2500-10 Permit Set 4-30-25 Full set (1).pdf

PDF 10 MB Posted

Attached to
Roof Replacement (South Region HQ) for the Florida and Wildlife Conservation Commission
Solicitation number
ITB-14278
Issued by
Palm Beach County, Florida

About this file

Roof Replacement Project for Florida Wildlife Conservation Commission

This is a construction permit set and design documentation for a roof replacement project at the South Region Headquarters of the Florida Wildlife Conservation Commission (FWC), located at 8535 Northlake Boulevard, West Palm Beach, Florida 33412. The project, identified as FWC-02425150 with WDA Project No. 2500-01, involves complete demolition of existing roof structures and installation of new roofing systems across multiple buildings (Buildings A, B, and C). The scope of work includes removal of approximately 14,000 square feet of existing roof area and installation of new roof systems with associated wind load plans, nailing pattern specifications, and comprehensive detail drawings for valleys, ridges, gutters, vents, and fascia elements. The project incorporates mechanical, plumbing, electrical, and fire protection systems designed by CMTA Engineering, with architectural services provided by Williamson Design Associates. The permit set was dated April 30, 2025, and includes complete construction documents with specifications, general notes, demolition roof plans for all buildings, new roof plans with wind load calculations, typical roof details, and electrical lightning protection specifications.

The project documentation includes comprehensive design drawings prepared in compliance with the 2023 Florida Building Code, 2023 Florida Plumbing Code, and 8th Edition Florida Fire Prevention Code. The plans specify materials, construction methodologies, and performance requirements for all roofing systems, including detailed wind load Ultimate Wind Pressure (UWP) calculations and roof nailing patterns. The electrical scope encompasses a lightning protection system with ridge air terminals, exposed downleads, cable splicing requirements, and ground connections. Construction details address standard roofing conditions including typical valley details, ridge details, roof cutter systems, lower and upper level fascia details, expansion joint details, slope transition cap details, splash block details, and two-ridge reglet system details. The project deliverables consist of 16 architectural sheets (T-1 through A15), 2 electrical sheets (E0.1 and E1.0), and associated technical specifications, providing complete contract documentation for bidding and construction purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04/23/2025

A

B

C

2 Harvard Cir, Suite 100 | West Palm Beach, FL 33409

561.688.6575 | cmta.com

GENERAL NOTES

& SYMBOL LEGEND

ELECTRICAL

E0.1

GENERAL NOTES AND SYMBOL LEGEND - ELECTRICAL

Sudharma Wijeguna.

Stamp

Sudharma Wijeguna.

Date 04/28/2025

OVERALL ROOF PLAN - LIGHTNING PROTECTION

X

A

B

C

2 Harvard Cir, Suite 100 | West Palm Beach, FL 33409

561.688.6575 | cmta.com

OVERALL ROOF

PLAN -

LIGHTNING PROTECTION

E1.0

Sudharma Wijeguna.

Stamp

Sudharma Wijeguna.

Date 04/28/2025

2500-10 Permit Set 4-30-25 Arch
2500-01 T-1 Cover Sheet
2500-01 T-2 General Notes and Abbreviation
2500-01 A0.1 Overall Demolition Roof Plan
2500-01 A0.2 Demolition Roof Plan Bldg A
2500-01 A0.3 Demolition Roof Plan Bldg B
2500-01 A0.4 Demolition Roof Plan Bldg C
2500-01 A1.0 Overall New Roof Plan
2500-01 A1.1 New Roof Plan Bldg A
2500-01 A1.2 New Roof Plan Bldg B
2500-01 A1.3 New Roof Plan Bldg C
2500-01 A1.4 New Roof Wind Load Plan Bldgs A, B, C
2500-01 A1.5 New Roof Nailing Pattern Plan Bldgs A, B and C
2500-01 A5.1 Typical Roof Details
2500-01 A5.2 Typical Roof Details
Electrical Set
E0.1
25011E0.1-OCI
E1.0
25011E1.0-OCI

File details come from the government source that posted it. Updated .