25-1004 Cost Estimate Breakdown.xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- Repair Apron Lighting Generators Federal contract opportunity
- Solicitation number
- FA557525B0003
About this file
The document is a Cost Estimate Breakdown Excel spreadsheet for a construction project at Moron Air Base, Spain, detailing electrical work and generator replacement. The project involves standard demolition and electrical works, including installing a 20 kW generator, an automatic transfer switch, copper cabling, grounding system, circuit breakers, and associated electrical infrastructure. The spreadsheet provides a detailed breakdown of potential costs, though all line items are currently listed at 0.00 EUR, suggesting this is a preliminary or template cost estimate.
The related federal contract opportunity (Solicitation Number FA557525B0003) is for repairing apron lighting generators, with a project value between $500,000 and $1,000,000. The solicitation is restricted to local sources in Spain, requiring companies to be authorized under Spanish law. Key dates include a pre-proposal conference on 12 June 2025, question submission deadline of 19 June 2025, and bid submission deadline of 7 July 2025. The project is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with the understanding that funds are not currently available and the bid acceptance period should remain valid through 31 December 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 25-1004 Moron AB Generators Justification and Approval.pdf | ||
| 25-1004 Drawings.pdf | ||
| 25-1004 English Specifications.pdf | ||
| Solicitation - FA557525B0003.pdf | ||
| 25-1004 Especificaciones Espanol.pdf | ||
| 25-1004 Schedule of Material Submittals.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL APRON TOWER GENERATORS, MULTI | SUMMARY | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1004 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SUMMARY | ||||||||||
| RESÚMEN | ||||||||||
| TOTAL BASIC PACKAGE | ||||||||||
| TOTAL PAQUETE BASE | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL ADDITIVE ITEM #1 | ||||||||||
| TOTAL TRABAJOS ADICIONALES #1 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
BASIC PACKAGE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL APRON TOWER GENERATORS, MULTI | BASIC PACKAGE | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1004 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| STANDARD DEMOLITION WORKS | ||||||||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | ||||||||||
| 1 | Electrical demolition and disposal to authorized dump site | |||||||||
| Demolición eléctrica y transporte a vertedero autorizado | JOB | LS | ||||||||
| STANDARD DEMOLITION WORKS TOTAL | ||||||||||
| TOTAL TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| Generator and Automatic Transfer Switch | |||||
| Grupo electrógeno y Conmutador Automático | |||||
| 2 | Grupo electrógeno 20 kW, cableado, conductos y acc. | ||||
| Generator 20 kW, wiring, conduits & acc. | |||||
| 3 | Conmutador automático, 4 polos, 70 A, cableado y acc. | ||||
| 4-Pole, 70 A,Automatic Transfer Switch, wiring and acc. | |||||
| 4 | Seccionador de by-pass, cableado y luminaria tipo A y acc. | ||||
| By-pass/Isolation Switch, wiring, Type A luminaire and acc. | |||||
| 5 | Copper cable 1x50 mm2 RZ1-K (AS) 0.6/1 kV | ||||
| Cable de cobre 1x50 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| 6 | Copper cable 1x4 mm2 RZ1-K (AS) 0.6/1 kV | ||||
| Cable de cobre 1x4 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| 7 | Weatherproof metal raceway 100x200mm, incl. coplings & acc. | ||||
| Canal metal estanca 100x200mm, incluso acc. y conexiones | |||||
| 8 | Puesta a tierra | ||||
| Grounding System | |||||
| 9 | New 20A, 2 P, Curve C 10kA Circuit Breaker | ||||
| Nuevo magnetotérmico 20A, 2 Fases, Curva C 10 kA | |||||
| Generator and Automatic Transfer Switch Total | |||||
| Total Grupo electrógeno y Conmutador Automático | 0.00 | 0.00 | 0.00 | 0.00 | |
| ELECTRICAL WORKS TOTAL | |||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| STANDARD DEMOLITION WORKS | ||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS TOTAL | ||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADDITIVE #1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL APRON TOWER GENERATORS, MULTI | ADDITIVE ITEM #1 | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1004 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| STANDARD DEMOLITION WORKS | ||||||||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | ||||||||||
| 1 | Electrical demolition and disposal to authorized dump site | |||||||||
| Demolición eléctrica y transporte a vertedero autorizado | JOB | LS | ||||||||
| STANDARD DEMOLITION WORKS TOTAL | ||||||||||
| TOTAL TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| Generator and Automatic Transfer Switch | ||||||
| Grupo electrógeno y Conmutador Automático | ||||||
| 2 | Grupo electrógeno 20 kW, cableado, conductos y acc. | |||||
| Generator 20 kW, wiring, conduits & acc. | Ea | |||||
| 3 | Conmutador automático, 4 polos, 70 A, cableado y acc. | |||||
| 4-Pole, 70 A,Automatic Transfer Switch, wiring and acc. | Ea | |||||
| 4 | Seccionador de by-pass, cableado y luminaria tipo A y acc. | |||||
| By-pass/Isolation Switch, wiring, Type A luminaire and acc. | Ea | |||||
| 5 | Copper cable 1x50 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x50 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 6 | Copper cable 1x4 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x4 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 7 | Weatherproof metal raceway 100x200mm, incl. coplings & acc. | |||||
| Canal metal estanca 100x200mm, incluso acc. y conexiones | Lm | |||||
| 8 | Puesta a tierra | |||||
| Grounding System | Ea | |||||
| 9 | New 20A, 2 P, Curve C 10kA Circuit Breaker | |||||
| Nuevo magnetotérmico 20A, 2 Fases, Curva C 10 kA | Ea | |||||
| Generator and Automatic Transfer Switch Total | ||||||
| Total Grupo electrógeno y Conmutador Automático | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ELECTRICAL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| STANDARD DEMOLITION WORKS | ||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS TOTAL | ||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .