This is a contract agreement between the City of Johns Creek, Georgia and an unnamed contractor for Annual Park Maintenance Services under Request for Proposal (RFP) #25-104RP. The contract covers maintenance services for nine parks including Autrey Mill Nature Preserve, Morton Road Park, Newtown Park, Ocee Park, State Bridge Park, Bell-Boles Park, Cauley Creek Park, Shakerag Park, and Abbott Hill Elementary School Rear Park Area. The initial contract term is from October 2025 to September 2026, with two potential one-year renewals, for a maximum total contract period of five years. The contractor will be responsible for comprehensive park maintenance including landscape management, turf care, facility maintenance, trail upkeep, athletic field maintenance, equipment management, and special event support across these locations.
The contract's compensation is based on the cost proposal in Exhibit B, with pricing to be firm and fixed throughout the contract term. The contractor must provide fifteen personnel dedicated to the parks, including specialized staff like a licensed plumber, electrician, carpenter, and fence maintenance expert. The maintenance services include detailed requirements such as weekly mowing, trail maintenance, restroom cleaning, graffiti removal, playground inspections, irrigation system management, and handling special events totaling approximately 942 staffing hours annually. The contractor must also provide extensive equipment including multiple mowers, trucks, trailers, and utility vehicles. Performance will be evaluated weekly, and the contract includes provisions for termination if performance standards are not met, with the potential for immediate termination for serious issues like safety violations or non-compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Annual Park Maintenance RFP 25_140RP Bid Pack.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT AGREEMENT
RFP #25-104RP
ANNUAL PARK MAINTENANCE SERVICES
This Agreement made and entered into this __ day of ___________, in the year 2____; by and between The City of Johns Creek, Georgia, having its principal place of business at 11360 Lakefield Drive, Johns Creek, Georgia 30097 and Contractor Name (“Contractor”), located at Address, City, State Zip.
WHEREAS, the City of Johns Creek is charged with the responsibility for the establishment of contracts for the acquisition of goods, materials, supplies and equipment, and services by the various departments of the City of Johns Creek; and
WHEREAS, the City of Johns Creek has caused Request for Proposal (RFP) #25-104RP to be issued soliciting proposals from qualified Contractors to furnish all items, labor services, materials, and appurtenances called for by them in accordance with this proposal. Selected (“Contractor”) is required to provide the services as called for in the specifications; and
WHEREAS, the Contractor submitted a response to the RFP #25-104RP, and the Contractor’s submittal was deemed by the City of Johns Creek to be the lowest most responsive, responsible bid meeting the minimum specifications to the City per the scope dated May 20, 2025.
NOW THEREFORE, in consideration of the mutual covenant and promises contained herein, the parties agree as follows:
1.0 Definition
As used in this Agreement, the following terms shall have the meanings ascribed herein unless otherwise stated or reasonably required by the Agreement, and other forms of any defined words shall have a meaning parallel thereto.
• City: The City of Johns Creek.
• Contractor: The individual or corporation identified on page 1 to perform Park Maintenance
Services per Exhibit A specifications and contract documents. Contractor shall retain as necessary the services of those professions licensed by the state of Georgia.
• Contract Documents: Those documents so identified in the Agreement for the Project, including all associated documents. All terms defined in the General Conditions of the Agreement for professional services of the Project shall have the same meaning when used in this Agreement unless otherwise specifically stated or in the case of a conflict in which case the definition used in this Agreement shall prevail in the interpretation of this Agreement.
• Contract Sum: The total amount payable by City to Contractor for performance of the Work in accordance with the Contract Documents.
• Contract Time: The number of days allotted in the Contract Documents for achieving Substantial
Completion of the Work.
• Project Manager: The person employed by City and designated to act as the City’s representative for the Project.
• Scope of Work: That work as defined and identified with a time schedule in Exhibit A (Scope of
Services) attached hereto and incorporated herein.
1.1 Scope of Work
The Contractor agrees with the City to furnish all equipment, tools, materials, skill, labor of every description, and all things necessary to carry out in each designated area as delineated in Scope of Services
(Exhibit A) and complete in a good, firm, substantial and workmanlike manner, the Work in strict conformity with the specifications which shall form an essential part of this agreement. In addition to the foregoing, and notwithstanding anything to the contrary stated herein, the following terms and conditions, amendments, and other documents are incorporated by reference and made a part of the terms and conditions of this Agreement as is fully set out herein:
EXHIBIT A-SCOPE OF SERVICES
EXHIBIT B-COST PROPOSAL
EXHIBIT C-IMMIGRATION & SECURITY FORM / REQUIRED DOCUMENTS
EXHIBIT D-CONCEPT & MOWING MAPS
EXHIBIT F-CONTRACTOR’S PROPOSAL
2.0 Key Personnel
The City of Johns Creek enters into this Agreement having relied upon Contractor’s providing the services of the Key Personnel, if any, identified as such in the body of the Agreement. No Key Personnel may be replaced or transferred without the prior approval of the City’s authorized representative. Any Contractor personnel to whom the City objects shall be removed from City work immediately. The City maintains the right to approve in its sole discretion all personnel assigned to the work under this Agreement.
3.0 Compensation
3.1 Pricing. The Contractor will be paid for the goods and services sold pursuant to the Contract in accordance with the RFP and final pricing documents as incorporated into the terms of the Contract. Unless clearly stated otherwise in the Standard Contract, all prices are firm and fixed and are not subject to variation. Prices include, but are not limited to freight, insurance, fuel surcharges and customs duties. The prices quoted and listed on the attached Cost Proposal, a copy of which is attached hereto as Exhibit “B” and incorporated herein, shall be firm throughout the term of this Contract.
3.2 Billings. If applicable, and unless the RFP provides otherwise, the Contractor shall submit, on a regular basis, an invoice for goods and services supplied to the City under the Contract at the billing address specified in the Purchase Instrument or Contract. The invoice shall comply with all applicable rules concerning payment of such claims. The City shall pay all approved invoices in arrears and in accordance with applicable provisions of City law. Unless otherwise agreed in writing by the parties, the Contractor shall not be entitled to receive any other payment or compensation from the City for any goods or services provided by or on behalf of the Contractor under the Contract. The Contractor shall be solely responsible for paying all costs, expenses and charges it incurs in connection with its performance under the Contract.
Standard payment terms: Net-30.
3.3 Delay of Payment Due to Contractor’s Failure. If the City in good faith determines that the Contractor has failed to perform or deliver any service or product as required by the Contract, the Contractor shall not be entitled to any compensation under the Contract until such service or product is performed or delivered.
In this event, the City may withhold that portion of the Contractor’s compensation which represents payment for services or products that were not performed or delivered. To the extent that the Contractor’s failure to perform or deliver in a timely manner causes the City to incur costs, the City may deduct the amount of such incurred costs from any amounts payable to Contractor. The City’s authority to deduct such incurred costs shall not in any way affect the City’s authority to terminate the Contract.
3.4 Set-Off Against Sums Owed by the Contractor. In the event that the Contractor owes the City any sum under the terms of the Contract, pursuant to any judgment, or pursuant to any law, the City may set off the sum owed to the City against any sum owed by the City to the Contractor in the City's sole discretion.
4.0 Duration of Contract
4.1 The Contract between the City and the Contractor shall begin and end on the dates specified unless terminated earlier in accordance with the applicable terms and conditions. Pursuant to O.C.G.A. Section
36-60-13, this Contract shall not be deemed to create a debt of the City for the payment of any sum beyond the fiscal year of execution or, in the event of a renewal, beyond the fiscal year of such renewal.
The initial term of the contract shall be October, 2025 until September 30, 2026, with (2) one-year contract annual renewals contingent upon the approbation of funds on an annual basis, and said term shall be filled at the contract price (Exhibit B).
4.2 Contract Renewal
The City shall have the option, in its sole discretion, to renew the Contract for two (2) additional renewals as defined in the Standard Contract Form on a year-to-year basis not to exceed five (5) total years by giving the Contractor written notice of the renewal decision at least sixty (60) days prior to the expiration of the initial term or renewal term and requesting Contractor’s written consent for renewal of the Contract.
Renewal will depend upon the best interests of the City, funding, and Contractor’s performance. Renewal will be accomplished through the issuance of a Notice of Award Amendment. Upon the City’s election, in its sole discretion, to renew any part of this Contract, Contractor shall remain obligated to perform in strict accordance with this Contract unless otherwise agreed by the City and the Contractor.
4:3 Contract Extension
In the event that this Standard Contract shall terminate or be likely to terminate prior to the making of an award for a new contract for the identified goods and ancillary services, the City may, with the written consent of Contractor, extend this Contract for such period as may be necessary to afford the City a continuous supply of the identified goods and ancillary services.
If not set forth in the RFP and/or Contractor’s submittal, the City will determine the basic period of performance for the completion of any of Contractor’s actions contemplated within the scope of this
Agreement and notify Contractor of the same via written notice. If no specific period for the completion of
Contractor’s required actions pursuant to this Agreement is set out in writing, such time period shall be a reasonable period of time based upon the nature of the activity. If the completion of this Contract is delayed by actions of the City, then and in such event the time of completion of this Contract shall be extended for such additional time within which to complete the performance of the Contract as is required by such delay.
This Contract may be extended by mutual consent of both the City and the Contractor for reasons of additional time, additional services and/or additional areas of work.
5.0 Independent Contractor
5.1 The Contractor shall be an independent Contractor. The Contractor is not an employee, agent or representative of the City of Johns Creek. The successful Contractor shall obtain and maintain, at the
Contractor’s expense, all permits, license or approvals that may be necessary for the performance of the services. The Contractor shall furnish copies of all such permits, licenses or approvals to the City of Johns
Creek Representative within ten (10) day after issuance.
5.2 Inasmuch as the City of Johns Creek and the Contractor are independent of one another neither has the authority to bind the other to any third person or otherwise to act in any way as the representative of the other, unless otherwise expressly agreed to in writing signed by both parties hereto. The Contractor agrees not to represent itself as the City’s agent for any purpose to any party or to allow any employee of the
Contractor to do so, unless specifically authorized, in advance and in writing, to do so, and then only for the limited purpose stated in such authorization. The Contractor shall assume full liability for any contracts or agreements the Contractor enters into on behalf of the City of Johns Creek without the express knowledge and prior written consent of the City.
6.0 Indemnification
6.1 The Contractor agrees to indemnify, hold harmless and defend the City, its public officials, officers, employees, and agents from and against any and all liabilities, suits, actions, legal proceedings, claims, demands, damages, costs and expenses (including attorney’s fees) to the extent rising out of any act or omission of the Contractor, its agents, subcontractors or employees in the performance of this Contract except for such claims that arise from the City’s sole negligence or willful misconduct.
6.2 Notwithstanding the foregoing indemnification clause, the City may join in the defense of any claims raised against it in the sole discretion of the City. Additionally, if any claim is raised against the City, said claim(s) cannot be settled or compromised without the City’s written consent, which shall not be unreasonably withheld.
7.0 Performance
Performance shall be evaluated and scored weekly by the City’s Project Manager and or appointed designate. Performance Scores and all work orders completed for the week will be mutually reviewed during a weekly meeting between Contractor and the City Project Manager. If requirements are not met, City of Johns Creek Public Works and or Procurement will notify the Contractor in writing stating deficiencies, substitutions, delivery schedule, and/or poor workmanship.
A written response from the Contractor detailing how correction(s) will be made is required to be delivered to the City. Contractor will have no more than Seven (7) days to remedy the situation.
7.1 Final Completion, Acceptance, and Payment
a) Final Completion shall be achieved when the work is fully and finally complete in accordance with the Contract Documents. The City shall notify Contractor once the date of final completion has been achieved in writing.
b) Final Acceptance is the formal action of City acknowledging Final Completion. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the
City’s right under any warranty or guarantee. Prior to Final Acceptance, Contractor shall, in addition to all other requirements in the Contract Documents, submit to City a Notice of any outstanding disputes or claims between Contractor and any of its Subcontractors, including the amounts and other details thereof. Neither Final Acceptance, nor final payment, shall release
Contractor or its sureties from any obligations of these Contract Documents or the bond, or constitute a waiver of any claims by City arising from Contractor’s failure to perform the work in accordance with the Contract Documents.
c) Acceptance of final payment by Contractor, or any Subcontractor, shall constitute a waiver and release to City of all claims by Contractor, or any such Subcontractor, for an increase in the Contract
Sum or the Contract Time, and for every act or omission of City relating to or arising out of the work, except for those Claims made in accordance with the procedures, including the time limits, set forth in section 12.
8.0 Changes
City, within the general scope of the Agreement, may, by written notice to Contractor, issue additional instructions, require additional services or direct the omission of services covered by this Agreement. In such event, there will be made an equitable adjustment in price, but any claim for such an adjustment must be made within thirty (30) days of the receipt of said written notice.
9.0 Change Order Defined
Change Order shall mean a written order to the Contractor executed by the City issued after the execution of this Agreement, authorizing and directing a change in services. The Price and Time may be changed only by a Change Order.
10.0 Insurance
10.1 The Contractor shall, at its own cost and expense, obtain and maintain worker’s compensation and commercial general liability insurance coverage covering the period of this Agreement, such insurance to be obtained from a responsible insurance company legally licensed and authorized to transact business in the State of Georgia. The minimum limit for Worker’s Compensation Insurance shall be the statutory limit for such insurance. The minimum limits for commercial general liability insurance, which must include personal liability coverage will be $1,000,000 per person and $2,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage.
10.2 Contractor shall provide certificates of insurance evidencing the coverage requested herein before the execution of this Agreement, and at any time during the term of this Agreement, upon the request of the
City, Contractor shall provide proof sufficient to the satisfaction of the City that such insurance continues in force and effect.
11.0 Termination
11.1 Immediate Termination. Pursuant to O.C.G.A. Section 36-60-13, this Contract will terminate immediately and absolutely if the City determines that adequate funds are not appropriated or granted or funds are de-appropriated such that the City cannot fulfill its obligations under the Contract, which determination is at the City's sole discretion and shall be conclusive. Further, the City may terminate the
Contract for any one or more of the following reasons effective immediately without advance notice:
a) In the event the Contractor is required to be certified or licensed as a condition precedent to providing goods and services, the revocation or loss of such license or certification may result in immediate termination of the Contract effective as of the date on which the license or certification is no longer in effect;
b) The City determines that the actions, or failure to act, of the Contractor, its agents, employees or subcontractors have caused, or reasonably could cause, life, health or safety to be jeopardized;
c) The Contractor fails to comply with confidentiality laws or provisions; and/or
d) The Contractor furnished any statement, representation or certification in connection with the
Contract or the bidding process which is materially false, deceptive, incorrect or incomplete.
e) The Contractor fails to pass more than 1 of 4 weekly performance reviews in any rolling four week period.
11.2 Termination for Cause. The occurrence of any one or more of the following events shall constitute cause for the City to declare the Contractor in default of its obligations under the Contract:
a) The Contractor fails to deliver or has delivered nonconforming goods or services or fails to perform, to the City’s satisfaction, any material requirement of the Contract or is in violation of a material provision of the Contract, including, but without limitation, the express warranties made by the
Contractor;
b) The City determines that satisfactory performance of the Contract is substantially endangered or that a default is likely to occur;
c) The Contractor fails to make substantial and timely progress toward performance of the contract;
d) The Contractor becomes subject to any bankruptcy or insolvency proceeding under federal or state law to the extent allowed by applicable federal or state law including bankruptcy laws; the
Contractor terminates or suspends its business; or the City reasonably believes that the Contractor has become insolvent or unable to pay its obligations as they accrue consistent with applicable federal or state law;
e) The Contractor has failed to comply with applicable federal, state and local laws, rules, ordinances, regulations and orders when performing within the scope of the Contract;
f) The Contractor has engaged in conduct that has or may expose the City to liability, as determined in the City’s sole discretion; or
g) The Contractor has infringed any patent, trademark, copyright, trade dress or any other intellectual property rights of the State, the City, or a third party.
11.3 Notice of Default. If there is a default event caused by the Contractor, the City shall provide written notice to the Contractor requesting that the breach or noncompliance be remedied within the period of time specified in the City’s written notice to the Contractor. If the breach or noncompliance is not remedied by the date of the written notice, the City may:
a) Immediately terminate the Contract without additional written notice; and/or
b) Procure substitute goods or services from another source and charge the difference between the
Contract and the substitute contract to the defaulting Contractor; and/or,
c) Enforce the terms and conditions of the Contract and seek any legal or equitable remedies.
11.4 Termination for Convenience. The City may terminate this Agreement for convenience at any time upon thirty (30) day written notice to the Contractor. In the event of a termination for convenience, Contractor shall take immediate steps to terminate work as quickly and effectively as possible and shall terminate all commitments to third-parties unless otherwise instructed by the City. Provided that no damages are due to the City for Contractor’s failure to perform in accordance with this Agreement, the City shall pay Contractor for work performed to date in accordance with Section 3 herein. The City shall have no further liability to Contractor for such termination.
11.5 Payment Limitation in Event of Termination. In the event of termination of the Contract for any reason by the City, the City shall pay only those amounts, if any, due and owing to the Contractor for goods and services actually rendered up to and including the date of termination of the Contract and for which the City is obligated to pay pursuant to the Contract or Purchase Instrument. Payment will be made only upon submission of invoices and proper proof of the Contractor’s claim. This provision in no way limits the remedies available to the City under the Contract in the event of termination. The City shall not be liable for any costs incurred by the Contractor in its performance of the Contract, including, but not limited to, startup costs, overhead, profit, delay damages or other costs associated with the performance of the
Contract.
11.6 The Contractor’s Termination Duties. Upon receipt of notice of termination or upon request of the
City, the Contractor shall:
a) Cease work under the Contract and take all necessary or appropriate steps to limit disbursements and minimize costs, and furnish a report within thirty (30) days of the date of notice of termination, describing the status of all work under the Contract, including, without limitation, results accomplished, conclusions resulting therefrom, and any other matters the City may require;
b) Immediately cease using and return to the City, any personal property or materials, whether tangible or intangible, provided by the City to the Contractor;
c) Comply with the City’s instructions for the timely transfer of any active files and work product produced by the Contractor under the Contract;
d) Cooperate in good faith with the City, its employees, agents and Contractors during the transition period between the notification of termination and the substitution of any replacement Contractor;
and
e) Immediately return to the City any payments made by the City for goods and services that were not delivered or rendered by the Contractor.
12.0 CLAIMS and DISPUTE RESOLUTION
12.1 Claims Procedure
a) If the parties fail to reach agreement regarding any dispute arising from the Contract Documents, including a failure to reach agreement on the terms of any Change Order for City-directed work as provided in Section 8, or on the resolution of any request for an equitable adjustment in the Contract
Sum or the Contract Time, Contractor’s only remedy shall be to file a Claim with City as provided in this section.
b) Contractor shall file its Claim within the earlier of: 120 Days from City’s final offer in accordance with Section 8; or the date of Final Acceptance.
c) The Claim shall be deemed to cover all changes in cost and time (including direct, indirect, impact, and consequential) to which Contractor may be entitled. It shall be fully substantiated and documented. The Claim shall contain a detailed factual statement of the Claim for additional compensation and time, if any, providing all necessary dates, locations, and items of work affected by the Claim.
d) If an adjustment in the Contract Time is sought: the specific Days and dates for which it is sought;
the specific reasons Contractor believes an extension in the Contract Time should be granted; and
Contractor’s analysis of its Progress Schedule to demonstrate the reason for the extension in
Contract Time.
e) If any adjustment in the Contract Sum is sought: the exact amount sought and a breakdown of that amount into the categories; and a statement certifying, under penalty of perjury, that the Claim is made in good faith, that the supporting cost and pricing data are true and accurate to the best of
Contractor’s knowledge and belief, that the Claim is fully supported by the accompanying data, and that the amount requested accurately reflects the adjustment in the Contract Sum or Contract
Time for which Contractor believes City is liable.
f) After Contractor has submitted a fully-documented Claim that complies with all applicable provisions of this Section 12.1, City shall respond, in writing, to Contractor with a decision within sixty (60) Days from the date the Claim is received, or with notice to Contractor of the date by which it will render its decision.
12.2 Arbitration
a) If Contractor disagrees with City’s decision rendered in accordance with paragraph 12.1f, Contractor shall provide City with a written demand for arbitration. No demand for arbitration of any such Claim shall be made later than thirty (30) Days after the date of City’s decision on such
Claim; failure to demand arbitration with said thirty (30) Day period shall result in City’s decision being final and binding upon Contractor and its Subcontractors.
b) Notice of the demand for arbitration shall be filed with the American Arbitration Association
(AAA), with a copy provide to City. The parties shall negotiate or mediate under the Voluntary
Construction Mediation Rules of the AAA, or mutually acceptable service, before seeking arbitration in accordance with the Construction Industry Arbitration Rules of AAA as follows:
1. Disputes involving $30,000 or less shall be conducted in accordance with the Southeast Region
Expedited Commercial Arbitration Rules; or
2. Disputes over $30,000 shall be conducted in accordance with the Construction Industry
Arbitration Rules of the AAA, unless the parties agree to use the expedited rules.
c) All Claims arising out of the work shall be resolved by arbitration. The judgment upon the arbitration award may be entered, or review of the award may occur, in the Superior Court of Fulton
County.
d) If the parties resolve the Claim prior to arbitration judgment, the terms of the resolution shall be incorporated in a Change Order. The Change Order shall constitute full payment and final settlement of the Claim, including all claims for time and for direct, indirect, or consequential costs, including costs of delays, inconvenience, disruption of schedule, or loss of efficiency or productivity.
e) Choice of Law and Forum. The laws of the State of Georgia shall govern and determine all matters arising out of or in connection with this Contract without regard to the choice of law provisions of
State law. The Superior Court of Fulton County, Georgia shall have exclusive jurisdiction to try disputes arising under or by virtue of this contract. In the event any proceeding of a quasi-judicial or judicial nature is commenced in connection with this Contract, such proceeding shall solely be brought in a court or other forum of competent jurisdiction within Fulton County, Georgia. This provision shall not be construed as waiving any immunity to suit or liability, including without limitation sovereign immunity, which may be available to the City.
f) All Claims filed against City shall be subject to audit at any time following the filing of the Claim.
Failure of Contractor, or Subcontractor of any tier, to maintain and retain sufficient records to allow
City to verify all or a portion of the Claim or to permit City access to the books and records of
Contractor, or Subcontractors of any tier, shall constitute a waiver of the Claim and shall bar any recovery.
13.0 Confidential Information
13.1 Access to Confidential Data. The Contractor’s employees, agents and subcontractors may have access to confidential data maintained by the City to the extent necessary to carry out the Contractor's responsibilities under the Contract. The Contractor shall presume that all information received pursuant to the Contract is confidential unless otherwise designated by the City. If it is reasonably likely the Contractor will have access to the City’s confidential information, then:
a) The Contractor shall provide to the City a written description of the Contractor's policies and procedures to safeguard confidential information;
b) Policies of confidentiality shall address, as appropriate, information conveyed in verbal, written, and electronic formats;
c) The Contractor must designate one individual who shall remain the responsible authority in charge of all data collected, used, or disseminated by the Contractor in connection with the performance of the Contract; and
d) The Contractor shall provide adequate supervision and training to its agents, employees and subcontractors to ensure compliance with the terms of the Contract. The private or confidential data shall remain the property of the City at all times. Some services performed for the City may require the Contractor to sign a nondisclosure agreement. Contractor understands and agrees that refusal or failure to sign such a nondisclosure agreement, if required, may result in termination of the
Contract.
13.2 No Dissemination of Confidential Data. No confidential data collected, maintained, or used in the course of performance of the Contract shall be disseminated except as authorized by law and with the written consent of the City, either during the period of the Contract or thereafter. Any data supplied to or created by the Contractor shall be considered the property of the City. The Contractor must return any and all data collected, maintained, created or used in the course of the performance of the Contract, in whatever form it is maintained, promptly at the request of the City.
13.3 Subpoena. In the event that a subpoena or other legal process is served upon the Contractor for records containing confidential information, the Contractor shall promptly notify the City and cooperate with the
City in any lawful effort to protect the confidential information.
13.4 Reporting of Unauthorized Disclosure. The Contractor shall immediately report to the City any unauthorized disclosure of confidential information.
13.5 Survives Termination. The Contractor’s confidentiality obligation under the Contract shall survive termination of the Contract.
14.0 Inclusion of Documents
Contractor’s response submitted in response thereto, including any best and final offer, are incorporated in this Agreement by reference and form an integral part of this agreement. In the event of a conflict in language between this Agreement and the foregoing documents incorporated herein, the provisions and requirements set forth in this Agreement shall govern. In the event of a conflict between the language of the RFP, as amended, and the Contractor’s submittal, the language in the former shall govern.
14.1 Counterparts: This Agreement may be executed in any number of counterparts, each of which shall be an original, but all of which together shall constitute one and the same instrument.
15.0 Compliance with All Laws and Licenses
The Contractor must obtain all necessary licenses and comply with local, state and federal requirements.
The Contractor shall comply with all laws, rules and regulations of any governmental entity pertaining to its performance under this Agreement.
15.1 Federal Requirements.
15.1.1 Federal Compliance Regulations
Federal regulations apply to all City of Johns Creek contracts using Federal funds as a source for the solicitation of goods and services. Successful bidders must comply with the following Federal requirement as they apply to:
a) Equal Employment Opportunity - The Contractor shall not discriminate against any employee or applicant or employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to: employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The Contractor shall comply with Executive Order
11246, as amended, and the rules, regulations, and orders of the Secretary of Labor.
b) Reports - The submission of reports to the City on behalf of the U.S. Department of Housing and
Urban Development as may be determined necessary for the activities covered by this contract, which is federally funded;
c) Patents - The U.S. Department of Housing and Urban Development reserves a royalty-free, nonexclusive and irrevocable right to use, and to authorize others to use, for Federal Government purposes:
1. Any patent that shall result under this Contract; and
2. Any patent rights to which the Contractor purchases ownership with grant support;
d) Copyrights - The U.S. Department of Housing and Urban Development reserves a royalty-free, nonexclusive and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for Federal Government purposes:
1. The copyright in any work developed under this contract; and
2. Any rights of copyright to which the Contractor purchases ownership with grant support.
e) Access to books, documents, papers and records of the Contractor which are directly pertinent to the specific contract for the purposes of making audit, examination, excerpts and transcriptions by
Federal agencies, the Comptroller General of the United States, or any of their duly authorized representatives; and
f) Retention of all required records for three years after the City makes final payment and all other pending matters are closed.
15.2 Georgia Security and Immigration Compliance Act
a) The parties certify that Contractor has executed an affidavit verifying that Contractor has registered and participates in the federal work authorization program to verify information of all new employees, per O.C.G.A. 13-10-90, et seq., and Georgia Department of Labor Regulations Rule
300-10-1-02. The appropriate affidavit is attached hereto as “Exhibit C” and incorporated herein by reference and made a part of this contract.
b) The Contractor further certifies that any subcontractor employed by Contractor for the performance of this agreement has executed an appropriate subcontractor affidavit verifying its registration and participation in the federal work authorization program and compliance with O.C.G.A. 13-10-90, et seq., and Georgia Department of Labor Regulations Rule 300-10-1-02, and that all such affidavits are incorporated into and made a part of every contract between the Contractor and each subcontractor.
c) Contractor’s compliance with O.C.G.A. 13-10-90, et. seq., and Georgia Department of Labor
Regulations Rule 300-10-1-02 is a material condition of this agreement and Contractor’s failure to comply with said provisions shall constitute a material breach of this agreement.
16.0 Assignment
The Contractor shall not assign or subcontract the whole or any part of this Agreement without the City of
Johns Creek’s prior written consent.
17.0 Amendments in Writing
No amendments to this Agreement shall be effective unless it is in writing and signed by duly authorized representatives of the parties.
18.0 Drug-Free and Smoke-Free Work Place
18.1 A drug-free and smoke-free work place will be provided for the Contractor’s employees during the performance of this Agreement; and
18.2 The Contractor will secure from any sub-contractor hired to work in a drug-free and smoke-free work place a written certification so stating and in accordance with Paragraph 7, subsection B of the Official
Code of Georgia Annotated Section 50-24-3.
18.3 The Contractor may be suspended, terminated, or debarred if it is determined that:
a) The Contractor has made false certification herein; or
b) The Contractor has violated such certification by failure to carry out the requirements of Official
Code of Georgia Annotated Section 50-24-3.
19.0 Additional Terms
Neither the City nor any Department shall be bound by any terms and conditions included in any Contractor packaging, invoice, catalog, brochure, technical data sheet, or other document which attempts to impose any condition in variance with or in addition to the terms and conditions contained herein.
20.0 Antitrust Actions
For good cause and as consideration for executing this Contract or placing this order, Contractor acting herein by and through its duly authorized agent hereby conveys, sells, assigns, and transfers to the City of
Johns Creek all rights, title, and interest to and to all causes of action it may now or hereafter acquire under the antitrust laws of the United States and the State of Georgia relating to the particular goods or services purchased or acquired by the City of Johns Creek pursuant hereto.
21.0 Reporting Requirement
Reports shall be submitted to the Project Manager on a monthly basis providing, as a minimum, data regarding the number of items purchased as well as the total dollar volume of purchases made from this contract.
22.0 Governing Law
This Agreement shall be governed in all respects by the laws of the State of Georgia. The Superior Court of Fulton County, Georgia shall have exclusive jurisdiction to try disputes arising under or by virtue of this contract.
23.0 Entire Agreement
This Agreement constitutes the entire Agreement between the parties with respect to the subject matter contained herein; all prior agreements, representations, statement, negotiations, and undertakings are suspended hereby. Neither party has relied on any representation, promise, or inducement not contained herein.
24.0 Special Terms and Conditions
(Attached are any special terms and conditions to this contract, if applicable)
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their duly authorized officers as of the day and year set forth next to each signature.
CITY OF JOHNS CREEK: CONTRACTOR:
By: __________________________ By: ________________________________
Title: City Manager______________ Title:_______________________________
Name: Kimberly Greer___________ Name:______________________________
Date: ________________________ Date: ______________________________
ATTEST:______________________ ATTEST:____________________________
CITY SEAL CORPORATE SEAL
EXHIBIT A
SPECIFICATIONS
The City of Johns Creek is seeking proposals from highly qualified firms to provide park maintenance and repair services described below Scope of Services for the city’s parks.
In order to effectively provide the maintenance services for Johns Creek’s Parks, the Contractor will need to be in regular communication with the City’s Project Manager (Parks Superintendent). At a minimum, the Contractor shall meet with the City’s Project Manager on a weekly basis and provide an anticipated scope of work to the Project Manager on a daily basis via email or text no later 8:00am.
The Recreation and Parks Department is responsible for providing high-quality and responsive service to the residents of Johns Creek, including the on-call and maintenance staff who strive to respond to citizen and community requests in a professional and timely manner.
Parks Included:
(South)
• Autrey Mill Nature Preserve- 9770 Autrey Mill Road 30022
• Morton Road Park- 4866 Morton Road 30097
• Newtown Park- 3150 Old Alabama Road 30022
• Ocee Park- 10900 Buice Road 30022
• State Bridge Park- 10610 State Bridge Road 30022
(North)
• Bell-Boles Park- 10575 Bell Road 30097
• Cauley Creek Park- 7255 Bell Road 30097
• Shakerag Park- 10945 Rogers Circle 30097
• Abbott Hill Elementary School Rear Park Area 5575Abbotts Bridge Rd 30097
• City Hall Exterior Grounds- 11360 Lakefield Dr 30097
• The Boardwalk at Town Center- 11360 Lakefield Dr 30097 (Opening April 2026)
SCOPE OF SERVICES
Personnel
1. The Contractor must provide appropriate staff to perform the park service and maintenance tasks identified in the scope, assigned work orders, and in support of special events.
2. The base personnel from the Contractor is identified as fifteen personnel dedicated to the nine existing parks. The initial arrangement contemplated consists of five teams of three personnel – one primarily serving each park and one roving crew addressing work orders.
3. As part of the base personnel, the Contractor will make available a Licensed Plumber, a Licensed
Electrician, Carpenter, and a team member with Fence Maintenance and Repair experience.
4. Park Coverage Minimum Requirements - General minimum park coverage by the Contractor is required as follows:
a. Weekdays (year-round) Full Staff – Monday through Friday from 8:00 AM to 5:00 PM.
b. Weekdays (year-round) – four workers with four trucks – Monday through Friday from
5:00 PM to 10:00 PM.
c. Saturdays (24 Saturdays during spring and fall athletic seasons) – from 8:00 AM to 10:00
PM.
i. 2 staff members with truck – Newtown Park and Autrey Mill Nature Preserve
ii. 1 staff member with truck – Ocee Park and Morton Road Park
iii. 2 staff members with truck – Shakerag Park and Cauley Creek Park
d. Saturdays (28 Saturdays during summer season) – from 8:00 AM to 5:00 PM.
i. 2 staff members with truck – Newtown Park and Autrey Mill Nature Preserve
ii. 1 staff member with truck – Ocee Park and Morton Road Park
iii. 1 staff member with truck – Shakerag Park and Cauley Creek Park
e. Saturdays(28 Saturdays during the winter season) from 8:00AM- 5:00PM
2 staff members with truck – Newtown Park and Autrey Mill Nature Preserve
i. 1 staff member with truck – Ocee Park and Morton Road Park
ii. 1 staff member with truck – Shakerag Park and Cauley Creek Park
f. Sundays (52 Sundays) – from 8:00 AM to 5:00 PM
i. 2 staff members with truck – Newtown Park and Autrey Mill Nature Preserve
ii. 1 staff member with truck – Ocee Park and Morton Road Park
iii. 1 staff member with truck – Shakerag Park
g. Holidays (11 Holidays) – one staff member with truck from 8:00 AM to 1:00 PM.
5. The Contractor must also provide appropriate staff and equipment to facilitate Special Events as directed by the City’s Project Manager or his or her designee.
a. Setting up the City’s 48’ x 48’ frame tent – estimated ten times per year
b. Supporting City events by ensuring the event areas are clean prior to the start of the event, cleaning the restrooms and keeping them stocked with supplies throughout the event, and emptying trash and recycling receptacles throughout the event.
c. Anticipated annual events are listed below
Anticipated Maintenance Staffing Hours for Special Events
• Summer Concert 100 hours
• Movies 10 hours
• Pupapalooza 5 hours
• Battle of the Bands 5 hours
• Touch A Truck 20 hours
• Santa 2 hours
• Tournaments Cauley 80 hours
• Tournaments @ Ocee 300 hours
• Amp Rental 96 hours
• CC 5k 55 hours
• LNY 22 hours
• Diwali 30 hours
• Holly Jolly 20 hours
• Ind. Day 25 hours
• Juneteenth 20 hours
• Int’l Fest 50 hours
• Daffodil Days 22 hours
• Trunk or Treat 20 hours
• Art event 20 hours
• Literary event 20 hours
• Bunny event 20 hours
TOTAL: 942 hours
Work Orders
1. The Contractor agrees to follow the City’s established electronic work order procedures and priorities.
a. The City will provide any related training to use the work order system.
https://survey123.arcgis.com/
b. All City provided necessary equipment must be returned at the conclusion of the contract.
2. The priority system for work orders and specific service requests is as follows:
a. Priority 1: Complete within 24 hours.
b. Priority 2: Complete within 48 hours.
c. Priority 3: Complete within 3 business days.
d. Priority 4: Complete within the scheduled maintenance period.
3. The Contractor will provide sufficient personnel to complete all work orders within the established priority schedule.
4. For work necessitating after hours call out and/ or weekend work, the Contractor will provide crews available for incidents, emergencies, and weather related emergencies on a 24 hour on-call basis within a 2 hour response time for Priority 1 work orders.
5. After hours and emergency work orders may be authorized verbally or via text message and followed up with a formal work order through the standard work order procedures.
Equipment
1. The Contractor agrees to provide equipment and vehicles necessary to complete the tasks as described and within the service maintenance tasks and timeframes specified. Base equipment and vehicles include:
a. Aerator/Dethatcher
b. Back Pack Sprayers
c. Leaf Blowers
d. Bobcat – with all attachments
e. Dump Truck
f. Edgers
g. Front End Loaders – four
h. Leaf Vacuum
i. Mini Excavator
j. Mowers – 52” – minimum of twelve
k. Mowers – 60” – minimum of eight
l. Mowers (Reel) – 72” – minimum of two
m. Pole Saws
n. Pressure Washers
o. 2- Dumpsters – 9 cubic yards, to be located at Cauley Creek, Newtown and Ocee Parks
p. 1- Roll off Dumpster- 30 cubic yards- to be located at Newtown and Cauley Creek Parks
q. Trailer (Dump) – 20 foot
r. Trailer (Enclosed) – 22 foot
s. Trailers (Utility) – three 25 foot trailers, one 30 foot trailer
t. Trimmers
u. Trucks – Heavy Duty – three – such as a Ford F350 or Ford F450
v. Trucks – Light Duty – five – such as a Ford F150
w. Trucks – Medium Duty – four – such as a Ford F250
x. Water Tank – 300 gallon
y. Lift
z. Utility Vehicles with dump beds- eight- (i.e. Gator Ranger, Cart with Dump)
aa. Equipment that needs to be available on a 3-day notice:
i. Bobcat/Skidsteer
ii. Dump Truck
iii. Front End Loader
iv. Mini Excavator
2. Contractor may substitute equipment and vehicles with the approval of the City’s Project Manager or his or her designee. The Contractor may utilize additional equipment and vehicles without specific approval of the City’s Project manager or his or her designee.
3. The Contractor agrees to maintain equipment to meet clean and professional conditions reflecting the City’s high standards.
Service and Maintenance Tasks
The following service and maintenance tasks are anticipated to provide a top-tier, friendly, safe, and attractive atmosphere in the City’s parks. The Contractor agrees to complete all the specified tasks (listed below) without prompting by the City’s Project Manager and without specific work order requests.
1. Routine Maintenance
a. Visually inspect the assigned area at least once daily, Monday through Sunday.
b. Evaluate site conditions and identify potential maintenance needs or safety hazards that require immediate attention.
c. Identify excessive litter or debris, graffiti, and broken or vandalized amenities that may create a safety hazard.
d. Adjust the daily schedule, as needed, based on the findings of these inspections.
e. Perform maintenance services as needed.
2. Problem areas
a. Problem areas identified through daily visual inspections of facilities and grounds, biannual inspections of facilities and grounds, and emergency reports by the Contractor and park users will be reported to the City’s Project Manager or his or her designee who will follow up and schedule repairs via work orders as needed.
3. Preventive Maintenance
a. Perform preventive measures to avoid maintenance issues that could become a hazard to park users and result in unnecessary costs. These items include but are not limited to:
i. Winterizing restrooms, water fountains, faucets and irrigation systems
ii. Painting and sanding wood structures on benches, bridges and playgrounds
iii. Cleaning and clearing gutter, drains and pipes
4. Litter, Debris and Trash Removal
a. Remove trash, ground litter, and debris daily or as often as needed during the week
b. Empty trash containers when they are more than half filled or are attracting bees and insects at the time of inspections or when park usage indicates that containers may be filled to capacity before the next inspection
c. Inspect specific areas such as pavilion rentals and athletic areas for litter and debris and remove litter and debris prior to schedules use during normal working schedule
d. Remove and replace trash liners placed by dog parks, dog water stations, pavilions and player areas daily regardless of how much or how little the containers are filled
e. Pick up ground trash and debris in the park while checking the trash containers
f. Report any debris that is too large to easily remove to the City’s Project Manager or his or her designee
g. Provide a 30 cubic yard roll-off container and two 9-yard cubic dumpsters on site in an inconspicuous location for deposit of all trash from receptacles on site. The container will be provided by a responsible vendor and will be emptied as needed.
h. Check trash from all containers daily and collect and deposit trash in the roll-off three days per week.
i. Install new clear or dark colored plastic bags in all trash containers as required.
5. Restroom Cleaning
a. Inspect and clean all park restrooms by 10:00 AM daily at a minimum and more often based on usage, particularly at rental and athletic facilities:
i. Newtown Park- five facilities
ii. Ocee Park- three facilities
iii. Shakerag Park- two facilities
iv. Autrey Mill- two facilities
v. Morton Road Park – one facility
vi. Cauley Creek Park- four facilities
vii. The Boardwalk- one facility (opening summer 2026)
b. Restroom cleaning includes but is not limited to removing all litter and debris, sweeping and mopping floors, scrubbing toilets, sinks and urinal with disinfecting cleaner, and refilling toilet paper, hand sanitizer, and paper towels as needed
c. Wash and scrub restroom floors and walls on a monthly basis
6. Graffiti Removal
a. Clean, remove or paint over graffiti within 24 hours from the time it is identified.
b. Report graffiti which cannot be easily removed or painted over to the City’s Project
Manager or his or her designee
c. Take pictures to document all graffiti
7. Vandalism Repairs
a. Secure any vandalized area that is creating a public safety hazard immediately upon identification. This may include securing the areas for safety reasons, removing the object or placing a barrier around the area to prevent possible public access.
b. Schedule necessary repairs based on the urgency of the repair
c. Document and report all vandalism to the Project Manager or his or her designee
8. Playground and Sand Volleyball Court Inspection and Repair
a. Visually inspect each playground every week
b. Schedule an independent playground inspection for each playground in October with a
Certified Playground Inspector.