25_031 Viper Switch Installtion Addendum 2.docx

DOCX document 90 KB Posted

Attached to
25-031 Distribution Circuit Automation
Solicitation number
PE-64750-NONST-2025-000000087
Issued by
Douglas County, Georgia

About this file

This is Addendum No. 2 for the City of Albany's Distribution Circuit Automation - Phase 1 Viper Switch Installation Project (Bid Ref. #25-031), issued on January 6, 2025. The project involves the installation of twenty-nine Viper Switches in the city's electrical distribution system, with bids due on January 13, 2025, at 2:30 p.m. The contract term is one year, though the project is expected to be completed within 6 months after receipt of equipment and materials.

The addendum clarifies several key requirements: contractors must obtain their own permits for construction work within road right of way, secure their own show-up area, and ensure double dead-end framing on existing poles with C1 configuration. The Viper switches must be left bypassed until programmed by the City of Albany Light Department. Traffic control costs should be incorporated into the contractor's bid as there is no separate line item. The addendum also specifies that a crew foreman cannot serve as the superintendent, and there is no rock adder provision for encountering rock while digging.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 6, 2025

TO:All Potential Bidders
SUBJECT:Distribution Circuit Automation – Phase 1 Viper Switch Installation Project
Bid Ref. #25-031

Bid Opening Date & Time: January 13, 2025 @ 2:30 p.m.

ADDENDUM NO. 2

The items contained in this addendum are added to and/or deleted and become part of the specifications and bid documents for the above referenced Invitation to Bid.

Questions and Answers:

1. What permits will the contractor be required to obtain? Answer: The contractor will be required to get their own permits to perform construction work within the road right of way.

2. Can you provide the construction specifications for the viper? Answer: The specifications are in the bid package.

3. On existing poles with the configuration of C1 that are not called to be replaced, will the framing need to be changed to a double dead-end? Answer: Yes

4. Once construction is completed at a location, are the vipers to be left bypassed until they are programmed by COA at a later date? Answer: Yes, the vipers are to be left bypassed until programmed at a later date by City of Albany Light Department.

5. Is there a rock adder to be used in the event that rock is encountered while digging? Answer: No.

6. Although the contract term is one year, is there a timeframe as to when this particular project needs to be completed? Answer: This project ideally should be completed within 6 months contingent upon receipt of the equipment/materials.

7. How is any cost for traffic control to be calculated into the bid? Answer: Unless the contractor incorporated it into their submitted bid, this was not a stand alone factor baked into the bid package.

8. Will a show-up area be provided or is that the responsibility of the contractor to obtain? Answer: The contractor will obtain their own show-up area.

9. Can the crew foreman be considered the "superintendent"? Answer: No.

All other terms and conditions remain unchanged. Acknowledge receipt of this addendum with your submittal. If you have any questions, feel free to contact me at (229) 431-3211.

City of Albany, Joshua Williams Joshua Williams, Procurement Manager Cc: Jason Clenney, Utility Operations Kendall Hodge, Utility Operations

FINANCE

P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov

FINANCE

P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov image1.jpeg

File details come from the government source that posted it. Updated .