The document is a Schedule of Material Submittals for a federal contract (Solicitation Number: FA557525B0003) to repair apron lighting generators at Moron Air Base in Spain. The project is valued between $500,000 and $1,000,000 and requires comprehensive material and documentation submissions across multiple sections, including construction schedules, warranty letters, electrical equipment specifications, generator set data, LED luminaire details, and site preparation documentation.

Key submission dates include a pre-proposal conference on 12 June 2025, with questions due by 19 June 2025 and bids due by 10:00 hours local time on 7 July 2025. The solicitation is exclusively for local Spanish sources authorized to perform government works, with a requirement to use Spanish material, labor, and equipment when feasible. The contract is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with bid acceptance valid through 31 December 2025, contingent on fund availability. The government reserves the right to cancel the solicitation at any time with no obligation to offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Apron Lighting Generators, newest first.
File Type Posted
25-1004 Moron AB Generators Justification and Approval.pdf PDF
25-1004 Cost Estimate Breakdown.xlsx XLSX spreadsheet
25-1004 Especificaciones Espanol.pdf PDF
25-1004 Drawings.pdf PDF
25-1004 English Specifications.pdf PDF
Solicitation - FA557525B0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 25-1004PROJECT TITLE

RPR APRON LIGHTING GENERATORS, MULTI

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1Contract Award+7
2Work Plan1Contract Award+7
SECTION 01 11 01
3Warranty letter1Acceptance+15
4Progress Schedule1Contract Award+10
5Mobility Plan1Contract Award+15
6Project sign1Contract Award+15
7Quality Control Plan1Contract Award+15
8Existing Facilities Report1Before any Work Activity
9Environmental protection plan1Contract Award+15
10Waste & construction debris management certificate1Final Inspection
11As-Built drawings1Final Inspection+15
12Spatial Data1As-Built Drawings+10
13Key Personnel1Contract Award+15
14Health and safety program1Contract Award+15
15O&M Manuals1Prior to FI
SECTION 26 20 00
16Conduit and fittings, 1 x type1
17Weatherproof Metal Raceway1
18Junction and pull boxes1
19Wires and cables1
20Circuit breakers1
21Surge Protective Device1
22Labels1
23One-line Diagram1
24Devices subject to manual operation1Facility Acceptance -5
251000-Volt wiring test1Facility Acceptance -5
26Single line diagram of the "as-built"1
27Schematic diagram1
28Active electrical equipment O&M Manuals1
SECTION 26 32 13.00 20
29Engine-generator set and auxiliary equipment1
30Auxiliary systems1
31Engine generator set data1
32Engine generator set efficiencies1
33Diesel engine data1
34Generator and exciter data1
35Auxiliary systems and equipment1
36Calculations for brake mean effective pressure1
37Torsional vibration stress analysis computations1
38Capacity calculations for batteries1
39Acceptance checks and tests1Before Functional Tests
40Functional acceptance tests1Facility Acceptance -15
41Functional acceptance tests procedure1
42Vibration isolation system certification1
43Fuel system certification1
44Start-up technician qualification resume1
45Instructor's qualification resume1
46Engine tests1Before shipment
47Generator set routine tests1Before shipment
48Generator set design tests1
49Diesel engine-generator set1
50Auxiliary systems and equipment1
51Preliminary assembled O&M manuals1
52Posted operating instructions1
53Training plan1
SECTION 26 36 00.00 10
54Detail drawings1
55Equipment1
56Installation1
57Equipment11
58Material11
59Testing1Facility Acceptance -7
60Switching equipment1
61Switching equipment1
62Instructions1
SECTION 26 51 00
63LED Luminaire Type A, Driver and accessories1
64LED Luminaires1
65Operating Test1
66Spare Parts Delivery1
SECTION 31 23 00.00 20
67Material proposed as backfill, soil & topsoil1
68Backfill material1Upon test execution
69Compaction1Upon test execution
SECTION 33 71 02.00 20
70Conduits1
71Underground Low-Voltage Cables1
72Buried Warning and Identification Tape1
73Ground wires1
74Handholes11
75Handhole covers111
76Grounding test/Bar wells1
77Grounding Bars1
78Ground rods1
79Exothermic welding11
80Field acceptance checks and tests1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 25-1004TÍTULO DE PROYECTO:
REPARAR GRUPOS ELECTRÓGENOS DE ILUMINACIÓN DE PLATAFORMA, MULTISOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Cronograma de obra1Adjudicación Contrato+7
2Plan de obra1Adjudicación Contrato+7
SECCIÓN 01 11 01
3Carta de garantía1Aceptación+15
4Programa de avance de obras1Adjudicación Contrato+10
5Plan de movilización1Adjudicación Contrato+15
6Cartel de proyecto1Adjudicación Contrato+15
7Plan de control de calidad1Adjudicación Contrato+15
8Informe de Instalaciones Existentes1Antes de ejecutar cualquier trabajo
9Plan de protección medioambiental1Adjudicación Contrato+15
10Certificado de gestión de residuos y escombros1Antes de Inspección final (IF)
11Planos As-Builts1Antes de Inspección final (IF)
12Datos espaciales1Antes de Inspección final (IF)
13Personal Clave1Adjudicación Contrato+15
14Plan de salud y seguridad1Adjudicación Contrato+15
15Manuales de Funcionamiento y Mantenimiento1Antes de Inspección final (IF)
SECCIÓN 26 20 00
16Tubos y accesorios, 1 x tipo1
17Canaleta metálica estanca1
18Cajas de conexión y paso1
19Conductores y cables1
20Interruptores automáticos1
21Descargadores de sobretensiones1
22Etiquetas1
23Diagrama unifilar1
24Dispositivos sujetos a operación manual1Aceptación Edificio -5
25Pruebas de cableado de 1000 voltios1Aceptación Edificio -5
26Esquema unifialr del sistema eléctrico del edificio1
27Diagrama esquemático del sistema de control eléctrico1
28Manuales Uso y Mto de equipo eléctrico activo1
SECCIÓN 26 32 13.00 20
29Grupo electrógeno y equipo auxiliar1
30Sistemas auxiliares1
31Datos de grupo electrógeno1
32Eficiencias de grupo electrógeno1
33Motor diesel1
34Grupo electrógeno y excitatriz1
35Equipos y sistemas auxiliares1
36Cálculos de presión efectiva al freno1
37Análisis por ordenador de fatiga por vibraciones1
38Cálculos de capacidad de baterías1
39Ensayos y pruebas de aceptación1Antes de ensayos funcionales
40Ensayos funcionales de aceptación1Aceptación Edificio -15
41Procedimiento de ensayos funcionales de aceptación1
42Certificado del sistema antivibracional1
43Certificado del sistema de combustible1
44Cualificación del técnico de puesta en marcha1
45Cualificación del formador1
46Pruebas del motor1Antes de embarque
47Pruebas rutinarias del grupo electrógeno1Antes de embarque
48Pruebas de diseño del grupo electrógeno1
49Grupo electrógeno1
50Equipos y sistemas auxiliares1
51Manuales preliminares de operación y mantenimiento1
52Instrucciones de funcionamiento expuestas1
53Plan de formación1
SECCIÓN 26 36 00.00 10
54Planos de detalle1
55Equipo1
56Instalación1
57Equipo11
58Materiales11
59Ensayos1Aceptación Edificio -7
60Equipo de conmutación1
61Equipo de conmutación1
62Instrucciones1
SECCIÓN 26 51 00
63Luminaria LED Tipo A, Driver y accesorios1
64Luminarias LED1
65Ensayos de funcionamiento1
66Entrega de Repuestos1
SECCIÓN 31 23 00.00 20
67Material de relleno propuesto para suelo y terreno vegetal1
68Ensayo del material de relleno1Tras real.

ensayo 69 Ensayos de densidad 1 Tras real.

ensayo

SECCIÓN 33 71 02.00 20
70Conductos1
71Cables de Baja Tensión Enterraods1
72Cinta de Aviso e Identificación1
73Conductores de tierra1
74Arquetas11
75Tapas de arquetas111
76Arquetas para lecturas de tierra1
77Barras equipotenciales1
78Picas de tierra1
79Soldadura exotérmica11
80Ensayos y pruebas en obra1

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .