25004 Randolph CC Applied Industrial AI & Simulation Center Renovation & Cost (2).pdf

PDF 3 MB Posted

Attached to
AI2C Building Renovation Commissioning Services
Solicitation number
116-11102026
Issued by
Richmond County, North Carolina

About this file

This is a Scope of Work document for building and building systems commissioning services for the Applied Industrial Artificial Intelligence Center (AI2C) renovation project at Randolph Community College in North Carolina. The project involves the comprehensive commissioning of an approximately 25,000 square-foot renovation of an existing, unoccupied warehouse building constructed of CMU block walls with an interior steel frame, concrete slab floor, and built-up roof system. The selected vendor must provide building construction and building system commissioning services while holding relevant certifications in these areas. The commissioning scope extends from design development through owner occupancy, with the vendor working collaboratively with the Design Architect, General Contractor, and owner to ensure all building and building systems are designed, installed, tested, and performing according to the owner's project requirements. The facility will house classroom and laboratory space for Artificial Intelligence, Agribusiness, building trades, and customized training programs. The submission deadline is November 10, 2026, at 2:00 p.m.

The document does not specify pricing terms, contract duration, renewal options, set-asides, or incumbent information within the provided file excerpt. Additional details regarding funding sources, budget amounts, or other financial requirements are not included in this summary document. Vendors responding to this opportunity must demonstrate prior experience with building construction and building system commissioning services through documented examples and hold appropriate industry certifications to qualify for consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUDGET RECONCILIATION

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

DN

GENERAL SHEET NOTES

1. ALL ARCHITECTURAL COMPONENTS ARE TO BE ATTACHED AS REQUIRED BY ASCE 7-05 CHAPTER 13 SEISMIC DESIGN FOR NONSTRUCTURAL COMPONENTS. EACH INDIVIDUAL CONTRACTOR RESPONSIBLE FOR THE COMPONENT MUST PROVIDE PROJECT SPECIFIC DESIGN AND DOCUMENTATION PREPARED BY A LICENSED

ENGINEER. CHAPTER 13 DEFINES THE FORCE REQUIRED TO SUPPORT THE COMPONENT FOR THE

ANCHORAGE AND BRACING. THE COST OF PREPARING THIS INFORMATION AND DESIGN SHALL BE INCLUDED

IN EACH CONTRACTOR'S BID PROVIDING THE COMPONENT.

2. FIELD VERIFY ALL CONDITIONS. GENERAL CONTRACTOR MUST NOTIFY ARCHITECT OF ANY DISCREPANCIES

PRIOR TO START OF WORK AFFECTED BY SUCH DISCREPANCY.

3. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, OBTAIN CLARIFICATION FROM ARCHITECT.

4. PROVIDE BLOCKING WITHIN STUD WALLS AS REQUIRED FOR SUPPORT OF CABINETS, SHELVING, WALL

STOPS, COUNTERTOPS, MARKERBOARDS, TACKBOARDS, AV EQUIPMENT AND SIMILAR.

5. PLACE CONTROL JOINTS IN SIDEWALK AND PAVING PER MINIMUM REQUIREMENTS STATED IN CIVIL

DOCUMENTS. GENERAL LAYOUT TO BE COORDINATED BY G.C.

6. ALL INTERIOR DIMENSIONS ARE TO FACE OF STUD U.N.O.

6 5 4 3 2810 1

B

C

A

29' - 0 1/8" 27' - 11" 27' - 11" 27' - 11" 27' - 4 1/8" 28' - 11" 27' - 11 1/2" 27' - 11" 25' - 1 1/4"

VESTIBULE

SERVER

STORAGE

ELECTRICAL

CYBER

SECURITY

EXIBITION

SPACE

STORAGE

OFFICE

OFFICE

RISER

MEN'S

RESTROOM

WOMEN'S

RESTROOM

JANITOR

UNISEX

STORAGE

AG

STORAGE

AG

SIMULATION

CLASSROOM/

MEETING

CLASSROOM/

MEETING

AEROSPACE

COLLABORATION

SANDBOX

AR/VR

SIMULATION

AR/VR

SIMULATION

CATERING

KITCHEN

REAR

ENTRY

RECEPTION

HALLWAY

IMMERSIVE

TECH ROOM

SHEET NUMBER:

THIS DRAWING IS THE PROPERTY OF ADW ARCHITECTS,

P.A. AND SHALL NOT BE REPRODUCED OR COPIED IN

WHOLE OR PART. IT SHALL NOT BE USED ON ANY OTHER

PROJECT OR GIVEN TO ANY OTHER COMPANY OR AGENCY

WITHOUT THE CONSENT OF ADW ARCHITECTS, P.A.

DATE:

PROJECT NO:

adwarchitects environmentsfor life architecture planning interiors

510 Glenwood Avenue

Raleigh, n c 2 7603 9 1 9 . 5 8 9 . 2 3 5 0 a d w a r c h i t e c t s . c o m

S u i t e 313

10/28/2025 3:58:09 PM

A100

PROPOSED FLOOR PLAN

07.15.25 25004

RANDOLPH COMMUNITY

COLLEGE

ASHEBORO, NC

APPLIED

INDUSTRIAL AI &

SIMULATION

CENTER

1/8" = 1'-0"LEVEL 01 - OVERALL PLAN 1

4' 8' 16'0

2"0

REVISIONS

NO: DATE: DESCRIPTION:

P R O P O S E D F L O O R P L A N

INDUSTRY PARTNER - SHELL SPACE

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

E X T E R I O R

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

I N T E R I O R

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

I N T E R I O R

A P P L I E D I N D U S T R I A L A R T I F I C I A L I N T E L L I G E N C E C E N T E R O F N O R T H C A R O L I N A

B U D G E T & C O N S T R U C T I O N C O S T

COLD DARK SHELL FUTURE

SIMULATION SPACE

(766,051 ALTERNATE TO UPFIT )

EXTERIOR TO BE REPAINTED WITH

ADDITIONS AT ENTRIES

($71,934 ADD ALTERNATE FOR SKYLIGHTS)

($71,000 PV READY ADD ALTERNATE)

REDUCED $$$ CEILING FINISHES

November 2025 25,000sf. COST/SF = $320

EXTERIOR:$1,979,325
INTERIOR:$1,316,694
UTILITIES:$2,673,700
GC:$2,025,049
CONSTRUCTION TOTAL:$7,994,768
5% OWNER CONTINGENCY:$419,813
SITE:$401,494

TOTAL CONSTRUCTION COST = $8,816,075

DESIGN COST:$969,768
SOFT COST:$2,470,750

TOTAL PROJECT COST: $12,256,593