25-8367_-_Bid_Schedule.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Stan Gober Memorial Bridge Rehabilitation
Solicitation number
25-8367
Issued by
Collier County, Florida

About this file

The document is a Bid Schedule for the Stan Gober Memorial Bridge Rehabilitation Construction Invitation to Bid (ITB 25-8367) issued by Collier County, Florida. The project involves comprehensive bridge rehabilitation, with a non-mandatory pre-bid meeting scheduled for April 22, 2025, at 10:00 a.m. in Naples, Florida. Sealed bids will be accepted until May 23, 2025, at 3:00 p.m. local time, with prospective bidders required to register on the county's procurement portal. The bid schedule details 32 line items for bridge rehabilitation work, including mobilization, maintenance of traffic, concrete restoration, cathodic protection systems, expansion joint repair, and various surface treatments.

The bid schedule indicates a total project budget with an owner's allowance of $900,000 allocated for unforeseen conditions or owner-directed work. The allowance will be used through change orders with documented time and materials support. Notably, all line items in the current bid schedule show zero dollar amounts, suggesting bidders will need to provide their specific pricing. The project involves extensive bridge infrastructure work, including removal of existing concrete, installation of cathodic protection systems, concrete surface treatments, and structural repairs. Bidders must obtain complete documentation through the Collier County procurement portal and comply with the specified bidding procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Stan Gober Memorial Bridge Rehabilitation
Construction ITB 25-8367
Bid Schedule
Item No.DESCRIPTIONUNITQTYUnit PriceTOTAL AMOUNT
101-1MOBILIZATIONLS1$ - 0$ - 0
102-1MAINTENANCE OF TRAFFICLS1$ - 0$ - 0
104-11FLOATING TURBIDITY BARRIERLF3,150$ - 0$ - 0
104-30TURBIDITY MONITORINGLS1$ - 0$ - 0
110-3-10LADDERS AND PLATFORMS, REMOVEEA2$ - 0$ - 0
110-4-10REMOVAL OF EXIST CONCSY2,137$ - 0$ - 0
400-4-47CONCRETE CLASS IV, CAST IN PLACE TOPPING WITH SRACY89.1$ - 0$ - 0
400-7-1BRIDGE DECK GROOVINGSY2,137$ - 0$ - 0
400-142-2CATHODIC PROTECTION SYSTEM, ZINC ARC SPRAYSF4,802$ - 0$ - 0
400-142-10EMBEDDED GALVANIC ANODEEA6$ - 0$ - 0
400-142-11GALVANIC OVERBUILD WITH ANODES FOR FOOTINGS/STRUTSSF13,854$ - 0$ - 0
401-70-5RESTORE SPALLED AREAS, CONTRACTOR'S OPTIONCF79$ - 0$ - 0
413-150PENETRATING CORROSION INHIBITORGA933$ - 0$ - 0
413-154CLEANING AND SEALING CONCRETE SURFACES - PENETRANT SEALER OR METHACRYLATESSF81,048$ - 0$ - 0
457-2-131CATHODIC PROTECTION INTEGRAL COLUMN JACKET, NON-STRUCUTRAL, GALVANIC SYSTEMLF108$ - 0$ - 0
457-2-221CATHODIC PROTECTION INTEGRAL PILE JACKET, STRUCTURAL, 16.1-30" GALVANIC SYSTEMLF8$ - 0$ - 0
458-1-21BRIDGE DECK EXPANSION JNT, REHAB, POURED JOINT WITH BACKER RODLF1,064$ - 0$ - 0
470-75-2TIMBER FENDER SYSTEM REPAIRLS1$ - 0$ - 0
530-3-3RIPRAP-RUBBLE, BANK AND SHORETN5,872$ - 0$ - 0
530-74BEDDING STONETN1,961$ - 0$ - 0
561-1-1COATING EXISTING STRUCTURAL STEEL, BEARINGEA4$ - 0$ - 0
630-2-30CONDUIT ANCHOR REPLACEEA1$ - 0$ - 0
630-2-31CONDUIT REPAIR/REPLACELF100$ - 0$ - 0
706-1-3RAISED PAVEMENT MARKER, TYPE BEA44$ - 0$ - 0
711-16-101THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6"GM0.04$ - 0$ - 0
711-16-201THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6"GM0.04$ - 0$ - 0
713-103-101PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGESGM0.44$ - 0$ - 0
713-103-201PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGESGM0.54$ - 0$ - 0
TOTAL BID AMOUNT$ - 0

* Staff has allocated $900,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.