Stan Gober Memorial Bridge Rehabilitation Project – Department of the Army Permit
This document is a Department of the Army permit (SAJ-2009-01021, NWP-MLT) issued by the U.S. Army Corps of Engineers Jacksonville District to Collier County Government for the Stan Gober Memorial Bridge Rehabilitation Project located over Marco Channel in Goodland, Collier County, Florida. The project involves repair of existing scour holes and failed scour protection at piers 12 through 16 of Bridge No. 030184 by placing clean rubble riprap and bedding stone around five existing piers. The proposed work encompasses a total impact area of 0.52 acre (0.104 acre per pier) based on approximately 84-foot by 60-foot fill dimensions at each pier. Work will occur within tidal waters of Goodland Bay in the Rookery Bay National Estuarine Research Reserve, designated as an outstanding Florida water. The permit was issued on October 28, 2022, and authorization is valid until March 14, 2026. The applicant must commence work within the specified timeframe or obtain re-verification; if work begins before permit modification or revocation, the permittee has 12 months from modification/revocation to complete activities under existing terms.
The permit authorizes work pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. Special conditions require the permittee to maintain floating turbidity curtains with weighted skirts extending to within one foot of bottom, implement a detailed Turbidity Monitoring Plan with a 100-foot mixing zone limiting turbidity to zero nephelometric turbidity units above background conditions, provide commencement notification within 10 days of start, submit self-certification compliance within 60 days of completion, and comply with standard manatee conditions for in-water work and sea turtle/smalltooth sawfish construction conditions. A subaquatic vegetation and hardbottom benthic survey conducted September 8, 2021, documented no SAV or hardbottom resources within the survey area, and no impacts to adjacent mangrove wetlands are proposed. Cultural resources protection protocols require immediate cessation and notification to the Florida Department of State and Corps if historic or archaeological materials are discovered. All work must be completed during daylight hours, with erosion control measures and stabilization required upon completion. The permittee must maintain a copy of the permit and approved plans at the construction site and allow Corps representatives to inspect authorized activities at any time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regulatory Division West Permits Branch Fort Myers Permits Section
SAJ-2009-01021 (NWP-MLT)
Collier County Government c/o Jay Ahmad 2885 Horseshoe Drive S Naples, Florida 34104
Dear Mr. Ahmad:
Your application for a Department of the Army permit, received on May 28, 2022, has been assigned number SAJ-2009-01021 (NWP-MLT). A review of the information and drawings provided shows the proposed work includes the repair of the existing scour holes and failed scour protection in the vicinity of piers 12 through 16 where significant scour has occurred. No repairs or improvements are required at the remaining piers or the bridge abutments. The project proposes to place clean rubble riprap and bedding stone around the five (5) existing piers. The bedding stone will fill the existing scour hole and the riprap will provide a protective layer to avoid bedding stone and native substrate scouring. The total proposed impact area for the five (5) piers is 0.52 acre (0.104 acre each) based on approximately 84-foot by 60-foot fill dimensions at each pier. The proposed work will occur within the tidal waters of Goodland Bay within the Rookery Bay National Estuarine Research Reserve which is an outstanding Florida water (OFW) and the applicant is requesting a 100-foot mixing zone surrounding the proposed scour protection work and has submitted detailed plans to avoid discharges greater than zero
(0) nephelometric turbidity unit (NTUs) above the background conditions. The applicant will utilize floating turbidity curtains to control erosion and sedimentation within the vicinity and a detailed Turbidity Monitoring Plan is included in the project plans attached to this permit. A submerged aquatic vegetation (SAV) and hardbottom benthic survey was conducted by ESA on September 8, 2021, to document the existing conditions and the presence of SAV and hardbottom habitats. Neither of these resources were documented within the survey area that encompassed piers 12 through 16 and the vicinity of the proposed activities. No impacts to the adjacent mangrove wetlands are proposed or authorized. The applicant will utilize floating turbidity curtains to control erosion and sedimentation within the bay. The activities subject to this permit are authorized pursuant to authorities under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 403) and Section 404 of the Clean Water Act (33 U.S.C. § 1344).
The project would affect waters of the United States, associated with the Marco Channel (a navigable vessel channel but is not a federal channel) of Goodland Bay, in
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
1520 ROYAL PALM SQUARE BLVD, SUITE 310
FORT MYERS, FLORIDA 33919
October 28, 2022
REPLY TO
ATTENTION OF
Section 13, Township 52 South, Range 26 East, in Goodland, Collier County, Florida (Latitude: 25.9329°, Longitude: -81.6533°).
Your project, as depicted on the enclosed drawings, is authorized by Nationwide Permit (NWP) Number 3. This authorization is valid until March 14, 2026.
Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit. Please access the U.S. Army Corps of Engineers' (Corps) Jacksonville District's Regulatory Internet page to access Internet links to view the Final Nationwide Permits, Federal Register Vol. 82, dated January 6, 2017, specifically pages 1983 to 2008, and the table of Regional Conditions. The Internet page address is:
http://www.saj.usace.army.mil/Missions/Regulatory.aspx
Please be aware this Internet address is case sensitive and should be entered as it appears above. Once there you will need to click on “Source Book”; and, then click on “Nationwide Permits.” These files contain the description of the Nationwide Permit authorization, the Nationwide Permit general conditions, and the regional conditions, which apply specifically to this verification for NWP-3. Enclosed is a list of the six General Conditions, which apply to all Department of the Army authorizations. You must comply with all of the special and general conditions and any project specific condition of this authorization, or you may be subject to enforcement action. In the event you have not completed construction of your project within the specified time limit, a separate application or re-verification may be required.
The following special conditions are included with this verification:
1. Reporting Address: The permittee shall submit all reports, notifications, documentation and correspondence required by the general and special conditions of this permit to one (not both) of the following addresses:
a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
b. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
The Permittee shall reference this permit number, SAJ-2009-01021 (NW-MLT), on all submittals.
2. Commencement Notification: Within 10 days from the date of initiating the work authorized by this permit, the permittee shall provide a written notification of the date of commencement of authorized work to the Corps.
http://www.saj.usace.army.mil/Missions/Regulatory.aspx mailto:SAJ-RD-Enforcement@usace.army.mil
3. Self-Certification: Within 60 days of completion of the work authorized by this permit, the permittee shall complete the attached “Self-Certification Statement of Compliance” form (attached) and submit it to the Corps. In the event that the completed work deviates in any manner from the authorized work, the permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the “Self-Certification Statement of Compliance” form. The description of any deviations on the “Self-Certification Statement of Compliance” form does not constitute approval of any deviations by the Corps.
4. Assurance of Navigation and Maintenance: The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
5. Posting of Permit: The permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site.
6. Erosion Control: Prior to the initiation of any work authorized by this permit, the permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using sod, degradable mats, barriers, or a combination of similar stabilizing materials to prevent erosion. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized.
7. Turbidity Barriers: Prior to the initiation of any of the work authorized by this permit, the Permittee shall install floating turbidity barriers with weighted skirts that extend to within 1 foot of the bottom around all work areas that are in, or adjacent to, surface waters. The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all suspended and erodible materials have been stabilized. Turbidity barriers shall be removed upon stabilization of the work area.
8. Turbidity Monitoring Plan: The permittee shall follow the Turbidity Monitoring Plan included in the attached plans. No turbidity levels greater than zero (0) nephelometric turbidity unit (NTUs) above the background conditions will be permissible beyond the prescribed mixing zone.
9. Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect, impact, or disturb properties listed in the National Register of Historic Places (NRHP), or those eligible for inclusion in the NRHP.
b. If, during permitted activities, items that may have historic or archaeological origin are observed the Permittee shall immediately cease all activities adjacent to the discovery that may result in the destruction of these resources and shall prevent his/her employees from further removing, or otherwise damaging, such resources. The applicant shall notify both the Florida Department of State, Division of Historical Resources, Compliance Review Section at (850)-245-6333 and the Corps, of the observations within the same business day (8 hours). Examples of submerged historical, archaeological or cultural resources include shipwrecks, shipwreck debris fields (such as steam engine parts, or wood planks and beams), anchors, ballast rock, concreted iron objects, concentrations of coal, prehistoric watercraft (such as log "dugouts"), and other evidence of human activity. The materials may be deeply buried in sediment, resting in shallow sediments or above them, or protruding into water. The Corps shall coordinate with the Florida State Historic Preservation Officer (SHPO) to assess the significance of the discovery and devise appropriate actions. Project activities shall not resume without verbal and/or written authorization from the Corps.
c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and, if deemed necessary by the SHPO or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.
d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the State Archeologist and from the Corps.
10. Standard Manatee Conditions for In-Water Work: The Permittee shall comply with the “Standard Manatee Conditions for In-Water Work – 2011”. The most recent version of the Manatee Conditions must be utilized.
11. Daylight Hours: All work must be completed during daylight hours.
12. Jacksonville District Programmatic Biological Opinion (JAXBO): Structures and activities authorized under this permit will be constructed and operated in accordance with all applicable PDCs contained in the JAXBO, based on the permitted activity.
Failure to comply with applicable PDCs will constitute noncompliance with this permit. In addition, failure to comply with the applicable PDCs, where a take of listed species occurs, would constitute an unauthorized take. The NMFS is the appropriate authority to determine compliance with the Endangered Species Act. The most current version of JAXBO can be accessed at the Jacksonville District Regulatory Division website in the Endangered Species section of the Sourcebook located at:
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx
JAXBO may be subject to revision at any time. The most recent version of these JAXBO must be utilized during the design and construction of the permitted work.
13. Wetland Avoidance Areas: The adjacent mangrove wetlands, were avoided in accordance with the Section 404(b)(1) guidelines and Public Interest Review. Any proposed discharge of fill material to these areas would require re-evaluation for the Department of Army authorization.
This letter of authorization does not give absolute Federal authority to perform the work as specified on your application. The proposed work may be subject to local building restrictions mandated by the National Flood Insurance Program. You should contact your local office that issues building permits to determine if your site is located in a flood-prone area, and if you must comply with the local building requirements mandated by the National Flood Insurance Program.
If you are unable to access the internet or require a hardcopy of any of the conditions, limitations, or expiration date for the above referenced NWP, please contact Michael Taylor by telephone at 239-334-1975 x0010 or by email at Michael.l.taylor@usace.army.mil.
Thank you for your cooperation with our permit program. The Corps Jacksonville District Regulatory Division is committed to improving service to our customers. We strive to perform our duty in a friendly and timely manner while working to preserve our environment. We invite you to complete our automated Customer Service Survey at https://regulatory.ops.usace.army.mil/customer-service-survey/. Please be aware this Internet address is case sensitive, and you will need to enter it exactly as it appears above. Your input is appreciated – favorable or otherwise.
Sincerely, Michael Taylor Project Manager http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx mailto:Michael.l.taylor@usace.army.mil https://regulatory.ops.usace.army.mil/customer-service-survey/
Enclosures General Conditions Department of the Army Permit Transfer Request Commencement Notification Self-Certification Statement of Compliance Standard Manatee Conditions for In-Water Work National Marine Fisheries Service’s “General PDCs Applicable to All Projects” National Marine Fisheries Service’s “PDCs for In-Water Activities” Permit Drawings
GENERAL CONDITIONS
33 CFR PART 320-330
1. The time limit for completing the work authorized ends on March 18, 2022.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.
6. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST
PERMIT NUMBER: SAJ-2009-01021 (NWP-MLT)
When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire.
To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box 4970, Jacksonville, FL 32232-0019.
(TRANSFEREE-SIGNATURE) (SUBDIVISION)
(DATE) (LOT) (BLOCK)
__________________________________ (STREET ADDRESS)
(NAME-PRINTED)
(MAILING ADDRESS)
(CITY, STATE, ZIP CODE)
COMMENCEMENT NOTIFICATION
Within ten (10) days of initiating the authorized work, submit this form via electronic mail to saj-rd-enforcement@usace.army.mil (preferred, not to exceed 15 MB) or by standard mail to U.S. Army Corps of Engineers, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
1. Department of the Army Permit Number: SAJ-2009-01021 (NWP-MLT)
2. Permittee Information:
Name: __________________________________________
Email: __________________________________________
Address: __________________________________________
Phone: __________________________________________
3. Construction Start Date: ______________________
4. Contact to Schedule Inspection:
Name: __________________________________________
Email: __________________________________________
Phone: __________________________________________
Signature of Permittee
Printed Name of Permittee
Date mailto:saj-rd-enforcement@usace.army.mil
SELF-CERTIFICATION STATEMENT OF COMPLIANCE
Within sixty (60) days of completion of the authorized work, submit this form via electronic mail to saj-rd-enforcement@usace.army.mil (preferred, not to exceed 15MB) or by standard mail to U.S. Army Corps of Engineers, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
1. Department of the Army Permit Number: SAJ-2009-01021 (NWP-MLT)
2. Permittee Information: Name: ____________________________________________
Email: ____________________________________________
Address: __________________________________________
Phone: ___________________________________________
3. Date Authorized Work Started: _________________ Completed: _______________
4. Contact to Schedule Inspection: Name: ____________________________________
Email: ____________________________________
Phone: ___________________________________
5. Description of Authorized Work (e.g. bank stabilization, fill placed within wetlands, docks, dredging, etc.): ________________________________________________________
6. Acreage or Square Feet of Impacts to Waters of the United States: _________________
7. Describe Mitigation completed (if applicable): __________________________________
8. Describe any Deviations from Permit (attach drawing(s) depicting the deviations):
I certify that all work and mitigation (if applicable) was done in accordance with the limitations and conditions as described in the permit. Any deviations as described above are depicted on the attached drawing(s).
Signature of Permittee
Printed Name of Permittee
Date mailto:saj-rd-enforcement@usace.army.mil
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
The permittee shall comply with the following conditions intended to protect manatees from direct project effects:
a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.
d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shut down if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and
Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida, and to FWC at ImperiledSpecies@myFWC.com
f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8 ½” by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at MyFWC.com/manatee. Questions concerning these signs can be sent to the email address listed above.
mailto:ImperiledSpecies@myFWC.com
CAUTION : M A N A T E E H A B ITA T
All project vessels
ID L E S P E ED / N O W A K E
W hen a manat ee is within 50 feet of w or k all in-water ac tivities must
S H UT D O W N
Re port any co llision with or injury t o a manatee:
Wildlife Alert:
888-404-FWCC (3922)
cell *FWC or #FWC
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office 263
13th Avenue South St.
Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the
Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment.
Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service’s Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes
(e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection.
These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment.
Activities may not resume until the protected species has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824- 5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006
O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
General PDCs Applicable to All Projects:
AP.1. The applicant must agree to adhere to PDCs for In-Water Activities (provided below).
AP.2. All projects involving the installation of piles or sheet piles shall follow the PDCs for In- Water Noise from Pile and Sheet Pile Installation (Section 2.2). This Opinion does not cover projects that use seismic surveys, low frequency sonar, explosions, and seismic air guns.
AP.3. All projects proposed in or near areas with mangroves, seagrasses, corals, or hard bottom habitat must refer to PDCs for Mangroves, Seagrasses, Corals, and Hard Bottom for All Projects (provided below) to determine whether the project is covered under the Opinion and, if it is covered, to ensure it is sited, designated, and implemented following all of the PDCs in that section.
AP.4. For every project, the USACE must determine if the project is located within:
• Smalltooth sawfish critical habitat limited exclusion zones (Section 2.1.1.1)
• Gulf sturgeon critical habitat migratory restriction zones (Section 2.1.1.2)
• Atlantic sturgeon critical habitat exclusion zone (St. Marys River) (Section 2.1.1.3)
• North Atlantic right whale educational sign zones (Section 2.1.1.4)
• U.S. Caribbean sea turtle critical habitat restriction zones (Section 2.1.1.5)
• Bryde’s whale exclusion zone (Section 2.1.1.6) Where the activity is excluded from the Opinion within a particular zone, the application must be processed under a separate consultation. Where additional restrictions apply to activities within that zone, the USACE or other authorizing entity must ensure that the project meets the requirements for that zone.
AP.5. This Opinion only covers new construction (i.e., installation, repair, replacement) and does not apply to after-the-fact consultations or enforcement actions handled by the
USACE.
AP.6. All activities must be completed during daylight hours.
U.S. Army Corps of Engineers Jacksonville District's Programmatic Biological Opinion (JaxBO) Project Design Criteria (PDCs) for In-Water Activities
November 20, 2017
1) (AP.7.) Education and Observation: The permittee must ensure that all personnel associated with the project are instructed about the potential presence of species protected under the ESA and the Marine Mammal Protection Act (MMPA). All on-site project personnel are responsible for observing water-related activities for the presence of protected species. All personnel shall be advised that there are civil and criminal penalties for harming, harassing, or killing ESA-listed species or marine mammals. To determine which species may be found in the project area, please review the relevant Protected Species List at:
http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangered/in dex.html
2) (AP.8.) Reporting of interactions with protected species:
a) Any collision(s) with and/or injury to any sea turtle, sawfish, whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS’s Protected Resources Division (PRD) at (1-727-824-5312) or by email to takereport.nmfsser@noaa.gov and SAJ-RD-Enforcement@usace.army.mil.
b) Smalltooth sawfish: Report sightings to 1-844-SAWFISH or email Sawfish@MyFWC.com
c) Sturgeon: Report dead sturgeon to 1-844-STURG 911 (1-844-788-7491) or email nmfs.ser.sturgeonnetwork@noaa.gov
d) Sea turtles and marine mammals: Report stranded, injured, or dead animals to 1-
877-WHALE HELP (1-877-942-5343).
e) North Atlantic right whale: Report injured, dead, or entangled right whales to the USCG via VHF Channel 16.
3) (AP.9.) Vessel Traffic and Construction Equipment: All vessel operators must watch for and avoid collision with species protected under the ESA and MMPA.
Vessel operators must avoid potential interactions with protected species and operate in accordance with the following protective measures:
a) Construction Equipment:
i) All vessels associated with the construction project shall operate at “Idle Speed/No Wake” at all times while operating in water depths where the draft of the vessel provides less than a 4-foot (ft) clearance from the bottom, and in all depths after a protected species has been observed in and has departed the area.
ii) All vessels will follow marked channels and/or routes using the maximum water depth whenever possible.
iii) Operation of any mechanical construction equipment, including vessels, shall cease immediately if a listed species is observed within a 50-ft radius of http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangered/index.html http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangered/index.html construction equipment and shall not resume until the species has departed the area of its own volition.
iv) If the detection of species is not possible during certain weather conditions (e.g., fog, rain, wind), then in-water operations will cease until weather conditions improve and detection is again feasible.
b) All Vessels:
i) Sea turtles: Maintain a minimum distance of 150 ft.
ii) North Atlantic right whale: Maintain a minimum 1,500-ft distance (500 yards).
iii) Vessels 65 ft in length or longer must comply with the Right Whale Ship Strike
Reduction Rule (50 CFR 224.105) which includes reducing speeds to 10 knots or less in Seasonal Management Areas (http://www.fisheries.noaa.gov/pr/shipstrike/).
iv) Mariners shall check various communication media for general information regarding avoiding ship strikes and specific information regarding right whale sightings in the area. These include NOAA weather radio, USCG NAVTEX broadcasts, and Notices to Mariners.
v) Marine mammals (i.e., dolphins, whales [other than North Atlantic right whales], and porpoises): Maintain a minimum distance of 300 ft.
vi) When these animals are sighted while the vessel is underway (e.g., bow-riding), attempt to remain parallel to the animal’s course. Avoid excessive speed or abrupt changes in direction until they have left the area.
vii) Reduce speed to 10 knots or less when mother/calf pairs or groups of marine mammals are observed, when safety permits.
4) (AP.10.) Turbidity Control Measures during Construction: Turbidity must be monitored and controlled. Prior to initiating any of the work covered under this Opinion, the Permittee shall install turbidity curtains as described below. In some instances, the use of turbidity curtains may be waived by the USACE project manager if the project is deemed too minimal to generate turbidity (e.g., certain ATON installation, scientific survey device placement, marine debris removal) or if the current is too strong for the curtains to stay in place. Turbidity curtains specifications:
a) Install floating turbidity barriers with weighted skirts that extend to within 1 ft of the bottom around all work areas that are in, or adjacent to, surface waters.
b) Use these turbidity barriers throughout construction to control erosion and siltation and ensure that turbidity levels within the project area do not exceed background conditions.
c) Position turbidity barriers in a way that does not block species’ entry to or exit from designated critical habitat.
d) Monitor and maintain turbidity barriers in place until the authorized work has been completed and the water quality in the project area has returned to background conditions.
e) In the range of ESA-listed corals (St. Lucie Inlet, Martin County south to the Dry Tortugas and the U.S. Caribbean) and Johnson’s seagrass (Turkey Creek/Palm http://www.fisheries.noaa.gov/pr/shipstrike/
Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida):
i) Projects that include upland earth moving (e.g., grading to install a building or parking lot associated with a dock and seawall project), must install sediment control barriers to prevent any upland sediments from reaching estuarine or marine waters.
ii) The turbidity curtain requirement cannot be waived for any project that moves or removes sediment (e.g., dredging, auger to create a pile, trenching to install a cableline). If turbidity curtains are not feasible in an area based on site conditions such as water current, high wave action, or stormy conditions, the project must undergo individual Section 7 consultation and is not covered under this Programmatic Opinion.
5) (AP.11.) Entanglement: All turbidity curtains and other in-water equipment must be properly secured with materials that reduce the risk of entanglement of marine species (described below). Turbidity curtains likewise must be made of materials that reduce the risk of entanglement of marine species.
a) In-water lines (rope, chain, and cable, including the lines to secure turbidity curtains) must be stiff, taut, and non-looping. Examples of such lines are heavy metal chains or heavy cables that do not readily loop and tangle. Flexible in-water lines, such as nylon rope or any lines that could loop or tangle, must be enclosed in a plastic or rubber sleeve/tube to add rigidity and prevent the line from looping and tangling. In all instances, no excess line is allowed in the water.
b) Turbidity curtains and other in-water equipment must be placed in a manner that does not entrap species within the construction area or block access for them to navigate around the construction area.
Location of Project
PROJECT MANAGER
COLLIER COUNTY
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY
LAKE
F
LO
R
ID
A 'S
BEACH LINE
NN
BRIDGE NO. 030184
ENGINEER OF RECORD:
STRUCTURE PLANS
NAPLES
TO
22 B-1
NAPLES
TO
BRIDGE NO. 030184
STRUCTURE PLANS
GENERAL SHEETS
MARIO A. PUENTE, P.E., C.G.C.
P.O. NO. 4500187495
CONTRACT NO. 16-6700
(727) 531-3505
CLEARWATER, FL 33759
380 PARK PLACE BOULEVARD, SUITE 300
CARDNO
CHRISTOPHER P. GAMACHE, P.E. NO. 82122
FEBRUARY 2022
PERMIT PLANS
NN
NO. 030184
BEGIN BRIDGE
STA. 268+84.00
¡ CONST.
NO. 030184
END BRIDGE
STA. 287+26.00
¡ CONST.
NO.
SHEET
YEAR
FISCAL
8:20:05 AM J:\00026\00026060.00\ms\struct\100% Submittal\B1KeySheet01.dgnmichael.regan 2/4/2022
TRANSPORTATION ENGINEERING DIVISION
CONTRACT PLANS
SHEET DESCRIPTIONSHEET NO.
CONTRACT NO.
CONSTRUCTION
http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:
Florida Department of Transportation, January 2022 Standard Specifications
COLLIER COUNTY PROJECT NO. 66066.2
http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction are available at the following website:
Bridge Construction.
Florida Department of Transportation, FY2021-22 Standard Plans for Road and
STAN GOBER MEMORIAL BRIDGE REHABILITATION
T 51 S
T 52 S
R
E
R
E
T 51 S
T 52 S
R
E
R
E
GENERAL NOTES
SUMMARY OF QUANTITIES
KEY SHEET
B-2
BQ-1
B-1
William L. McDaniel, Jr.DISTRICT 5:
Penny TaylorDISTRICT 4:
Burt L. SaundersDISTRICT 3:
Andy Solis, Esq.DISTRICT 2:
Rick LoCastroDISTRICT 1:
COLLIER COUNTY GROWTH MANAGEMENT DEPARTMENT
B1-9
B1-8
B1-7
B1-6
B1-5
B1-4
B1-3
B1-2
B1-1
CATHODIC PROTECTION DETAILS
SCOUR REPAIRS
DECK REPAIR DETAILS
BEAM REPAIR DETAILS 2 OF 2
BEAM REPAIR DETAILS 1 OF 2
SPALL REPAIR DETAILS
TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK
TURBIDITY BARRIER PLAN FOR CONCRETE WORK
PLAN & ELEVATION
NO.
SHEET
YEAR
FISCAL
8:20:05 AM J:\00026\00026060.00\ms\struct\100% Submittal\B1KeySheet01.dgnmichael.regan 2/4/2022
TRANSPORTATION ENGINEERING DIVISION
CONTRACT PLANS
SHEET DESCRIPTIONSHEET NO.
CONTRACT NO.
CONSTRUCTION
http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:
Florida Department of Transportation, January 2022 Standard Specifications
COLLIER COUNTY PROJECT NO. 66066.2
http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction are available at the following website:
Bridge Construction.
Florida Department of Transportation, FY2021-22 Standard Plans for Road and
STAN GOBER MEMORIAL BRIDGE REHABILITATION
T 51 S
T 52 S
R
E
R
E
T 51 S
T 52 S
R
E
R
E
GENERAL NOTES
SUMMARY OF QUANTITIES
KEY SHEET
B-2
BQ-1
B-1
William L. McDaniel, Jr.DISTRICT 5:
Penny TaylorDISTRICT 4:
Burt L. SaundersDISTRICT 3:
Andy Solis, Esq.DISTRICT 2:
Rick LoCastroDISTRICT 1:
COLLIER COUNTY GROWTH MANAGEMENT DEPARTMENT
B1-9
B1-8
B1-7
B1-6
B1-5
B1-4
B1-3
B1-2
B1-1
CATHODIC PROTECTION DETAILS
SCOUR REPAIRS
DECK REPAIR DETAILS
BEAM REPAIR DETAILS 2 OF 2
BEAM REPAIR DETAILS 1 OF 2
SPALL REPAIR DETAILS
TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK
TURBIDITY BARRIER PLAN FOR CONCRETE WORK
PLAN & ELEVATION
GOVERNING DESIGN STANDARDS:
GOVERNING STANDARD SPECIFICATIONS:
INDEX OF STRUCTURE PLANS
COLLIER COUNTY BOARD OF COMMISSIONERS:
GOVERNING DESIGN STANDARDS:
GOVERNING STANDARD SPECIFICATIONS:
INDEX OF STRUCTURE PLANS
COLLIER COUNTY BOARD OF COMMISSIONERS:
By DescriptionDate By DescriptionDate
N O
T I C
E
T H
E
F
F I C I A
L
R
C O
D
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
U
D
L E
1G
-2
.0
F .A .C
STAN GOBER MEMORIAL BRIDGE REHAB
PROJECT NAME:
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 2/4/2022 8:23:20 AM J:\00026\00026060.00\ms\struct\100% Submittal\B1GeneralNotes.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
GENERAL NOTES
DESIGN SPECIFICATIONS:
DESIGN METHOD:
CLASS
STRUCTURE
CONCRETE IN
LOCATION OF
CONCRETE:
CONCRETE COVER:
BRIDGE FLOOR GROOVING:
REINFORCING STEEL:
JOINTS IN CONCRETE:
ENVIRONMENT:
REINFORCEMENT BARS SHALL BE GRADE 60.
IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 931. ALL
ALL REINFORCEMENT BARS AND WELDED WIRE REINFORCEMENT SHALL BE
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9TH EDITION.
ELEMENTS UNLESS OTHERWISE NOTED.
LOAD AND RESISTANCE FACTOR DESIGN METHOD (LRFD) FOR ALL
SUBSTRUCTURE - EXTREMELY AGGRESSIVE
SUPERSTRUCTURE - EXTREMELY AGGRESSIVE
f'c = 5,500 f'c = 5,500
DESIGN BULLETINS.
FDOT STRUCTURES MANUAL DATED 2022 AND SUBSEQUENT STRUCTURES
4" TO EXTERNAL FORMED SURFACESC.I.P. SUBSTRUCTURE:
2" TO EXTERNAL FORMED SURFACESC.I.P. SUPERSTRUCTURE:
TO FACE OF CONCRETE.
CENTERLINE OF BARS EXCEPT WHERE THE CLEAR DIMENSION IS SHOWN
ALL DIMENSIONS PERTAINING TO LOCATIONS OF REINFORCING ARE TO
FDOT STANDARD SPECIFICATIONS FOR ALLOWABLE TOLERANCES.
FABRICATION TOLERANCES UNLESS SHOWN AS "MINIMUM COVER". SEE
CONCRETE COVER SHOWN IN PLANS DOES NOT INCLUDE PLACEMENT AND
ACCORDANCE WITH SECTION 400-15.2.5 OF THE FDOT SPECIFICATIONS.
BRIDGE FLOOR SURFACE SHALL RECEIVE A CLASS 4 FINISH IN
ENGINEER.
ALTERATIONS TO THOSE SHOWN SHALL REQUIRE APPROVAL OF THE
INDICATED IN THE PLANS. ADDITIONAL CONSTRUCTION JOINTS OR
CONSTRUCTION JOINTS WILL BE PERMITTED ONLY AT LOCATIONS
& SUBSTRUCTURE REPAIRS
SUPERSTRUCTURE
IV
DECK TOPPINGIV (WITH SRA)
SHRINKAGE REDUCING ADMIXTURE (SRA):
STRENGTH (psi)
COMPRESSIVE
28-DAY
MINIMUM
TURBIDITY CONTROL:
HORIZONTALLY OR VERTICALLY UNLESS OTHERWISE NOTED.
ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET EITHER
PLAN DIMENSIONS:
EXISTING BRIDGE REMOVAL AND DISPOSAL:
GUARD 60 DAYS PRIOR TO ANY WORK OVER THE WATERWAY.
APPROVED BY THE COUNTY, SHALL BE SUBMITTED TO THE US COAST
CONTRACTOR'S PLAN, SCHEDULE, AND SEQUENCE OF OPERATIONS,
REGARDING MAINTENACE OF BOAT TRAFFIC. A COPY OF THE
THE CONTRACTOR SHALL COMPLY WITH COAST GUARD REGULATIONS
BOAT TRAFFIC:
VERTICAL & HORIZONTAL DATUMS:
SPECIFICATIONS SECTION 510.
FLEXIBLE CONDUIT SHALL MEET THE REQUIREMENTS OF FDOT STANDARD
CONDUIT FOR NAVIGATIONAL SWING LIGHTING:
ALL DECKING SHALL BE FASTENED WITH #10x4" STAINLESS STEEL SCREWS.
SOFTWOOD LUMBER STANDARD PS 20.
OTHERWISE NOTED. DRESSED SIZES SHALL CONFORM TO THE AMERICAN
LUMBER SIZES SHOWN REPRESENT NOMINAL DRESSED SIZES UNLESS
SPECIFICATIONS SECTION 955 FOR SALT WATER ENVIRONMENTS.
AND BE PRESSURE TREATED IN ACCORDANCE WITH FDOT STANDARD
SPECIFICATIONS SECTION 952, SOUTHERN PINE, MARINE GRADE NO. 1,
ALL LUMBER SHALL MEET THE REQUIREMENTS OF FDOT STANDARD
LUMBER FOR FENDER DECKING:
316 STAINLESS STEEL WITH A MINIMUM BREAKING STRENGTH OF 18,000 LBS.
" DIAMETER 6x19, 6x25, OR 6x37 CLASS IWRC TYPE2
1WIRE ROPE SHALL BE
WIRE ROPE FOR FENDER PILES:
ADJUSTMENT OF 2011 (NAD 83/2011).
SYSTEM USED FOR THE PLANS IS THE NORTH AMERICAN DATUM OF 1983,
VERTICAL DATUM OF 1988 (NAVD 88). THE STATE PLANE COORDINATE
THE BENCH MARK DATUM USED FOR THE PLANS IS THE NORTH AMERICAN
SPAN BEAM PILEBENT/PIER
BEING PERFORMED ON SUPERSTRUCTURE ELEMENTS.
TRAFFIC SHALL NOT BE PERMITTED TO TRAVEL DIRECTLY OVER REPAIRS
TRAFFIC THROUGHOUT CONSTRUCTION.
THROUGH 102-661. MAINTAIN A MINIMUM OF ONE LANE OF ALTERANATING
STANDARD PLANS INDEX 102-600 AND APLICABLE INDEXES 102-601
PRIOR TO THE START OF WORK. MOT PLANS SHALL FOLLOW FDOT
SUBMIT A MAINTENANCE OF TRAFFIC (MOT) PLAN TO THE COUNTY
TRAFFIC CONTROL:
APPLYING THE REPAIR MORTAR FOR THESE SITE OBSERVATIONS.
SHALL CONTACT THE COUNTY A MINIMUM OF 24 HOURS PRIOR TO
BUT BEFORE THE REPAIR MATERIAL HAS BEEN APPLIED. CONTRACTOR
SURFACE PREPARATION FOR THE REPAIR WORK HAS BEEN COMPLETED
TO INSPECT THE AREA FOR THE CONCRETE SPALL REPAIRS AFTER THE
THE COUNTY (OR THEIR REPRESENTATIVE) SHALL HAVE THE OPPORTUNITY
COORDINATION WITH THE COUNTY:
BRIDGE DECK GROOVING:
WITH FDOT STANDARD SPECIFICATIONS SECTION 400-15.2.5.
BRIDGE DECK SURFACE SHALL RECEIVE A CLASS 4 FINISH IN ACCORDANCE
ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS SECTION 110.
REMOVE AND DISPOSE MATERIAL OF THE EXISTING BRIDGE IN
10 - 18 - 2
EXAMPLE:
NUMBER FOLLOWED BY THE PILE/COLUMN NUMBER.
BY THE BEAM NUMBER. PILES/COLUMNS ARE IDENTIFIED BY THE BENT/PIER
OF STATIONING. BEAMS ARE IDENTIFIED BY THE SPAN NUMBER FOLLOWED
CONSECUTIVELY FROM LEFT TO RIGHT WHEN LOOKING IN THE DIRECTION
STATION (WEST TO EAST). BEAMS AND PILES ARE NUMBERED
BENTS AND PIERS ARE NUMBERED CONSECUTIVELY FROM LOW TO HIGH
IDENTIFICATION OF MEMBERS:
B-2
SHRINKAGE TO 500 MICROSTRAINS.
SRA USED IN THE DECK TOPPING SHALL LIMIT THE 28-DAY DRYING
ACCORDANCE WITH PERMIT REQUIREMENTS. SEE SHEETS B1-2 AND B1-3.
CONTROL TURBIDITY CAUSED BY CONSTRUCTION OPERATIONS IN
PROVIDE AND MAINTAIN FLOATING TURBIDITY BARRIERS AS REQUIRED TO
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 2/4/2022 8:51:08 AM J:\00026\00026060.00\ms\struct\100% Submittal\B1PlanElev01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
E F
E F E F
E F
E F
E F E F
E F E E EE FE
F E
FE
F E
F E
FE
F E F E
FE
F E
F E
PLAN AND ELEVATION
B1-1
P I
S T
A
.0
C L B
E
T
B E
B E
LC
P I
LC
P I
LC
P I
LC
P I
LC LC LC LC LC LC LC
LCLCLC
P I
P I
P I
P I
P I
P I
P I
LC
B
E
LC
B
E
LC
B
E
LC
B
E
LC
B
E
LC
B
E
E N
D
B
E
E N
D
B
E
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.5
S T
A
.1
S T
A
.7
S T
A
.3
S T
A
.9
S T
A
.0
S T
A
.6
S T
A
.2
S T
A
.8
S T
A
.4
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
-20
-20
-40
NAVD88
-40
MHW ELEV. 0.67
MSL ELEV. -0.62
MLW ELEV. -1.89
275 280
STA. 268+84.00
BEGIN BRIDGE
STA. 287+26.00
END BRIDGE
P C
S
T A
.0
P T
S
T A
.1
PLAN
ELEVATION
Direction of Stationing
(SEE NOTE 2)
FENDER
SYSTEM (SEE NOTE 1)
ACCESS LADDER
(SEE NOTE 2)
FENDER
� CONST.
FRONT FACE OF BACKWALL
BEGIN BRIDGE
FRONT FACE OF BACKWALL
END BRIDGE
NOTES:
7 SPANS @ 70'-0" = 490'-0"
5 SPANS @ 95'-7" = 477'-11"
116'-2"
5 SPANS @ 95'-7" = 477'-11"
= 280'-0"
4 SPANS @ 70'-0"
LIGHTING (TYP.)
NAVIGATIONAL
LIGHTING (TYP.)
NAVIGATIONAL
CHANNEL
NAVIGATIONAL
M A
R C
O
C
H A
N N
E L
NO. 030184
BRIDGE
EXPANSION JOINT (TYP.)
REMOVE AND REPLACE DECK
FILLED SCOUR HOLES (TYP.)
BANK AND SHORE OVER
INSTALL RUBBLE RIPRAP,
INSTALL RUBBLE RIPRAP, BANK AND SHORE (TYP.)
FILL SCOUR HOLES WITH BEDDING STONE AND
CONCRETE WITH SRA
DECK AND REPLACE WITH CLASS IV
" OF CONCRETE2
1REMOVE TOP 1
LIGHTING (SEE NOTE 3)
NAVIGATIONAL SWING
1842'-0"
+6.
0±
-6.0±%
R = 5729.58'±
CURVE 1
R = 1495.76'±
CURVE 2
EXISTING GROUND
APPROXIMATE
WITH GALVANIC ANODES AT PILE #15
8'-0" STRUCTURAL PILE JACKET
AT EACH PIER COLUMN (TYP.)
5'-0" TALL GALVANIC JACKET
GALVANIC ANODES (TYP.)
OVERBUILD WITH
PIER FOOTING
WATER LIMITS
SURFACE
APPROXIMATE
WATER LIMITS
SURFACE
APPROXIMATE
ON EXISTING PLANS.
BRIDGE GEOMETRY, DIMENSIONS, AND ELEVATIONS ARE BASED5.
BRIDGE LENGTH IS MEASURED ALONG � OF CONSTRUCTION.4.
AND REPLACE WITH FLEXIBLE CONDUIT.
REMOVE EXISTING CONDUIT TO NAVIGATIONAL SWING LIGHTING3.
PILES AND REPLACE WITH SS CABLE WRAPS.
SPACED AT 6" O.C. REMOVE ALL CABLE WRAPS ON FENDER
REPLACE WITH 2x6, PRESSURE TREATED LUMBER, 2'-6" LONG, REMOVE ALL TIMBER PLANKS ON FENDER WALKWAY AND2.
AND GANGWAY TO THE FENDER WALKWAY AND REPLACE NEW.
ALL LADDERS, SUPPORTS, CONNECTING HARDWARE, PLATFORMS
REMOVE THE EXISTING ACCESS LADDER SYSTEM INCLUDING1.
WATER LIMITS
SURFACE
APPROXIMATE
WATER LIMITS
SURFACE
APPROXIMATE
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 2/4/2022 8:44:56 AM J:\00026\00026060.00\ms\struct\100% Submittal\B1TurbidityMonitoring01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
N 81° 42' 23" E
MZO1-N MZO2-N MZO3-N MZO4-N MZO5-N
MZO1-S MZO2-S MZO3-S MZO4-S MZO5-S
BS-N
MZI1-N MZI2-N MZI4-NMZI3-N MZI5-N
MZI5-SMZI1-S MZI2-S MZI3-S MZI4-S
BS-S
PIER NO. 10 PIER NO. 11 PIER NO. 12
PIER NO. 13 PIER NO. 14 PIER NO. 15 PIER NO. 16 PIER NO. 17 PIER NO. 18
PIER NO. 19
TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK
(T Y P
U .N .O
N
M A
R C
O
C
H A
N N
E L
(TYP.)
25'-0"
OR AS OTHERWISE DIRECTED BY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE).
TURBIDITY METER READINGS SHOW ACCEPTABLE TURBIDITY LEVELS HAVE BEEN RESTORED
IN-WATER WORK AND THE FOUR-HOUR SAMPLING INTERVAL WILL NOT RESUME UNTIL
INTERVAL TO SHOW WHEN TURBIDITY LEVELS HAVE RETURNED TO AN ACCEPTABLE LEVEL.
AREA. AT THIS TIME, THE SAMPLING FREQUENCY WILL BE INCREASED TO A TWO-HOUR
REPLACED AS NECESSARY TO CONTROL TURBID DISCHARGES FROM THE IMMEDIATE WORK
TURBIDITY CONTROL DEVICES WILL BE INSPECTED IMMEDIATELY AND REPAIRED OR
IN-WATER WORK AND NOTIFY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE). ALL
(MZO) EXCEED THE BACKGROUND LEVELS, THE CONTRACTOR WILL IMMEDIATELY STOP ALL
NTUS ABOVE BACKGROUND LEVELS OR READINGS AT THE MIXING ZONE OUTSIDE STATIONS
IF TURBIDITY READINGS AT THE MIXING ZONE INSIDE STATION (MZI) READINGS EXCEED 41 5.
READINGS AT MIXING ZONE OUTSIDE STATIONS MAY NOT EXCEED THE BACKGROUND LEVELS.
OVER THE DAILY AMBIENT BACKGROUND LEVELS AS MEASURED AT BS-N OR BS-S. TURBIDITY
WITHIN THE MIXING ZONE (MIXING ZONE INSIDE STATIONS) TO BE INCREASED TO 41 NTUS
ZONES. THIS PLAN AND THE ERP INCLUDE A MIXING ZONE ALLOWING TURBIDITY LEVELS
INCREASED OVER DAILY AMBIENT BACKGROUND LEVELS OTHER THAN IN APPROVED MIXING
WATERS (OFW). STATE WATER QUALITY STANDARDS DO NOT ALLOW TURBIDITY TO BE
THE ROOKERY BAY NATIONAL ESTUARINE RESEARCH RESERVE IS AN OUTSTANDING FLORIDA 4.
SOUTH (MZI1-S, MZI2-S, MZI3-S, MZI4-S, AND MZI5-S).
FIVE ON THE NORTH (MZI1-N, MZI2-N, MZI3-N, MZI4-N, AND MZI5-N) AND FIVE ON THE
SHOWN ON THIS SHEET, TEN MIXING ZONE INSIDE STATIONS WILL BE ESTABLISHED WITH
WILL BE CONDUCTED AT FOUR-HOUR INTERVALS FOR THE DURATION OF THE WORK DAY. AS
TURBIDITY READINGS AT THE MIXING ZONE INSIDE AND MIXING ZONE OUTSIDE STATIONS 2.
ZONE SAMPLE STATIONS.
TAKEN AT MID-DEPTH AT THE PROPER BACKGROUND STATION PRIOR TO SAMPLING MIXING
OUTGOING OR OUTGOING TO INCOMING), A NEW BACKGROUND TURBIDITY READING WILL BE
EXPECTED DURING THE WORK PERIOD. WHEN TIDAL CONDITIONS CHANGE (E.G. INCOMING TO
MID-DEPTH AT THE PROPER BACKGROUND STATION RELATIVE TO TIDAL CONDITIONS
PLACEMENT WILL BE OCCURRING, A BACKGROUND TURBIDITY READING WILL BE TAKEN AT
APPROXIMATE LOCATION SHOWN ON THIS SHEET. ON ANY GIVEN DAY THAT IN-WATER FILL
TWO BACKGROUND SAMPLE STATIONS (BS-N AND BS-S) WILL BE ESTABLISHED AT THE 1.
AUTHORIZATION FOR A TURBIDITY MONITORING PLAN THAT DEVIATES FROM THIS PLAN.
PROJECT CONSTRUCTION, UNLESS THE PROJECT CONTRACTOR OBTAINS SEPARATE
MONITORING PLAN WILL BE IMPLEMENTED DURING ALL IN-WATER WORK REQUIRED TO COMPLETE
PLACEMENT OF FILL MATERIALS WITHIN WATERS OF THE STATE. THE FOLLOWING TURBIDITY
CONSTRUCTION OF THE STAN GOBER BRIDGE REHABILITATION PROJECT REQUIRES THE
IDENTIFIED WITHIN THE PERMIT OR AS ADVISED BY THE PERMITTING AGENCY.
RESOURCE PERMIT (ERP) NUMBER WILL BE SUBMITTED WEEKLY TO THE ADDRESS
PRECEDING 24 HOURS, ETC.).