON BE LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON LIMITED TO THE SOUTHERNMOST 40 FT OF THE APRON TO THE SOUTHERNMOST 40 FT OF THE APRON TO THE SOUTHERNMOST 40 FT OF THE APRON THE SOUTHERNMOST 40 FT OF THE APRON THE SOUTHERNMOST 40 FT OF THE APRON SOUTHERNMOST 40 FT OF THE APRON SOUTHERNMOST 40 FT OF THE APRON 40 FT OF THE APRON 40 FT OF THE APRON FT OF THE APRON FT OF THE APRON OF THE APRON OF THE APRON THE APRON THE APRON APRON APRON PAVEMENT. CONTRACTOR SHALL YIELD RIGHT-OF-WAY TO AIRCRAFT AT ALL TIMES. 4. WORK REQUIRING PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE WORK REQUIRING PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIRING PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIRING PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE PAVEMENT CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE CLOSURE SHALL BE PERFORMED IN ACCORDANCE WITH THE SHALL BE PERFORMED IN ACCORDANCE WITH THE SHALL BE PERFORMED IN ACCORDANCE WITH THE BE PERFORMED IN ACCORDANCE WITH THE BE PERFORMED IN ACCORDANCE WITH THE PERFORMED IN ACCORDANCE WITH THE PERFORMED IN ACCORDANCE WITH THE IN ACCORDANCE WITH THE IN ACCORDANCE WITH THE ACCORDANCE WITH THE ACCORDANCE WITH THE WITH THE WITH THE THE THE SAFETY PLANS AND THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT PLANS AND THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT PLANS AND THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT AND THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT AND THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT THE PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT PROJECT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT MANUAL. NO RUNWAY, TAXIWAY, APRON OR AIRPORT NO RUNWAY, TAXIWAY, APRON OR AIRPORT NO RUNWAY, TAXIWAY, APRON OR AIRPORT RUNWAY, TAXIWAY, APRON OR AIRPORT RUNWAY, TAXIWAY, APRON OR AIRPORT TAXIWAY, APRON OR AIRPORT TAXIWAY, APRON OR AIRPORT APRON OR AIRPORT APRON OR AIRPORT OR AIRPORT OR AIRPORT AIRPORT AIRPORT ROADWAY SHALL BE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE SHALL BE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE SHALL BE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE BE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE BE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE CLOSED WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE WITHOUT APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE APPROVAL OF AIRPORT MANAGEMENT. TO ENABLE OF AIRPORT MANAGEMENT. TO ENABLE OF AIRPORT MANAGEMENT. TO ENABLE AIRPORT MANAGEMENT. TO ENABLE AIRPORT MANAGEMENT. TO ENABLE MANAGEMENT. TO ENABLE MANAGEMENT. TO ENABLE TO ENABLE TO ENABLE TO ENABLE ENABLE ENABLE NECESSARY NOTICES TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR NOTICES TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR NOTICES TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR OR ADVISORIES TO AIRPORT SERVICES OR OR ADVISORIES TO AIRPORT SERVICES OR ADVISORIES TO AIRPORT SERVICES OR ADVISORIES TO AIRPORT SERVICES OR TO AIRPORT SERVICES OR TO AIRPORT SERVICES OR AIRPORT SERVICES OR AIRPORT SERVICES OR SERVICES OR SERVICES OR OR OR TENANTS, A MINIMUM OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED A MINIMUM OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED A MINIMUM OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED MINIMUM OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED MINIMUM OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED OF SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED SEVENTY-TWO (72) HOURS WRITTEN NOTICE OF REQUESTED (72) HOURS WRITTEN NOTICE OF REQUESTED (72) HOURS WRITTEN NOTICE OF REQUESTED HOURS WRITTEN NOTICE OF REQUESTED HOURS WRITTEN NOTICE OF REQUESTED WRITTEN NOTICE OF REQUESTED WRITTEN NOTICE OF REQUESTED NOTICE OF REQUESTED NOTICE OF REQUESTED OF REQUESTED OF REQUESTED REQUESTED REQUESTED CLOSING SHALL BE DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH SHALL BE DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH SHALL BE DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH BE DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH BE DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH DIRECTED TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH TO THE OWNER, WHO WILL COORDINATE THE REQUEST WITH THE OWNER, WHO WILL COORDINATE THE REQUEST WITH THE OWNER, WHO WILL COORDINATE THE REQUEST WITH OWNER, WHO WILL COORDINATE THE REQUEST WITH OWNER, WHO WILL COORDINATE THE REQUEST WITH WHO WILL COORDINATE THE REQUEST WITH WHO WILL COORDINATE THE REQUEST WITH WILL COORDINATE THE REQUEST WITH WILL COORDINATE THE REQUEST WITH COORDINATE THE REQUEST WITH COORDINATE THE REQUEST WITH THE REQUEST WITH THE REQUEST WITH REQUEST WITH REQUEST WITH WITH WITH FAA AND AIRPORT OPERATIONS. 5.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .