25-8352_-_BID_SCHEDULE_R1.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Immokalee Rd (CR 846) Shoulder Improvements - SCOP2
Solicitation number
25-8352
Issued by
Collier County, Florida

About this file

The file is a Bid Schedule (No. 25-8352) for the Immokalee Road (C.R. 846) Shoulder Improvements - SCOP2 Project, issued by Collier County, Florida. The project involves widening existing traffic lanes from 10' to 12' and adding 5' paved shoulders along approximately 4.129 miles of roadway, extending from east of Agri Boulevard to west of Bridge No. 034832. The bid solicitation was advertised on April 14, 2025, with sealed bids due electronically by May 29, 2025, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for April 23, 2025, at 10:00 a.m. The project includes multiple construction activities such as mobilization, maintenance of traffic, sediment barrier installation, excavation, embankment, pavement milling, asphalt concrete work, sodding, and signage relocation. The contract requires substantial completion within 150 calendar days from the Notice to Proceed.

The project is funded through the Small County Outreach Program (SCOP) with a Financial Project I.D. No. 44966801054-01 and a total project estimate of $1,199,970.44. An Owner's Allowance of $50,000 is included for unforeseen conditions. Bidders must submit a 5% bid bond or certified/cashier's check and hold appropriate contractor's licenses. The procurement does not have specific set-aside designations for disadvantaged enterprises, but includes an Anticipated Disadvantaged, Minority, Women or Veteran Participation Statement. Contractors must comply with Environmental, Health and Safety requirements, including OSHA, DOT, and EPA regulations. Liquidated damages are set at $1,685.00 per calendar day for failure to achieve Substantial Completion. The successful bidder must provide Payment and Performance Bonds for 100% of the contract award amount, with work hours restricted to 7:00 a.m. to 7:00 p.m., Monday through Friday.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Immokalee Rd SCOP 2 BID SCH

Immokalee Road (C.R. 846) SCOP Shoulder Improvements 2
CONSTRUCTION ITB NO. 25-8352
BID SCHEDULE
Project Description: Widening existing traffic lanes from 10' to 12' and adding 5' paved shoulders (from east of Agri Boulevard to west of Bridge No. 034832
Financial Project I.D. No. 44966801054-01
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
101-1MOBILIZATION1LS$ - 0$ - 0
102-1MAINTENANCE OF TRAFFIC1LS$ - 0$ - 0
104-10-3SEDIMENT BARRIER8,244LF$ - 0$ - 0
104-18INLET PROTECTION SYSTEM2EA$ - 0$ - 0
110-1-1STANDARD CLEARING & GRUBBING1LS$ - 0$ - 0
120-1EXCAVATION855CY$ - 0$ - 0
120-6EMBANKMENT2,386CY$ - 0$ - 0
160-4TYPE B STABILIZATION (3-FOOT SHOULDERS)2,640SY$ - 0$ - 0
285-701OPTIONAL BASE GROUP 1 (4" THICK, BLACK BASE ONLY)4,400SY$ - 0$ - 0
285-715OPTIONAL BASE GROUP 15 (9" THICK, BLACK BASE ONLY)1,650SY$ - 0$ - 0
327-70-1MILLING EXISTING ASPHALT PAVEMENT (1" AVG. DEPTH)904SY$ - 0$ - 0
334-1-12SUPERPAVE ASPH. CONC. TYPE SP-12.5 (TRAF. B)(2" THICK)200TN$ - 0$ - 0
337-7-81A. C. FRICTION COURSE TYPE FC-9.5 (TRAFFIC B), PG 76-22382TN$ - 0$ - 0
430-982-129MITERED END SECTION, OPTIONAL ROUND, 24" CD2EA$ - 0$ - 0
570-1-2PERFORMANCE TURF (SOD)13,500SY$ - 0$ - 0
700-1-50SIGNS, SINGLE POLE (RELOCATE)10AS$ - 0$ - 0
701-18-101PROFILED THERMO., STD.-ASPH. SURF., 6" WHITE SOLID1.540GM$ - 0$ - 0
701-18-221PROFILED THERMO., STD.-ASPH. SURF., 6" YELLOW SKIP (10'-30')0.770GM$ - 0$ - 0
706-1-3PAVEMENT MARKERS, RETRO-REFLECTIVE204EA$ - 0$ - 0
711-17REMOVE EXIST. PAVEMENT MARKINGS1LS$ - 0$ - 0
TOTAL BID AMOUNT:$ - 0
*Staff has allocated $50,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.