25-26-41 Construction Package.pdf
PDF 17 MB Posted
- Attached to
- Wildwood Bard Bridges & Boardwalk B2
- Solicitation number
- 311-25-26-41
- Issued by
- Randolph County, Greensboro City, North Carolina
About this file
This is a construction document package for the Wildwood Park Bridges & Boardwalks B2 project, developed by the City of Greenville, North Carolina in partnership with the Greenville Recreation & Parks Department. The project encompasses the design and construction of timber boardwalks, pre-fabricated bridges, concrete sidewalks, and related infrastructure improvements in "The Swamp" area (Area 4) of Wildwood Park, a 566-acre recreational facility. The work includes approximately 1.83 acres of total site disturbance, construction of observation decks, installation of erosion control measures, and site restoration. A non-mandatory pre-bid meeting is scheduled for Tuesday, May 5, 2026, at 10:00 am at 3450 Blue Heron Drive, Greenville, NC 27834, with inquiries directed to Mark Nottingham at 252-329-4242 or mnottingham@greenvillenc.gov. The project involves five parcels owned by the City of Greenville, with total parcel acreage of 566 acres and a total site acreage of 283 acres, located in the Johnson Mill/Parkers Creek/Tar-Pamlico Watershed.
The construction documents include detailed specifications for timber boardwalk installation, structural details for bridges and observation decks, concrete sidewalk construction, erosion and sediment control measures, and grading plans. The project is subject to North Carolina Department of Environmental Quality (NCDEQ) erosion control standards, National Pollutant Discharge Elimination System (NPDES) requirements, and Army Corps of Engineers permitting, including compliance with Nationwide Permit #14 and water quality certification. Contractors are required to obtain all necessary permits prior to construction, maintain erosion control measures throughout all phases, and complete record drawing certifications. The project falls within Special Flood Hazard Area Zone "AE" per FEMA documentation and includes requirements for utility coordination, tree protection, and environmental compliance with the Tar-Pamlico River Basin regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SURVEYOR GEOTECHNICAL ENGINEER
OWNER/DEVELOPER
RIVERS & ASSOCIATES , INC.
107 EAST SECOND STREET
GREENVILLE, NC 27858
PHONE: (252) 752-4135
CONTACT: PATRICK HARTMAN, P.L.S.
EMAIL: PHARTMAN@RIVERSANDASSOCIATES.COM
PROJECT DESIGN TEAM
FALCON ENGINEERING, INC.
1210 TRINITY ROAD, SUITE 110
CARY, NC 27513
PHONE: (919) 302-9758
CONTACT: JEREMY R. HAMM, P.E.
EMAIL: JHAMM@FALCONENGINEERS.COM
CITY OF GREENVILLE
GREENVILLE RECREATION & PARKS DEPARTMENT
2000 CEDAR LANE
GREENVILLE, NC 27858
PHONE: (252) 329-4242
CONTACT: MARK NOTTINGHAM, AICP
EMAIL: MNOTTINGHAM@GREENVILLENC.GOV
CIVIL ENGINEER
KIMLEY-HORN & ASSOCIATES, INC
421 FAYETTEVILLE STREET
SUITE 600
RALEIGH, NC 27601
PHONE: (919) 653-2990
CONTACT: JOHN KUZENSKI, P.E.
EMAIL: JOHN.KUZENSKI@KIMLEY-HORN.COM
KIMLEY-HORN & ASSOCIATES, INC
421 FAYETTEVILLE STREET
SUITE 600
RALEIGH, NC 27601
PHONE: (919) 653-2928
CONTACT: BRANDON WHITE, PLA, ASLA
EMAIL : BRANDON.WHITE@KIMLEY-HORN.COM
LANDSCAPE ARCHITECT
C O
VE
R
S H
EE
T
OVERALL SITE DATA
MUNICIPALITY: CITY OF GREENVILLE
OWNER: CITY OF GREENVILLE, PO BOX 7207
GREENVILLE, NC 27835
LAND USE CLASSIFICATION: (6) RECREATIONAL/ENTERTAINMENT
TOTAL PARCEL ACREAGE: 566 ACRES
TOTAL SITE ACREAGE: 283 ACRES
PROPOSED TOWER GROSS FLOOR AREA: 1,023 SF (0.02 ACRES)
PROPOSED TOWER HEIGHT: 120 FEET (12 STORIES)
TOTAL PARKING: N/A
TOTAL ACCESSIBLE PARKING: N/A
TOTAL AREA DISTURBED: 1.83 ACRES
EXISTING IMPERVIOUS AREA: 134,600 SF (3.09 ACRES)
PROPOSED IMPERVIOUS AREA: 22,652 SF (0.52 ACRES)
TOTAL IMPERVIOUS AREA: 157,252 SF (3.61 ACRES)
WATERSHED: JOHNSON MILL/PARKERS CREEK /TAR-PAMLICO WATERSHED
PARCEL DATA
PARCEL 1 2 3 4 5
NCPIN: 4698725454 4698536478 4698436559 4698432018 4688635909
PARCEL NUMBER: 086710 022504 035488 024274 028893
OWNER CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE
PHYSICAL ADDRESS: 3450 BLUE HERON DR 0 NE GREENVILLE BV 0 OLD PACTOLUS RD 0 OLD PACTOLUS RD 1000 MUMFORD RD
LEGAL DESCRIPTION: PHILLIP E. CARROLL BOYD TRIPP RED BANKS (PITT #37) RIVER PARK NORTH
MAP/BLOCK/LOT 4698.15-72-5454.000 4698.15-53-6478.000 4698.14-43-6559.000 4698.14-43-2018.000 4688.15-63-5909.000
DEED REFERENCE DB. 4012 PG. 124 DB. 4049 PG. 261 DB. 4049 PG. 261 DB. 4049 PG. 261 NOT FOUND
CURRENT ZONING HEAVY COMMERCIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL INDUSTRY
CENSUS TRACT: 900 800 800 800 800
PARCEL ACREAGE: 101 137 28 7 293
APPROXIMATE
IMPERVIOUS AREA: 3.09 AC 0.00 AC 0.00 AC 0.00 AC 0.00 AC
ARCHITECT
IN SITU STUDIO
704 N PERSON STREET
RALEIGH, NC 27604
PHONE: (919) 397-3949
CONTACT: MATTHEW GRIFFITH, AIA
EMAIL: MATT@INSITUSTUDIO.US
C0.0SHEET C0.0 OF 30
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
STRUCTURAL ENGINEER
KIMLEY-HORN & ASSOCIATES, INC
421 FAYETTEVILLE STREET
SUITE 600
RALEIGH, NC 27601
PHONE: (919) 653-2990
CONTACT: MITCH MAGEE, P.E.
EMAIL: MITCH.MAGEE@KIMLEY-HORN.COM
CONSTRUCTION DOCUMENTS
FOR
WILDWOOD PARK - TOWER AND TRAILS
CITY OF GREENVILLE
RECREATION & PARKS DEPARTMENT
2000 CEDAR LANE
GREENVILLE, NC 27858
PITT COUNTY
SITE
NORTH
TAR RIVER
SCALE: 1" = 1000'
OLD PACTOLUS ROAD
US
-2
EXISTING TRAILS
APPROXIMATE SITE BOUNDARY
PACKAGE B
PACKAGE A
THE TOWER (AREA 1)
THE BEACH (AREA 2)
THE CONNECTION (AREA 3)
EXISTING TRAILS
THE SWAMP (AREA 4)
REG
IS
T
ER
ED
LANDSCAPE ARCH
ITECT
B R
A
NDO N P H I L L I P W
HIT
E
N O
R T H C A R O L I N A
SHEET LIST TABLE - BID PACKAGE B2
SHEET NUMBER SHEET TITLE
C0.0 COVER SHEET
C0.1 GENERAL NOTES
C1.0 EXISTING CONDITIONS
C2.0.B OVERALL DEMOLITION AND EROSION CONTROL PLAN
C2.1.B DEMOLITION AND PH 1 EROSION CONTROL PLAN - THE SWAMP
C2.2.B DEMOLITION AND PH 1 EROSION CONTROL PLAN - THE SWAMP
C3.0.B OVERALL SITE PLAN
C3.1.B PLAN AND PROFILE - THE SWAMP (AREA 4)
C3.2.B PLAN AND PROFILE - THE SWAMP (AREA 4)
C3.3.B PLAN AND PROFILE - THE SWAMP (AREA 4)
C4.0.B SIDEWALK DETAILS
C4.1.B EROSION CONTROL DETAILS
C4.2.B EROSION CONTROL DETAILS
S.01.B BRIDGE GENERAL NOTES
S.02.B BRIDGE GENERAL NOTES
S.03.B STRUCTURE LOCATIONS
S.04.B PLAN AND PROFILE - THE SWAMP (AREA 4)
S.05.B PLAN AND PROFILE - THE SWAMP (AREA 4)
S.06.B PLAN AND PROFILE - THE SWAMP (AREA 4)
S.07.B PLAN AND PROFILE - THE SWAMP (AREA 4)
S.08.B PLAN AND PROFILE - THE SWAMP (AREA 4)
S.09.B TIMBER BOARDWALK DETAILS
S.10.B TIMBER BOARDWALK FRAMING DETAILS
S.11.B TIMBER BOARDWALK BRACING DETAILS
S.15.B OBSERVATION DECK DETAILS
S.16.B OBSERVATION DECK DETAILS
S.17.B OBSERVATION DECK DETAILS
S.18.B OBSERVATION DECK DETAILS
S.19.B OBSERVATION DECK DETAILS
S.20.B STRUCTURAL STANDARD NOTES
BID PACKAGE B2
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
G
EN
ER
AL
N O
TE
S
C0.1
1.
2.
3.
4.
7.
6.
5.
IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL PUBLIC
UTILITIES IN THE CONSTRUCTION OF THIS PROJECT. ALL MANHOLES,
CLEANOUTS, VALVE BOXES, FIRE HYDRANTS, ETC., MUST BE ADJUSTED TO
PROPER GRADE BY THE CONTRACTOR PRIOR TO AND AFTER PLACING OF
PERMANENT PAVING. UTILITIES MUST BE MAINTAINED TO PROPER LINE AND
GRADE DURING CONSTRUCTION OF THE PAVING FOR THIS PROJECT.
ELECTRIC - BRIAN MURPHY
PHONE: 252-329-4416
GAS - JASON CYPHERS
PHONE: 252-551-3313
DRAINAGE - KENDALL PARAMORE
PHONE: 252-524-4000
WATER AND SANITARY SEWER- MICKEY TRIPP
PHONE: 252-551-1555
FIRE - BRYANT BEDDARD
PHONE: 252-329-4416
8.
1. ALL ACCESSIBLE SPACES AND ACCESSIBLE ROUTES SHALL COMPLY WITH THE CITY OF GREENVILLE AND NORTH
CAROLINA ACCESSIBILITY STANDARDS AND CITY REQUIREMENTS.
2. PARKING SPACES AND ACCESS AISLES SHALL BE LEVEL WITH SURFACE SLOPES NOT EXCEEDING 1:50 (2%) IN ALL
DIRECTIONS.
3. EACH ACCESSIBLE PARKING SPACE SHALL BE DESIGNATED AS RESERVED BY A VERTICALLY MOUNTED OR SUSPENDED SIGN SHOWING THE SYMBOL OF ACCESSIBILITY. VAN ACCESSIBLE SPACES SHALL HAVE AN ADDITIONAL SIGN
"VAN-ACCESSIBLE" MOUNTED BELOW THE SYMBOL OF ACCESSIBILITY.
(A) CHARACTERS AND SYMBOLS ON SUCH SIGNS SHALL BE LOCATED 60" (1525 MM) MINIMUM ABOVE THE GROUND, FLOOR, OR PAVING SURFACE SO THEY CANNOT BE OBSCURED BY A VEHICLE PARKED IN THE SPACE.
(B) SIGNS LOCATED WITHIN AN ACCESSIBLE ROUTE SHALL COMPLY WITH THE LATEST STANDARDS.
(C) CHARACTERS AND SYMBOLS ON OVERHEAD SIGNS SHALL COMPLY WITH THE LATEST STANDARDS.
4. SLOPES OF CURB RAMPS SHALL COMPLY WITH 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN. TRANSITIONS FROM RAMPS TO WALKS, GUTTERS, OR STREETS SHALL BE FLUSH AND FREE OF ABRUPT CHANGES. MAXIMUM SLOPES OF ADJOINING GUTTERS, ROAD SURFACE IMMEDIATELY ADJACENT TO THE CURB RAMP, OR ACCESSIBLE ROUTE SHALL NOT
EXCEED 1:20.
5. ALL ACCESSIBLE RAMPS, CURB RAMPS, STRIPING, AND PAVEMENT MARKING SHALL CONFORM TO ADA , LATEST EDITION.
6. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE CONSTRUCTED BASED ON THE CITY
STANDARD CONSTRUCTION DETAIL AND SPECIFICATIONS.
7. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL CONFORM TO ADA AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH AND FULL DEPTH OF THE CURB RAMP, NOT INCLUDING
FLARES.
8. CONTRACTOR SHALL CONSTRUCT PROPOSED PAVEMENT TO MATCH EXISTING PAVEMENT WITH A SMOOTH, FLUSH, CONNECTION.
9. CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKING FOR FIRE LANES, PARKING STALLS, HANDICAPPED PARKING SYMBOLS, AND MISCELLANEOUS STRIPING WITHIN PARKING LOT AND AROUND BUILDING AS SHOWN ON THE PLANS. ALL PAINTED AND PAVEMENT MARKINGS SHALL ADHERE TO CITY AND OWNER STANDARDS.
10. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA, AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN
ANY DIRECTION.
11. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ADA SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDER WILL BE
ACCEPTED FOR ADA SLOPE COMPLIANCE ISSUES.
STORM DRAINAGE NOTES
1. ALL STORM SEWER MATERIALS AND CONSTRUCTION SHALL COMPLY WITH CITY STANDARD CONSTRUCTION DETAILS
AND SPECIFICATIONS.
2. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND APPURTENANCES NECESSARY FOR COMPLETE
INSTALLATION OF THE STORM SEWER.
3. THE CONTRACTOR SHALL FIELD VERIFY THE SIZE, CONDITION, HORIZONTAL, AND VERTICAL LOCATIONS OF ALL EXISTING STORM SEWER FACILITIES THAT ARE TO BE CONNECTED TO, PRIOR TO START OF CONSTRUCTION OF ANY STORM
SEWER, AND SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS DISCOVERED.
4. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF CURB INLETS AND GRATE INLETS AND ALL UTILITIES CROSSING THE STORM SEWER.
5. FLOW LINE, TOP-OF-CURB, RIM, THROAT, AND GRATE ELEVATIONS OF PROPOSED INLETS SHALL BE VERIFIED WITH THE
GRADING PLAN AND FIELD CONDITIONS PRIOR TO THEIR INSTALLATION.
6. ALL PUBLIC STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO CITY PUBLIC WORKS STANDARD DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
7. ALL PRIVATE STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO THE APPLICABLE
PLUMBING CODE. CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
8. ALL PVC TO RCP CONNECTIONS AND ALL STORM PIPE CONNECTIONS ENTERING STRUCTURES OR OTHER STORM PIPES SHALL HAVE A CONCRETE COLLAR AND BE GROUTED TO ASSURE THE CONNECTION IS WATERTIGHT.
9. ALL PUBLIC STORM SEWER LINES SHALL BE MINIMUM CLASS III RCP. PRIVATE STORM SEWER LINES 18-INCHES AND
GREATER SHALL BE CLASS III RCP OR OTHER APPROVED MATERIAL.
10. WHERE COVER EXCEEDS 20-FEET OR IS LESS THAN 2-FEET, CLASS IV RCP SHALL BE USED.
11. IF CONTRACTOR PROPOSES TO USE HDPE OR PVC IN LIEU OF RCP FOR PRIVATE STORM SEWER, CONTRACTOR SHALL SUBMIT TECHNICAL DATA TO THE OWNER, ENGINEER AND CITY ENGINEER/INSPECTOR FOR APPROVAL PRIOR TO
ORDERING THE MATERIAL. ANY PROPOSED HDPE AND PVC SHALL BE WATERTIGHT.
13. EMBEDMENT FOR ALL STORM SEWER LINES, PUBLIC OR PRIVATE, SHALL BE PER CITY STANDARD DETAILS.
14. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT
PRIOR WRITTEN APPROVAL OF THE CITY.
15. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER.
16. RIM ELEVATIONS FOR STORM CATCH BASINS ARE MEASURED TO THE GUTTER FLOW LINE.
17. THE LOCATIONS OF STORM SEWER STRUCTURES SHOWN ON THESE PLANS (AND PROVIDED IN ASSOCIATED CAD FILES) ARE APPROXIMATE. THE CONTRACTOR SHALL STAKE ALL CURB INLET STRUCTURES SUCH THAT INLET TOPS ALIGN HORIZONTALLY WITH PROPOSED CURB LOCATIONS (PER DETAIL, IF PROVIDED). WHERE PROPOSED STORM SEWERS TIE TO EXISTING STRUCTURES, PIPES, ETC., THE CONTRACTOR SHALL FIELD ADJUST PROPOSED STORM SEWERS TO MATCH
THE LOCATIONS OF THESE EXISTING FEATURES.
7.
20.
19.
18.
9.
8.
6.
5.
4.
17.
16.
11.
12.
13.
15.
10.
14.
21.
22.
THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES SHOWN ON THE
PLANS WERE OBTAINED FROM AVAILABLE UTILITY COMPANY RECORDS AND PLANS AND
ARE CONSIDERED APPROXIMATE. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY
TO VERIFY LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ADJACENT AND/OR CONFLICTING
UTILITIES SUFFICIENTLY IN ADVANCE OF CONSTRUCTION IN ORDER THAT ADJUSTMENTS
CAN BE MADE TO PROVIDE ADEQUATE CLEARANCES. THE CONTRACTOR SHALL PRESERVE
AND PROTECT PUBLIC UTILITIES AT ALL TIMES DURING CONSTRUCTION. ANY DAMAGE TO
UTILITIES RESULTING FROM CONTRACTOR'S OPERATIONS SHALL BE RESTORED AT
CONTRACTOR'S EXPENSE. THE ARCHITECT/ENGINEER SHALL BE IMMEDIATELY NOTIFIED
WHEN PROPOSED GRADES CONFLICT WITH EXISTING UTILITIES.
THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION AND DEPTH OF ALL
FRANCHISE UTILITY SERVICES AND ANY REQUIRED RELOCATIONS AND/OR
EXTENSIONS.
THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY PHYSICAL DAMAGE
TO OWNER'S PROPERTY OR ANY ADJACENT PROPERTIES, INCLUDING, BUT NOT
LIMITED TO FENCES, WALLS, PAVEMENT, GRASS, TREES, AND LAWN SPRINKLER AND
IRRIGATION SYSTEMS AT NO COST TO THE OWNER, OR OWNER'S AGENTS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE ALL SURPLUS MATERIALS, SPOILS, AND
DEBRIS OFF SITE. THIS WORK IS INCIDENTAL TO THE CONTRACT.
THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS AND
APPROVALS PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE
CONTRACT DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, AND SPECIAL CONDITIONS,
COPIES OF ANY REQUIRED CONSTRUCTION PERMITS, EROSION CONTROL PLANS, SWPPP
AND INSPECTION REPORTS.
ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER BEFORE COMMENCING WORK. NO FIELD
CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF
THE OWNER AND NOTIFICATION TO THE ARCHITECT/ ENGINEER.
ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE
SENT TO THE OWNER, ARCHITECT AND ENGINEER. ALLIANCE GEOTECHNICAL GROUP WILL
PROVIDE TESTING FOR CONSTRUCTION.
CONTRACTOR SHALL VERIFY BENCHMARKS AND DATUMS PRIOR TO COMMENCING
CONSTRUCTION OR STAKING OF IMPROVEMENTS. CONTRACTOR SHALL IMMEDIATELY
REPORT DISCREPANCIES TO THE ARCHITECT AND ENGINEER.
CONTRACTOR SHALL THOROUGHLY CHECK COORDINATION OF CIVIL, LANDSCAPE,
ARCHITECTURAL, AND OTHER PLANS PRIOR TO COMMENCING CONSTRUCTION. OWNER AND
ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO COMMENCING WITH
CONSTRUCTION.
CONTRACTOR ADJUSTMENTS TO SPOT GRADES TO MAINTAIN POSITIVE DRAINAGE IS
ALLOWED WITH THE PRIOR APPROVAL OF THE ARCHITECT / ENGINEER.
THE CONTRACTOR SHALL SALVAGE AND PROTECT ALL EXISTING POWER POLES, SIGNS,
MANHOLES, TELEPHONE RISERS, WATER VALVES, ETC. DURING ALL CONSTRUCTION PHASES
UNLESS NOTED OTHERWISE.
CONTRACTOR STAGING AREA TO BE AGREED UPON BY OWNER PRIOR TO CONSTRUCTION.
ALL EXISTING CONCRETE PAVING, SIDEWALK, STRUCTURES AND CURBS NOTED FOR
DEMOLITION SHALL BE REMOVED IN THEIR ENTIRETY AND DISPOSED OF BY THE
CONTRACTOR, OFFSITE UNLESS OTHERWISE DIRECTED BY THE OWNER, ARCHITECT /
ENGINEER.
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL PROVIDE AS-BUILT PLANS
IDENTIFYING ALL DEVIATIONS OR VARIATIONS OF ORIGINAL PLANS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING
AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER
SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL
COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
PROTECTION. THIS OR ANY OTHER MEANS OF CONTROL SHALL BE PROVIDED AT NO
ADDITIONAL COST TO THE OWNER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING MEASURES TO MINIMIZE DAMAGE
TO TREE LIMBS, TREE TRUNKS, AND TREE ROOTS ALONG THE ROUTE OF THE PROJECT. ALL
SUCH MEASURES SHALL BE CONSIDERED AS INCIDENTAL WORK INCLUDED IN THE
CONTRACT UNIT PRICE BID FOR APPLICABLE SITE WORK OR STRUCTURE INSTALLATION.
WHEN CONSTRUCTION PASSES BY OR CLOSE TO TREES, THE CONTRACTOR SHALL ERECT
TEMPORARY CONSTRUCTION FENCE TO LIMIT ACTIVITY OUTSIDE OF THE EASEMENT IN THE
TREE AREAS. NO PARKING WILL BE ALLOWED UNDER DRIP LINE OR MINIMUM OF TEN (10)
FEET OF ANY TREE TO REMAIN. CONTRACTOR SHALL INSPECT EACH WORK SITE IN ADVANCE
AND ARRANGE TO HAVE ANY TREE LIMBS PRUNED THAT MIGHT BE DAMAGED BY EQUIPMENT
OPERATIONS. THE OWNER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY TREE
TRIMMING WORK. NOTHING SHALL BE STORED OVER THE TREE ROOT SYSTEM WITHIN THE
DRIP LINE AREA OF ANY TREE. THE CONTRACTOR SHALL EMPLOY A QUALIFIED LANDSCAPER
FOR ALL THE WORK REQUIRED FOR TREE CARE TO ENSURE UTILIZATION OF THE BEST
AGRICULTURAL PRACTICES AND PROCEDURES.
REFERENCE GEOTECH REPORT AND SPECIFICATIONS PREPARED BY FALCON ENGINEERING, DATED OCTOBER 27, 2021 FOR BUILDING SLAB, POOL, PAVEMENT PREPARATION, COMPACTION, AND ALL EARTHWORK OPERATIONS.
THE CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS, POWER POLES, GUY WIRES, AND TELEPHONE BOXES WHICH ARE TO REMAIN IN PLACE AND UNDISTURBED DURING CONSTRUCTION.
ALL SPOT ELEVATIONS ARE PROPOSED PAVEMENT, OR TOP OF GRADE ELEVATIONS UNLESS OTHERWISE NOTED. TC= TOP OF CURB, EX= EXIST. GRADE, FF= FINISH FLOOR, ME = MATCH EXISTING, TD = TOP OF DRAIN, TW = TOP OF WALL, BW= BOTTOM
OF WALL,TS = TOP OF STAIRS
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL PROVIDE AS-BUILT PLANS IDENTIFYING ALL DEVIATIONS OR
VARIATIONS OF ORIGINAL PLANS.
CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES BEFORE CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE CONTRACTOR SHALL REPLACE THEM AT HIS
OWN EXPENSE.
ALL PUBLIC WORKS CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LOCAL DESIGN AND TECHNICAL CONSTRUCTION
STANDARDS.
THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE CONDITION ALL FILL PER THE GEOTECHNICAL ENGINEER'S SPECIFICATIONS. ANY FILL MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL
ENGINEER PRIOR TO PLACEMENT.
ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH. THE AREAS SHALL THEN BE SEEDED, IRRIGATED, AND STABILIZED AS INDICATED IN THE PLANS AND SPECIFICATIONS, AND MAINTAINED UNTIL SOIL IS STABILIZED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE CONSTRUCTION SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE STABILIZED AND
MULCHED AS SHOWN ON THE LANDSCAPE, GRADING, AND EROSION CONTROL PLANS.
ALL CUT OR FILL SLOPES SHALL BE 4:1 OR FLATTER UNLESS OTHERWISE INDICATED.
GRADING NOTESGENERAL CONSTRUCTION NOTES
ACCESSIBILITY NOTES
CO - CLEAN OUT
DI - DROP INLET
YI - YARD INLET
EX - EXISTING
ME - MATCH EXISTING
FES - FLARED-END-SECTION
LOD - LIMITS OF DISTURBANCE
PVC - POLYVINYL CHLORIDE
RCP - REINFORCED CONCRETE PIPE
TYP. - TYPICAL
*NOT ALL ABBREVIATIONS MAY BE USED FOR THIS PROJECT.
1. RECORD DRAWING CERTIFICATIONS REQUIRED FOR THIS PROJECT INCLUDES, BUT MAY NOT BE LIMITED TO WATER AND SEWER MAINS, STORM DRAINAGE PIPING, STORMWATER CONTROL MEASURES AND INDIVIDUAL WATER AND SEWER SERVICE LOCATIONS. ALL RECORD DRAWING DATA SHALL BE PROVIDED BY THE CONTRACTOR PRIOR THE ISSUANCE OF CERTIFICATE
OF OCCUPANCY PER CITY OF GREENVILLE, NCDOT, AND NCDEQ REQUIREMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL SURVEY DATA REQUIRED BY THE CITY OF GREENVILLE, NCDOT, NCFMP AND NCDEQ IN ORDER TO PREPARE THE RECORD DRAWING CERTIFICATIONS. RECORD DRAWINGS SHALL BE PREPARED AND CERTIFIED BY A NORTH CAROLINA LICENSED SURVEYOR IN ACCORDANCE WITH ALL
APPLICABLE REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE ALL NECESSARY ITEMS INCLUDING ANY TESTING, REPORTS OR CERTIFICATION DOCUMENTS REQUIRED BY GOVERNING JURISDICTIONS TO PROPERLY CLOSE OUT THE PROJECT BEFORE IT CAN BE DEEMED COMPLETE.
RECORD DRAWING NOTES:
ABBREVIATIONS
EROSION CONTROL NOTES
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF
THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK.
2. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (NCDENR) AND NCDEQ EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL CONSTRUCTION SHALL COMPLY WITH NCDEQ STANDARDS AND SPECIFICATIONS.
4. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT.
5. ALL EROSION CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE.
6. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT
ALL TIMES.
7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. STABILIZE DISTURBED AREAS WITH TEMPORARY VEGETATION. DENUDED AREAS MUST BE SEEDED WITHIN FOURTEEN (14) DAYS OF COMPLETION OF ANY PHASE OF CONSTRUCTION.
8. INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT SEDIMENT RUNOFF.
9. WHERE POSSIBLE, EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO CONSTRUCTION AND SHALL BE
ADEQUATE TO MAINTAIN SEDIMENT ON SITE.
10. ALL EXCAVATED SOILS NOT NEEDED ON SITE FOR BACKFILL OPERATIONS SHALL BE TAKEN OFF SITE AND LEGALLY DISPOSED OF, NO SOIL CAN BE REMOVED FROM SITE WITHOUT EHS APPROVAL, REFER TO THE PROJECT'S SITE SOIL
MANAGEMENT PROGRAM.
11. PROVIDE EROSION CONTROL MEASURES AS NECESSARY TO PREVENT SOIL FROM GETTING OFF SITE OR INTO EXISTING DRAINAGE STRUCTURES. SOIL PILES AND CONTRACTOR STAGING AND MATERIALS LAY DOWN AREAS SHOULD BE A
MINIMUM OF 50' AWAY FROM ANY STORM DRAIN OR WATERCOURSE.
12. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL
MEASURES ARE INSTALLED PRIOR TO OFF-SITE GRADING.
13. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO THE NCDEQ FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED
PERMIT.
14. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS.
15. CONTRACTOR TO ENSURE THAT SEDIMENT LADEN RUNOFF DOES NOT LEAVE SITE LIMITS OR ENTER PROTECTED AREAS.
ANY SEDIMENT DEPOSITED BEYOND DISTURBED AREA WITHIN SITE LIMITS SHALL BE REMOVED.
16. ALL EROSION CONTROLS MEASURES AND DEVICES SHALL BE IN ACCORDANCE WITH STATE AND LOCAL EROSION
CONTROL REGULATIONS.
17. ALL DISTURBED AREAS WHERE WORK HAS CEASED SHALL BE STABILIZED WITHIN 14 DAYS UNLESS OTHERWISE NOTED.
18. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY (7) CALENDAR DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS 1 INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED
IMMEDIATELY.
19. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY
AFTER SEDIMENT IS REMOVED IN THIS MANNER.
20. WHEN THE CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF THE
ORIGINAL APPLICATION.
21. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED FOR ADDITIONAL CONTRACTOR LAYDOWN AREA.
CONTRACTOR TO COORDINATE WITH ENGINEER DURING CONSTRUCTION.
22. ROLLED EROSION CONTROL PRODUCTS (RECP'S) SHOULD BE USED TO AID PERMANENT VEGETATED STABILIZATION OF SLOPES 2:1 OR GREATER AND WITH MORE THAN 10' OF VERTICAL RELIEF. RECP'S SHOULD ALSO BE USED WHEN MULCH CANNOT BE ADEQUATELY TACKED AND WHERE IMMEDIATE GROUND COVER IS REQUIRED TO PREVENT EROSION
DAMAGE.
23. CONCRETE WASHOUT MUST BE LOCATED AT LEAST 50 FEET FROM ANY STORM DRAIN, AND THAT CONCRETE DUST/WASTE/WASTEWATER MAY NOT BE RELEASED TO THE STORM DRAIN, INCLUDING RINSING CONCRETE TRUCK
CHUTES.
24. ALL STOCKPILES TO REMAIN COVERED EXCEPT WHILE IN USE.
25. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. DEWATERING DIRECTLY TO THE STORM DRAINS IS PROHIBITED.
26. ALL HANDLING PROCEDURES SHALL BE IN ACCORDANCE TO NCG010000 PART II SECTION F.
27. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. NO SEDIMENT AND EROSION CONTROL MEASURE SHALL BE REMOVED WITHOUT INSPECTOR APPROVAL.
28. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDEQ INSPECTOR'S FINAL
APPROVAL IS REQUIRED.
29. STABILIZATION MEASURES SHALL BE APPLIED TO STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY
AFTER INSTALLATION.
30. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DEPENDING UPON FIELD
CONDITIONS.
31. LIMITS OF GRADING SHOWN ON THE PLAN ARE MAXIMUM LIMITS FOR EROSION CONTROL
PURPOSES ONLY. SURVEYOR TO DETERMINE ACTUAL LIMIT.
32. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NCDEQ
EROSION CONTROL ORDINANCE, AND IS SUBJECT TO A FINE.
33. GRADING MORE THAN 1 ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION
OF THE NCDEQ EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
34. TEMPORARY CONSTRUCTION ENTRANCES SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREAS. TWO TO
THREE INCH STONE SHALL BE USED FOR THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE.
35. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION
DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN
ACCEPTABLE METHOD OF CLEANING.
36. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE
TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS
WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
37. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES
INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY
LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES PLACE.
38. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL
TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
STABILIZATION IS ACHIEVED.
39. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 21 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER
NEEDED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE
DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
40. THIS PROJECT IS LOCATED IN THE TAR/PAMLICO RIVER BASIN.
DIP- DUCTILE IRON PIPE
STRM - STORM
MH - MANHOLE
SD - STORM DRAIN
RD - ROOF DRAIN
TC - TOP OF CONCRETE
CI - CAST IRON PIPE
TW - TOP OF WALL
BW - BOTTOM OF WALL
PIV - POST INDICATOR VALVE
EROSION CONTROL NOTES
1. CITY OR NCDOT DRIVEWAY PERMIT REQUIRED. ANY ENCROACHMENT AGREEMENTS SHALL BE
APPROVED BEFORE INSTALLATION.
2. AN UNUSED DRIVEWAY MUST BE CLOSED IN ACCORDANCE WITH THE CITY OF GREENVILLE'S
DRIVEWAY ORDINANCE.
3. CONTRACTOR MUST NOTIFY ONE-CALL CENTER INC. (NC ONE-CALL) (811) AT LEAST 72 HOURS
PRIOR TO THE START OF EXCAVATION OR TRENCHING TO HAVE ALL UNDERGROUND UTILITIES
LOCATED.
4. ALL REQUIRED IMPROVEMENTS SHALL CONFORM TO THE CITY OF GREENVILLE MANUAL OF
STANDARD DESIGNS AND DETAILS (MSDD).
5. CONTRACTOR SHALL NOTIFY PUBLIC WORKS, STREET MAINTENANCE DIVISION 48 HOURS PRIOR
TO MAKING CONNECTION TO EXISTING STORM DRAINS LOCATED WITHIN PUBLIC STORM
DRAINAGE EASEMENTS OR RIGHT-OF-WAY.
6. THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE
FEDERAL EMERGENCY MANAGEMENT AGENCY. THIS PROPERTY IS LOCATED IN ZONE "AE" AS
SHOWN ON FIRM PANEL NUMBER 3720468800K, COMMUNITY NUMBER 370191, INDEX DATE 7/7/2014.
7. LANE CLOSURES ON THOROUGHFARE ROADS ARE ONLY PERMITTED BETWEEN THE HOURS OF
9:00 AM AND 4:00 PM, MONDAY THROUGH FRIDAY, UNLESS OTHERWISE PERMITTED BY THE
TRAFFIC ENGINEER. IN ADDITION, THERE WILL BE NO LANE CLOSURES ON HOLIDAYS INCLUDING
THE DAY BEFORE OR AFTER SAID HOLIDAY. A TRAFFIC CONTROL PLAN PREPARED IN
ACCORDANCE WITH THE NCDOT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES IS REQUIRED
FOR ALL LANE CLOSURES AND MUST BE APPROVED BY THE TRAFFIC ENGINEER.
8. ANY LAND DISTURBING ACTIVITY WHICH WILL UNCOVER MORE THAN ONE (1) ACRE, OR IF ANY PORTION OF THE PROPERTY IS LOCATED IN THE FLOODWAY, SHALL OBTAIN SOIL EROSION AND
SEDIMENTATION CONTROL PLAN APPROVAL OF THE CITY ENGINEER PRIOR TO INITIATION OF
SUCH ACTIVITY.
9. ANY LAND DISTURBING ACTIVITY THAT RESULTS IN A NET INCREASE OF IMPERVIOUS AREA AND DISTURBS GREATER OR EQUAL TO 12 ACRE FOR NON-SINGLE FAMILY RESIDENTIAL, SHALL OBTAIN
APPROVAL OF A STORMWATER MANAGEMENT PLAN PRIOR TO INITIATION OF SUCH ACTIVITY.
CITY OF GREENVILLE GENERAL NOTES
REFER TO EXISTING CONDITIONS AND DEMOLITION PLAN SHEETS FOR ALL TREE REMOVAL
REQUIREMENTS.
1. ALL MATERIAL AND CONSTRUCTION SHALL CONFORM TO THE CITY OF GREENVILLE
AND GREENVILLE UTILITIES COMMISSION MUNICIPAL CODES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH ALL MATERIAL AND LABOR
TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION
DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES,
SPECIFICATIONS AND REQUIREMENTS.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY
COMPANIES WHICH MAY HAVE UNDERGROUND OR AERIAL UTILITIES WITHIN OR
NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR
SHALL PROVIDE 72 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES AND THE
CITY OF GREENVILLE AND GREENVILLE UTILITIES COMMISSION PRIOR TO
BEGINNING CONSTRUCTION. AN INFORMAL LIST OF UTILITY CONTACTS ARE AS
FOLLOWS:
1. EXISTING VEGETATION SHALL BE PROTECTED TO THE GREATEST EXTENT PRACTICABLE AND
SHALL BE CREDITED TOWARDS THE REQUIREMENTS OF THE CITY OF GREENVILLE'S ZONING
ORDINANCE.
2. ALL CONTINUOUS STANDS OF VEGETATION SHALL BE PROTECTED AND HAVE BEEN IDENTIFIED
HEREIN.
3. ALL INFRASTRUCTURE REQUIRING ADDITIONAL VEGETATION (I.E. PARKING LOTS, BUILDINGS, ETC)
HAVE BEEN REVIEWED AND PERMITTED UNDER A SEPARATE SUBMITTAL.
4. ALL BUFFERS SHALL BE LEFT UNDISTURBED AND EXISTING VEGETATION SHALL COUNT TOWARDS
ANY AND ALL REQUIREMENTS.
VEGETATION NOTES
LIMITS OF DISTURBANCE NOTE:
CONTRACTOR SHALL ESTABLISH LIMITS OF DISTURBANCE AT
A MINIMUM OF (FIFTY) 50'-0" INTERVALS. LIMITS OF ALIGNMENT
STAKING SHALL BE VERIFIED BY ENGINEER AND/OR
LANDSCAPE ARCHITECT PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION. LIMITS SHALL BE CLEARLY MARKED IN THE
FIELD AND SHALL REMAIN IN PLACE THROUGHOUT THE
DURATION OF CONSTRUCTION.
C1.0EXISTING CONDITIONS
© 2024 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
R
R28'
120'
R
R28'
120'
GPS 2 (#11)
CIT
Y
OF
GRE
EN
VIL
LE
D.B . 3
3 P
G. 5
P.N . 0
/26
CITY OF
GREENVILLE
D.B. 3863 PG. 527
P.N. 01031/26467
NCPIN: 4698507427
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 0 NE
GREENVILLE BLVD
CURRENT ZONING:
RESIDENTIAL - AGRICULTURAL
C2.1 .B
EXISTING
LAKE
EXISTING
LAKE
TAR RIVER
G R
EE
N
VI
LL
E
BL
VD
(A
LT
H W
Y-
4)
C2.2.B
EXISTING SOUTH TAR RIVER GREENWAY
THE SWAMP (A
REA 4)
NCPIN: 4698411224
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 2805 E
SECOND STREET
CURRENT ZONING: INDUSTRY
NCPIN: 4697495737
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 2900 E
SECOND STREET
CURRENT ZONING:
RESIDENTIAL - AGRICULTURAL
NCPIN: 4697594379
OWNER: EWT 77 LLC
PHYSICAL ADDRESS: 2209 NE
GREENVILE BV
DB: 4066 PG. 585
CURRENT ZONING:
OFFICE - RESIDENTIAL
NCPIN: 4698313793
OWNER: FLANAGAN, CURTIS J
HEIRS
PHYSICAL ADDRESS: 0 BEECH
STREET
DB: 2824 PG. 576
CURRENT ZONING:
R6 - RESIDENTIAL
PARCEL 1
PARCEL 2
PARCEL 4
PARCEL 3PARCEL 5
PARK ENTRANCE AT
BLUE HERON ROAD
FLOODWAY
FLOODWAY
APPROXIMATE EXISTING
TRAIL ALIGNMENT
APPROXIMATE EXISTING
TRAIL ALIGNMENT
EXISTING TRAIL ALIGNMENT
CONNECTING TO RIVER
PARK NORTH
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
O
VE
R
AL
L D
EM
O
LI
TI
O N
A N
D
ER
O
SI
O N
C O
N
TR
O L
PL
AN
C2.0.B
NORTH
PARCEL DATA
PARCEL 1 2 3 4 5
NCPIN: 4698725454 4698536478 4698436559 4698432018 4688635909
PARCEL NUMBER: 086710 022504 035488 024274 028893
OWNER CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE
PHYSICAL ADDRESS: 3450 BLUE HERON DR 0 NE GREENVILLE BV 0 OLD PACTOLUS RD 0 OLD PACTOLUS RD 1000 MUMFORD RD
LEGAL DESCRIPTION: PHILLIP E. CARROLL BOYD TRIPP RED BANKS (PITT #37) RIVER PARK NORTH
MAP/BLOCK/LOT 4698.15-72-5454.000 4698.15-53-6478.000 4698.14-43-6559.000 4698.14-43-2018.000 4688.15-63-5909.000
DEED REFERENCE DB. 4012 PG. 124 DB. 4049 PG. 261 DB. 4049 PG. 261 DB. 4049 PG. 261 NOT FOUND
CURRENT ZONING HEAVY COMMERCIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL INDUSTRY
CENSUS TRACT: 900 800 800 800 800
PARCEL ACREAGE: 101 137 28 7 293
APPROXIMATE
IMPERVIOUS AREA: 3.09 AC 0.00 AC 0.00 AC 0.00 AC 0.00 AC
N.I.C.
CITY OF GREENVILLE
D.B. U-43 PG. 660
M.B. 37 PG. 5
P.N. 28893
CONTROL NAIL - 9" SPIKE (#5831)
CONTROL NAIL - 9" SPIKE (#5832)
BGS-05
ELEV: 0.00'
GW DEPTH: 0.0'
GW ELEV: 0.00'
BGS-04
ELEV: 0.34'
GW DEPTH: 0.0'
GW ELEV: 0.34'
BGS-03
ELEV: 0.82'
GW DEPTH: 0.0'
GW ELEV: 0.82'
BGS-02
ELEV: 1.38'
GW DEPTH: 0.0'
GW ELEV: 1.38'
BGS-01
GW DEPTH:1.5'
CITY OF GREENVILLE
D.B. 4049 PG. 261
P.N. 24274
EXISTING
WETLAND
168,148 SF
(3.86 AC)
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
EXISTING WETLAND TO BE
PERMANENTLY DISTURBED
LIMITS OF DISTURBANCE
(TYP.)
PARCEL BOUNDARY
EXISTING WETLAND
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
EXISTING WETLAND
LIMITS OF DISTURBANCE
(TYP.)
EXISTING WETLAND
TBM LAG IN 15" OAK (#5828)
EL. 12.82 (NAVD88)
SILT FENCE (TYP.)
SILT FENCE (TYP.)
BORINGS
Description
BGS-01
BGS-02
BGS-03
BGS-04
BGS-05
BGS-06
BT-01
BW-01
BW-02
BW-03
BW-04
CT-01
EB-01
TB-01
TB-02
WB-01
Northing
682792.95
682892.95
683000.02
683039.01
683102.00
683134.01
680328.00
680778.00
680688.98
680537.96
680538.00
682368.01
680591.02
681864.00
681879.00
683318.01
Easting
2493966.99
2493965.96
2494048.00
2494143.00
2494220.00
2494399.00
2496924.00
2496865.01
2496877.96
2497117.98
2497235.95
2496810.98
2496938.96
2497416.99
2497532.00
2494539.98
NOTES:
BGS - BLACK GUM SWAMP
WB - WESTERN BRIDGE
CT - CONNECTOR TRAIL
TB - TOWER BRIDGE
BW - BOARDWALK
EB - EAST BRIDGE
BT - BEACH TRAIL
LEGEND
PROPERTY LINE
LIMITS OF DISTURBANCE
DEMOLISH SITE ITEM
SILT FENCE
"FLOATING SILT FENCE, TYPE 1" FOR OPEN WATER APPLICATIONS AS NEEDED
TREE PROTECTION FENCE
DEMOLISH SITE ITEM/TREE TO BE REMOVED
CONCRETE WASHOUT STATION
NATURAL TRAIL TO BE REMOVED
PERMANENT WETLAND DISTURBANCE
TEMPORARY WETLAND DISTURBANCE
TEMPORARY/PERMANENT OPEN WATER DISTURBANCE (SEE NOTE #3)
SPOIL PILE TO BE REMOVED
TEMPORARY HEAVY DUTY GRAVEL CONSTRUCTION ACCESS
20' FIRE ACCESS DRIVE
DEMOLITION AND EROSION CONTROL LEGEND
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
NORTH
C2.1.B
D
EM
O
LI
TI
O
N A
N D
P H
ER
O
SI
O N
C O
N
TR
O L
PL
AN
TH
E
SW
AM
P
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T C
2.
2.
B
PHASE 1 CONSTRUCTION SEQUENCE
THE FOLLOWING PHASE 1 CONSTRUCTION SEQUENCE IS FURNISHED AS A GENERAL GUIDE FOR PREPARATION
OF A SEQUENCE OF CONSTRUCTION EVENTS.
1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ.
2. SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH NCDEQ EROSION CONTROL INSPECTOR TO
DISCUSS EROSION CONTROL MEASURES.
3. CONTRACTOR TO INSTALL SILT FENCE, TREE PROTECTION FENCE, AND OTHER EROSION CONTROL MEASURES AS SHOWN ON PLANS. CONTRACTOR TO CLEAR ONLY AS NECESSARY TO INSTALL THESE
DEVICES.
4. INSTALL TEMPORARY CONSTRUCTION ACCESS ROADS AND TURN AROUND AREAS AND TEMPORARY STREAM CROSSING TO PROVIDE ACCESS TO CONSTRUCTION SITE AREAS. CONTRACTOR TO CLEAR ONLY AS
NECESSARY TO INSTALL THESE MEASURES.
5. CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED PATH FOOTPRINT. USE MUD
MATS IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT IMPACTS.
6. CALL FOR ON-SITE INSPECTION BY INSPECTOR ONCE ALL EROSION CONTROL MEASURES ARE INSTALLED.
7. UPON APPROVAL AND RECEIPT OF USACE NATIONWIDE PERMIT #14 AND NCDWR GENERAL WATER QUALITY CERTIFICATION #4135, CLEARING AND DEMOLITION MAY BEGIN. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. EROSION CONTROL MEASURES SHALL BE RESTORED TO ORIGINAL
DIMENSIONS WHEN SEDIMENT ACCUMULATES TO 50% OF DESIGN DEPTH.
8. INSPECT AND REPAIR EROSION CONTROL MEASURES AFTER EVERY RAINFALL EVENT OF 1/2" OR GREATER
OR EVERY SEVEN (7) CALENDAR DAYS.
9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPARTMENT OF AGRICULTURE, AND CITY
OF GREENVILLE EROSION CONTROL ORDINANCE.
NOTES
1. REFER TO THIS SHEET AND GENERAL NOTES SHEET C0.1 FOR GENERAL EROSION CONTROL NOTES AND
MAINTENANCE AND SEEDBED PREPARATION AND SEEDING SCHEDULE.
2. THIS PROJECT HAS COMBINED INFORMATION FROM PREVIOUS PHASING PLANS TO PROVIDE CONTEXT.
REFER TO PLANS BY RIVERS AND ASSOCIATES WITH THE ADVENTURE PARK PROJECT. ALL INFORMATION WHICH DOES NOT EXIST IN THE FIELD TODAY, BUT HAS BEEN DEPICTED AS "EXISTING CONDITIONS" HEREIN SHALL BE BROUGHT TO THE ENGINEER OR LANDSCAPE ARCHITECT'S ATTENTION PRIOR TO CONSTRUCTION.
3. SEE ENVIRONMENTAL PERMITS PACKAGE FOR EXTENTS OF ALL ENVIRONMENTAL IMPACTS AND REPORTS.
REPORT INCLUDES OPEN WATER, WETLAND, AND BUFFER IMPACTS, TEMPORARY AND PERMANENT.
LIMITS OF DISTURBANCE NOTE:
CONTRACTOR SHALL ESTABLISH LIMITS OF DISTURBANCE AT
A MINIMUM OF (FIFTY) 50'-0" INTERVALS. LIMITS OF ALIGNMENT
STAKING SHALL BE VERIFIED BY ENGINEER AND/OR
LANDSCAPE ARCHITECT PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION. LIMITS SHALL BE CLEARLY MARKED IN THE
FIELD AND SHALL REMAIN IN PLACE THROUGHOUT THE
DURATION OF CONSTRUCTION.
CITY OF GREENVILLE
D.B. 4049 PG. 261
P.N. 35488
CITY OF GREENVILLE
D.B. 4049 PG. 261
P.N. 24274
TBM LAG IN 12" GUM (#5829)
EL. 9.02 (NAVD88)
CONTROL NAIL - 9" SPIKE (#5833)
BGS-06
GW DEPTH: 7.2'
BGS-05
ELEV: 0.00'
GW DEPTH: 0.0'
GW ELEV: 0.00'
WB-01
ELEV: 7.71'
GW DEPTH: 0.0'
GW ELEV: 7.71'
EXISTING WETLAND
38,947 SF
(0.89 AC)
POTENTIAL 50.0'
RIPARIAN BUFFER
EXISTING 10' NATURAL TRAIL
POTENTIAL 50.0'
RIPARIAN BUFFER
EXISTING LAKE
EXISTING 10' NATURAL TRAIL
LIMITS OF DISTURBANCE
(TYP.)
RETAIN
AND PROTECT
EXISTIN
G TREE
PARCEL BOUNDARY
PARCEL BOUNDARY
LIMITS OF DISTURBANCE
(TYP.)
EXISTING WETLAND
EXISTING 10' NATURAL TRAIL
EXISTING WETLAND
20' TEMPORARY GRAVEL
CONSTRUCTION STAGING
AND TRUCK TURNAROUND
LIMITS OF DISTURBANCE (TYP.)
SILT FENCE (TYP.)
SILT FENCE (TYP.)
FLOATING SILT FENCE (TYP.)
LEGEND
BORINGS
Description
BGS-01
BGS-02
BGS-03
BGS-04
BGS-05
BGS-06
BT-01
BW-01
BW-02
BW-03
BW-04
CT-01
EB-01
TB-01
TB-02
WB-01
Northing
682792.95
682892.95
683000.02
683039.01
683102.00
683134.01
680328.00
680778.00
680688.98
680537.96
680538.00
682368.01
680591.02
681864.00
681879.00
683318.01
Easting
2493966.99
2493965.96
2494048.00
2494143.00
2494220.00
2494399.00
2496924.00
2496865.01
2496877.96
2497117.98
2497235.95
2496810.98
2496938.96
2497416.99
2497532.00
2494539.98
NOTES:
BGS - BLACK GUM SWAMP
WB - WESTERN BRIDGE
CT - CONNECTOR TRAIL
TB - TOWER BRIDGE
BW - BOARDWALK
EB - EAST BRIDGE
BT - BEACH TRAIL
PROPERTY LINE
LIMITS OF DISTURBANCE
DEMOLISH SITE ITEM
SILT FENCE
"FLOATING SILT FENCE, TYPE 1" FOR OPEN WATER APPLICATIONS AS NEEDED
TREE PROTECTION FENCE
DEMOLISH SITE ITEM/TREE TO BE REMOVED
CONCRETE WASHOUT STATION
NATURAL TRAIL TO BE REMOVED
PERMANENT WETLAND DISTURBANCE
TEMPORARY WETLAND DISTURBANCE
TEMPORARY/PERMANENT OPEN WATER DISTURBANCE (SEE NOTE #3)
SPOIL PILE TO BE REMOVED
TEMPORARY HEAVY DUTY GRAVEL CONSTRUCTION ACCESS
20' FIRE ACCESS DRIVE
DEMOLITION AND EROSION CONTROL LEGEND
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
NORTH
C2.2.B
MATCH LINE - SEE SHEET C2.1.B
PHASE 1 CONSTRUCTION SEQUENCE
1. THE FOLLOWING PHASE 1 CONSTRUCTION SEQUENCE IS FURNISHED AS A GENERAL
GUIDE FOR PREPARATION OF A SEQUENCE OF CONSTRUCTION EVENTS.
2. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ.
3. SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH NCDEQ EROSION CONTROL
INSPECTOR TO DISCUSS EROSION CONTROL MEASURES.
4. CONTRACTOR TO INSTALL SILT FENCE, TREE PROTECTION FENCE, AND OTHER EROSION
CONTROL MEASURES AS SHOWN ON PLANS. CONTRACTOR TO CLEAR ONLY AS
NECESSARY TO INSTALL THESE DEVICES.
5. INSTALL TEMPORARY CONSTRUCTION ACCESS ROADS AND TURN AROUND AREAS AND
TEMPORARY STREAM CROSSING TO PROVIDE ACCESS TO CONSTRUCTION SITE AREAS.
CONTRACTOR TO CLEAR ONLY AS NECESSARY TO INSTALL THESE MEASURES.
6. CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED PATH
FOOTPRINT. USE MUD MATS IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT
IMPACTS.
7. CALL FOR ON-SITE INSPECTION BY INSPECTOR ONCE ALL EROSION CONTROL MEASURES
ARE INSTALLED.
8. UPON APPROVAL AND RECEIPT OF USACE NATIONWIDE PERMIT #14 AND NCDWR
GENERAL WATER QUALITY CERTIFICATION #4135, CLEARING AND DEMOLITION MAY
BEGIN. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY.
EROSION CONTROL MEASURES SHALL BE RESTORED TO ORIGINAL DIMENSIONS WHEN
SEDIMENT ACCUMULATES TO 50% OF DESIGN DEPTH.
9. INSPECT AND REPAIR EROSION CONTROL MEASURES AFTER EVERY RAINFALL EVENT OF
1/2" OR GREATER OR EVERY SEVEN (7) CALENDAR DAYS.
10. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S.
DEPARTMENT OF AGRICULTURE, AND CITY OF GREENVILLE EROSION CONTROL
ORDINANCE.
NOTES
1. REFER TO THIS SHEET AND GENERAL NOTES SHEET C0.1 FOR GENERAL EROSION
CONTROL NOTES AND MAINTENANCE AND SEEDBED PREPARATION AND SEEDING
SCHEDULE.
2. THIS PROJECT HAS COMBINED INFORMATION FROM PREVIOUS PHASING PLANS TO
PROVIDE CONTEXT. REFER TO PLANS BY RIVERS AND ASSOCIATES WITH THE
ADVENTURE PARK PROJECT. ALL INFORMATION WHICH DOES NOT EXIST IN THE FIELD
TODAY, BUT HAS BEEN DEPICTED AS "EXISTING CONDITIONS" HEREIN SHALL BE
BROUGHT TO THE ENGINEER OR LANDSCAPE ARCHITECT'S ATTENTION PRIOR TO
CONSTRUCTION.
3. SEE ENVIRONMENTAL PERMITS PACKAGE FOR EXTENTS OF ALL ENVIRONMENTAL
IMPACTS AND REPORTS. REPORT INCLUDES OPEN WATER, WETLAND, AND BUFFER
IMPACTS, TEMPORARY AND PERMANENT.
LIMITS OF DISTURBANCE NOTE:
CONTRACTOR SHALL ESTABLISH LIMITS OF DISTURBANCE AT
A MINIMUM OF (FIFTY) 50'-0" INTERVALS. LIMITS OF ALIGNMENT
STAKING SHALL BE VERIFIED BY ENGINEER AND/OR
LANDSCAPE ARCHITECT PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION. LIMITS SHALL BE CLEARLY MARKED IN THE
FIELD AND SHALL REMAIN IN PLACE THROUGHOUT THE
DURATION OF CONSTRUCTION.
D
EM
O
LI
TI
O
N A
N D
P H
ER
O
SI
O N
C O
N
TR
O L
PL
AN
TH
E
SW
AM
P
© 2024 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NO
RT
H (N
AD
3/
C3.1 .B
C3.2.B
EXISTING
LAKE
EXISTING
LAKE
C3.3.B
EXISTING SOUTH TAR RIVER GREENWAY
FLOODWAY
FLOODWAY
APPROXIMATE EXISTING
TRAIL ALIGNMENT
APPROXIMATE EXISTING
TRAIL ALIGNMENT
EXISTING TRAIL
ALIGNMENT CONNECTING
TO RIVER PARK NORTH
THE SWAMP (A
REA 4)
PARCEL 1
PARCEL 2
PARCEL 4
PARCEL 3PARCEL 5
NCPIN: 4698507427
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 0 NE
GREENVILLE BLVD
CURRENT ZONING:
RESIDENTIAL - AGRICULTURAL
TAR RIVER
G R
EE
N
VI
LL
E
BL
VD
(A
LT
H W
Y-
4)
NCPIN: 4698411224
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 2805 E
SECOND STREET
CURRENT ZONING: INDUSTRY
NCPIN: 4697495737
OWNER: CITY OF GREENVILLE
PHYSICAL ADDRESS: 2900 E
SECOND STREET
CURRENT ZONING:
RESIDENTIAL - AGRICULTURAL
NCPIN: 4697594379
OWNER: EWT 77 LLC
PHYSICAL ADDRESS: 2209 NE
GREENVILE BV
DB: 4066 PG. 585
CURRENT ZONING:
OFFICE - RESIDENTIAL
NCPIN: 4698313793
OWNER: FLANAGAN, CURTIS J
HEIRS
PHYSICAL ADDRESS: 0 BEECH
STREET
DB: 2824 PG. 576
CURRENT ZONING:
R6 - RESIDENTIAL
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
O
VE
R
AL
L
SI
TE
P
LA
N
C3.0.B
NORTH
PARCEL DATA
PARCEL 1 2 3 4 5
NCPIN: 4698725454 4698536478 4698436559 4698432018 4688635909
PARCEL NUMBER: 086710 022504 035488 024274 028893
OWNER CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE CITY OF GREENVILLE
PHYSICAL ADDRESS: 3450 BLUE HERON DR 0 NE GREENVILLE BV 0 OLD PACTOLUS RD 0 OLD PACTOLUS RD 1000 MUMFORD RD
LEGAL DESCRIPTION: PHILLIP E. CARROLL BOYD TRIPP RED BANKS (PITT #37) RIVER PARK NORTH
MAP/BLOCK/LOT 4698.15-72-5454.000 4698.15-53-6478.000 4698.14-43-6559.000 4698.14-43-2018.000 4688.15-63-5909.000
DEED REFERENCE DB. 4012 PG. 124 DB. 4049 PG. 261 DB. 4049 PG. 261 DB. 4049 PG. 261 NOT FOUND
CURRENT ZONING HEAVY COMMERCIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL OFFICE-RESIDENTIAL INDUSTRY
CENSUS TRACT: 900 800 800 800 800
PARCEL ACREAGE: 101 137 28 7 293
APPROXIMATE
IMPERVIOUS AREA: 3.09 AC 0.00 AC 0.00 AC 0.00 AC 0.00 AC
OPEN WATER
L4
STA:10+00.00
OFF:0.00LT
N:682768.2942 E:2493927.3672
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
L4
STA:16+82.18
OFF:0.00
N:683138.2309 E:2494345.9171
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
EXISTING WETLAND
168,148 SF
(3.86 AC)
10.0'
CITY OF GREENVILLE
D.B. U-43 PG. 660
M.B. 37 PG. 5
P.N. 28893
CONTROL NAIL - 9" SPIKE (#5833)
CONTRACTOR TO
PROVIDE CONNECTION
TO EXISTING 10'
NATURAL TRAIL
10' X 10' CONCRETE
APPROACH SLAB,
SEE DETAILS 3 & 8,
SHEET C4.0.B
10' X 25' CONCRETE
APPROACH SLAB, SEE
DETAILS 3 & 8, SHEET C4.0.B
CONNECT TO EXISTING
10' NATURAL TRAIL
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
SILT FENCE (TYP.)
LIMITS OF
DISTURBANCE (TYP.)
END BOARDWALK CONNECT
TO PROPOSED SIDEWALK
6.0'
SEE SHEET
C3.2.B
EXISTING
10' NATURAL TRAIL
SILT FENCE (TYP.)
10.0'
10.0'
10+00
+00
12+00
13+00
14+00
15+00
16+00
10.0'
BP: 10+00.00
EP: 16+82.18
PI: 12+05.56 PI: 12+15.79
PI: 12+35.56
PI: 12+75.56
PI: 13+94.18
PI: 14+74.18
PI: 15+04.18
PI: 15+44.18
PI: 16+14.18
PI: 10+55.56
PI: 10+30.01
PI: 10+38.19
PI: 10+47.56
PI: 16+72.18
PI: 10+45.53
PI: 10+45.96
PI: 11+55.56
PI: 13+64.18
L4 CONNECT TO Y4
STA:14+69.86
OFF:0.00
N:683061.1485 E:2494164.3225
APPROX. LOCATION OF EXISTING 10'
NATURAL TRAIL.
EXTENTS OF TRAIL NOT SURVEYED.
CREEK BANK
THE OUTPOST
SILT FENCE (TYP.)
SILT FENCE (TYP.)
SILT FENCE (TYP.)
RAILING (TYP.)
SEE STRUCTURES
PLANS FOR DETAILS
RAILING (TYP.)
SEE STRUCTURES
PLANS FOR DETAILS
TBM (#5828)
NORTHING: 68093
EASTING: 2494330
ELEV:12.82'
L4
0.00%
4.78%
0.00%
0.22%
8.00%
1.50%
1.50%
8.00%
0.00%
-3.50%
-4.32%
PV
I:
+0
0.
EL
: 5
.0
PV
I:
+5
5.
EL
: 5
.1
PV
I:
+8
5.
EL
: 7
.5
PV
I:
+9
5.
EL
: 7
.6
PV
I:
+2
5.
EL
: 1
0.
PV
I:
+3
5.
EL
: 1
0.
PV
I:
+3
5.
EL
: 1
5.
PV
I:
+1
9.
EL
: 1
5.
PV
I:
+6
9.
EL
: 1
5.
PV
I:
+4
4.
EL
: 1
5.
PV
I:
+5
7.
EL
: 1
1.
PV
I:
+8
2.
EL
: 9
.9
IN
TE
R
SE
C
TI
O N
10-YR WSEL
16.1'
5-YR WSEL
14.01'
2-YR WSEL
10.46'
MEAN WATER
LEVEL 2.5'
EXISTING GRADE
PROPOSED BOARDWALK
NATURAL SURFACE
CONCRETE APPROACH SLAB
STRUCTURAL EXCAVATION -
SEE SHEET S.07.B FOR DETAILS
BEGINNING OF HANDRAIL
(STA 10+55)
END OF HANDRAIL
(STA 10+25)
FIELD WALK PINK FLAGGING
EXISTING CONTOUR
WATER EDGE LINE
PRE-FABRICATED BRIDGE
BOARDWALK
ADA ADA
SITE LEGEND
CONCRETE SIDEWALK
PF
WETLAND
LIMITS OF DISTURBANCE
SILT FENCE
ADA ACCESSIBLE ROUTE
TEMPORARY HEAVY DUTY GRAVEL
HEAVY DUTY GRAVEL PAVEMENT FOR
20' FIRE ACCESS DRIVE
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
PL
AN
A N
D P
R O
FI
LE
TH
E
SW
AM
P
(A R
EA
C3.1.B
NORTH
PHASE 2 CONSTRUCTION SEQUENCE
1. SEE SHEET C3.6 FOR
CONSTRUCTION SEQUENCE
SEE SHEET C3.1.B
SEE SHEET C3.1.B
OPEN WATER
(CREEK)
10.0'
6.0' Y4
STA:10+00.00
OFF:0.00
N:683011.1766 E:2494152.9483
13+00
+0
15+00
PI: 12+75.56
PI: 13+94.18
PI: 14+74.18
PI: 15+04.18
PI: 15+44.18
PI: 13+64.18
10+00 10+51
BP: 10+00.00
EP: 10+51.25
Y4 CONNECT TO L4
STA:10+51.25
OFF:0.00
N:683061.1485 E:2494164.3225
CREEK BANK
6' WIDE BOARDWALK
WITH HANDRAIL
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND
PROTECT
EXISTING TREES
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREES
LIMITS OF
DISTURBANCE (TYP.)
SILT FENCE (TYP.)
LIMITS OF
DISTURBANCE (TYP.)
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
RETAIN AND PROTECT
EXISTING TREE
THE OUTPOST
10' WIDE BOARDWALK
Y4
0.00%
PV
I:
+0
0.
EL
: 1
5.
PV
I:
+5
1.
EL
: 1
5.
10-YR WSEL
16.1'
5-YR WSEL
14.01'
2-YR WSEL
10.46'
MEAN WATER
LEVEL 2.5'
PROPOSED 6' BOARDWALK
EXISTING GRADE
CONNECTION TO
PROPOSED 10' BOARDWALK
FIELD WALK PINK FLAGGING
EXISTING CONTOUR
WATER EDGE LINE
PRE-FABRICATED BRIDGE
BOARDWALK
ADA ADA
SITE LEGEND
CONCRETE SIDEWALK
PF
WETLAND
LIMITS OF DISTURBANCE
SILT FENCE
ADA ACCESSIBLE ROUTE
TEMPORARY HEAVY DUTY GRAVEL
HEAVY DUTY GRAVEL PAVEMENT FOR
20' FIRE ACCESS DRIVE
W
IL
D W
O O
D P
AR
K
TO
W
ER
A N
D T
R
AI
LS
BI
D P
AC
KA
G E
B
PR
EP
AR
ED
F
O R
C
IT
Y O
F G
R
EE
N
VI
LL
E
Know what'sbelow.
before you dig.Call
R
SURVEY NOTE:
ALL EXISTING TOPOGRAPHICAL AND BOUNDARY
INFORMATION WAS PROVIDED BY RIVERS &
ASSOCIATES, INC., DATED 05/17/21 LOCATED AT
107 EAST SECOND STREET GREENVILLE, NC 27858
PHONE: 252-752-4135.
PL
AN
A N
D P
R O
FI
LE
TH
E
SW
AM
P
(A R
EA
C3.2.B
NORTH
PHASE 2 CONSTRUCTION SEQUENCE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .