25-26-35-PWSD_RETRO_ROOF_ITB.pdf

PDF 644 KB Posted

Attached to
Retrofit Roof System
Solicitation number
311-25-26-35
Issued by
Randolph County, Hallsboro CDP, North Carolina

About this file

Retrofit Roof System - Invitation to Bid Summary

This is an Invitation to Bid (ITB) document issued by the City of Greenville, North Carolina, for a retrofit roof system project at the Public Works Street Division facility located at 1511 Dickinson Avenue, Greenville, NC 27834. The project scope includes installing a new 60 mil TPO membrane roof system with associated components including EPS flute fill, R-15 polyisocyanurate insulation (with an add-alternate for R-25 insulation), curb and penetration flashing, gutters, downspouts, and skylight covers on the existing metal roof structure. Contractors must complete the project within 30 consecutive working days. A mandatory pre-bid meeting and site visit are scheduled for Thursday, April 9, 2026, at 2:00 PM at the project site. Written questions regarding specifications must be submitted by 5:00 PM on Tuesday, April 14, 2026, with answers provided by addendum by 5:00 PM on Thursday, April 16, 2026. Bids are due Thursday, April 23, 2026, by 2:00 PM, submitted to Ross Peterson at Project Management via email to rpeterson@greenvillenc.gov or by mail/hand delivery to the Jaycee Park Administrative office at 2000 Cedar Lane, Greenville, NC 27834. The City reserves the right to award to the lowest responsible and responsive bidder.

Bidders must submit lump sum pricing for the base bid, the R-25 insulation add-alternate, and unit pricing for wet/damaged insulation replacement and deteriorated metal replacement per square foot. All bid pricing must be inclusive of labor, materials, equipment, and site cleanup, with sales taxes listed separately. Contractors are required to comply with the City's Minority and Women Business Enterprise (MWBE) program with aspirational goals of 10% minority business enterprise and 6% women business enterprise participation. Contractors must provide worker's compensation insurance coverage and maintain commercial general liability insurance with minimum limits of $1,000,000 per occurrence and $2,000,000 general aggregate, along with commercial automobile liability insurance at $1,000,000 combined single limit. All permits will be obtained by the City at no cost to the contractor. Contractors must provide a 20-year no dollar limit manufacturer's warranty and a 2-year contractor's warranty. Work hours are restricted to Monday through Friday, 7:00 AM to 5:00 PM, with any weekend or extended hours requiring advance approval. The City assumes no liability for contractor property damage or employee injuries on City property.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID REQUEST

#25-26-35

RETROFIT ROOF SYSTEM

PUBLIC WORKS STREET DIVISION

CITY OF GREENVILLE

NORTH CAROLINA

MANDATORY

PRE-BID MEETING: THURSDAY, APRIL 9, 2026 @ 2:00 PM

STREET DIVISION

1511 DICKINSON AVE., GREENVILLE, NC 27834

BIDS DUE DATE: THURSDAY, APRIL 23, 2026 @ 2:00 PM

PROJECT MANAGEMENT

2000 CEDAR LANE, GREENVILLE, NC 27834

CONTACT PERSONS:

QUESTIONS REGARDING THE BID PACKAGE: QUESTIONS REGARDING THE SPECIFICATIONS:

Wanda House Mr. Ross Peterson Financial Services Manager Telephone: (252) 329-4862 Email: whouse@greenvillenc.gov

Project Management Telephone: (252) 329-4570 Email: rpeterson@greenvillenc.gov

Exhibit “A”

ADVERTISEMENT FOR PROPOSALS

Retrofit Roof System Public Works Street Division

The City of Greenville, NC is requesting proposals for the “Retrofit Roof System” located at 1511 Dickinson Ave., Greenville, NC 27834. Provide labor and material to retrofit existing metal roof with new 60 Mil TPO. Includes covering skylights, EPS flute fill, R-15 insulation board, curb and penetration flashing, gutters/downspouts and other associated items to complete retrofit roof system.

There is an add alternate to install R-25 insulation board verse R-15.

There are two-unit pricings for Sq. Ft. wet/damaged insulation and damage/deteriorated metal decking.

This is a turn-key project.

A mandatory pre-bid meeting and site visit will be held at 1511 Dickinson Ave., Greenville, NC on Thursday April 9, 2026 at 2:00 PM.

The person, firm or corporation making a proposal shall submit a bid to Ross Peterson, Project Management, on or before the hour and day of Thursday, April 23, 2026 by 2:00pm. The preferred method of delivery of the bid is by email to rpeterson@greenvillenc.gov The bid may also be mailed or hand delivered to the Jaycee Park Administrative office located at 2000 Cedar Lane, Greenville, N.C., 27834 and must be received prior to the submittal deadline time and date. Any method of submitting must state and shall have the words Bid Enclosed, Retrofit Roof System Attn: Ross Peterson along with the company name in the subject line or on the outside of the envelope.

Bids received after the deadline will not be opened. All bids will be marked with the date and time they are received by reception staff. Bids will NOT be opened and read aloud. Bids will be open and reviewed by city staff.

A bid tabulation will be available upon request once the contract is awarded to the successful bidder.

The bidder shall include the required responses and supply all the information as indicated on Attachment A, B, C, D, and E. The prices inserted shall be net and shall be the full cost including all factors whatsoever. Any bids not submitted on such forms provided will be considered unresponsive.

No bid may be changed or withdrawn after the time of the opening. Any modifications or withdrawals requested before this time shall be acceptable only when such request in writing is made to Ross Peterson, Project Management.

The City of Greenville reserves the right to reject any or all bids, waive any informality and award contracts that appear to be in its best interest. The right is reserved to hold any or all proposals for a period of sixty (60) days from the bid opening thereof.

The scope of work attached represents the minimum specification or description of work to be purchased or contracted. These requirements are not intended to prevent fair responses or to eliminate competition, but they are intended for the protection of each and every proposer to ensure, if possible, that all bids submitted shall be upon a fair and comparable basis.

All work shall be FOB, Greenville, N.C.

From the date of this advertisement until the date of opening the proposals, the plans and specifications of the proposed work and/or a complete description of the apparatus, supplies, materials or equipment are and will continue to be on file in the office of the City of Greenville Purchasing Manager, 200 W. 5th Street, Greenville, NC 27834, during regular business hours, and available to prospective bidders. Inquiries should be directed to the Purchasing Manager at the above address --- Telephone (252) 329-4862. Minority/Women owned business are encouraged to submit proposals.

INSTRUCTIONS TO BIDDERS

Proposal to Provide

Public Works Street Division 1511 Dickinson Ave., Greenville, NC

1. Contractor is to provide verification to the City that the company’s employees are covered under worker’s compensation insurance coverage.

2. All permits can be obtained through the City at no cost to the Contractor.

3. It is expressly understood by the contractor offering a proposal after a written notice of award by the City, a purchase order will be required to be executed and will serve together with this proposal, these instructions, scope of work, and any detailed specifications as the entire form of contract between the parties except in cases where formal contracts are warranted.

4. Each Contractor submitting a proposal is affirming that no official or employee of the City is directly or indirectly interested in this proposal for any reason of personal gain.

5. Sales taxes may be listed on the proposal, but as a separate item. No charge will be allowed for Federal Excise and Transportation Tax from which the City is exempt.

6. Questions regarding any procedure for submission of a proposal for the Retrofit Roof System shall be directed by email to Ross Peterson, Project Management, @ rpeterson@greenvillenc.gov. Questions shall be submitted by 5:00 PM, Tuesday, April 14, 2026. Answers will be provided in an addendum and email to those that signed in at the pre-bid by 5:00 PM, Thursday, April 16, 2026. If an addendum is provided it must be indicated by initialing on bid form. Addendums will be available on city web page.

7. If the Contractor is unable to provide a proposal for any reason, please send an email with an explanation to rpeterson@greenvillenc.gov.

8. By submitting a proposal for Retrofit Roof System the Contractor attests that it is in compliance with all items listed in the bid/proposal instructions. Furthermore, the Contractor attests that the City of Greenville accepts no responsibility for any injuries to the firm’s employees, while on City property performing their duties.

9. Contractor shall comply with all local, state, and federal laws, as well as safety/regulatory requirements and ordinances associated with the work within this contract

10. It is expected that work would begin and scheduled after a pre-construction meeting to determine the best dates and once all material has been delivered and confirmed.

11. No work will be performed at any time without proper supervision. Names and experience of supervisors shall be provided.

12. Parking and staging areas for equipment and materials can be arranged on site during the pre-construction meeting conducted prior to the work starting.

13. All work must be performed Monday – Friday from 7:00 AM to 5:00 PM. Weekends and other hours will have to be approved in advance.

14. The Contractor shall accompany a designated representative(s) of the City on inspections of work at any time during the contract period. The City reserves the right to make determinations as to whether service is performed satisfactorily. Deficiencies in work performance must be corrected immediately.

15. Deficiencies in work performance must be corrected immediately. The City reserves the right to add or delete similar items/services specified in the proposal as requirements change during the period of the contract. The City of Greenville and the Contractor will mutually agree upon prices for items/services to be added or deleted from contract. A contract amendment will be issued for each addition or deletion.

16. Contractor shall not engage subcontractors to perform the Services without the City of Greenville’s prior written consent by the Project Manager or designee. If any part of this work agreement is sublet, the subcontractor shall be required to meet all insurance requirements set forth in the Agreement. The parties stipulate that the Company will maintain each type of insurance set forth in the Agreement at a coverage equal to the amount set forth in the Agreement at a coverage equal to the amount set forth for each type of insurance. However, nothing contained herein shall relieve the Company from meeting all insurance requirements or otherwise being responsible for the subcontractor.

17. Contractor is responsible for cleaning the worksite daily prior to the end of day.

18. New vendors must register online at the City of Greenville Vendor Self Service portal:

https://cityofgreenvillenc.munisselfservice.com/vss. This does not have to be completed to submit a bid, however, the bidder must be a registered vendor prior to award of the contract.

SPECIFICATIONS

1.0 SCOPE:

The scope of work shall include, but is not limited to:

1.1 Contractor will have 30 consecutive working days to complete project.

1.2 Install matching metal panels over all skylights.

1.3 Identify damaged or deteriorated metal panels. Replace or repair with like material.

1.4 Remove and dispose of all curb and penetration flashings.

1.5 Install EPS flute fill material loose laid between metal panel ribs.

1.6 Install 2.6”, R-15, Polyisocyanurate insulation mechanically fastened into the metal panels per wind uplift requirements.

1.7 Install 60 Mil TPO membrane mechanically fastened into the purlins with heat welded seams per manufacture’s details and specifications.

1.8 Install all associated curb and penetration flashings as required by the manufacturer.

1.9 Install all new 24gs. Steel edge metal.

1.10 Install all new 24 ga. Steel box gutters and downspouts.

1.11 Provide 20-year No Dollar Limit Manufacturer’s Labor and Material warranty.

1.12 Provide a 2-year Contractor’s warranty.

1.13 It is the responsibility of roofing contractor to protect working areas from damage. The roofing contractor is responsible for repairs from any damage.

1.14 All work shall be done by done by certified/licensed contractors.

1.15 Obtain all permits from the City of Greenville at no cost.

1.16 Cleanup and removal of all debris at work site.

1.17 Add Alternate to install R-25 insulated board verses R-15.

1.18 Unit pricing for Sq. Ft. insulation repair.

1.19 Unit pricing for Sq. Ft. metal repair.

1.20 After completion, owner and contractor will perform walk through to determine punch list items.

Any punch list items shall be address within a week.

1.21 Provide close out documents to include warranty and manuals.

2.0 PAYMENT AND BID:

2.1 Bidders will comply with all local, state, and federal laws and ordinances governing said work including the Occupational Safety and Health Act of 1970.

2.2 By submitting a proposal, the firm is attesting that they are an Equal Opportunity Employer.

2.3 The City of Greenville has adopted an Affirmative Action Program. Firms submitting a proposal are attesting that they also have taken affirmative action to ensure equality of opportunity in all aspects of employment.

2.4 Minority and/or Women Business Enterprise (MWBE) Program

It is the policy of the City of Greenville to provide minorities and women equal opportunity for participating in all aspects of the City’s contracting and procurement programs, including but not limited to, construction projects, supplies and materials purchases, and professional and personal service contracts. In accordance with this policy, the City has adopted a Minority and Women Business Enterprise (M/WBE) Plan and subsequent program, outlining verifiable goals.

The City has established a 10% Minority Business Enterprise (MBE) and 6% Women Business Enterprise (WBE) goal for the participation of MWBE firms in supplying goods and services for the completion of this project. All firms submitting bids agree to utilize minority and women-owned firms whenever possible.

Questions regarding the City’s M/WBE Program should be directed to Wanda House in the M/WBE Office at (252) 329-4862.

2.5 The City of Greenville reserves the right to reject any and all bids, to waive any informalities and to accept the bid if seems most advantages to the City. Any bid submitted will be binding for sixty

(60) days after the date of the bid opening.

2.6 Equal Employment Opportunity Clause

The City has adopted an Equal Employment Opportunity Clause, which is incorporated into all specifications, purchase orders, and contracts, whereby a vendor agrees not to discriminate against any employee or applicant for employment on the basis of race, color, religion, sex, national origin or ancestry. Federal law (Rehabilitation Act and ADA) prohibits handicapped discrimination by all governmental units. By submitting a proposal, the vendor is attesting to its policy of nondiscrimination regarding the handicapped.

2.7 Iran Divestment Act Certification:

The CONTRACTOR hereby certifies that, it is not on the Iran Final Divestment List created by the North Carolina State Treasurer pursuant to N.C.G.S. 147-86.58. The CONTRACTOR shall not utilize in the performance of the Agreement any subcontractor that is identified on the Iran Final Divestment List.

2.8 E-Verify Compliance:

The CONTRACTOR shall comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statues. Further if the CONTRACTOR utilizes a subcontractor, the CONTRACTOR shall require the subcontractor to comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statues. The CONTRACTOR represents that the

CONTRACTOR and its subcontractors are in compliance with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes.

2.9 TITLE VI NONDISCRIMINATION NOTIFICATION

The City of Greenville, North Carolina in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit proposals in response to this advertisement and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

2.10 If necessary, the contractor must complete a new vendor application and associated documents as required upon acceptance of this contract.

2.11 The contractor will develop a lump sum bid; that will include, but is not limited to all work, equipment, parts, and labor specified herein.

3.0 WORKERS COMPENSATION AND INSURANCE:

3.1 The contractor must maintain during the life of this contract, Worker’s Compensation Insurance for all employees working at the project site under this contract, or as otherwise required by North Carolina General Statutes.

3.2 The Consultant/Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. Work under this contract shall not commence until all insurance required as listed has been obtained. Insurance required shall remain in effect through the life of this contract.

a. Workers’ Compensation Insurance: No contractor or subcontractor may exclude executive officers. Workers Compensation must include all employees

Limits:

Workers Compensation: Statutory for the State of North Carolina.

Employers Liability: Bodily Injury by Accident $1,000,000 each accident.

Bodily Injury by Disease $1,000,000 policy limit.

Bodily Injury by Disease $1,000,000 each employee.

b. Commercial General Liability:

Limits:

Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000

The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations. Additionally, the Consultant/Contractor must be added as an Additional Insured to the Commercial General Liability policy.

c. Commercial Automobile Liability:

Limits: $1,000,000 combined single limit.

d. Cancellation:

Each certificate of insurance shall bear the provision that the policy cannot be altered or canceled in less than ten (10) days after mailing written notice to the assured of such alteration or cancellation, sent registered mail.

e. Proof of Carriages:

I. The Consultant/Contractor shall provide the City with insurance industry standard ACCORD form Certificate(s) of Insurance on all policies of insurance and renewals thereof in a form(s) acceptable to the City prior to the commencement of services. Said policies shall provide that the City be an additional named insured.

II. The City shall be notified in writing of any reduction, cancellation, or substantial change of policy or policies at least thirty (30) days prior to the effective date of said action.

III. All insurance policies shall be issued by responsible companies who are acceptable to the City and licensed and authorized to do business under the laws of North Carolina

3.3 OTHER INSURANCE:

The contractor shall furnish such additional insurance as may be required by the General Statues of North Carolina, including motor vehicle insurance in amounts not less than statutory limits.

3.4 The contractor shall furnish the owner with satisfactory proof of insurance required before written approval of such insurance is granted by the owner.

Executed contract documents, insurance certifications, invoices and other information requested, are to be sent to:

Ross Peterson, Project Management

City of Greenville 2000 Cedar Lane Greenville, N.C. 27834 Email: rpeterson@greenvillenc.gov

3.4 CANCELLATION:

Each certificate of insurance shall bear the provision that the policy cannot be altered or canceled in less than ten (10) days after mailing written notice to the assured of such alteration or cancellation, sent registered mail.

4.0 DAMAGE TO CONTRACTORS PROPERTY:

4.1 The City of Greenville shall be under no obligation to replace or in any way compensate the contractor for fire, theft, vandalism or any other casualty, injury or damage to equipment or property belonging to the contractor while on City property.

4.2 The successful bidder agrees to indemnify or hold harmless the City of Greenville from and against any liability, loss, cost, damage suit, claim, or expense arising occurrence on the part of the successful bidder to include its officers, servants, agents or employees arising from its activities, operations, and performance of services while on City property and further agrees to release and discharge the City of Greenville and its Agents from all claims or liabilities arising from or caused by the successful bidder in fulfilling its obligations under this Agreement.

4.3 It is understood and agreed by the parties that the City of Greenville will assume no liability for damages, injury, or other loss to the successful bidder, its employees or property, tools or equipment, or to other persons or properties located on City facilities resulting from the successful bidder’s activities and operations while performing those service enumerated herein. The successful bidder shall assume full and complete liability for any and all damages on City or private properties caused by or resulting from its activities, operations, and that of its employees, agents and officers.

5.0 ADDENDUM

5.1 Addendum: Any changes to the specifications will be issued as a written addendum. No oral statements, explanations, or commitments by whosoever shall be of any effect.

5.2 Amendment: The contract may be amended from time to time through written agreement by both parties.

Exhibit “B”

Title VI of the Civil Rights Act of 1964 Nondiscrimination Provisions, Appendices A & E.

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows:

1) Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation (USDOT), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.

(2) Nondiscrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, national origin, sex, age, creed (religion), low-income, limited English proficiency, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21.

(3) Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

(4) Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the USDOT to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the USDOT, as appropriate, and will set forth what efforts it has made to obtain the information.

(5) Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Nondiscrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the USDOT may determine to be appropriate, including, but not limited to:

(a) withholding payments to the contractor under the contract until the contractor complies; and/or

(b) cancelling, terminating, or suspending a contract, in whole or in part.

(6) Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the USDOT may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.

I. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:

Pertinent Nondiscrimination Authorities

• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21.

• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);

• Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex);

Exhibit “B”

• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27;

• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);

• Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex);

• The Civil Rights Restoration Act of 1987, (PL 100- 209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, subrecipients and contractors, whether such programs or activities are Federally funded or not);

• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38;

• The Federal Aviation Administration's Nondiscrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex);

• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low- Income Populations, which ensures Nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;

• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of Limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);

• Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq); • Federal transit laws, specifically 49 U.S.C. § 5332 (prohibiting discrimination based on race, color, religion, national origin, sex (including gender identity), disability, age, employment, or business opportunity.

Attachment “A”

6.0 REFERENCE INFORMATION

All bidders must provide a list of three (3) client references for similar work. The reference information must include the company’s name, a contact person’s name with his or her title and their telephone number. Contractor must provide the information below with their bid sheet. Contractor must be experienced in projects of similar construction.

1. Company name: ________________________________________________

Contact person: ________________________________________________

Title: _______________________ Phone No. _________________________

2. Company name:_________________________________________________

Contact person: _________________________________________________

3. Company name: ________________________________________________

Contact person: ________________________________________________

Attachment “B”

7.0 CONTRACTOR INFORMATION

Contractor must provide the information below with the bid sheet.

NORTH CAROLINA

PROSPECTIVE CONTRACTOR DATA FORM

Company Name: ______________________________________________________________________

Address: ____________________________________________________________________________

Phone Number: ______________________Mobile Phone Number: ____________________________

Email: __________________________ ____Business Fax Number: ____________________________

Tax ID# _____________________________________________________________________________

NC General Contractors License#________________________________________________________

Corporation or Partnership: ____________________________________________________________

Number of Years in Business: ___________________________________________________________

Attachment “C”

PROJECT MANAGEMETN DEPARTMENT

REQUEST FOR BIDS

In compliance with the request for bids by the City of Greenville and subject to all conditions and specifications thereof, the undersigned offers and agrees to furnish all equipment, labor and work site clean-up as provided in the above-mentioned specifications.

Description Base Bid: Tax Lump Sum

Add Alternate:

R-25 insulation

Unit Cost:

Wet/Damage Insulation Replacement, per Sq. Ft.

Unit Cost:

Damage/Deteriorated Metal Replacement, per Sq. Ft.

Bid reviewed, prepared and submitted by-

Company Name: _______________________________ Addenda Received: ______

Signed: _______________________________________

Print Name: ___________________________________

Date: _________________________________________

Attachment “D”

City of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise (MWBE) Program

City of Greenville Construction Guidelines and Affidavits

$100,000 and above

These instructions shall be included with each bid solicitation.

Attach to Bid Attach to Bid Attach to Bid Attach to Bid Attach to Bid

City of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise Program

$100,000 and Construction Guidelines for MWBE Participants

Policy Statement It is the policy of the City of Greenville and Greenville Utilities Commission to provide minorities and women equal opportunity for participating in all aspects of the City’s and Utilities’ contracting and procurement programs, including but not limited to, construction projects, supplies and materials purchases, and professional and personal service contracts.

Goals and Good Faith Efforts Bidders responding to this solicitation shall comply with the MWBE program by making Good Faith Efforts to achieve the following aspiration goals for participation.

CITY

MBE WBE

Construction This goal includes Construction Manager at Risk.

10% 6%

Bidders shall submit MWBE information with their bids on the forms provided. This information will be subject to verification by the City prior to contract award. As of July 1, 2009, contractors, subcontractors, suppliers, service providers, or MWBE members of joint ventures intended to satisfy City MWBE goals shall be certified by the NC Office of Historically Underutilized Businesses (NC HUB) only. Firms qualifying as “WBE” for City’s goals must be designated as a “women-owned business” by the HUB Office. Firms qualifying as “MBE” for the City’s goals must be certified in one of the other categories (i.e.: Black, Hispanic, Asian American, American Indian, Disabled, or Socially and Economically Disadvantaged). Those firms who are certified as both a “WBE” and “MBE” may only satisfy the “MBE” requirement.

Each goal must be met separately. Exceeding one goal does not satisfy requirements for the other. A complete database of NC HUB certified firms may be found at http://www.doa.nc.gov/hub/. An internal database of firms who have expressed interest to do business with the City and GUC is available at www.greenvillenc.gov. However, the HUB status of these firms must be verified by the HUB database. The City shall accept NCDOT certified firms on federally funded projects only. Please note: A contractor may utilize any firm desired. However, for participation purposes, all MWBE vendors who wish to do business as a minority or female must be certified by NC HUB.

The Bidder shall make good faith efforts to encourage participation of MWBEs prior to submission of bids in order to be considered as a responsive bidder. Bidders are cautioned that even though their submittal indicates they will meet the MWBE goal, they should document their good faith efforts and be prepared to submit this information, if requested.

The MWBE’s listed by the Contractor on the Identification of Minority/Women Business Participation which are determined by the City to be certified shall perform the work and supply the materials for which they are listed unless the Contractors receive prior authorization from the City to perform the work with other forces or to obtain materials from other sources. If a contractor is proposing to perform all elements of the work with his own forces, he must be prepared to document evidence satisfactory to the owner of similar government contracts where he has self-performed.

The Contractor shall enter into and supply copies of fully executed subcontracts with each MWBE or supply signed Letter(s) of Intent to the Project Manager after award of contract and prior to Notice to Proceed. Any amendments to subcontracts shall be submitted to the Project Manager prior to execution.

Instructions

The Bidder shall provide with the bid the following documentation:

Identification of Minority/Women Business Participation (if participation is zero, please mark zero—Blank forms will be considered nonresponsive)

Affidavit A (if subcontracting)

OR

(if participation is zero, please mark zero—Blank forms will be considered nonresponsive)

Affidavit B (if self-performing; must attest that bidder does not customarily subcontract work on this type of project—includes supplies and materials)

Within 72 hours or 3 business days after notification of being the apparent low bidder who is subcontracting anything must provide the following information:

Affidavit C (if aspirational goals are met or are exceeded)

OR

Affidavit D (if aspirational goals are not met)

After award of contract and prior to issuance of notice to proceed:

Letter(s) of Intent or Executed Contracts

**With each pay request, the prime contractors will submit the Proof of Payment Certification, listing payments made to MWBE subcontractors.

***If a change is needed in MWBE Participation, submit a Request to Change MWBE Participation Form.

Good Faith Efforts to substitute with another MWBE contractor must be demonstrated.

Minimum Compliance Requirements:

All written statements, affidavits, or intentions made by the Bidder shall become a part of the agreement between the Contractor and the City for performance of contracts. Failure to comply with any of these statements, affidavits or intentions or with the minority business guidelines shall constitute a breach of the contract. A finding by the City that any information submitted (either prior to award of the contract or during the performance of the contract) is inaccurate, false, or incomplete, shall also constitute a breach of the contract. Any such breach may result in termination of the contract in accordance with the termination provisions contained in the contract. It shall be solely at the option of the City whether to terminate the contract for breach or not. In determining whether a contractor has made Good Faith Efforts, the CITY will evaluate all efforts made by the Contractor and will determine compliance in regard to quantity, intensity, and results of these efforts.

DOC #586829

I, , (Name of Bidder) do hereby certify that on this project, we will use the following minority/women business enterprises as construction subcontractors, vendors, suppliers or providers of professional services.

Firm Name, Address and Phone # Work type *MWBE Category

*MWBE categories: Black, African American (B), Hispanic, Latino (L), Asian American (A) American Indian (I), Female (F) Socially and Economically Disadvantaged (S) Disabled (D)

If you will not be utilizing MWBE contractors, please certify by entering zero “0”

The total value of MBE business contracting will be ($) .

The total value of WBE business contracting will be ($) .

City of Greenville AFFIDAVIT A – Listing of Good Faith Efforts County of

(Name of Bidder) Affidavit of

I have made a good faith effort to comply under the following areas checked:

Bidders must earn at least 50 points from the good faith efforts listed for their bid to be considered responsive. (1 NC Administrative Code 30 I.0101) 1 – (10 pts) Contacted minority businesses that reasonably could have been expected to submit a quote and that were known to the contractor, or available on State or local government maintained lists, at least 10 days before the bid date and notified them of the nature and scope of the work to be performed.

2 --(10 pts) Made the construction plans, specifications and requirements available for review by prospective minority businesses, or providing these documents to them at least 10 days before the bids are due.

3 – (15 pts) Broken down or combined elements of work into economically feasible units to facilitate minority participation.

4 – (10 pts) Worked with minority trade, community, or contractor organizations identified by the Office of Historically Underutilized Businesses and included in the bid documents that provide assistance in recruitment of minority businesses.

5 – (10 pts) Attended prebid meetings scheduled by the public owner.

6 – (20 pts) Provided assistance in getting required bonding or insurance or provided alternatives to bonding or insurance for subcontractors.

7 – (15 pts) Negotiated in good faith with interested minority businesses and did not reject them as unqualified without sound reasons based on their capabilities. Any rejection of a minority business based on lack of qualification should have the reasons documented in writing.

8 – (25 pts) Provided assistance to an otherwise qualified minority business in need of equipment, loan capital, lines of credit, or joint pay agreements to secure loans, supplies, or letters of credit, including waiving credit that is ordinarily required. Assisted minority businesses in obtaining the same unit pricing with the bidder's suppliers in order to help minority businesses in establishing credit.

9 – (20 pts) Negotiated joint venture and partnership arrangements with minority businesses in order to increase opportunities for minority business participation on a public construction or repair project when possible.

10 - (20 pts) Provided quick pay agreements and policies to enable minority contractors and suppliers to meet cash-flow demands.

The undersigned, if apparent low bidder, will enter into a formal agreement with the firms listed in the Identification of Minority/Women Business Participation schedule conditional upon scope of contract to be executed with the Owner. Substitution of contractors must be in accordance with GS143-128.2(d) Failure to abide by this statutory provision will constitute a breach of the contract.

The undersigned hereby certifies that he or she has read the terms of the minority/women business commitment and is authorized to bind the bidder to the commitment herein set forth.

Date: Name of Authorized Officer:

Signature:

Title:____________________________________________

State of______________, County of

Subscribed and sworn to before me this day of 20

Notary Public

My commission expires

SEAL

City of Greenville --AFFIDAVIT B-- Intent to Perform Contract with Own Workforce.

Affidavit of

(Name of Bidder) I hereby certify that it is our intent to perform 100% of the work required for the contract.

(Name of Project)

In making this certification, the Bidder states that the Bidder does not customarily subcontract elements of this type project, and normally performs and has the capability to perform and will perform all elements of the work on this project with his/her own current work forces; and

The Bidder agrees to provide any additional information or documentation requested by the owner in support of the above statement.

The undersigned hereby certifies that he or she has read this certification and is authorized to bind the Bidder to the commitments herein contained.

Date: Name of Authorized Officer:

Signature:

Title:

State of _________ __ , County of ________________________

Subscribed and sworn to before me this day of 20___

Notary Public

Do not submit with the bid Do not submit with the bid Do not submit with the bid

City of Greenville - AFFIDAVIT C - Portion of the Work to be Performed by MWBE Firms County of (Note this form is to be submitted only by the apparent lowest responsible, responsive bidder.)

If the portion of the work to be executed by MWBE businesses as defined in GS143-128.2(g) and the COG/CITY MWBE Plan sec. III is equal to or greater than 16% of the bidders total contract price, then the bidder must complete this affidavit. This affidavit shall be provided by the apparent lowest responsible, responsive bidder within 72 hours after notification of being low bidder.

Affidavit of I do hereby certify that on the

(Name of Bidder)

(Project Name)

Project ID# Amount of Bid $

I will expend a minimum of % of the total dollar amount of the contract with minority business enterprises and a minimum of % of the total dollar amount of the contract with women business enterprises.

Minority/women businesses will be employed as construction subcontractors, vendors, suppliers or providers of professional services. Such work will be subcontracted to the following firms listed below.

Attach additional sheets if required Name and Phone Number *MWBE

Category Work description Dollar Value

*Minority categories: Black, African American (B), Hispanic or Latino (L), Asian American (A) American Indian (I), Pursuant to GS143-128.2(d), the undersigned will enter into a formal agreement with MWBE Firms for work listed in this schedule conditional upon execution of a contract with the Owner. Failure to fulfill this commitment may constitute a breach of the contract.

The undersigned hereby certifies that he or she has read the terms of this commitment and is authorized to bind the bidder to the commitment herein set forth.

Date: Name of Authorized Officer:

Signature: ________________________

Title:

State of , County of Subscribed and sworn to before me this day of 20

City of Greenville AFFIDAVIT D – Good Faith Efforts

(Note this form is to be submitted only by the apparent lowest responsible, responsive bidder.)

If the goal of 16% participation by minority/women business is not achieved, the Bidder shall provide the following documentation to the Owner of his good faith efforts:

Affidavit of I do hereby certify (Name of Bidder) that on the ___________________________________________________

(Project Name)

Project ID# Amount of Bid $

I will expend a minimum of % of the total dollar amount of the contract with minority business enterprises and a minimum of % of the total dollar amount of the contract with women business enterprises. Minority/women businesses will be employed as construction subcontractors, vendors, suppliers or providers of professional services. Such work will be subcontracted to the following firms listed below.

(Attach additional sheets if required)

Name and Phone Number *MWBE

Category Work description Dollar Value

*Minority categories: Black, African American (B), Hispanic or Latino (L), Asian American (A) American Indian (I),Female (F) Socially and Economically Disadvantaged (S) Disabled (D)

Examples of documentation required to demonstrate the Bidder's good faith efforts to meet the goals set forth in these provisions include, but are not necessarily limited to, the following:

A. Copies of solicitations for quotes to at least three (3) minority business firms from the source list provided by the State for each subcontract to be let under this contract (if 3 or more firms are shown on the source list). Each solicitation shall contain a specific description of the work to be subcontracted, location where bid documents can be reviewed, representative of the Prime Bidder to contact, and location, date and time when quotes must be received.

B. Copies of quotes or responses received from each firm responding to the solicitation.

C. A telephone log of follow-up calls to each firm sent a solicitation.

D. For subcontracts where a minority business firm is not considered the lowest responsible sub-bidder, copies of quotes received from all firms submitting quotes for that particular subcontract.

E. Documentation of any contacts or correspondence to minority business, community, or contractor organizations in an attempt to meet the goal.

F. Copy of pre-bid roster.

G. Letter documenting efforts to provide assistance in obtaining required bonding or insurance for minority business.

H. Letter detailing reasons for rejection of minority business due to lack of qualification.

I. Letter documenting proposed assistance offered to minority business in need of equipment, loan capital, lines of credit, or joint pay agreements to secure loans, supplies, or letter of credit, including waiving credit that is ordinarily required.

Failure to provide the documentation as listed in these provisions may result in rejection of the bid and award to the next lowest responsible and responsive bidder.

Pursuant to GS143-128.2(d), the undersigned will enter into a formal agreement with MWBE Firms for work listed in this schedule conditional upon execution of a contract with the Owner. Failure to fulfill this commitment may constitute a breach of the contract.

The undersigned hereby certifies that he or she has read the terms of this commitment and is authorized to bind the bidder to the commitment herein set forth.

Date: Name of Authorized Officer:

Signature:

Title:

State of , County of

Subscribed and sworn to before me this day of 20

LETTER OF INTENT

MWBE Subcontractor Performance

Please submit this form or executed subcontracts with MWBE firms after award of contract and prior to issuance of notice to proceed.

PROJECT: ____________________________________________________________________

(Project Name)

TO: _________________________________________________________________________

(Name of Prime Bidder/Architect)

The undersigned intends to perform work in connection with the above project as a:

____Minority Business Enterprise _____Women Business Enterprise

The MWBE status of the undersigned is certified the NC Office of Historically Underutilized Businesses (required). ___ Yes ___ No

The undersigned is prepared to perform the following described work or provide materials or services in connection with the above project at the following dollar amount:

Work/Materials/Service Provided Dollar Amount of Contract

Projected Start Date

Projected End Date

(Date)

(Address) (Name & Phone No. of MWBE Firm)

(Name & Title of Authorized Representative of MWBE) (Signature of Authorized Representative of MWBE)

REQUEST TO CHANGE MWBE PARTICIPATION

(Submit changes only if notified as apparent lowest bidder, continuing through project completion)

Project: ______________________________________________________________________

Bidder or Prime Contractor: ____________________________________________________

Name & Title of Authorized Representative: _______________________________________

Address: ________________________________ Phone #: ___________________________

________________________________________ Email Address: ______________________

Total Contract Amount (including approved change orders or amendments): $__________

Name of subcontractor: _________________________________________________________

Good or service provided: _______________________________________________________

Proposed Action:

___Replace subcontractor ___Perform work with own forces

For the above actions, you must provide one of the following reasons (Please check applicable reason):

___ The listed MBE/WBE, after having had a reasonable opportunity to do so, fails or refuses to execute a written contract.

___The listed MBE/WBE is bankrupt or insolvent.

___The listed MBE/WBE fails or refuses to perform his/her subcontract or furnish the listed materials.

___The work performed by the listed subcontractor is unsatisfactory according to industry standards and is not in accordance with the plans and specifications; or the subcontractor is substantially delaying or disrupting the progress of the work.

If replacing subcontractor:

Name of replacement subcontractor: _______________________________________________

The MWBE status of the contractor is certified by the NC Office of Historically Underutilized Businesses (required). ___Yes ___No

Dollar amount of original contract $________________

Dollar amount of amended contract $ _______________

Other Proposed Action:

___Increase total dollar amount of work ___Add additional subcontractor ___Decrease total dollar amount of work ___Other

Please describe reason for requested action: _________________________________________

If adding* additional subcontractor:

The MWBE status of the contractor is certified by the NC Office of Historically Underutilized Businesses (required).___Yes ___No

*Please attach Letter of Intent or executed contract document

Dollar amount of original contract $________________

Dollar amount of amended contract $ _______________

Interoffice Use Only:

Approval __Y __N

Date___________________

Signature

Proof of Payment Certification MWBE Contractors, Suppliers, Service Providers

Project Name: ________________________________________________

Prime Contractor: _____________________________________________

Current Contract Amount (including change orders): $_________________

Requested Payment Amount for this Period: $_______________________

Is this the final payment? ___Yes ___No

Firm Name MWBE Category*

Total Amount Paid from this Pay

Request

Total Contract Amount

(including changes)

Total Amount Remaining

*Minority categories: Black, African American (B), Hispanic or Latino (L), Asian…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .