The document is a comprehensive set of engineering and construction plans for the Immokalee Road (C.R. 846) Paved Shoulders - Phase 2 Improvements project, prepared by the Collier County Board of County Commissioners' Transportation Engineering Division in Florida. The project involves road shoulder improvements from East Agri Boulevard to West of Bridge No. 034832, with a total project length of approximately 4.129 miles. The plans include detailed drawings for roadway layout, typical cross-sections, drainage structures, pavement design, signing and pavement markings, erosion control, and cross-sections at various station points along the project route.

The project's technical specifications indicate a complete road shoulder enhancement, including pavement widening, milling and resurfacing, shoulder stabilization, and the installation of new pavement markings. The total earthwork volumes are estimated at 855 cubic yards of excavation and 2,386 cubic yards of embankment. The plans detail specific requirements for erosion control measures, such as silt fence installation, baled hay barriers, and protection around inlet structures. The design incorporates 5-foot paved shoulders, 2-foot stabilization areas, and various pavement treatments including asphalt concrete friction course and thermoplastic markings. The project appears to be funded through the Small County Outreach Program (SCOP) with a financial project ID of 45l525-1-54-01.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JulioOrdonez Text Box This item has been digitally signed and sealed by Julio F. Ordonez on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies

JulioOrdonez Text Box November 5, 2024

JulioOrdonez

3450860.CDR

Binder1_Page_01
Binder1_Page_02
Binder1_Page_03
Binder1_Page_04
Binder1_Page_05
Binder1_Page_06
Binder1_Page_07
Binder1_Page_08
Binder1_Page_09
Binder1_Page_10
Binder1_Page_11
Binder1_Page_12
Binder1_Page_13
Binder1_Page_14
Binder1_Page_15
Binder1_Page_16
Binder1_Page_17
Binder1_Page_18
Binder1_Page_19
Binder1_Page_20
Binder1_Page_21
Binder1_Page_22
Binder1_Page_23
Binder1_Page_24
Binder1_Page_25
2024-11-05T15:22:07-0500
OrdonezJulio

File details come from the government source that posted it. Updated .