25-253 2024-09-13_BeltwayTr_special spec.pdf
PDF 956 KB Posted
- Attached to
- BELTWAY DRIVE TRAIL BIKE LANES – PHASE II
- Solicitation number
- 25-253
- Issued by
- Dallas County, Abilene City, Texas
About this file
The document is the Town of Addison Irrigation Specifications, revised on September 5, 2021, which provides comprehensive technical guidelines for irrigation system installation for municipal projects. The specifications cover detailed requirements for water taps, water meters, backflow devices, controllers, wiring, piping, heads, risers, drip systems, and installation procedures, with strict compliance mandated to the Town of Addison Water Department and Parks Department standards. The document specifies approved equipment manufacturers, installation techniques, material specifications, and technical requirements for irrigation contractors, with an emphasis on precise installation methods, quality control, and adherence to local and national codes.
Key technical requirements include using specific manufacturers like Weathermatic for valves, Toro for pop-up heads and nozzles, Netafim for drip systems, and Intrespec for controllers, with mandatory use of 14-gauge UF wiring, Schedule 40 or 80 PVC pipes, and detailed installation protocols for various irrigation components. The specifications mandate contractor responsibilities such as obtaining proper permits, conducting water pressure verification, providing workmanship warranties, performing valve sequencing, and coordinating with Town inspectors throughout the installation process. Contractors must also submit detailed documentation, including as-built plans, zone maps, and equipment certifications, and are required to rectify any installation deficiencies at their own expense.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
ADDISON BELTWAY TRAIL
100% CONSTRUCTION DOCUMENTS 26 05 00-1 9/13/2024
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Electrical equipment coordination and installation.
2. Common electrical installation requirements.
1.02 COORDINATION
A. Coordinate arrangement, mounting, and support of electrical equipment:
1. To provide for ease of disconnecting the equipment with minimum interference to other installations.
2. To allow right of way for piping and conduit installed at required slope.
3. So connecting raceways will be clear of obstructions and of the working and access space of other equipment.
B. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.
1.03 PERMITS, UTILITY CONNECTIONS AND INSPECTIONS
A. Cost for Power Company service and infrastructure will be paid directly by Owner from Owner’s contingency. Do not include this cost in bid.
B. Other miscellaneous fees related to permits shall be paid by the Contractor and shall be included in the Bid.
1.04 CONTRACT DOCUMENTS
A. The specifications and accompanying drawings indicate plans and details showing installations and locations of equipment, conduit, poles, etc., based on a product or a group of products, from an identified manufacture or manufacturers, the layout of the equipment and the installation drawing are based on the identified equipment, materials, etc.
B. Installation drawings of the systems are based on the identified vendors and products, and these items are used for dimensions, utility connections, service clearances, etc. These drawings, even when dimensioned, are schematic in nature and are subject to field coordination to reflect actual conditions, final equipment shop drawings, construction means and methods, as well as coordination between trades.
C. It shall be the Contractor’s responsibility to coordinate the final installation of all equipment and systems where alternate manufacturers or substitutions are incorporated into the work.
Any architectural or engineering design required to incorporate that work shall be the responsibility of the Contractor. Any cost resulting from changes in layout, increase sizes or length of run, services for any additional utilities that may be required by the use of alternates or substitutions shall be the responsibility of the Contractor and provided at no additional costs.
D. Any changes in the project required to support alternates or substitutions shall be fully identified and submitted as an attachment to the shop drawing for the alternate or substituted product. In addition, such changes shall be reflected in the coordination drawings and shall be approved by all affected trades.
100% CONSTRUCTION DOCUMENTS 26 05 00-2 9/13/2024
E. Due to the intricacies of construction it is impractical to specify or indicate every detail; in such cases the current rules of good construction practices and applicable specifications shall govern. If departures from the drawings are deemed necessary by the Contractor, details of such proposed departures shall be made to the Architect/Engineer in writing. Each request shall state reasons and recommended correction for proposed departure. No departure shall be made without prior written approval of the Architect/Engineer.
F. The Contractor shall familiarize himself with all drawings and specifications and properly use information found on the Civil, Landscape, Electrical, and any other drawings and specifications affecting his work.
G. The electrical power circuits shown on the drawings to items of equipment may or may not be the correct size to serve the equipment to be installed by other Contractors. The Electrical Contractor shall obtain from other Contractors the exact power requirements for each item of equipment before all circuit breakers, disconnects, power wiring, conduit, etc., have been purchased or installed. Correct power wiring to serve the installed equipment items shall be provided at no additional cost to the Owner.
H. Dimensional information pertaining to new work in the structure shall be taken from the appropriate drawings. Dimensional information pertaining to existing conditions and outside the structure shall be made by the Contractor on the site.
I. Should the drawings or specifications disagree within themselves, or with each other, the better quality or greater quantity of work or materials shall be performed or furnished at no additional cost to the Owner.
J. Interrelation of the specifications and drawings and schedules is as follows:
1. Specifications determine type and installation of material.
2. Drawings establish location, quantities, dimensions and details.
3. Schedules establish performance characteristics of equipment.
K. Dimensions indicated on drawings govern scaled measurements. Large scale details govern small scale drawings.
1.05 SPACE AND EQUIPMENT
A. The size of electrical equipment indicated on the drawings is based on the dimensions of the equipment by the manufacturer indicated on the drawings or specifications. Other manufacturers may be acceptable in some cases if equal in design and function. Other manufacturers are specifically noted in each section.
B. It is the responsibility of the Contractor to determine if equipment proposed to be furnished will fit in the allotted space.
C. Contractor shall prepare and furnish detailed installation drawings indicating arrangement and installation of proposed equipment and submit to Architect/Engineer for approval. Approval, in writing, shall be obtained before ordering equipment.
1.06 PROJECT OBSERVATION
A. Project observation by the Architect/Engineer is for the express purpose of verifying compliance by the Contractor with the Contract Documents and shall not be construed as construction supervision nor indication of approval of the manner in which the work is being performed.
100% CONSTRUCTION DOCUMENTS 26 05 00-3 9/13/2024
1.07 CONSTRUCTION REQUIREMENTS
A. It is the intent of the Contract Documents to provide an installation complete in every respect. If additional work is required for Work indicated or specified, it shall be the responsibility of the Contractor to provide same as well as to provide material and equipment usually furnished with such systems or as required to complete the installation.
B. The Contractor shall be responsible for placing his material and equipment into the structures and site and shall carefully lay out his work in the project to conform to the structural conditions, to avoid all obstructions, to conform to the details of the installation supplied by the manufacturer of the equipment to be installed and thereby provide an integrated, satisfactorily operating installation.
1.08 LOCATION OF POLES AND EQUIPMENT
A. The drawings show the locations of the various poles and equipment. Exact locations and mounting heights of these poles and equipment shall be determined by reference to the general construction plans and to all detail drawings, equipment drawings, roughing-in drawings, etc., by measurements at the building, and in cooperation with the other trades.
B. Lighting poles, may, at the Owner's option, be relocated to a point within 10 feet of the location indicated on the drawings, at no additional cost to the Owner, provided the Contractor is advised of this relocation before roughing-in begins.
C. The Contractor shall install his work complete and in good working order. If the requirements of the drawings and specifications are impossible to perform, or if the installation when made in accordance with such requirements will not perform satisfactorily, he shall report same to the Architect/Engineer for correction.
D. No extra compensation will be allowed for extra work or change caused by failure to comply with the above requirements.
1.09 EXCAVATION, BACKFILL AND COMPACTION
A. All safety systems shall meet Occupational Safety and Health Administration Standards.
A. A pay item for these same safety systems shall be included as part of the Contractor's bid and included in the Schedule of Values.
B. Submit trenching/shoring shop drawings where applicable.
C. Trenching shall be in accordance with Occupational Safety and Health Document, Part 1926 - Safety and Health Regulations for Construction; 1926-652 - General Trenching Requirements.
1. Banks more than 5 feet high shall be shored, laid back to a stable slope, or some other equivalent means of protection shall be provided where employees may be exposed to moving ground or cave-ins. Refer to drawings for standard trenching details.
2. The Contractor may also have supporting systems, pilings, cribbing, shoring, etc., designed by a Registered Professional Structural Engineer and submitted to the Architect/Engineer as a shop drawing submittal before trenching work is done.
Submittal drawings shall be sealed by the Engineer.
D. Excavate to the depths indicated or as otherwise specified.
E. Pile materials suitable for backfilling in an orderly manner a sufficient distance from the banks of the trench to avoid overloading and to prevent slide or cave-ins.
F. Remove excavated materials not required or suitable for backfill.
100% CONSTRUCTION DOCUMENTS 26 05 00-4 9/13/2024
G. Prevent surface water from flowing into trenches or other excavations, and remove all water accumulating therein.
H. Sheeting and shoring shall be done as may be necessary.
I. Unless otherwise indicated, excavation shall be by open cut except that short sections of a trench may be tunneled if the conduit, cable, or duct can be safely and properly installed and backfill can be properly tamped in such tunnel sections.
J. Excavate all materials encountered including rock and filled-in material.
K. Trench Excavation:
1. Sides and Bottom: Trenches shall be of the necessary width for proper laying of conduit, cables, or ducts. The banks of conduit trenches shall be as nearly vertical as practicable. Do not over-excavate. Grade bottom of the trenches to provide uniform bearing and support for each section of the conduit on undisturbed soil at every point along its entire length.
2. Stones: Remove stones necessary to avoid point bearing. Where rock excavation is required in trenches for conduit, excavate rock to a minimum over-depth of 6 inches below the trench depths indicated or specified. Except as hereinafter specified for wet or otherwise unstable material, over-depths shall be backfilled as and with materials specified for backfilling the lower portion of trenches.
3. Unstable Material: Remove wet or otherwise unstable material encountered beyond the depths indicated on the drawings or specified herein and replace with satisfactory material.
L. Excavation for Appurtenances: Excavate for pull boxes and similar structures sufficiently to leave at least 12 inches in the clear between the outer surfaces and the embankment or timber that may be used to hold and protect the banks. Over-depth excavation below such appurtenances shall be refilled with sand, gravel or concrete.
M. Removal of Utility Lines: When utility lines that are to be removed are encountered within the area of operations, notify representatives of the Utility, the Owner, and others in ample time for the necessary measures to be taken to prevent interruption of the service.
N. Backfilling:
1. General: The trenches shall not be backfilled until the utilities systems as installed conform to the requirements specified in the several sections covering the installation of the various utilities. Where damage is likely to result from withdrawing sheeting, leave the sheeting in place. Except as otherwise specified for special conditions of over-depths, backfill the trenches to the ground surface with selected material that is suitable for the specified compaction and as hereinafter specified. Reopen improperly backfilled trenches, and trenches that show sinking within 12 months after Substantial Completion to the depth required for proper compaction, then refill and compact as specified. The meaning of "density of the adjacent soil" when the adjacent formation is rock shall be interpreted as maximum density. The surface shall be restored to its original condition as near as practicable and as hereinafter specified. Replace sidewalks, curbs, gravel, pavement, base course, and compacted subgrade disturbed by trenching operations.
2. Lower Portion of Trench: Deposit backfill material in 6-inch-maximum-thickness layers and compact with suitable tampers to the density of the adjacent soil or grade as hereinafter specified until there is a cover of not less than 2 feet over sewers and 1 foot over other utility lines. The backfill material in this portion of the trench shall consist of a selected material at a moisture content that will facilitate compaction, free from stones larger than 3 inches in dimension and hard clods and frozen conglomerates larger than 6 inches in dimension, except that where the pipe is coated or wrapped for protection against corrosion the backfill material shall be free from stones larger than 1 inch in
100% CONSTRUCTION DOCUMENTS 26 05 00-5 9/13/2024
dimension. If portions of the cover in the lower portion of the trench is in the depth of special compaction and materials requirements under pavement, the special requirements shall control.
3. Remainder of Trench: Except for special materials for pavements, the remainder of the trench shall be backfilled with material that is free of stones larger than 6 inches or 1/2 the layered thickness, whichever is smaller, in dimension. Backfill material shall be deposited in layers not exceeding the thickness specified, and each layer shall be compacted to the minimum density specified as applicable to the particular area except that in areas other than under roadways, parking areas, shoulders of roadways and parking areas, and other paved areas subject to vehicular movement, settling of granular, non-cohesive material with water will be permitted.
a. Under Pavements: Six-inch layers, 90 percent CE 55 maximum density for cohesive soils and 95 percent CE 55 maximum density for cohesionless soils up to the elevation at which the requirements for pavement subgrade material and compaction control or up to the bottom of the concrete backfill.
b. Under Turfed or Seeded Lawn Areas and Sidewalks: Twelve-inch layers, 85 percent CE 55 maximum density for cohesive soils and 90 percent CE 55 maximum density for cohesionless soils. This requirement also applies to areas designated to be turfed or seeded.
c. Under Other Areas: Two-foot layers, density equal to the adjacent soil.
4. Public Streets, Sidewalks and Other Public Rights-of-Way: Repair in compliance with the requirements of the Town of Addison, Texas.
O. Landscape:
1. Routing:
a. Stake the route jointly with the Owner.
b. Mark trees, shrubbery and other landscaping to be saved, jointly with the Owner.
c. Avoid the dripline of other trees and large shrubbery.
2. Repair: Place topsoil in top 6 inches of trench in areas of existing cultivated ground cover.
3. Sod: Plant sod in areas of existing sod.
1.10 ELECTRIC UTILITY
A. Verify all standard practices of the electric utility company and requirements for electric metering and provide metering to conform to the requirements.
1.11 SUBMIT ONCOR LOAD FORM
A. Notify the electric utility company at least 120 working days before job completion deadline to inform them of added lighting load.
1.12 PROJECT CLOSEOUT
A. In order to close out the Electrical Work of this project, the work hereinafter noted is required.
B. Requirements for project closeout are, but not necessarily limited to, the following:
1. Record Drawings.
2. Tests.
3. Operation and Maintenance Manuals.
4. Owner's Instructions.
5. Shop Drawings.
6. Correction of Deficiencies Found on Final Observation.
7. Guarantees.
8. Final Cleaning.
100% CONSTRUCTION DOCUMENTS 26 05 00-6 9/13/2024
C. Record Documents:
1. Maintain a set of Contract Drawings consisting of a complete set of blueline prints at the jobsite.
2. Indicate on the record drawings the installed locations of:
a. Equipment
b. Dimensional locations of underground work
c. Dimensional locations of site work
3. Include addenda, change orders, clarifications, and other modifications to the Drawings.
4. Deliver Drawings to the Architect/Engineer on the completion of the work.
5. Do not use these Drawings for reference or construction, nor allow them to leave the field office.
6. Drawings will be reviewed by the Architect/Engineer as required and prior to approval of each month's Certificate for Payment. Certificate for Payment will not be approved until record drawings are brought up to date.
D. Test and Start-Up Data:
1. Conduct tests as specified in Section 16059 for the various systems.
2. Log pertinent data at the time of testing, including:
a. System identification
b. Date and time
c. Personnel
d. Description
e. Test conditions
f. Test results
g. Corrective measures taken
3. Log of start-up for all equipment including:
a. Equipment identification
b. Date and time
c. Personnel
d. Start-up procedures
e. Problems encountered
f. Corrective measures taken
E. Operation and Maintenance Instructions:
1. Complete written operating instructions at each item of equipment and related systems.
2. Written instructions for preventative maintenance for each item of equipment and related systems.
3. Release, signed by the Owner and his Authorized Representative, for demonstration of operating and maintenance procedures.
a. List of equipment and systems
b. Dates and times
c. Personnel present for demonstrations
4. List of equipment serial numbers.
5. Systems diagrams and drawings.
6. List of manufacturers', suppliers', and subcontractors' names, addresses, and telephone numbers; give both local representatives and service headquarters.
7. Spare Parts Data:
a. List of parts and supplies
b. Current unit prices
c. Sources of supply (local and national)
d. List of parts and supplies recommended by manufacturer for the Owner to keep on hand
8. Provide three (3) bound copies of all data in loose-leaf, three-ring binders with identifying tabs.
100% CONSTRUCTION DOCUMENTS 26 05 00-7 9/13/2024
F. Final Cleaning:
1. Employ experienced workmen, or professional cleaners for final cleaning.
2. In preparation for substantial completion or occupancy, conduct final inspection of sight-exposed surfaces, and of concealed spaces, and clean as follows:
a. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign materials from sight-exposed interior and exterior surfaces; polish surfaces so designated to shine finish.
b. Repair, patch and touch-up marred surfaces to specified finish, to match adjacent surfaces.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
3.01 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION
A. Comply with NECA 1.
B. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
END OF SECTION
SECTION 26 05 10
GENERAL REQUIREMENTS FOR ELECTRICAL WORK
100% CONSTRUCTION DOCUMENTS 26 05 10-1 9/13/2024
PART 1 - GENERAL
1.01 BASIC REQUIREMENTS
A. In accordance with the Conditions of the Contract, each Electrical Contractor is acting in the capacity of a sub-contractor. However, the electrical sub-contractor is hereinafter referred to as the Contractor.
B. The Contractor is duly bound to all applicable requirements of the prime Contractor as stipulated in the Conditions of the Contract.
C. The Contractor shall execute all work hereinafter specified or indicated on accompanying drawings, and provide equipment and labor as required in connection with his work and systems.
1.02 GENERAL REQUIREMENTS
A. Unless otherwise specified, materials are to be new and of current U.S. manufacturer, free from defects, and of the best quality of their respective kinds.
B. Equipment and/or materials damaged in shipment or handling, or otherwise damaged before installation, shall be replaced with new equipment and/or materials. Damaged equipment and/or materials shall not be repaired at the jobsite.
C. Furnishing of the proper equipment and/or materials and to see that it is installed as recommended by the manufacturer is entirely the responsibility of the Contractor. If required for proper installation, the Contractor shall obtain advice and supervisory assistance from a representative of the specific manufacturer of the equipment being installed.
D. The Contractor shall promptly notify the Architect/Engineer in writing of conflicts between the requirements of the Contract Documents and the manufacturer's directions and shall obtain the Architect/Engineer's instructions before proceeding with the work. Should the Contractor perform such work that does not comply with the manufacturer's directions or such instructions from the Architect/Engineer, he shall bear all costs arising in connection with the deficiencies.
1.03 CONSTRUCTION REQUIREMENTS
A. It is the intent of the Contract Documents to provide an installation complete in every respect. If additional work is required for Work indicated or specified, it shall be the responsibility of the Contractor to provide same as well as to provide material and equipment usually furnished with such systems or as required to complete the installation.
B. The Contractor shall be responsible for placing his material and equipment into the site elements and site, and shall carefully lay out his work in the project to conform to the site and structural conditions, to avoid all obstructions, to conform to the details of the installation supplied by the manufacturer of the equipment to be installed and thereby provide an integrated, satisfactorily operating installation.
C. Investigate structural and finish conditions and coordinate all work with the various trades to avoid interferences between the different phases of Work. Harmonize work so that it may be installed in the most direct and workmanlike manner without hindering or handicapping each other.
100% CONSTRUCTION DOCUMENTS 26 05 10-2 9/13/2024
D. All conduits shall be concealed below grade or within site elements and poles, unless noted otherwise. Exposed conduit at existing panel and new lighting control cabinet is permitted.
E. Lay out work as required to avoid crippling of structural members and site elements. Provide and properly lay out sleeves in concrete for penetrating conduits.
F. Lay out and install equipment as required to provide convenient and safe maintenance and access for future replacement as well as providing easy access to removable access panels and junction boxes.
1.04 SITE INSPECTION
A. Contractor shall visit the site and verify the following:
1. Items shown or indicated as "existing" on the drawings, including structures, trees, utilities, obstructions, etc.
2. Work conditions.
3. Hazards.
4. Soil grades and conditions.
B. Acceptance of a contract shall be deemed as evidence that the site visit has been made and that the Contractor has familiarized himself with the conditions noted above.
1.05 SUPERINTENDENT
A. It shall be the responsibility of each superintendent to study all Contract Documents and familiarize himself with the work to be done by other trades. The superintendent shall coordinate his work with other trades and before material is fabricated or installed, make sure that his work will not cause interference that cannot be resolved without major changes to the Contract Documents.
1.06 CONCRETE
A. The work of this article is defined to include whatever concrete work is necessary or shown specifically to install the electrical work. Coordinate the work with other work, particularly other concrete work and accessories.
1. Comply with applicable provisions for electrical-work concrete, including formwork, reinforcement, mix design, materials, admixtures, accessories (including waterstops), placing of wet concrete, finishing, curing, protecting, testing, submittals, and other requirements of the concrete work. Refer instances of uncertain applicability to the Architect/Engineer for resolution before proceeding.
B. Provide strength classes as follows, for the indicated applications and similar required applications:
1. Provide 4000 PSI Class for vaults, beam-type foundations and similar structures.
2. Provide 3000 PSI Class for miscellaneous underground structural concrete, reinforced encasement, block-type foundations (with smallest dimension at least 0.2 x largest dimension), curbs, pads, and similar structural support work.
3. Provide 2500 PSI Class for plain encasement, filling steel-framed units, and similar work.
100% CONSTRUCTION DOCUMENTS 26 05 10-3 9/13/2024
1.07 LOCKING OF ELECTRICAL FACILITIES
A. Provide padlocks or lockable latches for electrical facilities subject to unauthorized entry, such as disconnects, etc.
B. Furnish locks to match existing locking system. Key all locks alike.
C. Furnish Owner with two keys per lock up to a quantity of ten keys.
D. Install locks immediately upon installation of electrical facility.
1.08 CLEANING AND PREPARATION OF ITEMS FOR PAINTING
A. Refer to architectural specifications for painting requirements.
B. Thoroughly clean all parts of materials and equipment of cement, plaster, and other materials. All oil and grease spots shall be removed.
C. Thoroughly clean the finish on all parts of the materials and equipment with factory applied finishes. If the factory finish or job applied painted finished surface has been damaged, the surfaces shall be repainted by this Contractor to the satisfaction of the Owner's Designated Representative.
D. No nameplates on equipment shall be painted, and suitable protection shall be afforded to the plates to prevent their being rendered illegible during the painting operation.
1.09 FINAL CLEANING
A. Employ experienced workmen, or professional cleaners for final cleaning.
B. In preparation for substantial completion or occupancy, conduct final inspection of sight-exposed interior and exterior surfaces, and of concealed spaces, and clean as follows:
1. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign materials from sight-exposed interior and exterior surfaces; polish surfaces so designated to shine finish.
2. Repair, patch and touch-up marred surfaces to specified finish, to match adjacent surfaces.
1.10 DISRUPTION OF EXISTING FUNCTIONS
A. Access to and use of the existing site except as otherwise indicated will be restricted, and will be under the direction and control of the Owner.
B. Maintain existing electric service, except for scheduled disruptions.
C. Obtain approval two weeks in advance of schedule for date, time and duration of required disruptions.
D. Other disruptions:
1. Make request immediately on knowledge of the requirement.
2. Perform Work to cause minimum disruption.
E. Notify the Architect/Engineer and the Owner immediately by telephone and then in writing as changes and additions to the scheduled disruption requirements become known.
F. Duration:
1. Complete as large a portion of the Work as possible before the disruption.
100% CONSTRUCTION DOCUMENTS 26 05 10-4 9/13/2024
2. Maintain on hand adequate supplies, materials, equipment, workers, and other items during the disruption.
3. Duration of disruption shall be kept to a minimum.
4. During disruption, perform only the amount of Work that requires the disruption.
1.11 SALVAGE, DEMOLITION AND RELOCATION
A. General:
1. Modify, remove, or relocate materials and items indicated on the Drawings or required by the installation of new facilities.
2. All salvage equipment and material shall become the property of the Contractor and removed from the site.
B. Relocations:
1. Materials and items scheduled for relocation and which are damaged during dismantling or reassembly operations shall be repaired and restored to good operational and functional condition.
2. If materials are damaged and cannot be repaired, new materials and items of like design and quality shall be substituted upon approval of Shop Drawings, Product Data, and Samples.
3. Remove carefully, in reverse to original assembly or placement, items which are to be relocated.
4. Store and protect items until relocation is complete.
5. Clean, repair and/or provide new materials, fittings, and appurtenances as required to complete the relocations and to restore to good operative order.
6. Perform the relocation work in accordance with pertinent sections of the specifications, utilizing skilled workers.
C. Before work has been started on dismantling, report to Architect/Engineer items which are scheduled for relocation, reinstallation or reuse and are found to be in damaged condition.
1.12 EQUIPMENT SERVICE
A. All equipment installed on this project shall have representation, factory authorized service, and a stock of repair parts within a 200 mile radius.
1.13 CODES, ASSOCIATIONS AND STANDARDS
A. Local governing codes and authorities, trade association standards and publications are an extension of the contract documents, and are hereby imposed as applicable to the work in each instance. In general, each manufacturer, fabricator, supplier, and installer of electrical work is recognized as an expert to be completely familiar with the standards and publications applicable to his portion of the work. Therefore, copies have not been bound with these specifications.
1. Where local codes, ordinances, rules or authorities conflict with associations and standards listed hereinafter, the local ordinances, codes, rules or authorities take precedence.
2. Obtain copies of trade association standards and publications, wherever needed for proper execution of the work.
3. Comply with the issue of applicable standard or publication which is in effect at the date shown on these contract documents.
4. Where application of a trade association standard or publication appears to be in conflict with the requirements of the contract documents, the Architect/Engineer will determine which must be complied with, and in general the more stringent will be required for the performance of the electrical work.
100% CONSTRUCTION DOCUMENTS 26 05 10-5 9/13/2024
1.14 LISTING OF ASSOCIATIONS AND STANDARDS
A. AASHTO: American Association of State Highway and Transportation Officials
B. AISC: American Institute of Steel Construction
C. AISI: American Iron and Steel Institute
D. ANSI: American National Standards Institute (Successor to USASI and ASA
E. ASTM: American Society for Testing and Materials
F. AWS: American Welding Society
G. BOCA: Building Officials and Code Administrators
H. CBM: Certified Ballast Manufacturers Association
I. ETL: Electrical Testing Laboratories
J. FM: Factory Mutual System
K. ICEA: Insulated Cable Engineers Association
L. IECC: International Energy Conservation Code
M. IEEE: Institute of Electrical & Electronics Engineers
N. NEC: National Electrical Code, (NFPA No. 70
O. NECA: National Electrical Contractors Association, Inc
P. NEMA: National Electrical Manufacturers Association
Q. NESC: National Electrical Safety Code (ANSI C2)
R. NFPA: National Fire Protection Association
S. OSHA: Occupational Safety & Health Administration (U.S. Dept. of Labor), Government Printing Office
T. SBCCI: Southern Building Code Congress International
U. UBC: Uniform Building Code
V. UL: Underwriters' Laboratories, Inc.
W. Town of Addison, Texas Code
1.15 ELECTRICAL SYMBOLS
A. The electrical contract drawings, and the Architect/Engineer's detail sheets are diagrammatic and show requirements by the use of graphic symbols. In general, these are the recognized symbols of the industry and of the engineering profession. Questions of meaning or intent will be decided by the Architect/Engineer, and shall be consistent with system of symbols indicated or, if none is indicated, with recognized conventions.
B. Listing of Symbols: The listing of (or key to) specific graphic symbols used to show the electrical work on the contract documents is shown on the drawings.
100% CONSTRUCTION DOCUMENTS 26 05 10-6 9/13/2024
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
Not used.
SECTION 26 05 19
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
100% CONSTRUCTION DOCUMENTS 26 05 19-1 9/13/2024
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes the following:
1. Building wires and cables rated 600 V and less.
2. Connectors, splices, and terminations rated 600 V and less.
3. Sleeves and sleeve seals for cables.
1.02 DEFINITIONS
A. EPDM: Ethylene-propylene-diene terpolymer rubber.
B. NBR: Acrylonitrile-butadiene rubber.
1.03 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Qualification Data: For testing agency.
C. Field quality-control test reports.
1.04 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the International Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the International Electrical Testing Association or the National Institute for Certification in Engineering Technologies to supervise on-site testing specified in Part 3.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
C. Comply with NFPA 70.
1.05 COORDINATION
A. Set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.
PART 2 - PRODUCTS
2.01 CONDUCTORS AND CABLES
A. Available Manufacturers:
1. Alcan Products Corporation; Alcan Cable Division.
2. American Insulated Wire Corp.; a Leviton Company.
3. General Cable Corporation.
4. Senator Wire & Cable Company.
5. Southwire Company.
B. Copper Conductors: Comply with NEMA WC 70.
100% CONSTRUCTION DOCUMENTS 26 05 19-2 9/13/2024
C. Conductor Insulation: Comply with NEMA WC 70 for Types THW, THHN-THWN, XHHW.
2.02 CONNECTORS AND SPLICES
A. Acceptable Manufacturers:
1. AFC Cable Systems, Inc.
2. Hubbell Power Systems, Inc.
3. O-Z/Gedney; EGS Electrical Group LLC.
4. 3M; Electrical Products Division.
5. Tyco Electronics Corp.
B. Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.
C. Use compression fittings with heat shrink for all connections in poles. Do not use Scotchlok type connectors.
PART 3 - EXECUTION
3.01 CONDUCTOR MATERIAL APPLICATIONS
A. Branch Circuits Larger than 10 AWG: 98% conductivity copper, soft-drawn, stranded conductor, 600 volt insulation, THHN/THWN. Use XHHW conductors where installed in conduit underground.
B. Branch Circuits 10 AWG and Smaller: 98% conductivity copper, soft-drawn, solid conductor, 600-volt insulation, THHN/THWN. Use XHHW conductors where installed in conduit underground.
3.02 INSTALLATION OF CONDUCTORS
A. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.
B. Use pulling means; including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage raceway.
C. Identify and color-code conductors according to Division 26 Section "Identification for Electrical Systems."
D. Bushings shall be installed on all conduit openings regardless of conduit or wire size prior to pulling. Any bushings damaged after wire pull shall be replaced by contractor and no additional cost.
E. All conductors or cables, including communication cables, shall be installed completely in conduit.
F. Provide pigtails as required for terminations at breakers, contactors, etc.
3.03 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.
B. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.
100% CONSTRUCTION DOCUMENTS 26 05 19-3 9/13/2024
3.04 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections and prepare test reports.
B. Perform tests and inspections and prepare test reports.
C. Tests and Inspections:
1. After installing conductors and before electrical circuitry has been energized, test service entrance and feeder conductors for compliance with requirements.
2. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters.
a. Record of Infrared Scanning: Prepare a certified report that identifies splices checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken and observations after remedial action.
D. Test Reports: Prepare a written report to record the following:
1. Test procedures used.
2. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements.
E. Remove and replace malfunctioning units and retest as specified above.
SECTION 26 05 26
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
100% CONSTRUCTION DOCUMENTS 26 05 26-1 9/13/2024
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes methods and materials for grounding systems and equipment.
1.02 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Other Informational Submittals: Plans showing dimensioned as-built locations of grounding features specified in Part 3 "Field Quality Control" Article, including the following:
1. Ground rods.
2. Grounding arrangements and connections for separately derived systems.
C. Qualification Data: For testing agency and testing agency's field supervisor.
D. Field quality-control test reports.
1.03 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the International Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the International Electrical Testing Association to supervise on-site testing specified in Part 3.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
C. Comply with UL 467 for grounding and bonding materials and equipment.
PART 2 - PRODUCTS
2.01 CONDUCTORS
A. Insulated Conductors: Copper or tinned-copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.
B. Bare Copper Conductors:
1. Solid Conductors: ASTM B 3.
2. Stranded Conductors: ASTM B 8.
3. Tinned Conductors: ASTM B 33.
4. Bonding Cable: 28 kcmil, 14 strands of No. 17 AWG conductor, 1/4-inch in diameter.
5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.
6. Bonding Jumper: Copper tape, braided conductors, terminated with copper ferrules;
1-5/8-inches wide and 1/16-inch thick.
7. Tinned Bonding Jumper: Tinned-copper tape, braided conductors, terminated with copper ferrules; 1-5/8-inches wide and 1/16-inch thick.
100% CONSTRUCTION DOCUMENTS 26 05 26-2 9/13/2024
2.02 CONNECTORS
A. Listed and labeled by a nationally recognized testing laboratory acceptable to authorities having jurisdiction for applications in which used, and for specific types, sizes, and combinations of conductors and other items connected.
B. Bolted Connectors for Conductors and Pipes: Copper or copper alloy, bolted pressure-type, with at least two bolts.
1. Pipe Connectors: Clamp type, sized for pipe.
C. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.
2.03 GROUNDING ELECTRODES
A. Ground Rods: Copper-clad steel; 3/4 inch by10 feet in diameter.
PART 3 - EXECUTION
3.01 APPLICATIONS
A. Conductors: Install solid conductor for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger, unless otherwise indicated.
B. Conductor Terminations and Connections:
1. Connections to Ground Rods: Exothermic.
2. Connections to enclosure steel: Bolted connectors.
3.02 EQUIPMENT GROUNDING
A. Install insulated equipment grounding conductors with all branch circuits.
B. Install insulated equipment grounding conductors with the following items, in addition to those required by NFPA 70:
1. Lighting circuits.
2. Irrigation controller circuit.
3. Poles.
3.03 INSTALLATION
A. Ground Rods: Drive rods until tops are 2 inches below finished floor or final grade, unless otherwise indicated.
1. Interconnect ground rods with grounding electrode conductor below grade and as otherwise indicated. Make connections without exposing steel or damaging coating, if any.
B. Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance, except where routed through short lengths of conduit.
1. Bonding to Enclosure and Structures: Bond straps directly to basic structure, taking care not to penetrate any adjacent parts.
2. Use exothermic-welded connectors for outdoor locations, but if a disconnect-type connection is required, use a bolted clamp.
100% CONSTRUCTION DOCUMENTS 26 05 26-3 9/13/2024
3.04 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing and inspecting agency to perform the following field tests and inspections and prepare test reports:
B. Perform the following tests and inspections and prepare test reports:
1. After installing grounding system but before permanent electrical circuits have been energized, test for compliance with requirements.
2. Test completed grounding system at each location where a maximum ground-resistance level is specified, at service disconnect enclosure grounding terminal, at individual ground rods. Make tests at ground rods before any conductors are connected.
a. Measure ground resistance not less than two full days after last trace of precipitation and without soil being moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.
b. Perform tests by fall-of-potential method according to IEEE 81.
3. Prepare dimensioned drawings locating ground rod and ground rod assembly, and other grounding electrodes. Identify each by letter in alphabetical order, and key to the record of tests and observations. Include the number of rods driven and their depth at each location, and include observations of weather and other phenomena that may affect test results. Describe measures taken to improve test results.
C. Report measured ground resistances that exceed the following value:
1. 2 ohms.
D. Excessive Ground Resistance: If resistance to ground exceeds specified value, provide additional electrodes to reduce ground resistance.
SECTION 26 05 29
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
100% CONSTRUCTION DOCUMENTS 26 05 29-1 9/13/2024
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes the following:
1. Hangers and supports for electrical equipment and systems.
2. Construction requirements for concrete bases.
1.02 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design supports for multiple raceways, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
C. Rated Strength: Adequate in tension, shear, and pullout force to resist maximum loads calculated or imposed for this Project, with a minimum structural safety factor of five times the applied force.
1.03 SUBMITTALS
A. Product Data: Steel slotted support systems.
B. Shop Drawings: Signed and sealed by a qualified professional engineer. Show fabrication and installation details and include calculations for the following:
1. Equipment supports.
2. Lighting control cabinet attachment to existing wall.
C. Welding certificates.
PART 2 - PRODUCTS
2.01 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS
A. Raceway and Cable Supports: As described in NECA 1 and NECA 101.
B. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported.
C. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M, steel plates, shapes, and bars; galvanized.
D. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following:
1. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened Portland cement concrete, steel, or wood, with tension, shear, and pullout capacities appropriate for supported loads and building materials where used.
a. Available Manufacturers:
1) Hilti Inc.
2) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc.
3) MKT Fastening, LLC.
4) Simpson Strong-Tie Co., Inc.; Masterset Fastening Systems Unit.
100% CONSTRUCTION DOCUMENTS 26 05 29-2 9/13/2024
2. Mechanical-Expansion Anchors: Insert-wedge-type stainless steel, for use in hardened Portland cement concrete with tension, shear, and pullout capacities appropriate for supported loads and building materials in which used.
a. Available Manufacturers:
1) Cooper B-Line, Inc.; a division of Cooper Industries.
2) Empire Tool and Manufacturing Co., Inc.
3) Hilti Inc.
4) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc.
5) MKT Fastening, LLC.
3. Concrete Inserts: Steel or malleable-iron, slotted support system units similar to MSS Type 18; complying with MFMA-4 or MSS SP-58.
4. Clamps for Attachment to Steel Structural Elements: MSS SP-58, type suitable for attached structural element.
5. Through Bolts: Structural type, hex head, and high strength. Comply with
ASTM A 325.
6. Toggle Bolts: All-steel springhead type.
2.02 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES
A. Description: Welded or bolted, structural-steel shapes, shop or field fabricated to fit dimensions of supported equipment.
B. Materials: Comply with requirements in Division 05 Section "Metal Fabrications" for steel shapes and plates.
PART 3 - EXECUTION
3.01 APPLICATION
A. Comply with NECA 1 and NECA 101 for application of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter.
B. Spring-steel clamps not permitted.
3.02 SUPPORT INSTALLATION
A. Comply with NECA 1 and NECA 101 for installation requirements except as specified in this Article.
B. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb. (90 kg).
C. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to structural elements by the following methods unless otherwise indicated by code:
1. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.
2. To Existing Concrete: Expansion anchor fasteners.
3. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete 4 inches (100
mm) thick or greater. Do not use for anchorage to lightweight-aggregate concrete or for slabs less than 4 inches (100 mm) thick.
4. To Steel: Beam clamps (MSS Type 19, 21, 23, 25, or 27) complying with MSS SP-69.
5. To Light Steel: Sheet metal screws.
100% CONSTRUCTION DOCUMENTS 26 05 29-3 9/13/2024
D. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.
3.03 INSTALLATION OF FABRICATED METAL SUPPORTS
A. Comply with installation requirements in Division 05 Section "Metal Fabrications" for site-fabricated metal supports.
B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor electrical materials and equipment.
C. Field Welding: Comply with AWS D1.1/D1.1M.
3.04 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.
1. Apply paint by brush or spray to provide minimum dry film thickness of 2.0 mils (0.05 mm).
B. Touchup: Comply with requirements in Division 09 painting Sections for cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal.
C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.
SECTION 26 05 33
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
100% CONSTRUCTION DOCUMENTS 26 05 33-1 9/13/2024
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring.
1.02 SUBMITTALS
A. Product Data: For raceways, surface mounted cast boxes, and in-grade pull boxes.
B. Submit cable pulling tension and sidewall pressure for all site conduits.
C. Coordination Drawings: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:
1. Conduit installed below roadway.
D. Qualification Data: For professional engineer and testing agency.
E. Source quality-control test reports.
1.03 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .