The document is a Supplemental Qualifications of Bidders file for Collier County, Florida, specifically for the 25-8380 Pine Ridge Road & I-75 IQ Main Replacement project. The document outlines specific experience requirements for contractors bidding on this utility main replacement project. Bidders must demonstrate experience in large diameter utility main construction (12" or larger) within a Florida Department of Transportation (FDOT) Right of Way, including a minimum of one horizontal directional drill of at least 1,000 linear feet underneath an FDOT roadway within the last ten years.
The qualification requirements mandate that bidders submit five reference projects, with one reference specifically demonstrating the detailed FDOT right-of-way and horizontal directional drilling experience. Additionally, contractors must provide four more reference projects of similar magnitude completed within the last five years. These requirements are designed to ensure that only contractors with substantial, recent experience in complex utility infrastructure projects are considered for the Pine Ridge Road & I-75 IQ Main Replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25-8380 Pine Ridge Road & I-75 IQ Main Replacement
Supplemental Qualifications of Bidders
DESCRIPTION
Out of the reference projects submitted by the Contractor in Form 5, one shall clearly demonstrate experience in the last ten (10) years to meet the qualification(s) listed below. The qualification(s) will be verified by calling the reference. Reference project submitted shall include:
A. Experience performing large diameter utility main construction (12” or larger) within a
FDOT Right of Way, including installation of a single horizontal directional drill of at least
1,000 linear feet in length underneath a FDOT roadway. Provide at least one (1) reference project within the last ten (10) years.
CLARIFICATION
A. One of the five references provided in Form 5 by the Contractor and/or drilling subcontractor(s) qualifications must demonstrate experience with the qualifications listed above.
B. Additionally, four (4) reference projects of similar magnitude completed in the last five (5) years must be provided per Form 5 – Statement of Experience of Bidders.
File details come from the government source that posted it. Updated .