This is a construction plans document for the Stan Gober Memorial Bridge Rehabilitation Project (Bridge No. 030184) in Collier County, Florida, prepared by Stantec Consulting Services, Inc. and VCS Engineering, Inc. The project encompasses comprehensive rehabilitation of a bridge spanning Marco Channel, including deck restoration, concrete repairs, spall remediation, beam treatments, and installation of cathodic protection systems. The work scope includes removing and replacing approximately 2,137 square yards of bridge deck concrete with Class IV concrete containing shrinkage-reducing admixture (SRA), repairing 89.1 cubic yards of spalled concrete areas, installing galvanic anode systems for structural protection, treating approximately 81,048 square feet of concrete surfaces with penetrating corrosion inhibitor, installing structural pile jackets with integral cathodic protection, and implementing riprap and bedding stone scour protection covering approximately 5,872 and 1,961 tons respectively. Construction work is phased into two phases: Phase I addresses station 268+84.00 to 273+55.17, and Phase II addresses station 273+55.17 to 287+26.00, with one-lane alternating two-way traffic maintained throughout construction. The contract requires substantial completion within 365 calendar days from Notice to Proceed and final completion within 30 calendar days thereafter. A non-mandatory pre-bid meeting is scheduled for April 22, 2025, at 10:00 a.m., with sealed bids due by May 23, 2025, at 3:00 p.m. local time.

The project is estimated at $9,924,556.00 with an additional owner's allowance of $900,000 for unforeseen conditions, funded by Collier County. Work is restricted to hours between 7:00 a.m. and 7:00 p.m., Monday through Friday. The contractor must maintain environmental compliance, including turbidity monitoring with designated mixing zones and floating turbidity barriers to protect the Rookery Bay National Estuarine Research Reserve, an Outstanding Florida Water. Liquidated damages are assessed at $1,281.00 per calendar day for failure to achieve substantial completion within the specified timeframe. The contractor must obtain a valid State of Florida General Contractor license and FDOT Bridge Contractor qualification, provide a 5% bid bond, performance and payment bonds, and comprehensive insurance coverage. The contract will be awarded to the lowest responsive and responsible bidder, with Collier County reserving the right to reject any bid and postpone the award for up to 180 days from the bid opening date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location of Project

PROJECT MANAGER

COLLIER COUNTY

EXPRESSWAY

T U

R N P

IK

E

PENSACOLA FORT WALTON

BEACH

PANAMA

CITY

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA DAYTONA BEACH

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOWST PETERSBURG

SARASOTA -

BRADENTON

FT PIERCE

FT MYERS

WEST PALM

BEACH

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

CITY

LAKE

F

LO

R

ID

A 'S

BEACH LINE

NN

BRIDGE NO. 030184

ENGINEER OF RECORD:

STRUCTURE PLANS

NAPLES

TO

B-1

NAPLES

TO

BRIDGE NO. 030184

STRUCTURE PLANS

GENERAL SHEETS

TRAFFIC CONTROL PLAN

P.O. NO. 4500187495

CONTRACT NO. 16-6700

(727) 531-3505

CLEARWATER, FL 33759

380 PARK PLACE BOULEVARD, SUITE 300

STANTEC CONSULTING SERVICES, INC.

CHRISTOPHER P. GAMACHE, P.E. NO. 82122

EXISTING PLANS

BX-14 - BX-44

BX-1 - BX-13

EXISTING PLANS-ORIGINAL DRAWINGS

EXISTING PLANS-SCOUR REMEDIATION

BX-14 - BX-44

BX-1 - BX-13

EXISTING PLANS-ORIGINAL DRAWINGS

EXISTING PLANS-SCOUR REMEDIATION

RAGAEY GIRGIS

JANUARY 2025

CONSTRUCTION PLANS

NN

NO. 030184

BEGIN BRIDGE

STA. 268+84.00

¡ CONST.

NO. 030184

END BRIDGE

STA. 287+26.00

¡ CONST.

NO.

SHEET

YEAR

FISCAL

8:05:46 AM U:\238200196\ms\struct\Final Submittal\B1KeySheet01.dgnchgamache 1/2/2025

TRANSPORTATION ENGINEERING DIVISION

CONTRACT PLANS

SHEET DESCRIPTIONSHEET NO.

CONTRACT NO.

CONSTRUCTION

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

Florida Department of Transportation, January 2025 Standard Specifications

COLLIER COUNTY PROJECT NO. 66066.2

http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction are available at the following website:

Bridge Construction.

Florida Department of Transportation, FY2024-25 Standard Plans for Road and

STAN GOBER MEMORIAL BRIDGE REHABILITATION

T 51 S

T 52 S

R

E

R

E

T 51 S

T 52 S

R

E

R

E

COLLIER COUNTY GROWTH MANAGEMENT DEPARTMENT

GENERAL NOTES

SUMMARY OF QUANTITIES

SIGNATURE SHEET

KEY SHEET

B1-23

B1-22

B1-21

B1-20

B1-19

B1-18

B1-17

B1-16

B1-15

B1-14

B1-13

B1-12

B1-11

B1-10

B1-9

B1-8

B1-7

B1-6

B1-5

B1-4

B1-3

B1-2

B1-1

SCOUR PROTECTION

TYPICAL PANEL WIRING

TYPICAL MONITORING PANELS

STRUCTURE CONNECTIONS

WIRING DETAILS

STRUCTURAL PILE JACKET

JACKET OVERBUILD PIER 10 AND 11 (2 OF 2)

JACKET OVERBUILD PIER 10 AND 11 (1 OF 2)

COLUMN AND FOOTING JACKET OVERBUILD (2 OF 2)

COLUMN AND FOOTING JACKET OVERBUILD (1 OF 2)

GALVANIC ANODE SINGLE WIRE CONNECTION SECTIONS AND DETAILS

GALVANIC ANODE SINGLE WIRE CONNECTION INSTALLATION STEPS

GALVANIC ANODE SINGLE WIRE CONNECTION GENERAL NOTES

GALVANIC ANODE PLACEMENT DETAIL

ZINC CONNECTION DETAILS

BEAM ARC SPRAY ZINC LOCATION

BEAM REPAIR DETAILS (2 OF 2)

BEAM REPAIR DETAILS (1 OF 2)

SPALL REPAIR DETAILS

DECK REPAIR DETAILS

TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK

TURBIDITY BARRIER PLAN FOR CONCRETE WORK

PLAN & ELEVATION

TC-4 - TC-5

TC-2 - TC-3

TC-1

TRAFFIC CONTROL PLAN (PHASE II)

TRAFFIC CONTROL PLAN (PHASE I)

TEMPORARY TRAFFIC CONTROL PHASING TYPICAL SECTIONS

N O

T I C

E

T H

E

O F

F I C I A

L

R

C O

D

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

N

D

S

E A

L

U

D

L E

1G

-2

.0

F .A .C

William L. McDaniel, Jr.DISTRICT 5:

Dan KowalDISTRICT 4:

Burt L. SaundersDISTRICT 3:

Chris HallDISTRICT 2:

Rick LoCastroDISTRICT 1:

B-3

BQ-1

B-2 - B-2A

B-1

NO.

SHEET

YEAR

FISCAL

8:05:46 AM U:\238200196\ms\struct\Final Submittal\B1KeySheet01.dgnchgamache 1/2/2025

TRANSPORTATION ENGINEERING DIVISION

CONTRACT PLANS

SHEET DESCRIPTIONSHEET NO.

CONTRACT NO.

CONSTRUCTION

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

Florida Department of Transportation, January 2025 Standard Specifications

COLLIER COUNTY PROJECT NO. 66066.2

http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction are available at the following website:

Bridge Construction.

Florida Department of Transportation, FY2024-25 Standard Plans for Road and

STAN GOBER MEMORIAL BRIDGE REHABILITATION

T 51 S

T 52 S

R

E

R

E

T 51 S

T 52 S

R

E

R

E

COLLIER COUNTY GROWTH MANAGEMENT DEPARTMENT

GENERAL NOTES

SUMMARY OF QUANTITIES

SIGNATURE SHEET

KEY SHEET

B1-23

B1-22

B1-21

B1-20

B1-19

B1-18

B1-17

B1-16

B1-15

B1-14

B1-13

B1-12

B1-11

B1-10

B1-9

B1-8

B1-7

B1-6

B1-5

B1-4

B1-3

B1-2

B1-1

SCOUR PROTECTION

TYPICAL PANEL WIRING

TYPICAL MONITORING PANELS

STRUCTURE CONNECTIONS

WIRING DETAILS

STRUCTURAL PILE JACKET

JACKET OVERBUILD PIER 10 AND 11 (2 OF 2)

JACKET OVERBUILD PIER 10 AND 11 (1 OF 2)

COLUMN AND FOOTING JACKET OVERBUILD (2 OF 2)

COLUMN AND FOOTING JACKET OVERBUILD (1 OF 2)

GALVANIC ANODE SINGLE WIRE CONNECTION SECTIONS AND DETAILS

GALVANIC ANODE SINGLE WIRE CONNECTION INSTALLATION STEPS

GALVANIC ANODE SINGLE WIRE CONNECTION GENERAL NOTES

GALVANIC ANODE PLACEMENT DETAIL

ZINC CONNECTION DETAILS

BEAM ARC SPRAY ZINC LOCATION

BEAM REPAIR DETAILS (2 OF 2)

BEAM REPAIR DETAILS (1 OF 2)

SPALL REPAIR DETAILS

DECK REPAIR DETAILS

TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK

TURBIDITY BARRIER PLAN FOR CONCRETE WORK

PLAN & ELEVATION

TC-4 - TC-5

TC-2 - TC-3

TC-1

TRAFFIC CONTROL PLAN (PHASE II)

TRAFFIC CONTROL PLAN (PHASE I)

TEMPORARY TRAFFIC CONTROL PHASING TYPICAL SECTIONS

N O

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A .C

William L. McDaniel, Jr.DISTRICT 5:

Dan KowalDISTRICT 4:

Burt L. SaundersDISTRICT 3:

Chris HallDISTRICT 2:

Rick LoCastroDISTRICT 1:

B-3

BQ-1

B-2 - B-2A

B-1

GOVERNING DESIGN STANDARDS:

GOVERNING STANDARD SPECIFICATIONS:

INDEX OF STRUCTURE PLANS

COLLIER COUNTY BOARD OF COMMISSIONERS:

GOVERNING DESIGN STANDARDS:

GOVERNING STANDARD SPECIFICATIONS:

INDEX OF STRUCTURE PLANS

COLLIER COUNTY BOARD OF COMMISSIONERS:

DATE

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY:

ON THE DATE ADJACENT TO THE SEAL

PRINTED COPIES OF THIS DOCUMENT ARE

NOT CONSIDERED SIGNED AND SEALED

AND THE SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

STANTEC CONSULTING SERVICES, INC

380 PARK PLACE BOULEVARD, SUITE 300

CLEARWATER, FL 33759

PHONE NUMBER: (727) 531-3505

CHRISTOPHER P. GAMACHE, P.E. 82122

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

SHEET NO

8-1

B-2

BQ-1

8-3

81-1

81-2

81-3

81-4

81-5

81-6

81-7

81-23

BY

SHEET DFSCBTPTTQN

KEY SHEET

SIGNATURE SHEET

SUMMARY OF QUANTITIES

GENERAL NOTES

PLAN & ELEV AT/ON

TURBIDITY BARRIER PLAN FOR CONCRETE WORK

TURBIDITY MONITORING PLAN FOR SCOUR

PROTECTION WORK

DECK REPAIR DETAILS

SPALL REPAIR DETAILS

BEAM REPAIR DETAILS (1 OF 2)

BEAM REPAIR DETAILS (2 OF 2)

SCOUR PROTECTION

DESCRIPTION

REVISIONS

DATE BY DESCRIPTION

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY:

ON THE DATE ADJACENT TO THE SEAL

PRINTED COPIES OF THIS DOCUMENT ARE

NOT CONSIDERED SIGNED AND SEALED

AND THE SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

VCS ENGINEERING, INC.

8413 LAUREL FAIR CIRCLE, SUITE 200-8

TAMPA, FL 33610

PHONE NUMBER: (813) 501-0050

PRATIK MURKUTE, P.E. 100387

THIS ITEM HAS BEEN DIGITALLY

SIGNED AND SEALED BY:

ON THE DATE ADJACENT TO THE SEAL

PRINTED COPIES OF THIS DOCUMENT ARE

NOT CONSIDERED SIGNED AND SEALED

AND THE SIGNATURE MUST BE VERIFIED

ON ANY ELECTRONIC COPIES.

STANTEC CONSULTING SERVICES, INC

380 PARK PLACE BOULEVARD, SUITE 300

CLEARWATER, FL 33759

PHONE NUMBER: (727) 431-1617

JASON Y. YAM, P.E. 62449

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

SHEET NO SHEET DFSCBTPTTQN SHEET NO

B-2

81-8

81-9

81-10

81-11

81-12

81-13

81-14

81-15

81-16

81-17

81-18

81-19

81-20

81-21

81-22

SIGNATURE SHEET

BEAM ARC SPRAY ZINC LOCATION

ZINC CONNECTION DETAILS

GALVANIC ANODE PLACEMENT DETAIL

GALVANIC ANODE SINGLE WIRE CONNECTION

GENERAL NOTES

GALVANIC ANODE SINGLE WIRE CONNECTION

INSTALLATION STEPS

GALVANIC ANODE SINGLE WIRE CONNECTION

SECTIONS AND DETAILS

COLUMN AND FOOTING JACKET OVERBUILD (1 OF 2)

COLUMN AND FOOTING JACKET OVERBUILD (2 OF 2)

JACKET OVERBUILD PIER 10 AND 11 (1 OF 2)

JACKET OVERBUILD PIER 10 AND 11 (2 OF 2)

STRUCTURAL PILE JACKET

WIRING DETAILS

STRUCTURE CONNECTIONS

TYPICAL MONITORING PANELS

TYPICAL PANEL WIRING

B-2

TC-1

TC-2 - TC-3

TC-4 - TC-5

()§t��!C Drawn By: SHEET TfTLE:

380 PARK PLACE BLVD. SUITE 300

CLEARWATER, FL 33759

CHRISTOPHER P. GAMACHE P.E. NO. 82122

MPR

Checked by:

CPG

Designed by:

TRH

Checked by:

CPG

COLLIER COUNTY

R

OA

D

No

ST

A N

T E

C

PR

OJ

EC

T

No co uN

TY

PR

oJ

ECT

ID

----.IPROJECT NAME:

CR 92 238200196 66066.2

chgamache 1/30/2025

SHEET DFSCBTPTTQN

SIGNATURE SHEET

TEMPORARY TRAFFIC CONTROL PHASING TYPICAL

SECTIONS

TRAFFIC CONTROL PLAN (PHASE I)

TRAFFIC CONTROL PLAN (PHASE II)

BRIDGE NO. 030184

REF. DWG. NO.

SIGNATURE SHEET

SHEET NO.

STAN GOBER MEMORIAL BRIDGE REHAB

8-2

10:00:30 AM U:\238200196\ms\struct\F1nal Subm1ttal\BJS1gnatures.dgn

By DescriptionDate By DescriptionDate

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A .C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

kgrams 1/22/2025 10:14:43 AM U:\238200196\ms\struct\Final Submittal\B1SumOfQuantities01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

SUMMARY OF QUANTITIES

PAY ITEM DESCRIPTION UNIT

NOTES

DESIGN

REMARKS

CONSTRUCTION

P F

SUMMARY OF STRUCTURE QUANTITIES - BRIDGE NO. 030184

QUANTITY

ITEM NO.

FDOT

BQ-1

PAY ITEM NOTES:

CONDUIT REPAIR/REPLACE630-2-31

CONDUIT ANCHOR REPLACE630-2-30

COATING EXISTING STRUCTURAL STEEL, BEARING561-1-1

BEDDING STONE530-74

RIPRAP-RUBBLE, BANK AND SHORE530-3-3

TIMBER FENDER SYSTEM REPAIR 470-75-2

BRIDGE DECK EXPANSION JNT, REHAB, POURED JOINT WITH BACKER ROD458-1-21

CATHODIC PROTECTION INTEGRAL PILE JACKET, STRUCTURAL, 16.1-30", GALVANIC SYSTEM457-2-221

CATHODIC PROTECTION INTEGRAL COLUMN JACKET, NON-STRUCTURAL, GALVANIC SYSTEM457-2-131

CLEANING AND SEALING CONCRETE SURFACES - PENETRANT SEALER OR METHACRYLATES413-154

PENETRATING CORROSION INHIBITOR413-150

RESTORE SPALLED AREAS, CONTRACTOR'S OPTION401-70-5

GALVANIC OVERBUILD WITH ANODES FOR FOOTINGS/STRUTS400-142-11

EMBEDDED GALVANIC ANODE 400-142-10

CATHODIC PROTECTION SYSTEM, ZINC ARC SPRAY400-142-2

BRIDGE DECK GROOVING400-7-1

CONCRETE CLASS IV, CAST IN PLACE TOPPING WITH SRA400-4-47

REMOVAL OF EXIST CONC110-4-10

LADDERS AND PLATFORMS, REMOVE110-3-10

TURBIDITY MONITORING104-30

FLOATING TURBIDITY BARRIER104-11

MAINTENANCE OF TRAFFIC102-1

MOBILIZATION101-1

LF

EA

EA

TN

TN

LS

LF

LF

LF

SF

GA

CF

SF

EA

SF

SY

CY

SY

EA

LS

LF

LS

LS

81048

13584

89.1

CAN BE FOUND WITHIN THE TECHNICAL SPECIFICATIONS.

CONSTRUCTION. SPECIFICATIONS FOR ITEMS WITHOUT AN FDOT ITEM NUMBER

SECTION OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

THE FDOT ITEM NUMBER SHALL BE USED TO IDENTIFY THE APPLICABLE3.

MADE DUE TO DIFFERENCES BETWEEN THE ESTIMATED AND ACTUAL QUANTITIES.

ADJUSTMENT IN THE CONTRACT BID UNIT PRICE FOR EACH PAY ITEM WILL BE

AND WILL BE MEASURED IN THE FIELD AND VERIFIED BY THE COUNTY. NO

THE QUANTITIES PROVIDED ARE ESTIMATED. ACTUAL QUANTITIES MAY VARY2.

THE PLACEMENT OF AN ITEM SHALL BE CONSIDERED INCIDENTAL TO THAT ITEM.

ANY EXCAVATION OR DISPOSAL OF EXCAVATED MATERIAL NECESSARY FOR 1.

PAY ITEM NOTES:

MOT TO MATCH EXISTING.

RESTORE PAVEMENT MARKINGS AND RPMs DISTURBED BY DECK RESTORATION AND4.

CAN BE FOUND WITHIN THE TECHNICAL SPECIFICATIONS.

CONSTRUCTION. SPECIFICATIONS FOR ITEMS WITHOUT AN FDOT ITEM NUMBER

SECTION OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

THE FDOT ITEM NUMBER SHALL BE USED TO IDENTIFY THE APPLICABLE3.

MADE DUE TO DIFFERENCES BETWEEN THE ESTIMATED AND ACTUAL QUANTITIES.

ADJUSTMENT IN THE CONTRACT BID UNIT PRICE FOR EACH PAY ITEM WILL BE

AND WILL BE MEASURED IN THE FIELD AND VERIFIED BY THE COUNTY. NO

THE QUANTITIES PROVIDED ARE ESTIMATED. ACTUAL QUANTITIES MAY VARY2.

THE PLACEMENT OF AN ITEM SHALL BE CONSIDERED INCIDENTAL TO THAT ITEM.

ANY EXCAVATION OR DISPOSAL OF EXCAVATED MATERIAL NECESSARY FOR 1.

GM

GM

GM

GM

EA

PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES713-103-201

PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES713-103-101

THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6"711-16-201

THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6"711-16-101

RAISED PAVEMENT MARKER, TYPE B706-1-3

0.54

0.44

0.04

0.04

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

chgamache 1/2/2025 10:58:02 AM U:\238200196\ms\struct\Final Submittal\B1GeneralNotes.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

GENERAL NOTES

CLASS

STRUCTURE

CONCRETE IN

LOCATION OF

REINFORCEMENT BARS SHALL BE GRADE 60.

IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 931. ALL

ALL REINFORCEMENT BARS AND WELDED WIRE REINFORCEMENT SHALL BE

AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9TH EDITION.

ELEMENTS UNLESS OTHERWISE NOTED.

LOAD AND RESISTANCE FACTOR DESIGN METHOD (LRFD) FOR ALL

SUBSTRUCTURE - EXTREMELY AGGRESSIVE

SUPERSTRUCTURE - EXTREMELY AGGRESSIVE

f'c = 5,500

DESIGN BULLETINS.

FDOT STRUCTURES MANUAL DATED 2024 AND SUBSEQUENT STRUCTURES

4" TO EXTERNAL FORMED SURFACESC.I.P. SUBSTRUCTURE:

2" TO EXTERNAL FORMED SURFACESC.I.P. SUPERSTRUCTURE:

TO FACE OF CONCRETE.

CENTERLINE OF BARS EXCEPT WHERE THE CLEAR DIMENSION IS SHOWN

ALL DIMENSIONS PERTAINING TO LOCATIONS OF REINFORCING ARE TO

FDOT STANDARD SPECIFICATIONS FOR ALLOWABLE TOLERANCES.

FABRICATION TOLERANCES UNLESS SHOWN AS "MINIMUM COVER". SEE

CONCRETE COVER SHOWN IN PLANS DOES NOT INCLUDE PLACEMENT AND

ENGINEER.

ALTERATIONS TO THOSE SHOWN SHALL REQUIRE APPROVAL OF THE

INDICATED IN THE PLANS. ADDITIONAL CONSTRUCTION JOINTS OR

CONSTRUCTION JOINTS WILL BE PERMITTED ONLY AT LOCATIONS

DECK TOPPINGIV (WITH SRA)

STRENGTH (psi)

COMPRESSIVE

28-DAY

MINIMUM

ADJUSTMENT OF 2011 (NAD 83/2011).

SYSTEM USED FOR THE PLANS IS THE NORTH AMERICAN DATUM OF 1983,

VERTICAL DATUM OF 1988 (NAVD 88). THE STATE PLANE COORDINATE

THE BENCH MARK DATUM USED FOR THE PLANS IS THE NORTH AMERICAN

SPAN BEAM PILEBENT/PIER

B-3

SHRINKAGE TO 500 MICROSTRAINS.

SRA USED IN THE DECK TOPPING SHALL LIMIT THE 28-DAY DRYING

ACCORDANCE WITH PERMIT REQUIREMENTS. SEE SHEETS B1-2 AND B1-3.

CONTROL TURBIDITY CAUSED BY CONSTRUCTION OPERATIONS IN

PROVIDE AND MAINTAIN FLOATING TURBIDITY BARRIERS AS REQUIRED TO

1. DESIGN SPECIFICATIONS:

2. DESIGN METHOD:

3. ENVIRONMENT:

4. CONCRETE:

5. SHRINKAGE REDUCING ADMIXTURE (SRA):

6. CONCRETE COVER:

7. JOINTS IN CONCRETE:

9. REINFORCING STEEL:

316 STAINLESS STEEL WITH A MINIMUM BREAKING STRENGTH OF 18,000 LBS.

" DIAMETER 6x19, 6x25, OR 6x37 CLASS IWRC TYPE2

1WIRE ROPE SHALL BE

11. WIRE ROPE FOR FENDER PILES:

SPECIFICATIONS SECTION 510.

FLEXIBLE CONDUIT SHALL MEET THE REQUIREMENTS OF FDOT STANDARD

12. CONDUIT FOR NAVIGATIONAL SWING LIGHTING:

HORIZONTALLY OR VERTICALLY UNLESS OTHERWISE NOTED.

ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET EITHER

13. PLAN DIMENSIONS:

14. VERTICAL & HORIZONTAL DATUMS:

15. EXISTING BRIDGE REMOVAL AND DISPOSAL:

16. TURBIDITY CONTROL:

10 - 18 - 2

EXAMPLE:

NUMBER FOLLOWED BY THE PILE/COLUMN NUMBER.

BY THE BEAM NUMBER. PILES/COLUMNS ARE IDENTIFIED BY THE BENT/PIER

OF STATIONING. BEAMS ARE IDENTIFIED BY THE SPAN NUMBER FOLLOWED

CONSECUTIVELY FROM LEFT TO RIGHT WHEN LOOKING IN THE DIRECTION

STATION (WEST TO EAST). BEAMS AND PILES ARE NUMBERED

BENTS AND PIERS ARE NUMBERED CONSECUTIVELY FROM LOW TO HIGH

18. IDENTIFICATION OF MEMBERS:

GUARD 60 DAYS PRIOR TO ANY WORK OVER THE WATERWAY.

APPROVED BY THE COUNTY, SHALL BE SUBMITTED TO THE US COAST

CONTRACTOR'S PLAN, SCHEDULE, AND SEQUENCE OF OPERATIONS,

REGARDING MAINTENACE OF BOAT TRAFFIC. A COPY OF THE

THE CONTRACTOR SHALL COMPLY WITH COAST GUARD REGULATIONS

19. BOAT TRAFFIC:

ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS SECTION 110.

REMOVE AND DISPOSE OF THE EXISTING BRIDGE MATERIAL IN

STEEL SCREWS.

ALL DECKING AND FRAMING SHALL BE FASTENED WITH #10x4" STAINLESS

SOFTWOOD LUMBER STANDARD PS 20.

OTHERWISE NOTED. DRESSED SIZES SHALL CONFORM TO THE AMERICAN

LUMBER SIZES SHOWN REPRESENT NOMINAL DRESSED SIZES UNLESS

SPECIFICATIONS SECTION 955 FOR SALT WATER ENVIRONMENTS.

AND BE PRESSURE TREATED IN ACCORDANCE WITH FDOT STANDARD

SPECIFICATIONS SECTION 952, SOUTHERN PINE, MARINE GRADE NO. 1,

ALL LUMBER SHALL MEET THE REQUIREMENTS OF FDOT STANDARD

20. LUMBER FOR FENDER DECKING:

CONSTRUCTION. SEE TRAFFIC CONTROL PLANS FOR ADDITIONAL DETAILS.

MAINTAIN A MINIMUM OF ONE LANE OF ALTERANATING TRAFFIC THROUGHOUT

17. TRAFFIC CONTROL:

8. BRIDGE DECK GROOVING:

IN ACCORDANCE WITH SECTION 400-15.2.5 OF THE FDOT SPECIFICATIONS.

THE REPLACED BRIDGE FLOOR SURFACE SHALL RECEIVE A CLASS 4 FINISH

TO APPLYING THE REPAIR MORTAR FOR THESE SITE OBSERVATIONS.

CONTRACTOR SHALL CONTACT THE COUNTY A MINIMUM OF 24 HOURS PRIOR

COMPLETED BUT BEFORE THE REPAIR MATERIAL HAS BEEN APPLIED.

AFTER THE SURFACE PREPARATION FOR THE REPAIR WORK HAS BEEN

TO INSPECT THE AGREED UPON AREA FOR THE CONCRETE SPALL REPAIRS

THE COUNTY (OR THEIR REPRESENTATIVE) SHALL HAVE THE OPPORTUNITY

10. COORDINATION WITH THE COUNTY:

f'c = 5,500

SPALL REPAIR

STRUCTURAL PILE JACKETS

IV

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

chgamache 1/3/2025 12:02:54 PM U:\238200196\ms\struct\Final Submittal\B1PlanElev01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

E F

E F E F

E F

E F

E F E F

E F E E EE FE

F E

FE

F E

F E

FE

F E F E

FE

F E

F E

PLAN AND ELEVATION

B1-1

P I

S T

A

.0

C L B

E

T

B E

B E

LC

P I

LC

P I

LC

P I

LC

P I

LC LC LC LC LC LC LC

LCLCLC

P I

P I

P I

P I

P I

P I

P I

LC

B

E

LC

B

E

LC

B

E

LC

B

E

LC

B

E

LC

B

E

E N

D

B

E

E N

D

B

E

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.5

S T

A

.1

S T

A

.7

S T

A

.3

S T

A

.9

S T

A

.0

S T

A

.6

S T

A

.2

S T

A

.8

S T

A

.4

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

-20

-20

-40

NAVD88

-40

MHW ELEV. 0.67

MSL ELEV. -0.62

MLW ELEV. -1.89

275 280

STA. 268+84.00

BEGIN BRIDGE

STA. 287+26.00

END BRIDGE

P C

S

T A

.0

P T

S

T A

.1

PLAN

ELEVATION

Direction of Stationing

(SEE NOTE 2)

FENDER

SYSTEM (SEE NOTE 1)

ACCESS LADDER

(SEE NOTE 2)

FENDER

� CONST.

FRONT FACE OF BACKWALL

BEGIN BRIDGE

FRONT FACE OF BACKWALL

END BRIDGE

NOTES:

7 SPANS @ 70'-0" = 490'-0"

5 SPANS @ 95'-7" = 477'-11"

116'-2"

5 SPANS @ 95'-7" = 477'-11"

= 280'-0"

4 SPANS @ 70'-0"

LIGHTING (TYP.)

NAVIGATIONAL

LIGHTING (TYP.)

NAVIGATIONAL

CHANNEL

NAVIGATIONAL

M A

R C

O

C

H A

N N

E L

NO. 030184

BRIDGE

EXPANSION JOINT (TYP.)

REMOVE AND REPLACE DECK

FILLED SCOUR HOLES (TYP.)

BANK AND SHORE OVER

INSTALL RUBBLE RIPRAP,

INSTALL RUBBLE RIPRAP, BANK AND SHORE (TYP.)

FILL SCOUR HOLES WITH BEDDING STONE AND

CONCRETE WITH SRA

DECK AND REPLACE WITH CLASS IV

" OF CONCRETE2

1REMOVE TOP 1

LIGHTING (SEE NOTE 3)

NAVIGATIONAL SWING

1842'-0"

+6.

0±

-6.0±%

R = 5729.58'±

CURVE 1

R = 1495.76'±

CURVE 2

EXISTING GROUND

APPROXIMATE

WITH GALVANIC ANODES AT PILE #15

8'-0" STRUCTURAL PILE JACKET

AT EACH PIER COLUMN (TYP.)

5'-0" TALL GALVANIC JACKET

GALVANIC ANODES (TYP.)

OVERBUILD WITH

PIER FOOTING

WATER LIMITS

SURFACE

APPROXIMATE

WATER LIMITS

SURFACE

APPROXIMATE

WATER LIMITS

SURFACE

APPROXIMATE

WATER LIMITS

SURFACE

APPROXIMATE

ON EXISTING PLANS.

BRIDGE GEOMETRY, DIMENSIONS, AND ELEVATIONS ARE BASED5.

BRIDGE LENGTH IS MEASURED ALONG � OF CONSTRUCTION.4.

AND REPLACE WITH FLEXIBLE CONDUIT.

REMOVE EXISTING CONDUIT TO NAVIGATIONAL SWING LIGHTING3.

WRAPS.

CABLE WRAPS ON FENDER PILES AND REPLACE WITH SS CABLE

3 FT ADJACENT TO NAVIGATIONAL LIGHTS (6 TOTAL). REMOVE ALL

INSTALL NEW TIMBER FRAMING AND PLANKS FOR A LENGTH OF

REMOVE ALL TIMBER PLANKS AND FRAMING ON FENDER WALKWAY. 2.

AND GANGWAY TO THE FENDER WALKWAY.

ALL LADDERS, SUPPORTS, CONNECTING HARDWARE, PLATFORMS

REMOVE THE EXISTING ACCESS LADDER SYSTEM INCLUDING1.

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

chgamache 1/2/2025 8:27:45 AM U:\238200196\ms\struct\Final Submittal\B1TurbidityMonitoring02.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

M A

R C

O

C

H A

N N

E L

275 280

5'-0"

N

BARRIER (TYP.)

FLOATING TURBIDITY

FENDER (TYP.)

BETWEEN FENDER AND PIER

INSTALL TURBIDITY BARRIER

(TYP. U.N.O)

NO. 5

PIER

NO. 6

PIER

NO. 7

PIER

NO. 8

PIER

NO. 9

PIER

NO. 10

PIER

NO. 11

PIER

NO. 12

PIER

NO. 13

PIER

NO. 14

PIER

NO. 15

PIER

NO. 16

PIER

NO. 3

BENT

NO. 4

BENT

NO. 17

BENT

NO. 18

BENT

NO. 19

BENT

TURBIDITY BARRIER PLAN FOR CONCRETE WORK

GALVANIC OVERBUILD (TYP.)

B1-2

GALVANIC OVERBUILD (TYP.)

WITH GALVANIC ANODE

STRUCTURAL PILE JACKET

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

kgrams 12/11/2024 4:27:18 PM U:\238200196\ms\struct\Final Submittal\B1TurbidityMonitoring01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

N 81° 42' 23" E

MZO1-N MZO2-N MZO3-N MZO4-N MZO5-N

MZO1-S MZO2-S MZO3-S MZO4-S MZO5-S

BS-N

MZI1-N MZI2-N MZI4-NMZI3-N MZI5-N

MZI5-SMZI1-S MZI2-S MZI3-S MZI4-S

BS-S

PIER NO. 10 PIER NO. 11 PIER NO. 12

PIER NO. 13 PIER NO. 14 PIER NO. 15 PIER NO. 16 PIER NO. 17 PIER NO. 18

PIER NO. 19

TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK

(T Y P

U .N .O

N

M A

R C

A N

N E

L

(TYP.)

25'-0"

OR AS OTHERWISE DIRECTED BY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE).

TURBIDITY METER READINGS SHOW ACCEPTABLE TURBIDITY LEVELS HAVE BEEN RESTORED

IN-WATER WORK AND THE FOUR-HOUR SAMPLING INTERVAL WILL NOT RESUME UNTIL

INTERVAL TO SHOW WHEN TURBIDITY LEVELS HAVE RETURNED TO AN ACCEPTABLE LEVEL.

AREA. AT THIS TIME, THE SAMPLING FREQUENCY WILL BE INCREASED TO A TWO-HOUR

REPLACED AS NECESSARY TO CONTROL TURBID DISCHARGES FROM THE IMMEDIATE WORK

TURBIDITY CONTROL DEVICES WILL BE INSPECTED IMMEDIATELY AND REPAIRED OR

IN-WATER WORK AND NOTIFY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE). ALL

(MZO) EXCEED THE BACKGROUND LEVELS, THE CONTRACTOR WILL IMMEDIATELY STOP ALL

NTUS ABOVE BACKGROUND LEVELS OR READINGS AT THE MIXING ZONE OUTSIDE STATIONS

IF TURBIDITY READINGS AT THE MIXING ZONE INSIDE STATION (MZI) READINGS EXCEED 41 5.

READINGS AT MIXING ZONE OUTSIDE STATIONS MAY NOT EXCEED THE BACKGROUND LEVELS.

OVER THE DAILY AMBIENT BACKGROUND LEVELS AS MEASURED AT BS-N OR BS-S. TURBIDITY

WITHIN THE MIXING ZONE (MIXING ZONE INSIDE STATIONS) TO BE INCREASED TO 41 NTUS

ZONES. THIS PLAN AND THE ERP INCLUDE A MIXING ZONE ALLOWING TURBIDITY LEVELS

INCREASED OVER DAILY AMBIENT BACKGROUND LEVELS OTHER THAN IN APPROVED MIXING

WATERS (OFW). STATE WATER QUALITY STANDARDS DO NOT ALLOW TURBIDITY TO BE

THE ROOKERY BAY NATIONAL ESTUARINE RESEARCH RESERVE IS AN OUTSTANDING FLORIDA 4.

SOUTH (MZI1-S, MZI2-S, MZI3-S, MZI4-S, AND MZI5-S).

FIVE ON THE NORTH (MZI1-N, MZI2-N, MZI3-N, MZI4-N, AND MZI5-N) AND FIVE ON THE

SHOWN ON THIS SHEET, TEN MIXING ZONE INSIDE STATIONS WILL BE ESTABLISHED WITH

WILL BE CONDUCTED AT FOUR-HOUR INTERVALS FOR THE DURATION OF THE WORK DAY. AS

TURBIDITY READINGS AT THE MIXING ZONE INSIDE AND MIXING ZONE OUTSIDE STATIONS 2.

ZONE SAMPLE STATIONS.

TAKEN AT MID-DEPTH AT THE PROPER BACKGROUND STATION PRIOR TO SAMPLING MIXING

OUTGOING OR OUTGOING TO INCOMING), A NEW BACKGROUND TURBIDITY READING WILL BE

EXPECTED DURING THE WORK PERIOD. WHEN TIDAL CONDITIONS CHANGE (E.G. INCOMING TO

MID-DEPTH AT THE PROPER BACKGROUND STATION RELATIVE TO TIDAL CONDITIONS

PLACEMENT WILL BE OCCURRING, A BACKGROUND TURBIDITY READING WILL BE TAKEN AT

APPROXIMATE LOCATION SHOWN ON THIS SHEET. ON ANY GIVEN DAY THAT IN-WATER FILL

TWO BACKGROUND SAMPLE STATIONS (BS-N AND BS-S) WILL BE ESTABLISHED AT THE 1.

AUTHORIZATION FOR A TURBIDITY MONITORING PLAN THAT DEVIATES FROM THIS PLAN.

PROJECT CONSTRUCTION, UNLESS THE PROJECT CONTRACTOR OBTAINS SEPARATE

MONITORING PLAN WILL BE IMPLEMENTED DURING ALL IN-WATER WORK REQUIRED TO COMPLETE

PLACEMENT OF FILL MATERIALS WITHIN WATERS OF THE STATE. THE FOLLOWING TURBIDITY

CONSTRUCTION OF THE STAN GOBER BRIDGE REHABILITATION PROJECT REQUIRES THE

B1-3

EXISTING FENDER (TYP.)

MIXING ZONE

FLOATING TURBIDITY BARRIER (TYP.)

TURBIDITY MONITORING PLAN:

IDENTIFIED WITHIN THE PERMIT OR AS ADVISED BY THE PERMITTING AGENCY.

RESOURCE PERMIT (ERP) NUMBER WILL BE SUBMITTED WEEKLY TO THE ADDRESS

PRECEDING 24 HOURS, ETC.). A SUMMARY OF THE DAILY LOGS LISTING THE ENVIRONMENTAL

RELEVANT INFORMATION (E.G. PROLONGED HIGH WINDS, HEAVY RAINFALL WITHIN THE

WEATHER CONDITIONS, TIDAL CONDITIONS, NATURE OF WORK BEING CONDUCTED, AND OTHER

INTO A LOGBOOK AT THE TIME OF RECORDING ALONG WITH THE DATE, TIME OF DAY,

SOLUTIONS PER THE METER MANUFACTURER’S INSTRUCTIONS. READINGS SHALL BE ENTERED

PORTABLE TURBIDITY METER THAT HAS BEEN CALIBRATED WITH STANDARD CALIBRATION

TURBIDITY READINGS (IN NEPHELOMETRIC TURBIDITY UNITS NTUS) WILL BE TAKEN WITH A 3.

DURING SLACK TIDE CONDITIONS.

ZONE STATIONS (INSIDE AND OUTSIDE) CLOSEST TO THE ACTIVE WORK WILL BE USED

STATIONS (INSIDE AND OUTSIDE) WILL BE UTILIZED DURING OUTGOING TIDES. THE MIXING

(INSIDE AND OUTSIDE) WILL BE USED DURING INCOMING TIDES AND SOUTH MIXING ZONE

OCCURRED DURING THE PREVIOUS FOUR-HOUR PERIOD. NORTH MIXING ZONE STATIONS

MID-DEPTH FOR EACH OF THE MIXING ZONE STATIONS WHERE WORK IS OCCURRING OR HAS

MZO2-S, MZO3-S, MZO4-S, AND MZO5-S). TURBIDITY READINGS WILL BE TAKEN AT

(MZO1-N, MZO2-N, MZO3-N, MZO4-N, AND MZO5-N) AND FIVE ON THE SOUTH (MZO1-S,

TEN MIXING ZONE OUTSIDE STATIONS WILL BE ESTABLISHED WITH FIVE ON THE NORTH 2.

(TYP.) SEE SHEET B1-23

LIMITS OF RUBBLE RIPRAP

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

chgamache 1/3/2025 10:48:59 AM U:\238200196\ms\struct\Final Submittal\B1DeckRepair01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

N

DECK REPAIR DETAILS

270 275

STA. 268+84.00

BEGIN BRIDGE

PLAN

� CONST.

NOTES:

Direction of Stationing

REPAIR TYPE ITEM NO.LOCATION

DECK REPAIR SUMMARY

SPAN

1-10 110-4-10

4 SPANS @ 70'-0" = 280'-0" 5 SPANS @ 95'-7" = 477'-11" 116'-2"

M A

T C

H L I N

E

STA. 287+26.00

END BRIDGE

5 SPANS @ 95'-7" = 477'-11"

1842'-0"

M A

T C

H L I N

E

7 SPANS @ 7

0'-0"

= 490 '-0"1842'-0"

SPAN 4SPAN 1 SPAN 2 SPAN 3 SPAN 5 SPAN 6 SPAN 7 SPAN 8 SPAN 9 SPAN 10

2 6

SPAN 11 SPAN 12 SPAN 13 SPAN 14 SPAN 15 SPAN 16 SPAN 17 SPAN 18 SPAN 19

SPAN 20

SPAN 21

SPAN 2

P I

S T

A

.0

B E

B E

B E

LC

P I

LC

P I

LC

P I

LC

P I

LC LC

LC LC LC LC LC

LCLCLC

P I

P I

P I

P I

P I

P I

P I

LC

B

E

LC

B

E

LC

B

E

LC

B

E

LC

B

E N

T

N

O

LC

B

E N

T

N

O

E N

D

B

E N

T

N

O

E N

D

B

E

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.5

S T

A

.1

S T

A

.7

S T

A

.3

S T

A

.9

S T

A

.0

S T

A

.2

S T

A

.8

S T

A

.4

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

S T

A

.0

C L

LC

P I

S T

A

.0

LEGEND:

B1-4

S T

A

.6

SPALL REPAIR

SPALL REPAIR

LEFT FASCIA AT END BENT 1

17 SPALL REPAIR

LEFT FASCIA

LEFT OVERHANG AT PIER 17*

SPALL REPAIR

1-22

SPALL REPAIR

9 AT 2/3 SPAN BETWEEN GIRDERS 6 & 7*

1-22

PENETRANT

16 SPALL REPAIRRIGHT OVERHANG AT PIER 16*

18 SPALL REPAIRNEAR PIER 19 BETWEEN GIRDERS 3 & 4*14

SECTION 413.

IN ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS

DECK SURFACE AND APPLY PENETRATING CORROSION INHIBITOR

AFTER ALL OF THE DECK REPAIRS ARE COMPLETE, CLEAN THE3.

STANDARD PLANS INDEX 458-110.

POURED JOINT WITH BACKER ROD IN ACCORDANCE WITH FDOT

REMOVE EXISTING EXPANSION JOINTS AND REPLACE WITH 2.

CLASS IV CONCRETE WITH SRA.

" OF CONCRETE DECK AND REPLACE WITH2

1REMOVE TOP 11.

LIMITS OF REPAIR 1 (SEE NOTE 1)

REPAIRS MARKED WITH AN ASTERISK (*) ARE LOCATED ON THE UNDERSIDE OF THE DECK.*NOTE:

NEAR END BENT 1 BETWEEN GIRDERS 5 & 6*

400-4-47

458-1-21

NO.

EASTBOUND LANE & SHOULDER (SEE NOTE 1)

DECK REMOVAL

DECK REPAIR

DECK EXPANSION JOINTS (SEE NOTE 2) JOINT REPLACEMENT

CLEAN & SEAL

5 2 RIGHT FASCIA SPALL REPAIR

7 SPALL REPAIR

8 SPALL REPAIRJOINT HEADER

TOP OF BARRIER

15 SPALL REPAIR11 SOUTH FACE OF BARRIER

DECK SURFACE (SEE NOTE 3)

QUANTITY

2,137 SY

1 CF

2 CF

1 CF

2 CF

2 CF

81,048 SF

933 GA

2 CF

2 CF

89.1 CY

1064 LF

1 CF

1 CF

1 CF

1 CF

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

401-70-5

413-154

413-150

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

chgamache 1/3/2025 10:51:47 AM U:\238200196\ms\struct\Final Submittal\B1SpallRepairDet01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

SPALL REPAIR DETAILS

B1-5

CONCRETE SPALL REPAIR

SPALL

SPALL

SECTION

EXISTING

CONCRETE)

AND SPALLS (UNSOUND

CRACKS, DELAMINATIONS,

MIN. SPLICE LENGTHS

PREFERRED SPALL PATCH CONFIGURATION

SHALL BE KEPT AS SIMPLE AS POSSIBLE

NO FEATHER EDGES. PATCH CONFIGURATIONS

AT EDGE LOCATIONS PROVIDE RIGHT ANGLE CUTS.

CONDITION

EXISTING

REPAIR

PROPOSED

EXISTING REINFORCMENT BAR

NEW SPLICE BAR

LAP LENGTH DETAIL

EXISTING BAR SIZE SPLICE BAR SIZE SPLICE BAR LENGTH

L E

N G

T H

M I N

L A

P

S

P L I C

E

L E

N G

T H

M I N

L A

P

S

P L I C

E

CONCRETE SPALL REPAIR DETAIL

(COSMETIC)

3" MAX.

SMOOTH TO ADJACENT CONCRETE

MATERIAL AND FINISH

APPLY CONCRETE REPAIR

EXISTING REINFORCEMENT

EXISTING REINFORCEMENT

ADJACENT CONCRETE

MATERIAL, AND FINISH SMOOTH TO

", APPLY CONCRETE REPAIR2

1DEPTH OF

REMOVE CONCRETE TO A MINIMUM

" DEEP SAWCUT EDGE (TYP).2

CONCRETE SPALL REPAIR DETAIL

(WITHOUT EXPOSED REINFORCING)

CONCRETE SPALL REPAIR DETAIL

" DEEP SAWCUT EDGE (TYP).2

OF ALL RUST AND DIRT

MECHANICALLY CLEAN REINFORCEMENT

SURFACE (TYP.)

CONCRETE

MATCH EXIST

SMOOTH TO ADJACENT CONCRETE

APPLY CONCRETE REPAIR MATERIAL, AND FINISH

REMOVE CONCRETE TO 1" BEYOND REINFORCEMENT,

(WITH EXPOSED REINFORCING)

16"

20"

24"

28"

7 7

8 8

9 9

DAMAGE WHEN REMOVING CONCRETE)

EXISTING REINFORCEMENT (DO NOT

TYPICAL DELAMINATIONS, CRACKS, AND SPALLS

32"

36"

41"

49"

C L

(M A

X

CROSS SECTION OVER 25%

LOCATION HAS A REDUCTION IN

THAN 1'-0" OR IF AN ISOLATED

OCCURS OVER A LENGTH GREATER

WHERE MINOR SECTION LOSS

LINE AND SHAPE OF ADJACENT SURFACES.

SPALLED AREAS SHALL BE FINISHED SMOOTH TO MATCH THE 11.

FLAKING.

" CHAMFER ON ALL EXPOSED EDGES TO AVOID 4

3PROVIDE A 10.

PROVIDE CLEARANCE FOR THE LAP.

LENGTHS. REMOVE ADDITIONAL CONCRETE AS NECESSARY TO

IN ACCORDANCE WITH THE LAP LENGTH DETAIL AND MIN. SPLICE

REDUCTION IN ITS CROSS SECTIONAL AREA, USE A SPLICE BAR

WHEN THE EXISTING BAR EXHIBITS A 25% OR GREATER 9.

THE CONCRETE.

CLEAN EXPOSED REINFORCEMENT AND THE BOND SURFACE OF 8.

BONDED TO THE SURROUNDING CONCRETE.

SIGNIFICANT CORROSION AND THE REINFORCING STEEL IS WELL

THERE IS NO FURTHER DELAMINATION, CRACKING, OR

REMOVE CONCRETE ALONG THE REINFORCING STEEL UNTIL 7.

ACHIEVED.

EXPOSED REINFORCEMENT AND SURROUNDING CONCRETE IS

REINFORCEMENT UNTIL A MINIMUM 1" CLEARANCE BETWEEN THE

UNSOUND CONCRETE, THE REMOVAL SHALL UNDERCUT THE

IF REINFORCEMENT IS ENCOUNTERED DURING THE REMOVAL OF 6.

COSMETIC SPALL REPAIRS DO NOT REQUIRE A SAW CUT EDGE.5.

ADJACENT SPALLS SHALL BE JOINED INTO ONE REPAIR.

RECTANGULAR IN NATURE WITH CORNERS AT RIGHT ANGLES.

" SAW CUTS ENCOMPASSING SPALLED AREAS SHALL BE 2

1THE 4.

SHEETS B1-4, B1-6, AND B1-7.

WITH A HAMMER. KNOWN DEFICIENCIES CAN BE FOUND ON

OF THE ENGINEER PRIOR TO THE START OF WORK BY SOUNDING

BE IDENTIFIED AND MARKED IN THE FIELD IN THE PRESENCE

THE LOCATION AND LIMITS OF CONCRETE SPALL REPAIR SHALL 3.

SHOWN IN THESE PLANS.

SPECIFICATION T401 AND THE REPAIR CATEGORY DETAILS

SPALL REPAIRS SHALL BE IN ACCORDANCE WITH TECHNICAL 2.

(INCLUDING OVERHEAD) AND VERTICAL.

DETAILS ARE APPLICABLE TO ALL ORIENTATIONS: HORIZONTAL 1.

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

kgrams 12/11/2024 4:14:36 PM U:\238200196\ms\struct\Final Submittal\B1BeamRepair01.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

GENERAL NOTES:

PROCEDURE FOR REPAIR ON PRESTRESSED CONCRETE BEAMS:

B1-6

PRIOR TO PACHING BEAMS

EPOXY INJECT CRACKS

AND SPALLS IN DIAPHRAGMS (TYP.)

REPAIR CRACKS, DELAMINATIONS,

REPAIR TOP DECK

CONCRETE BEAMS

PRESTRESSED

REPAIR SPALLED

TYPICAL SUPERSTRUCTURES DEFICIENCIES

CURB SPALLS

REPAIR DECK AND

AND COAT WITH ZINC ARC SPRAY

CONCRETE BEAM ENDS

REPAIR SPALLED PRESTRESSED

BEAM REPAIR DETAILS 1 OF 2

1.DEFICIENCIES SHOWN IN THE ADJACENT TYPICAL SUPERSTRUCTURE DEFICIENCIES

DETAIL ARE FOR ILLUSTRATIVE PURPOSES ONLY.

2.REPAIRS FOR PRESTRESSED CONCRETE BEAMS SHALL FOLLOW THE TYPICAL SPALL

AND CRACK REPAIR PROCEDURES EXCEPT AS NOTED BELOW.

3.CHIP CRACKED/SPALLED CONCRETE BACK TO SOUND CONCRETE. LARGE PIECES OF

CONCRETE THAT CONFINE THE STRANDS AND "HOLD DOWN" DRAPED STRANDS (IF

APPLICABLE) SHALL NOT BE DISTURBED OR REMOVED.

4.REPAIRS FOR PRESTRESSED CONCRETE BEAMS THAT ARE DEEP ENOUGH TO EXPOSE

STEEL REINFORCING OR PRESTRESSING STRANDS AND ARE FARTHER THAN 7 FEET

FROM THE END OF THE BEAM, SHALL INCLUDE THE INSTALLATION OF EMBEDDED

GALVANIC ANODES, TYPE 1A, ALKAI-ACTIVATED.

5.AFTER REPAIRS ARE COMPLETE, APPLY ACTIVATED ZINC ARC SPRAY OVER THE

SURFACE OF THE BEAM FOR A DISTANCE OF 7 FEET FROM THE END OF THE BEAM.

BEAM CROSS SECTION AND PROFILE

(TYPE III SHOWN, TYPE IV SIMILIAR)

ZINC METALLIZING

ZINC METALLIZING

7'-0"

BEAM NUMBER DEFICIENCY

1-6 1 CF

2-4

2-5

2-6

2-7

3-4

4-5

4-6

WEST END OF BEAM, SPALL

WEST END OF BEAM, SPALL, DEBRIS, EXPOSED STEEL

RIGHT BOTTOM FLANGE OVER ABUTMENT 1, SPALL WITH EXPOSED CABLES

4-2

4-4

4-5

EAST END OF BEAM, SPALL

WEST END OF BEAM, SPALL WITH EXPOSED STEEL

6-1

6-5

WEST END OF BEAM, CORNER OF BEAM, SPALL

RIGHT BOTTOM FLANGE OVER PIER 7, SPALL AND EXPOSED STEEL

4-6

WEST END OF BEAM AT PIER 2, SPALL WITH EXPOSED STEEL

WEST END OF BEAM AT PIER 2, SPALL AND DEBRIS

WEST END OF BEAM, NORTH FLANGE SPALL, EXPOSED STEEL

ESTIMATED

QUANTITY

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1.PERFORM BEAM REPAIRS IN ACCORDANCE WITH APPLICABLE TECHNICAL

SPECIFICATIONS AND DETAILS SHOWN IN THESE PLANS AND FDOT STANDARD

SPECIFICATIONS SECTION 450.

2.DEFICIENCIES SHOWN ARE FOR ILLUSTRATION ONLY. ANY DIMENSIONS ARE

APPROXIMATE. IN THE PRESENCE OF THE ENGINEER, THE CONTRACTOR SHALL

CLEARLY OUTLINE ALL AREAS IN NEED OF REPAIR WITH AN APPROVED PAINT OR

MARKER PRIOR TO DEMOLITION. NO DEMOLITION OF ANY AREA OR MEMBER OF

THE BRIDGE SHALL BE PERFORMED UNTIL THE CONTRACTOR RECEIVES

APPROVAL FROM THE ENGINEER.

EAST END OF BEAM AT PIER 5, NORTH AND SOUTH FACE, SPALL

EAST END OF BEAM AT PIER 5, NORTH FACE, SPALL

EAST END OF BEAM AT PIER 5, SOUTH FACE, SPALL

EAST END OF BEAM AT PIER 5, NORTH FACE, SPALL

BEAM, DIAPHRAGM, AND PEDESTAL REPAIR SUMMARY

NOTE: REPAIRS MARKED WITH "*" SHALL INCLUDE ZINC METALLIZING

BEAM REPAIRS

CONTINUED ON FOLLOWING SHEET

T I C

E

T

F I C I

C O

T

H I S

S

H E

E T

I S

T

H E

E

L E

C T

R O

N I C

F I L E

S I G

N

D

S

E A

L

D

L E

1G

-2

.0

F .A

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. COUNTY PROJECT ID

66066.2 CR 92

REVISIONS

kgrams 12/11/2024 4:15:46 PM U:\238200196\ms\struct\Final Submittal\B1BeamRepair02.dgn

Drawn By:

MPR

Checked by:

Designed by:

TRH

Checked by:

CPG

CPG

CLEARWATER, FL 33759

380 PARK PLACE BLVD. SUITE 300

CHRISTOPHER P. GAMACHE P.E. NO. 82122

Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.Stantec Consulting Services, Inc.

238200196

STANTEC PROJECT NO.

B1-7

BEAM REPAIR DETAILS 2 OF 2

BEAM NUMBER DEFICIENCY

6-6

8-5

8-7

9-1

9-5

10-4 1 CF

10-8

11-4 EAST END, SPALL WITH EXPOSED STEEL

11-7

12-2

LOWER SOUTH FLANGE AT PIER 8, SPALL AND CORRODED CABLES

EAST END OF BEAM, SPALL

SOUTH FACE OVER PIER 12, SPALL WITH CORRODED CABLES

12-6

14-6

15-2

14-4

15-4

15-5

16-6

17-4 WEST END OF BEAM, SOUTH FACE, SPALL

17-5

18-4 LOWER NORTH FLANGE AT BENT 19, SPALL

19-1

19-2

20-3

21-1

21-3

21-4

21-4

21-5

21-5

21-6

21-6

21-7

EAST END OF BEAM, NORTH FACE, SPALL

WEST END OF BEAM, SPALL

WEST END OF BEAM, SOUTH FACE, SPALL

WEST END OF BEAM, SOUTH FACE, SPALL

21-7

22-2

22-6

12-6

19-4

19-1

22-3

9-6 END DIAPHRAGM, WEST END PIER 10, SPALL WITH EXPOSED REBAR

B2 & B3

B3 & B4 END DIAPHRAGM, PIER 16, SPALL WITH EXPOSED REBAR

END DIAPHRAGM, PIER 16, EXPOSED REBAR

1 CF

1 CF

1 CF

18-1

16-1

1-7 1 EA

1 EA

1 EA

BEARING PLATE AT ABUTMENT 1

BEARING PLATE AT PIER 16

BEARING PLATE AT PIER 18

BENT 19 SOUTH FACE OF BEAM, SPALL

EAST END OF BEAM AT PIER 7, SPALL

WEST END OF BEAM AT PIER 9, NORTH AND SOUTH FACE, SPALL

END OF BEAM AT PIER 11, CRACK

WEST END OF BEAM AT PIER 12, SOUTH FACE, SPALL

WEST END OF BEAM AT BENT 21, NORTH AND SOUTH FACE, SPALL

WEST END OF BEAM AT BENT 21, SOUTH FACE, SPALL

WEST END OF BEAM AT BENT 21, SOUTH FACE, SPALL

EAST END OF BEAM AT BENT 22, NORTH AND SOUTH FACE, SPALL

EAST END OF BEAM AT BENT 22, NORTH/SOUTH FACE

EAST END OF BEAM AT BENT 22, SOUTH FACE, SPALL

WEST END OF BEAM AT BENT 21, NORTH FACE, SPALL

EAST END OF BEAM AT BENT 22, NORTH AND SOUTH FACE, SPALL

END OF BEAM AT END BENT 23, SPALL

BOTTOM FLANGE NEAR END BENT 23, CORNER SPALL

END OF BEAM AT END BENT 23, SPALL

LOWER SOUTH EDGE 4 FT FROM PIER 77-3

7-5 LOWER NORTH EDGE ADJACENT TO PIER 8

10-1 LOWER NORTH EDGE 6 FT FROM PIER 11

12-4

LOWER SOUTH EDGE ADJACENT TO PIER 12

20-7 EAST END OF BEAM, SPALL

8-5 1 CFFIRST INTERMEDIATE DIAPGHRAGM LOWER WEST EDGE

8-6 1 CFEND DIAPHRAGM ADJACENT OVER PIER 9

ESTIMATED

QUANTIY

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

1 CF

EAST END DIAPHRAGM AT PIER 16, DELAMINATION

WEST END OF BEAM AT PIER 8, NORTH AND SOUTH FACE

WEST END OF BEAM AT PIER 12, SOUTH FACE, SPALL

EAST END OF BEAM AT PIER 13, EXPOSED STRANDS

WEST END OF BEAM, AT PIER 15 NEAR BEARING, SPALL

EAST END OF BEAM AT PIER 15

WEST END OF BEAM AT PIER 15, DELAMINATION

WEST END OF BEAM AT PIER 15, SPALL

SOUTH FACE, WEST END OF BEAM, SPALL

WEST END OF BEAM AT BENT 19, SPALL

EAST END OF BEAM AT BENT 20, NORTH AND SOUTH FACE, SPALL

EAST END OF BEAM AT BENT 20, SPALL WITH EXPOSED STEEL

NOTE: REPAIRS MARKED WITH "*" SHALL INCLUDE ZINC METALLIZING

BEAM, DIAPHRAGM, AND PEDESTAL REPAIR SUMMARY (CONTINUED)

DIAPHRAGM AND PEDESTAL REPAIRS

EAST END PEDESTAL, SPALL

ASZ

EXISTING BEAM

ZINC CONNECTION PLATE, AS

REQUIRED. SEE SHEET B1-9

FOR DETAILS

7' FROM

EXPANSION

JOINT

NOTE: ARC SPRAY ZINC SHALL BE

APPLIED ON ANY BEAM ENDS THAT

RECEIVES CONCRETE REPAIRS

SCALE: N.T.S.1 ARC SPRAY ZINC (ASZ) LOCATION

FILE PATH: Z:\Shared\VCS\FL\2024\Jobs\F24086FL - Stantec - Stan Gober Memorial Bridge\Drawings\CAD\Stan Gober Drawings_2024 Update.dwg

N O

TI

C

E:

T

H E

O

FF

IC

IA

L R

EC

O

R D

O F

TH

IS

S H

EE

T

IS

T

H E

EL

EC

TR

O

N

IC

F

IL

E

SI

G N

ED

A

N D

S

EA

LE

D

U N

D

ER

R U

LE

1G

-2 3.

3, F .A

.C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. SANTEC PROJECT NO. COUNTY PROJECT ID

66066.2CR 92

Drawn By:

LW

Checked by:

Designed by:

PM

Checked by:

PM

MM

8413 LAUREL FAIR CIR, SUITE 200B

TAMPA, FL 33610

238200196PRATIK V. MURKUTE P.E. NO. 100387

AutoCAD SHX Text B1-8

AutoCAD SHX Text

BEAM ARC SPRAY ZINC LOCATION

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

4" X 4" ZINC MESHEXISTING CONCRETE

ANCHOR (TYP.)

APPLY SECOND LAYER OF ASZ OVER TOP OF

CONNECTION PLATE AND HARDWARE

APPLY FIRST LAYER OF ASZ UNDER THE

CONNECTION PLATE AND HARDWARE

STAINLESS STEEL THREADED

ROD, NUTS AND WASHERS

APPLY TOP COAT OF ZINC SILICATE

NOTES:

1. THESE DETAILS ARE TO BE APPLIED

IN CONJUNCTION WITH ASZ DETAIL

ON B1-8

2. TWO CONNECTION PLATES ARE

REQUIRED PER CONTINUOUS ASZ

SPRAY AREA

4 STAINLESS STEEL THREADED ROD AND

ASSOCATED HARDWARE, NUTS AND WASHERS

REINFORCING

STEEL

HOLE FILLED

WITH EPOXY

1ST ASZ LAYER

2ND ASZ LAYER

ANCHOR ZINC MESH

APPLY ASZ OVER TOP OF

CONNECTION PLATE AND HARDWARE

DRILL AND TAP

CONNECTION TO REBAR

TOP COAT OF

ZINC SILICATE

SCALE: N.T.S.1

NON-MONITORED

ANODE CONNECTION

FILE PATH: Z:\Shared\VCS\FL\2024\Jobs\F24086FL - Stantec - Stan Gober Memorial Bridge\Drawings\CAD\Stan Gober Drawings_2024 Update.dwg

SCALE: N.T.S.2

NON-MONITORED

ANODE AND STRUCTURE CONNECTION

N O

TI

C

E:

T

H E

O

FF

IC

IA

L R

EC

O

R D

O F

TH

IS

S H

EE

T

IS

T

H E

EL

EC

TR

O

N

IC

F

IL

E

SI

G N

ED

A

N D

S

EA

LE

D

U N

D

ER

R U

LE

1G

-2 3.

3, F .A

.C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. SANTEC PROJECT NO. COUNTY PROJECT ID

66066.2CR 92

Drawn By:

LW

Checked by:

Designed by:

PM

Checked by:

PM

MM

8413 LAUREL FAIR CIR, SUITE 200B

TAMPA, FL 33610

238200196PRATIK V. MURKUTE P.E. NO. 100387

AutoCAD SHX Text B1-9

AutoCAD SHX Text

ZINC CONNECTION DETAILS

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

NOTE:

1. EMBEDDED GALVANIC ANODES WILL ONLY BE INSTALLED IN BEAM

DIAPHRAGM.

2. FOR LARGE REPAIRS PLACE EMBEDDED GALVANIC ANODES AROUND THE

PERIMETER OF SPALL REPAIR AT 12 IN O.C. ANODE SPACING AND LAYOUT

APPLIES FOR BOTH PARTIAL AND FULL DEPTH REPAIR AREAS.

3. IN PATCHES SMALLER THAN 1 SF PLACE ONE EMBEDDED GALVANIC ANODE

SOUND CONCRETEEMBEDDED

GALVANIC

ANODE (TYP.)

REMOVE ALL

DELAMINATED

CONCRETE

12"

SCALE: N.T.S.1 EMBEDDED GALVANIC ANODE PATCH REPAIRS

FILE PATH: Z:\Shared\VCS\FL\2024\Jobs\F24086FL - Stantec - Stan Gober Memorial Bridge\Drawings\CAD\Stan Gober Drawings_2024 Update.dwg

N O

TI

C

E:

T

H E

O

FF

IC

IA

L R

EC

O

R D

O F

TH

IS

S H

EE

T

IS

T

H E

EL

EC

TR

O

N

IC

F

IL

E

SI

G N

ED

A

N D

S

EA

LE

D

U N

D

ER

R U

LE

1G

-2 3.

3, F .A

.C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. SANTEC PROJECT NO. COUNTY PROJECT ID

66066.2CR 92

Drawn By:

LW

Checked by:

Designed by:

PM

Checked by:

PM

MM

8413 LAUREL FAIR CIR, SUITE 200B

TAMPA, FL 33610

238200196PRATIK V. MURKUTE P.E. NO. 100387

AutoCAD SHX Text B1-10

AutoCAD SHX Text

GALVANIC ANODE PLACEMENT DETAIL

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

SCALE: N.T.S.1

SECTION VIEW

GALVANIC ANODE INSTALLATION DETAIL

FILE PATH: Z:\Shared\VCS\FL\2024\Jobs\F24086FL - Stantec - Stan Gober Memorial Bridge\Drawings\CAD\Stan Gober Drawings_2024 Update.dwg

N O

TI

C

E:

T

H E

O

FF

IC

IA

L R

EC

O

R D

O F

TH

IS

S H

EE

T

IS

T

H E

EL

EC

TR

O

N

IC

F

IL

E

SI

G N

ED

A

N D

S

EA

LE

D

U N

D

ER

R U

LE

1G

-2 3.

3, F .A

.C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. SANTEC PROJECT NO. COUNTY PROJECT ID

66066.2CR 92

Drawn By:

LW

Checked by:

Designed by:

PM

Checked by:

PM

MM

8413 LAUREL FAIR CIR, SUITE 200B

TAMPA, FL 33610

238200196PRATIK V. MURKUTE P.E. NO. 100387

AutoCAD SHX Text

EMBEDDED GALVANIC ANODE (SEE SHEET B1-12 FOR INSTALLATION INSTRUCTIONS.)

AutoCAD SHX Text

CLEAN REINFORCING STEEL (REBAR)

AutoCAD SHX Text

EXISTING CONCRETE SUBSTRATE

AutoCAD SHX Text

CONCRETE REPAIR MATERIAL

AutoCAD SHX Text

TOP OF CONCRETE SURFACE

AutoCAD SHX Text

EMBEDDED GALVANIC ANODES GENERAL NOTES

AutoCAD SHX Text B1-11

AutoCAD SHX Text

GALVANIC ANODE SINGLE WIRE CONNECTION GENERAL NOTES

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

1. REMOVE DAMAGED CONCRETE AND CLEAN REMOVE DAMAGED CONCRETE AND CLEAN DAMAGED CONCRETE AND CLEAN DAMAGED CONCRETE AND CLEAN CONCRETE AND CLEAN CONCRETE AND CLEAN AND CLEAN AND CLEAN CLEAN CLEAN STEEL AS PER TSP T401-70. 2. ENSURE EXPOSED REINFORCING STEEL IS ENSURE EXPOSED REINFORCING STEEL IS EXPOSED REINFORCING STEEL IS EXPOSED REINFORCING STEEL IS REINFORCING STEEL IS REINFORCING STEEL IS STEEL IS STEEL IS IS IS SECURELY FASTENED WITH TIE WIRE TO FASTENED WITH TIE WIRE TO FASTENED WITH TIE WIRE TO WITH TIE WIRE TO WITH TIE WIRE TO TIE WIRE TO TIE WIRE TO WIRE TO WIRE TO TO TO PROVIDE GOOD ELECTRICAL CONTINUITY. 3. ATTACH EMBEDDED GALVANIC ANODES TO ATTACH EMBEDDED GALVANIC ANODES TO EMBEDDED GALVANIC ANODES TO EMBEDDED GALVANIC ANODES TO GALVANIC ANODES TO GALVANIC ANODES TO ANODES TO ANODES TO TO TO CLEAN STEEL AT AN EVEN SPACING WITHIN STEEL AT AN EVEN SPACING WITHIN STEEL AT AN EVEN SPACING WITHIN AT AN EVEN SPACING WITHIN AT AN EVEN SPACING WITHIN AN EVEN SPACING WITHIN AN EVEN SPACING WITHIN EVEN SPACING WITHIN EVEN SPACING WITHIN SPACING WITHIN SPACING WITHIN WITHIN WITHIN THE REPAIR AREA. PLACE THE ANODE AS REPAIR AREA. PLACE THE ANODE AS REPAIR AREA. PLACE THE ANODE AS AREA. PLACE THE ANODE AS AREA. PLACE THE ANODE AS PLACE THE ANODE AS PLACE THE ANODE AS THE ANODE AS THE ANODE AS ANODE AS ANODE AS AS AS CLOSE AS POSSIBLE TO THE INTERFACE AS POSSIBLE TO THE INTERFACE AS POSSIBLE TO THE INTERFACE POSSIBLE TO THE INTERFACE POSSIBLE TO THE INTERFACE TO THE INTERFACE TO THE INTERFACE THE INTERFACE THE INTERFACE INTERFACE INTERFACE BETWEEN THE REPAIR AND THE PARENT THE REPAIR AND THE PARENT THE REPAIR AND THE PARENT REPAIR AND THE PARENT REPAIR AND THE PARENT AND THE PARENT AND THE PARENT THE PARENT THE PARENT PARENT PARENT CONCRETE (WITHIN 4 INCHES) WHILE STILL (WITHIN 4 INCHES) WHILE STILL (WITHIN 4 INCHES) WHILE STILL 4 INCHES) WHILE STILL 4 INCHES) WHILE STILL INCHES) WHILE STILL INCHES) WHILE STILL WHILE STILL WHILE STILL STILL STILL ALLOWING THE REPAIR MATERIAL TO ENCASE THE REPAIR MATERIAL TO ENCASE THE REPAIR MATERIAL TO ENCASE REPAIR MATERIAL TO ENCASE REPAIR MATERIAL TO ENCASE MATERIAL TO ENCASE MATERIAL TO ENCASE TO ENCASE TO ENCASE ENCASE ENCASE THE ANODE. 4. EMBEDDED GALVANIC ANODES ARE TO BE EMBEDDED GALVANIC ANODES ARE TO BE GALVANIC ANODES ARE TO BE GALVANIC ANODES ARE TO BE ANODES ARE TO BE ANODES ARE TO BE ARE TO BE ARE TO BE TO BE TO BE BE BE INSTALLED PER THE DESIGN DRAWINGS AND PER THE DESIGN DRAWINGS AND PER THE DESIGN DRAWINGS AND THE DESIGN DRAWINGS AND THE DESIGN DRAWINGS AND DESIGN DRAWINGS AND DESIGN DRAWINGS AND DRAWINGS AND DRAWINGS AND AND AND SPECIFICATIONS ALONG THE PERIMETER OF THE ALONG THE PERIMETER OF THE ALONG THE PERIMETER OF THE THE PERIMETER OF THE THE PERIMETER OF THE PERIMETER OF THE PERIMETER OF THE OF THE OF THE THE THE REPAIR AREA AFTER ALL UNSOUND CONCRETE AREA AFTER ALL UNSOUND CONCRETE AREA AFTER ALL UNSOUND CONCRETE AFTER ALL UNSOUND CONCRETE AFTER ALL UNSOUND CONCRETE ALL UNSOUND CONCRETE ALL UNSOUND CONCRETE UNSOUND CONCRETE UNSOUND CONCRETE CONCRETE CONCRETE HAS BEEN REMOVED. 5. TEST ELECTRICAL CONTINUITY OF THE TEST ELECTRICAL CONTINUITY OF THE ELECTRICAL CONTINUITY OF THE ELECTRICAL CONTINUITY OF THE CONTINUITY OF THE CONTINUITY OF THE OF THE OF THE THE THE REINFORCING STEEL WITHIN ENTIRETY OF PATCH STEEL WITHIN ENTIRETY OF PATCH STEEL WITHIN ENTIRETY OF PATCH WITHIN ENTIRETY OF PATCH WITHIN ENTIRETY OF PATCH ENTIRETY OF PATCH ENTIRETY OF PATCH OF PATCH OF PATCH PATCH PATCH BEFORE INSTALLATION AND REPAIR AS INSTALLATION AND REPAIR AS INSTALLATION AND REPAIR AS AND REPAIR AS AND REPAIR AS REPAIR AS REPAIR AS AS AS NECESSARY. TEST ELECTRICAL CONTINUITY OF TEST ELECTRICAL CONTINUITY OF TEST ELECTRICAL CONTINUITY OF TEST ELECTRICAL CONTINUITY OF ELECTRICAL CONTINUITY OF ELECTRICAL CONTINUITY OF CONTINUITY OF CONTINUITY OF OF OF ANODE CONNECTION TO REINFORCING STEEL CONNECTION TO REINFORCING STEEL CONNECTION TO REINFORCING STEEL TO REINFORCING STEEL TO REINFORCING STEEL REINFORCING STEEL REINFORCING STEEL STEEL STEEL AFTER INSTALLATION. A DC VOLTAGE INSTALLATION. A DC VOLTAGE INSTALLATION. A DC VOLTAGE A DC VOLTAGE A DC VOLTAGE A DC VOLTAGE DC VOLTAGE DC VOLTAGE VOLTAGE VOLTAGE MEASUREMENT OF 1mV CONFIRMS GOOD OF 1mV CONFIRMS GOOD OF 1mV CONFIRMS GOOD 1mV CONFIRMS GOOD 1mV CONFIRMS GOOD CONFIRMS GOOD CONFIRMS GOOD GOOD GOOD CONTINUITY. 6. POUR BACK REPAIR AREA WITH COMPATIBLE POUR BACK REPAIR AREA WITH COMPATIBLE BACK REPAIR AREA WITH COMPATIBLE BACK REPAIR AREA WITH COMPATIBLE REPAIR AREA WITH COMPATIBLE REPAIR AREA WITH COMPATIBLE AREA WITH COMPATIBLE AREA WITH COMPATIBLE WITH COMPATIBLE WITH COMPATIBLE COMPATIBLE COMPATIBLE REPAIR MATERIAL AS PER PROJECT MATERIAL AS PER PROJECT MATERIAL AS PER PROJECT AS PER PROJECT AS PER PROJECT PER PROJECT PER PROJECT PROJECT PROJECT SPECIFICATIONS.

B1-13

SCALE: N.T.S.1 INSTALLATION STEP #1

FILE PATH: Z:\Shared\VCS\FL\2024\Jobs\F24086FL - Stantec - Stan Gober Memorial Bridge\Drawings\CAD\Stan Gober Drawings_2024 Update.dwg

SCALE: N.T.S.2 INSTALLATION STEP #2

SCALE: N.T.S.3 INSTALLATION STEP #3

SCALE: N.T.S.4 INSTALLATION STEP #4

N O

TI

C

E:

T

H E

O

FF

IC

IA

L R

EC

O

R D

O F

TH

IS

S H

EE

T

IS

T

H E

EL

EC

TR

O

N

IC

F

IL

E

SI

G N

ED

A

N D

S

EA

LE

D

U N

D

ER

R U

LE

1G

-2 3.

3, F .A

.C

STAN GOBER MEMORIAL BRIDGE REHAB

PROJECT NAME:

SHEET TITLE:

BRIDGE NO. 030184

REF. DWG. NO.

SHEET NO.

COLLIER COUNTY

ROAD NO. SANTEC PROJECT NO. COUNTY PROJECT ID

66066.2CR 92

Drawn By:

LW

Checked by:

Designed by:

PM

Checked by:

PM

MM

8413 LAUREL FAIR CIR,…