25-057-Appendix1-EMW-FINAL.pdf

PDF 179 MB Posted

Attached to
East Marginal Way S Preservation (FHWA)
Solicitation number
PW#2025-057
Issued by
King County, Spokane City, Washington

About this file

This is an appendix document related to the East Marginal Way S Preservation project, a federally-funded infrastructure initiative administered by the Washington State Department of Transportation (WSDOT) under FHWA guidelines. The project encompasses pavement overlay and spot base repairs along East Marginal Way South, extending from 1st Avenue South to the Tukwila City Limits, with associated work including milling, pavement removal, excavation, concrete and asphalt base repair, asphalt surfacing, curb ramps, sidewalks, drainage improvements, signals, street lighting, signing, striping, and landscaping. The project specifically incorporates rebar installation and electrical work as identified components for subcontractor listing purposes. The Engineer's Estimate for the project is $10,800,000, and the scope includes rechannelization for a protected bike lane and shared use path.

The appendix document serves as a reference material supporting the bid solicitation process for this federally-funded project. As a FHWA-funded initiative, the project is subject to federal procurement requirements and prevailing wage standards. The documentation appears designed to provide bidders with essential project information and specifications necessary for preparing comprehensive bids and identifying qualified subcontractors for the specialized work components included in the scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .