About this file
This is an Addendum #1 for an Audio Visual Systems contract for Northville Public Schools, issued by Wright & Hunter. The project involves upgrading audio-visual systems across multiple school sites, including Cooke, Moraine, Ridge Wood, Silver Springs, Thornton Creek, Winchester, Amerman, and Meads Mill schools. The Request for Bid (RFB) was made available on March 12, 2025, with contractor questions due by March 26, 2025, and answers provided by April 2, 2025. Bids are due on April 9, 2025, at 2:00 PM, with contract award expected on April 26, 2025. The project start date is May 4, 2025, with completion dates varying by school - August 22, 2025, for most schools, and phased completion for Amerman and Meads Mill as per attached drawings.
The addendum provides significant clarifications and modifications to the original RFB, including deletion of Northville High School from the scope of work, revisions to working hours (7am-4pm during summer, 3:30pm-11:00pm during school hours), and specific equipment and installation details. Key changes include replacing discontinued audio equipment like the Audio Technica System 10 with System 20 Pro, substituting the Denon DN-700CB with a Denon DN-300Z, and modifying microphone and speaker installations in various school locations. The bid requires a detailed breakdown by building, complete Bill of Materials with line-item pricing, bid forms, bid bond, familial disclosure form, and Iran Economic Sanctions form. All locations will receive new equipment racks, and bidders are required to quote specified base bid speakers before considering voluntary alternates.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 25-NPS -AVS Disclosure statement.pdf | ||
| 25-NPS-AVS-01 Advertisement for Bid.pdf | ||
| 25 - AVS Disclosure Statement.pdf | ||
| 25-NPS-AVS-01 Northville Technology Contractor Agreement Form.pdf | ||
| 25-NPS-AVS-01 Drawings.pdf | ||
| 25-NPS-AVS-01 RFB.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
818 West 11 Mile Road | Royal Oak, MI 48067 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com
Addendum #1
Date: March 31, 2025 W&H Project: Audio Visual Systems
Type: Addendum Project #: 25-NPS-AVS-01
Client: Northville Public Schools Project Mgr: Rob Richcreek
Project Timelines:
1. Revision: Timetables
a. RFB Available for Contractors March 12, 2025
b. Contractor Questions Due March 26, 2025, by 12:00 PM
c. Answers Due April 2, 2025, by 5:00 PM
d. Bids Due Date April 9, 2025, at 2:00 PM at Old Village School
e. Award to Contractor April 26, 2025
f. Start Date May 4, 2025
g. Completion Date August 22, 2025 (Cooke, Moraine, Ridge Wood, Silver Springs, Thornton Creek, Winchester)
h. Completion Date See Phasing Drawings (Amerman, Meads Mill)
Project Bid Information:
1. RFB forms review:
a. Base Bid requirements- Tab sequencing
b. Breakdown by Building
c. Complete Bill of Materials with line-item pricing
d. Bid Forms review- including Voluntary Alternates
e. Bid Bond
f. Familial Disclosure Form
g. Iran Economic Sanctions Form
2. Section 4 review and clarifications:
a. Working hours 7am-4pm Mon-Fri (Summer)
b. Working hours 3:30pm-11:00pm Mon-Fri (School working hours)
c. Drawings and Schematics Review
d. Products/Equipment Review
e. Project phasing for Amerman and Meads Mill
Project Clarifications:
1. RFB- Page 27. Section I e. Delete Northville High School from the scope of work. (RFB not reissued).
TECHNOLOGY ADVISORS
Innovative and Independent
2. Project phasing drawings for Amerman Elementary School and Meads Mill Middle School are Attached in this Addendum.
3. Revised Bid Form included in this Addendum. This shall replace the form released in the RFB.
4. Cooke School Gymnasium:
a. Delete replacement of AV system in its entirety. All existing equipment is to be reused.
b. Remove one (of two) existing microphone jacks (i.e labeled "Mic 2") currently located in the rack on a single space rack panel. Cover the existing hole or replace the 1RU rack panel with Middle Atlantic UNI-1-C Universal connector panel, or equivalent. Retain the jack name designation (i.e. Mic 1) on the rack mounted jack.
c. Install a new, properly labeled microphone jack (i.e. "Mic 2") on the wall opposite the rack utilizing specified Wiremold raceway and RDL surface box. Extend cabling to the Mic.2 input on the existing Crestron DMPS3-4K-150-C Presentation System.
5. Cooke School Cafeteria:
a. Delete replacement of the existing AV system in its entirety. All existing equipment is to be reused.
b. Remove one (of two) existing microphone jacks (i.e labeled "Mic 2") currently located in the rack on a single space rack panel. Cover the existing hole or replace the 1RU rack panel with Middle Atlantic UNI-1-C Universal connector panel or equivalent. Retain the jack name designation (i.e. Mic 1) on the rack mounted jack.
c. Install a new, properly labeled microphone jack (i..e. "Mic 2") on the wall opposite the rack utilizing specified Wiremold raceway and RDL surface box. Extend cabling to the Mic 2 input on the existing Crestron DMPS3-4K-150-C Presentation System.
d. Replace existing flush mount electric screen. Ceiling grid reconfiguration will be provided by others. Utilize Dalite #34614 164" Diagonal Tensioned Advantage series with DaMat screen surface as basis of bid. Confirm to be viable for this location prior to ordering. Electrical power to be final-connected by others.
6. General:
a. Remove and dispose of all existing speakers and cabling, unless otherwise noted on drawings and/or RFB.
Contractor Questions and Answers:
1. After verification with Audio Technica, it has been determined that the AT System 10 series has been discontinued. The replacement is the System 20 Pro. Should we use this series specification for replacement of the System 10 Pro?
Answer: Please use the System 20 Pro for the newly added microphones. It may be desirable to move some of the existing System 10 systems to other buildings so as to have consistent models in each system, where possible. Assume there will need to be some location reassignments of the existing systems to meet this goal, where possible
2. Can you please confirm that new microphones are only required in the following locations:
Amerman Café & Gym, Moraine Gym, Ridgewood Gym, Silver Springs Gym, Winchester Gym, Cooke School Gym.
Answer: That is correct.
3. The Denon DN-700CB has been discontinued, should we use the Tascam CD-200BT as the replacement.
Answer: Replace with a Denon DN-300Z . Add a Pixel Technologies AFHD-4 AM/FM antenna mounted externally to the building facing Southeast +/- 45 degrees. Provide plenum RG-6 cable where required. An inside building location can be used if it can be demonstrated this location picks up all local AM and FM stations
4. Can you please clarify the idea of the wired mic & plates as listed in 4.11 (F) 4-7?
Answer: Item 5 stands as is. Items 4,6, and 7 are the components to provide a wall mounted plate in the cafeterias to hang a handheld microphone utilizing the mic clip that comes with the microphone such that a microphone is easily accessible during lunch periods. Install this plate near the existing location of this item near a Mic jack on the front of the proscenium.
5. Are these inputs to the system that are being connected into one of the mic input plates on the block flow diagrams?
Answer: See answer to question #4.
6. What is the Atlas Sound AD-12BE supposed to connect to as this is just a flange?
7. Is the stainless-steel wall plate just the cover for the DS-XLR3F mic jack?
8. In the gym spaces how are the microphone jacks to be mounted? Should we be using the RDL SMB-1W boxes with Wiremold which are surface mount boxes? Are these boxes not a hazard in a gym space?
Answer: The Contractor shall use the RDL SMB-1W boxes with Wiremold raceway. Some of the existing boxes may be accessible and reusable but this is not verifiable at this time.
9. Are new racks required in all locations? If not, what locations get new racks?
Answer: All locations are to receive new racks.
10. Page 32 4.12(E): These jacks are listed as being Stainless steel, are these mic jacks to be different from the similar ones specified for the rest of the project listed on Page 30 4.11
(V) 1 & 2?
Answer: Yes.
11. Page 31 4.12 (A) this calls for a Soundcraft Ui16;n however, the drawing TA114 shows a QSC Core 110 audio processor. Please clarify.
Answer: Please replace this piece of equipment with a Soundcraft EPM12 Analog Mixer.
12. What locations are going to be provided with flush mounted boxes as it pertains to the A/V Equipment.
Answer: See answer to Question #6.
13. Is the intention of the (4) JBL CBT speakers in these cafeteria spaces for coverage or power?
Answer: Power over the normal lunch hour noise.
14. Would (2) CBT 1000 speakers be acceptable as a Voluntary alternate?
Yes- the CBT 1000 speakers are an acceptable Voluntary Alternate, however, the Base Bid speakers specified must be quoted before a voluntary alternate is considered.
15. Is there intention that the screen control be part of the control system or was it intended just to have a separate Low Voltage Screen control switch located by the screen/stage?
Answer: Both.
End of document
32'-0"
Area of demo
Phase 1 Jan 25 - Aug 25
Temp Wall
Temp Wall
Renovation Phasing Plan
Phase 2 June 25 - Aug 25
Phase 2 June 25 - Aug 25
Phase 2 April 25 - Aug 25
Phase 2 June 25 - Aug 25
Phase 1 New Cafeteria January 25 - August 25
Phase 2 Office Addition, classrooms, gym, and canopy April 25 - August 25
Phase 3 New Media Center June 25 - October 25
Roofing - Summer 2025
Paving - Summer 2026
Each phase indicated will require separate permits.
Phase 3 June 25 - Oct 25
COLLABORATION
DESIGN TO BE
DETERMINED
Phase 1 March 25 - Dec 25
Phase 2 June 25 - Aug 25
Phase 2 June 25 - Aug 25
Phase 3 Dec 25 - Feb 26
Phase 4 Feb 26 - Aug 26
Phase 1 STEAM Space Spring 25 - Dec 25
Phase 2 Classrooms, Bathrooms, Canopy June 25 - August 25
Phase 3 Temp Kitchen Dec 25 - February 26
Phase 4 Kitchen/Special Ed.
Renovation Feb 26 - August 26
Phase 5 Gym & Locker Rooms June 26 - August 26
Exterior Work - Summer 2025
Each phase indicated will require separate permits.
Mezzanine Above
Phase 4 Feb 26 - Aug 26
Phase 5 June 26 - Aug 26
Temp. Cafeteria
Meads Mill MS Phasing/Logistics Plan
Phase 3 Dec 25 - Feb 26
Shared Phase Area 3 & 4, Convert Back to Locker Room after Temp Kitchen
Existing Vestibule to be Removed Summer of 25
Rooftop Equipment Replacement (Less EF) to be completed in Phase 4
Addition-Existin g Doors to be completed in Phase 1
A
B
C
D E
G
F
H
J
Large letters correspond to Zones identified on the drawings
Scaffolding enclosure to maintain egress while building is occupied
Temporary wall.
Full height of the gymnasium
Temporary wall
12487 Rectangle
12487 Text Box
NEW IDF
12487 Cloud
12487 Rectangle
12487 Text Box
MDF
12487 Cloud
12487 Rectangle
12487 Text Box
IDF
12487 Cloud
12487 Text Box
IDF
12487 Rectangle
12487 Cloud
12487 Rectangle
12487 Text Box
NEW IDF
12487 Cloud
12487 Rectangle
12487 Line
12487 Line