This construction document file contains the detailed plans and specifications for the Accessibility Improvements project at Viking Lake State Park in Montgomery County, Iowa, prepared by the Iowa Department of Natural Resources (DNR) Engineering Section. The project involves constructing ADA-compliant Portland cement concrete (PCC) sidewalks, parking stalls, and fishing amenities across three sites within the park. Site 1 includes a fishing jetty with an 8-foot-wide pier sidewalk, a 10-foot-long pier abutment, and three fishing bump-outs with a 5-inch-thick PCC surface. Site 2 encompasses the beach and lodge parking area with two 8-foot ADA van parking stalls, sidewalk construction, and cast-in-place bollards. Site 3 features boat ramp improvements including a 5-foot-wide sidewalk and a 7-foot-long abutment for a future fish cleaning station. The construction documents specify extensive site preparation including topsoil stripping, Class 10 backfill placement, special backfill compaction, and riprap slope installation. The plans include detailed reinforcement specifications with #4 and #5 reinforcement bars, expansion joints, detectable warning panels, ADA-accessible parking signage, and parking stops. The bid closing date is May 28, 2026, at 3:00 PM, and bids must be submitted electronically in accordance with the General Information and Instructions to Bidders.
The project specifications emphasize strict ADA compliance with maximum cross slopes of 2 percent on sidewalks, maximum running slopes of 5 percent, and maximum slopes of 2 percent on parking stalls and access aisles. All work must conform to the 2010 ADA Standards and the Iowa DOT Standard Specifications for Highway and Bridge Construction, Series 2023. The contractor is required to visit the site prior to bidding to inspect actual job conditions and verify all dimensions and conditions shown on the plans. The contractor bears responsibility for providing disposal sites for excess excavated material and broken concrete and shall not disturb desirable grass areas or trees outside construction limits. The project includes survey and staking requirements, with non-compliant work subject to removal and replacement at the contractor's expense. Contact for bid package documentation and specifications is Zach Gunsolley, Iowa DNR, at 515-250-3713 or zach.gunsolley@dnr.iowa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-04-69-03 Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.01
Zachary A. Gunsolley Date License Number: 18702 My license renewal date is December 31, 2027 Pages or sheets covered by this seal:
All
Capital Manager Authorization - Parks
This project includes constructing ADA-compliant PCC sidewalk, parking stalls, and fishing amenities.
Iowa DNR
Zach Gunsolley
515-250-3713 zach.gunsolley@dnr.iowa.gov
1517 185th Ave
Diagonal, IA 50845
Iowa Department of Natural Resources Construction Documents for
Viking Lake State Park Montgomery County, Iowa
Accessibility Improvements Project No. 25-04-69-03
Project Location Map
N
Sheet Index A.01 A.02 A.03 A.04 B.01 B.02 B.03 B.04 C.01
Cover Sheet Location Map Project Overview Project Overview Project Details Project Details Project Details - Detectable Warnings Project Details - Detectable Warnings Quantities & General Information
Iowa DNR
Zach Gunsolley
515-250-3713 zach.gunsolley@dnr.iowa.gov
1517 185th Ave
Diagonal, IA 50845
Engineering Bureau Chief
Authorization to Bid
Date
Date
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
Directory Project Manager
Organization
Contact
Phone
Address
City, State, Zip
District Engineer Organization
Contact
Phone
Address
City, State, Zip
Project Description
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date Cover Sheet
Project Area
AutoCAD SHX Text Zachary A. Gunsolley 18702
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
0' 100' 200'
N
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date A.02Location Map
Site 1 Fishing Jetty
Site 2 Beach/Lodge Parking Lot
Site 3 Boat Ramp
Park Office
Lodge
Beach
4'
20'
8'
10'
7'
5'
2'
0' 30' 60'
N
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date A.03Project Overview
Site 1 Fishing Jetty
Site 2 Beach/Lodge Parking Lot
Site 3 Boat Ramp
Lodge
Site 1 Fishing Jetty
0' ##' ##'
N
0' 10' 20'
N
Pier Sidewalk and Pier Abutment
Maintain 4.5% target grade until touchdown point with existing grade.
Transition to existing grade at touchdown point.
Fishing Bump Out (Typ 3 Locations)
Strip and stockpile existing topsoil.
Furnish and compact Class 10 and Special Backfill to target grade for parking stall and sidewalk.
Harvest Class 10 material for fill at parking stall.
Detectable Warning Panels
Provide striping on west 5' of parking stall for access aisle. Add ADA van parking sign in front of stall.
Furnish and install Parking Stop 6" from end of sidewalk.
Construct one 11' 45° ADA van parking stall. Add expansion joint at sidewalk.
45.0°'
Match existing pavement grade and and add expansion joint
Perimeter Slope and Sediment Control Device
(typ. 2 locations)
20.83'
8'
8'
8'
2'
23'
5.
5'
5'
0' 5' 10'
N
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date A.04Project Overview
Transition zone
Lodge
Site 3 Boat Ramp
0' ##' ##'
N
0' 5' 10'
N
Fish Cleaning Station Sidewalk and Abutment
Construct boat ramp sidewalk.
Extend from existing dock. Add expansion joint at existing dock and along boat ramp.
Site 2 Beach/Lodge Parking Lot
Strip and stockpile existing topsoil.
Furnish and compact Class 10 and Special Backfill to target grade for parking stall and sidewalk.
Provide striping on center 8' of parking stall for access aisle. Add ADA van parking signs in front of stalls (Typical 2 Locations).
Construct two 8' 45° ADA van parking stalls.
45.0°'
Cast-in-Place Bollard (Typ 2 Locations)
Strip and stockpile existing topsoil.
Furnish and compact Special Backfill to target grade for sidewalk.
Harvest Class 10 material for fill at
Sites 1 and 2.
Match existing pavement grade and and add expansion joint
Remove existing PCC sidewalk
Perimeter Slope and Sediment Control Device
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date B.01Project Details
Sidewalk
Construct 10' long pier abutment for future pier, centered on 8' wide pier sidewalk.
Special Backfill
Riprap slope
Fishing Bump Out Not to Scale
PCC Fishing Bump Out 5" thick with 6" curb.
6" Curb
Align control joint with sidewalk control joint.
Pier Sidewalk
1' 8' 1'
10'
5" 4"
Pier Abutment Detail Not to Scale
.2
5"
10"8"
18"
" M ax
5" 4"
Expansion joint material between sidewalk and pier abutment.
Special Backfill
#4 ties as shown @ 12" o.c.
11- #5 horizontal as shown
#4 reinforcement bars @ 38" centers.
Extend sidewalk rebar into Fishing Bump Out
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date B.02Project Details
Construct 7' long abutment for future fish cleaning station, centered on 5' wide sidewalk.
Riprap slope
Sidewalk
Fish Cleaning Station Abutment Detail
Not to Scale
1/
2"
10" 8"
18"
" M ax
5" 4"
Expansion joint material between sidewalk and abutment.
Special Backfill
#4 ties as shown @ 12" o.c.
11- #5 horizontal as shown
Verify notch depth with Engineer prior to construction.
Embed two 12" 1/2-13 threaded stainless steel J Hooks. Verify location with Engineer prior to installation.
MUTCD R7-8 and R7-8aP (van accessible) Solid green legend and border, reflective white background, white accessibility symbol on blue background.
ADA Accessible Parking Signs Detail Not To Scale
Notes:
1. 12"X18" accessibility sign shall be mounted 7' from finish grade to bottom edge of sign face.
Mounting height may be reduced to 5' if placed in a landscape area in which pedestrians are not expected to use.
2. Signage to be located at end of parking stall, 2' back from edge of pavement, centered on stall if possible.
3. All signage shall be high-intensity prismatic .080 aluminum reflective sign meeting the requirements of the MUTCD and
ADAAG.
4. Installation of square post and anchor base in accordance with IDOT SUDAS Section 8040.
Square Post 2-1/4"
Ground/Paving Surface
6"
1' -6
7'
3' 3'
Square Anchor Base 2-1/2" located at top of bollard or top of ground surface.
Use 6" Steel Pipe Bollard filled with concrete and painted traffic yellow.
AutoCAD SHX Text
RESERVED PARKING
AutoCAD SHX Text
VAN
AutoCAD SHX Text
ACCESSIBLE
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date B.03Project Details - Detectable Warnings
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date B.04Project Details - Detectable Warnings
C.01
Estimate Reference Information 1,16,29.
2,17,30.
3,18,31.
4,19.
5,32.
6.
7.
8,21.
9.
10,23, 33.
11,24.
12-14.
25-27.
34-36.
15,28
20.
22.
See referenced IDOT specification. In fill areas, place and compact after Class 10 placement. Estimated quantities include 4" under sidewalks and 6" under parking stalls. Work is allowed on all three sites to assist in efficient utilization and placement of material.
See referenced IDOT specification. Place and compact in fill areas below special backfill and topsoil. Work is allowed on all three sites to assist in efficient utilization and placement of material.
See referenced IDOT specification. Place in areas after Class 10 placement. Work is allowed on all three sites to assist in efficient utilization and placement of material.
See referenced IDOT specification and Sheet A.03, B.01 and B.02. Class C mix, Class 2 durability coarse aggregate.
See referenced IDOT specification and Sheet A.03 and A.04. Class C mix, Class 2 durability coarse aggregate. Target control joint spacing to the width of sidewalk. Included in this item are three longitudinal #4 reinforcement bars evenly spaced, 6" lap.
See referenced IDOT specification and Sheet A.03 and B.01.
Class C mix, Class 2 durability coarse aggregate.
See referenced IDOT specification, Sheet A.03, B.03, and B.04.
See referenced IDOT specification and Sheet A.03 and A.04.
Class C mix, Class 2 durability coarse aggregate. Included in this item are #4 reinforcement bars placed on 36" centers, 6" lap.
See referenced IDOT specification and Sheet A.03. ULINE H-4608B/Y 6' black/yellow striped or approved equivalent. Include all labor, equipment, and materials necessary to install per manufacturer's recommendations.
See referenced IDOT specification. This item includes all necessary survey and staking to complete work in accordance with the Contract Documents and 2010 ADA Standards. Non-compliant work shall be removed and replaced at the sole expense of the contractor. Noteworthy ADA requirements:
A. 2% maximum cross slope on sidewalks.
B. 5% maximum running slope on sidewalks.
C. 2% maximum slope in any direction on parking stalls, access aisles, and fishing bump outs.
See referenced IDOT specification and Sheet A.03, A.04, B.02.
See referenced IDOT specification.
See referenced IDOT specification and Sheet A.03 and A.04.
See referenced IDOT specification and Sheet A.04.
See referenced IDOT specification. ULINE H-9089 48" yellow with black trim or approved equivalent, filled with concrete. Include all labor, equipment, and materials necessary to install per manufacturer's recommendations.
Project Number:
25-04-69-03
Bid Date:
05/28/2026
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Accessibility Improvements Viking Lake State Park, Montgomery County
Sheet No:Drawn by: ZG
C:
\U se rs
\Z ac h Gu ns ol le y\
De sk to p\
-0
4-
-0
Vi ki ng A cc es sib ili ty Im pr ov em en ts \2
5-
-6 9-
P la ns
.d w g 5/
1/
0:
A M
Pl ot
D at e:
Revision Date Quantities & General Information
General Information
1. Verify actual locations and elevations with DNR Engineer.
2. All work shall conform to and be performed in accordance with all applicable codes and ordinances.
3. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract.
4. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.
5. It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites.
No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.
6. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.
7. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor’s responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.
8. The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.
9. The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.
10. The Iowa DOT Standard Specifications for Highway and Bridge Construction, Series 2023, plus General Supplemental Specifications and Supplemental Specifications effective at the time of letting, shall apply to this project. The item's description includes applicable IDOT specification sections.
| Sheets and Views |
| 25-04-69-03 Plans-A.01 |
| 25-04-69-03 Plans-A.02 |
| 25-04-69-03 Plans-A.03 |
| 25-04-69-03 Plans-A.04 |
| 25-04-69-03 Plans-B.01 |
| 25-04-69-03 Plans-B.02 |
| 25-04-69-03 Plans-B.03 |
| 25-04-69-03 Plans-B.04 |
| 25-04-69-03 Plans-C.01 |
| 2026-05-01T11:11:51-0500 | |
| Zach Gunsolley |
| 2026-05-01T11:41:34-0500 | |
| Andrew Place |
| 2026-05-01T12:18:03-0500 | |
| Travis Baker |
File details come from the government source that posted it. Updated .