25_019_LH_ Attachment C_Access Road Technical.pdf

PDF 4 MB Posted

Attached to
25-019-LH Middle Georgia Airport Traffic Control Tower (12/12/24)
Solicitation number
PE-61100-NONST-2025-000000040
Issued by
Bibb County, Georgia

About this file

This document contains standards and specifications from the Macon Water Authority for the design, construction, and installation of water distribution systems. It covers requirements for water pipes, valves, fittings, backflow preventers, and other water system components. Key details include:

The document outlines the Authority's standards for materials, handling, construction methods, testing, disinfection, and protection and restoration of the work area for water distribution systems. It specifies requirements for ductile iron pipe, gate valves, tapping sleeves and valves, and backflow preventers. The standards must be followed for any water systems that will be owned, operated, and maintained by the Macon Water Authority. The document also covers requirements for As-Built drawings, easements and rights-of-way, and warranty periods.

The pricing, funding sources, incumbent contractors, and other commercial terms are not specified in this technical standards document. The focus is on detailing the Authority's technical requirements for the design, materials, and construction of water infrastructure that will be accepted into their system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

THIS PAGE INTENTIONALLY LEFT BLANK

Item C-001 Special Provisions: GDOT Standard Specifications 1

Item C-001 Special Provision: GDOT Standard Specifications

001-1 General. All work related to the project, unless otherwise included in a detailed specification in the project documents, shall be performed by the Contractor such that the work meets the requirements as detailed in the Georgia Department of Transportation (GDOT) Standard Specifications Construction of

Transportation Systems 2021. All GDOT Supplemental Provisions for the applicable specifications shall also apply. It is the responsibility of the Contractor to become familiar with and strictly adhere to the applicable specifications. The Contractor shall account for all applicable specifications, special provisions, and incidental items when preparing their bid proposal. Any reference to “GDOT” or “the Department” with regard to shop drawing review, material submittals, and construction materials testing/acceptance shall mean the Engineer or RPR.

METHOD OF MEASUREMENT

001-2 Basis of measurement and payment. Pay items that are governed by the GDOT Standard

Specifications Construction of Transportation Systems 2021 shall be measured for payment as detailed on the plans. Any items that are required per the GDOT Standard Specifications Construction of

Transportation Systems 2021 or as shown on the plans, and not specifically included as a separate pay item, shall be considered incidental to the project; and no separate measurement shall be made for those items.

BASIS OF PAYMENT

001-3 Payment. Payment shall be made at the contract unit price for that item; and shall be full compensation for furnishing all materials, for preparing and placing these materials, and for all labor, equipment tools, and incidentals necessary to complete the item.

C-102-1

ITEM C-102 TEMPORARY AIR AND WATER POLLUTION,

SOIL EROSION, AND SILTATION CONTROL

DESCRIPTION

102-1. This item shall consist of temporary control measures as shown on the plans or as ordered by the Resident Project Representative (RPR) during the life of a contract to control pollution of air and water, soil erosion, and siltation through the use of silt fences, berms, dikes, dams, sediment basins, fiber mats, gravel, mulches, grasses, slope drains, and other erosion control devices or methods.

Temporary erosion control shall be in accordance with the approved erosion control plan; the approved Construction Safety and Phasing Plan (CSPP), AC 150/5370-2, Operational Safety on

Airports During Construction, and the latest edition of the Manual For Erosion And Sediment

Control In Georgia. The temporary erosion control measures contained herein shall be coordinated with the permanent erosion control measures specified as part of this contract to the extent practical to assure economical, effective, and continuous erosion control throughout the construction period.

Temporary control may include work outside the construction limits such as borrow pit operations, equipment and material storage sites, waste areas, and temporary plant sites.

Temporary control measures shall be designed, installed and maintained to minimize the creation of wildlife attractants that have the potential to attract hazardous wildlife on or near public-use airports.

MATERIALS

102-2.1 Grass. Grass that will not compete with the grasses sown later for permanent cover per

Item T-901shall be a quick-growing species (such as ryegrass, Italian ryegrass, or cereal grasses) suitable to the area providing a temporary cover. Selected grass species shall not create a wildlife attractant.

102-2.2 Mulches. Mulches may be hay, straw, fiber mats, netting, bark, wood chips, or other suitable material reasonably clean and free of noxious weeds and deleterious materials per Item

T-908. Mulches shall not create a wildlife attractant.

102-2.3 Fertilizer. Fertilizer shall be a standard commercial grade and shall conform to all federal and state regulations and to the standards of the Association of Official Agricultural

Chemists.

102-2.4 Slope drains. Slope drains may be constructed of pipe, fiber mats, rubble, concrete, asphalt, or other materials that will adequately control erosion.

102-2.5 Silt fence. Silt fence shall consist of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected usable construction life. Silt fence shall meet the requirements of ASTM D6461.

102-2.6 Other. All other materials shall meet commercial grade standards and shall be approved

C-102-2 by the RPR before being incorporated into the project.

CONSTRUCTION REQUIREMENTS

102-3.1 General. In the event of conflict between these requirements and pollution control laws, rules, or regulations of other federal, state, or local agencies, the more restrictive laws, rules, or regulations shall apply.

The RPR shall be responsible for assuring compliance to the extent that construction practices, construction operations, and construction work are involved.

102-3.2 Schedule. Prior to the start of construction, the Contractor shall submit schedules in accordance with the approved Construction Safety and Phasing Plan (CSPP) and the plans for accomplishment of temporary and permanent erosion control work for clearing and grubbing;

grading; construction; paving; and structures at watercourses. The Contractor shall also submit a proposed method of erosion and dust control on haul roads and borrow pits and a plan for disposal of waste materials. Work shall not be started until the erosion control schedules and methods of operation for the applicable construction have been accepted by the RPR.

102-3.3 Construction details. The Contractor will be required to incorporate all permanent erosion control features into the project at the earliest practicable time as outlined in the plans and approved CSPP. Except where future construction operations will damage slopes, the

Contractor shall perform the permanent seeding and mulching and other specified slope protection work in stages, as soon as substantial areas of exposed slopes can be made available.

Temporary erosion and pollution control measures will be used to correct conditions that develop during construction that were not foreseen during the design stage; that are needed prior to installation of permanent control features; or that are needed temporarily to control erosion that develops during normal construction practices, but are not associated with permanent control features on the project.

Where erosion may be a problem, schedule and perform clearing and grubbing operations so that grading operations and permanent erosion control features can follow immediately if project conditions permit. Temporary erosion control measures are required if permanent measures cannot immediately follow grading operations. The RPR shall limit the area of clearing and grubbing, excavation, borrow, and embankment operations in progress, commensurate with the

Contractor’s capability and progress in keeping the finish grading, mulching, seeding, and other such permanent control measures current with the accepted schedule. If seasonal limitations make such coordination unrealistic, temporary erosion control measures shall be taken immediately to the extent feasible and justified as directed by the RPR.

The Contractor shall provide immediate permanent or temporary pollution control measures to minimize contamination of adjacent streams or other watercourses, lakes, ponds, or other areas of water impoundment as directed by the RPR. If temporary erosion and pollution control measures are required due to the Contractor’s negligence, carelessness, or failure to install permanent controls as a part of the work as scheduled or directed by the RPR, the work shall be performed by the Contractor and the cost shall be incidental to this item.

The RPR may increase or decrease the area of erodible earth material that can be exposed at any time based on an analysis of project conditions.

C-102-3

The erosion control features installed by the Contractor shall be maintained by the Contractor during the construction period.

Provide temporary structures whenever construction equipment must cross watercourses at frequent intervals. Pollutants such as fuels, lubricants, bitumen, raw sewage, wash water from concrete mixing operations, and other harmful materials shall not be discharged into any waterways, impoundments or into natural or manmade channels.

102-3.4 Installation, maintenance and removal of silt fence. Silt fences shall extend a minimum of 16 inches (41 cm) and a maximum of 34 inches (86 cm) above the ground surface.

Posts shall be set no more than 10 feet (3 m) on center. Filter fabric shall be cut from a continuous roll to the length required minimizing joints where possible. When joints are necessary, the fabric shall be spliced at a support post with a minimum 12-inch (300-mm) overlap and securely sealed. A trench shall be excavated approximately 4 inches (100 mm) deep by 4 inches (100 mm) wide on the upslope side of the silt fence. The trench shall be backfilled, and the soil compacted over the silt fence fabric. The Contractor shall remove and dispose of silt that accumulates during construction and prior to establishment of permanent erosion control.

The fence shall be maintained in good working condition until permanent erosion control is established. Silt fence shall be removed upon approval of the RPR.

102-3.5 Materials. Materials used in Construction of Erosion Control shall be governed by applicable technical section and details shown on the Plans. Concrete shall be in accordance with

P-610.

METHOD OF MEASUREMENT

102-4.1 This is a Lump Sum Item and thus there is no measurement for payment. The Item shall be completed per the requirements of this specification.

BASIS OF PAYMENT

102-5.1 The lump sum price bid shall include the cost of furnishing all labor, equipment, instruments, and all other material necessary to satisfactorily complete all requirements of this specification.

Partial payments may be made at the discretion of the Engineer as the work progresses.

Payment will be made under:

Item C-102-5.1 Temporary Air and Water Pollution, Soil Erosion, And

Siltation Control – per lump sum

Where other directed work falls within the specifications for a work item that has a contract price, the units of work shall be measured and paid for at the contract unit price bid for the various items.

Temporary control features not covered by contract items that are ordered by the RPR will be paid for in accordance with Section 90, Paragraph 90-05 Payment for Extra Work.

C-102-4

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

Advisory Circulars (AC)

AC 150/5200-33 Hazardous Wildlife Attractants on or Near Airports

AC 150/5370-2 Operational Safety on Airports During Construction

ASTM International (ASTM)

ASTM D6461 Standard Specification for Silt Fence Materials

United States Department of Agriculture (USDA)

FAA/USDA Wildlife Hazard Management at Airports, A Manual for Airport Personnel

END OF ITEM C-102

C-103-1

ITEM C-103: PROJECT SURVEY, STAKEOUT, AND RECORD DRAWINGS

103-1.1 Under this item, the Contractor shall do all necessary surveying required to construct all elements of the Project as shown on the Plans and specified in the Proposal and Specifications. This shall include but not be limited to stakeout, layout and elevations for pavements, structures, forms and appurtenances as shown and required, consistent with the current practices and shall be performed by competently qualified personnel acceptable to the Engineer. The stakeout survey shall proceed immediately following the award of the Contract and shall be expeditiously progressed to completion in a manner and at a rate satisfactory to the Engineer. The Contractor shall keep the Engineer fully informed as to the progress of the stakeout survey. All survey work shall be provided under the direction of a licensed land surveyor.

MATERIALS

103-2.1 All instruments, equipment, stakes, and any other material necessary to perform the work satisfactorily shall be provided by the Contractor.

All stakes used shall be of a type approved by the Engineer. It shall always be the Contractor’s responsibility to maintain these stakes in their proper location and position.

Record drawing deliverables shall meet the requirements of the Sections 100-4.1 and 100-4.2 as applicable to the project.

CONSTRUCTION DETAILS

103-3.1 The Contractor shall trim trees, brush, and other interfering objects, not consistent with the

Plans, from survey lines in advance of all survey work to permit accurate and unimpeded work by his stakeout survey crews and cross-section and topographic survey crews.

The exact position of all work shall be established from control points, baseline transit points or other points of similar nature which are shown on the Plans and/or modified by the Engineer. Any error, apparent discrepancy, or absence in or of data shown or required for accurately accomplishing the stakeout survey shall be referred to the Engineer for interpretation.

Permanent survey marker locations shall be established and referenced by the Contractor.

The Contractor shall be responsible for the accuracy of his work and shall maintain all reference points, stakes, etc., throughout the life of the Contract. Damaged or destroyed points, benchmarks or stakes, or any reference points made inaccessible by the progress of the construction, shall be replaced or transferred by the Contractor. Any of the above points which may be destroyed or damaged shall be transferred by the Contractor before construction begins. All control points shall be referenced by ties to acceptable objects and recorded. Any alterations or revisions in the ties shall be so noted and the information furnished to the Engineer immediately. All computations necessary to establish the

C-103-2 exact position of the work from control points shall be made and preserved by the Contractor. All computations, survey notes and other records necessary to accomplish the work shall be neatly made.

Such computations, survey notes and other records shall be made available to the Engineer upon request and delivered to the Engineer not later than the date of acceptance of the Contract, to become the property of the Owner.

The Engineer may check all or any portion of the stakeout survey work or notes made by the

Contractor. Any necessary correction to the work shall be made immediately by the Contractor. Such checking by the Engineer shall not relieve the Contractor of any responsibilities for the accuracy or completeness of his work.

Prior to the final cross-section and topo survey of the Project by the Contractor, the Contractor shall re-establish centerline or baseline points and stationing as required by the Engineer.

During the progress of the construction work, the Contractor will be required to furnish all of the surveying and stakeout incidental to the proper location by line and grade for each phase of the work.

For paving and any other operation requiring extreme accuracy, the Contractor will restake with pins or other acceptable hubs located directly adjacent to the work at a spacing directed by the Engineer.

Any existing stakes, iron pins, survey monuments or other markers defining property lines which may be disturbed during construction shall be properly tied into fixed reference points before construction begins and accurately reset in their proper position upon completion of the work.

The Contractor shall set nails or pins flush with finished grade on the centerline of the runway pavement at each runway threshold. The set points shall be located, elevated and referenced to the project coordinate system. The as-built runway threshold elevation and coordinates shall be given to the Engineer.

Just prior to completion of the Contract, the Contractor shall reestablish if necessary, and retie all control points as permanently as possible, to the satisfaction of the Engineer.

AS-BUILT DRAWINGS

103-4.1. REDLINE DRAWINGS. The Contractor shall be provided one (1) set of full-size construction drawings by the Engineer for the sole purpose of recording as-built conditions. The

Contractor shall mark each sheet of the non-reproducible drawings in red pencil and record thereon in a legible manner, (heretofore known as redline drawings) any and all field changes and conditions as they occur. A complete file of approved field sketches, diagrams, and other approved changes/modifications shall be maintained and attached to the redline drawings.

A Redline set of As-Built drawings shall be kept current during the progress of the work. All deviations from the proposed drawings shall be noted. Special attention shall be given to note any shift in the location of underground items (utilities, pipes, etc) to facilitate accurately locating underground items on the final As-Built drawings.

Redline drawings shall be reviewed by the Engineer for accuracy as often as deemed necessary by

C-103-3 the Engineer. Errors or omissions that are identified shall be promptly corrected. The Engineer may withhold the monthly progress payment request until such time as the redline drawings have been updated by the Contractor. At the completion of the work, each sheet of the redline drawings, plus all approved field sketches and diagrams shall be certified by the Contractor as reflecting the as-built conditions of the work. The Contractor shall thereafter submit to the Engineer the original redline drawings, referenced above, for approval prior to release of any retainage and establishing the value of the work.

103-4.2. FINAL AS-BUILT AND ELECTRONIC DRAWINGS. Horizontal datum shall be State

Plane Coordinates derived from North American Datum of 1983 (NAD 83). Vertical Datum shall be

North American Vertical Datum of 1988 (NAVD 1988). The location and elevation all benchmarks used shall be shown on the As-Built drawings.

The As-Built drawings shall accurately reflect and shall encompass all alterations that occurred during the progress of the work. The term As-Built Condition, referenced in this specification, shall be defined as the result of construction alterations. All proposed lines and proposed features on the design drawings that do not accurately reflect the As-Built condition shall not be shown on the As-

Built drawings. Such proposed lines and features shall be erased and redrawn or otherwise modified on the As-Built drawings to accurately reflect the As-Built Condition. All proposed notes on the design drawings that do not reflect the As-Built Condition shall not be shown on the As-Built drawings. Such notes shall be erased and replaced, struck-through and corrected, or otherwise modified to accurately reflect the As-Built Condition. Design elevations that deviate from As-Built elevations shall be struck-through, and the As-Built elevation shall be noted adjacent to the struck-through design elevation.

The Contractor shall provide original and finished grade, As-Built topographic survey of all areas altered during construction. Unless otherwise noted, As-Built elevations shall be measured at 50 feet intervals (50 feet grid), at changes in surface slope, and at limits of construction alteration (grading, clearing or otherwise). This spacing requirement applies to paved and unpaved surfaces that do not have specific topographic measurement spacing requirements defined elsewhere. A topographic digital terrain model (DTM) that can be utilized in .dwg, CAD format, version 2004 or later shall be provided for all areas altered during construction. DTM shall mean the AutoCAD surface generated from surface data points (location and elevation) connected by TIN (triangulated irregular network) lines.

Ditches: As-Built elevations shall be measured along the centerline, at toes of slopes, and at tops of bank. These measurements shall be taken at 50 feet intervals and at the beginning and end points of the ditch alteration.

Storm Drains, Structures, and Retention/Detention Ponds: All piping, wyes, tees, manholes, inlets, cleanouts and points of connection to the existing system shall be located and shown on the As-Built

Drawings. Runs of storm sewers shall be identified (i.e. 300’ of 15” RCP at S=.004). Elevations shall be given for top of rim/grate of all manhole covers and inlets. Elevations shall be given for all manhole, inlet, and catch basin inverts. Elevations shall be given for underdrain inverts at the location of cleanouts. Elevations shall be given for control structure weirs, orifices, and outfall elevations.

Elevations shall be given for inverts of all outfall pipes. Elevations shall be given for the bottom of

C-103-4 pond and top of bank for Retention/Detention ponds. Elevations may be required for any other pertinent design data not listed here.

A review-set of Final As-Built drawings shall be submitted to the Engineer (electronic PDF or CAD files is acceptable) and if requested modifications shall be made. When modifications are required, the Contractor shall make the requested modifications and submit a revised review-set. Written approval from the Engineer shall be given prior to submitting the Final As-Built drawings described in the below paragraph.

The Final As-Built drawings shall be prepared, signed, and sealed by a licensed Professional

Surveyor. These drawings shall describe all alterations that occurred during the construction project.

The Contractor shall provide one (1) set of Redline As-Built drawings, five (5) sets of signed and sealed Final As-Built drawings, and one (1) electronic copy of the As-Built drawings in CAD (version

2018 or later) including a DTM of all topographic information. Final payment for this project will not be made until the As-Built drawings have been reviewed and accepted by the engineer. Cost of producing the As-built drawings shall be considered incidental to the contract unless a specific pay item is provided.

METHOD OF MEASURMENT

103-7.1 This is a Lump Sum Item and thus there is no measurement for payment. The Item shall be completed per the requirements of this specification.

BASIS OF PAYMENT

103-8.1 The lump sum price bid shall include the cost of furnishing all labor, equipment, instruments, and all other material necessary to satisfactorily complete all requirements of this specification. Partial payments may be made at the discretion of the Engineer as the work progresses.

Item C-103-8.1 - Project Survey, Stakeout, and Record Drawings – per lump sum

END ITEM C-103

C-105-1

ITEM C-105 MOBILIZATION

105-1 Description. This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items.

105-2 Mobilization limit. Mobilization shall be limited to 10 percent of the total project cost.

105-3 Posted notices. Prior to commencement of construction activities, the Contractor must post the following documents in a prominent and accessible place where they may be easily viewed by all employees of the prime Contractor and by all employees of subcontractors engaged by the prime Contractor: Equal Employment Opportunity (EEO) Poster “Equal Employment Opportunity is the Law” in accordance with the Office of Federal Contract Compliance Programs Executive

Order 11246, as amended; Davis Bacon Wage Poster (WH 1321) - DOL “Notice to All

Employees” Poster; and Applicable Davis-Bacon Wage Rate Determination. These notices must remain posted until final acceptance of the work by the Owner. Links to the posters are available at: https://www.faa.gov/airports/engineering/

105-4 Engineer/RPR field office. An Engineer/RPR field office is included in Item C-109-3.1.

METHOD OF MEASUREMENT

105-5 Basis of measurement and payment. Based upon the contract lump sum price for

“Mobilization” partial payments will be allowed as follows:

a. With first pay request, 25%.

b. When 25% or more of the original contract is earned, an additional 25%.

c. When 50% or more of the original contract is earned, an additional 40%.

d. After Final Inspection, Staging area clean-up and delivery of all Project Closeout materials as required by Section 90, paragraph 90-11, Contractor Final Project Documentation, the final

10%.

BASIS OF PAYMENT

105-6 Payment will be made under:

Item C-105-6.1 Mobilization – per Lump Sum

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

https://www.faa.gov/airports/engineering/

C-105-2

Office of Federal Contract Compliance Programs (OFCCP)

Executive Order 11246, as amended

EEOC-P/E-1 – Equal Employment Opportunity is the Law Poster

United States Department of Labor, Wage and Hour Division (WHD)

WH 1321 – Employee Rights under the Davis-Bacon Act Poster

END OF ITEM C-105

D-701-1

ITEM D-701: PIPE FOR STORM DRAINS AND CULVERTS

DESCRIPTION

701-1.1 This item shall consist of the construction of pipe culverts and storm drains in accordance with these specifications and in reasonably close conformity with the lines and grades shown on the plans.

MATERIALS

701-2.1 Materials shall meet the requirements shown on the plans and specified below.

Underground piping and components used in drainage systems for terminal and aircraft fueling ramp drainage shall be noncombustible and inert to fuel in accordance with National Fire

Protection Association (NFPA) 415.

701-2.2 Pipe. The pipe shall be of the type called for on the plans or in the proposal and shall be in accordance with the following appropriate requirements:

American Association of State Highway and Transportation Officials (AASHTO) M167

Standard Specification for Corrugated Steel Structural Plate, Zinc-

Coated, for Field-Bolted Pipe, Pipe-Arches, and Arches

AASHTO M190 Standard Specification for Bituminous-Coated Corrugated Metal

Culvert Pipe and Pipe Arches

AASHTO M196 Standard Specification for Corrugated Aluminum Pipe for Sewers and Drains

AASHTO M219 Standard Specification for Corrugated Aluminum Alloy Structural

Plate for Field-Bolted Pipe, Pipe-Arches, and Arches

AASHTO M243 Standard Specification for Field-Applied Coating of Corrugated

Metal Structural Plate for Pipe, Pipe-Arches, and Arches

AASHTO M252 Standard Specification for Corrugated Polyethylene Drainage Pipe

AASHTO M294 Standard Specification for Corrugated Polyethylene Pipe, 300- to

1500-mm (12- to 60-in.) Diameter

AASHTO M304 Standard Specification for Poly (Vinyl Chloride) (PVC) Profile

Wall Drain Pipe and Fittings Based on Controlled Inside Diameter

AASHTO MP20 Standard Specification for Steel Reinforced Polyethylene (PE)

Ribbed Pipe, 300- to 900-mm (12- to 36-in.) Diameter

AASHTO R73 Standard Practice for Evaluation of Precast Concrete Drainage

Productions

ASTM A760 Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains

D-701-2

ASTM A761 Standard Specification for Corrugated Structural Steel Plate, Zinc-

Coated, for Field-Bolted Pipe, Pipe-Arches, and Arches

ASTM A762 Standard Specification for Corrugated Steel Pipe, Polymer

Precoated for Sewers and Drains

ASTM A849 Standard Specification for Post Applied Coatings, Pavings, and

Linings for Corrugated Steel Sewer and Drainage Pipe

ASTM B745 Standard Specification for Corrugated Aluminum Pipe for Sewers and Drains

ASTM C14 Standard Specification for Nonreinforced Concrete Sewer, Storm

Drain, and Culvert Pipe

ASTM C76 Standard Specification for Reinforced Concrete Culvert, Storm

Drain, and Sewer Pipe

ASTM C506 Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe

ASTM C507 Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe

ASTM C655 Standard Specification for Reinforced Concrete D-Load Culvert, Storm Drain, and Sewer Pipe

ASTM C1433 Standard Specification for Precast Reinforced Concrete Monolithic

Box Sections for Culverts, Storm Drains, and Sewers

ASTM C1479 Standard Practice for Installation of Precast Concrete Sewer, Storm

Drain, and Culvert Pipe Using Standard Installations

ASTM C1577 Standard Specification for Precast Reinforced Concrete Monolithic

Box Sections for Culverts, Storm Drains, and Sewers Designed

According to AASHTO LRFD

ASTM C1786 Standard Specification for Segmental Precast Reinforced Concrete

Box Sections for Culverts, Storm Drains, and Sewers Designed

According to AASHTO LRFD

ASTM C1840 Standard Practice for Inspection and Acceptance of Installed

Reinforced Concrete Culvert, Storm Drain, and Storm Sewer Pipe

ASTM D3262 Standard Specification for “Fiberglass” (Glass-Fiber-Reinforced

Thermosetting-Resin) Sewer Pipe

ASTM D4161 Standard Specification for “Fiberglass” (Glass-Fiber-Reinforced

Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals

ASTM F667 Standard Specification for 3 through 24 in Corrugated

Polyethylene Pipe and Fittings

ASTM F714 Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR)

Based on Outside Diameter https://www.astm.org/Standards/C1479.htm https://www.astm.org/Standards/C1479.htm https://www.astm.org/Standards/C1786.htm https://www.astm.org/Standards/C1786.htm https://www.astm.org/Standards/C1786.htm https://www.astm.org/Standards/D4161.htm https://www.astm.org/Standards/D4161.htm

D-701-3

ASTM F794 Standard Specification for Poly (Vinyl Chloride) (PVC) Profile

Gravity Sewer Pipe and Fittings Based on Controlled Inside

Diameter

ASTM F894 Standard Specification for Polyethylene (PE) Large Diameter

Profile Wall Sewer and Drain Pipe

ASTM F949 Standard Specification for Poly (Vinyl Chloride) (PVC)

Corrugated Sewer Pipe with a Smooth Interior and Fittings

ASTM F2435 Standard Specification for Steel Reinforced Polyethylene (PE)

Corrugated Pipe

ASTM F2562 Specification for Steel Reinforced Thermoplastic Ribbed Pipe and

Fittings for Non-Pressure Drainage and Sewerage

ASTM F2736 Standard Specification for 6 to 30 in. (152 to 762 mm)

Polypropylene (PP) Corrugated Single Wall Pipe and Double Wall

Pipe

ASTM F2764 Standard Specification for 30 to 60 in. (750 to 1500 mm)

Polypropylene (PP) Triple Wall Pipe and Fittings for Non-Pressure

Sanitary Sewer Applications

ASTM F2881 Standard Specification for 12 to 60 in. (300 to 1500 mm)

Polypropylene (PP) Dual Wall Pipe and Fittings for Non-Pressure

Storm Sewer Applications

ASTM D3034 Standard Specification for Type PSM Poly (Vinyl Chloride) (PVC)

Sewer Pipe and Fittings

701-2.3 Concrete. Concrete for pipe cradles shall have a minimum compressive strength of 2000 psi (13.8 MPa) at 28 days and conform to the requirements of ASTM C94.

701-2.4 Rubber gaskets. Rubber gaskets for rigid pipe shall conform to the requirements of

ASTM C443. Rubber gaskets for PVC pipe, polyethylene, and polypropylene pipe shall conform to the requirements of ASTM F477. Rubber gaskets for zinc-coated steel pipe and precoated galvanized pipe shall conform to the requirements of ASTM D1056, for the “RE” closed cell grades. Rubber gaskets for steel reinforced thermoplastic ribbed pipe shall conform to the requirements of ASTM F477.

701-2.5 Joint mortar. Pipe joint mortar shall consist of one part Portland cement and two parts sand. The Portland cement shall conform to the requirements of ASTM C150, Type I. The sand shall conform to the requirements of ASTM C144.

701-2.6 Joint fillers. Poured filler for joints shall conform to the requirements of ASTM D6690.

701-2.7 Plastic gaskets. Plastic gaskets shall conform to the requirements of ASTM C990.

701-2.8. Controlled low-strength material (CLSM). Controlled low-strength material shall conform to the requirements of Item P-153. When CLSM is used, all joints shall have gaskets.

701-2.9 Precast box culverts. Manufactured in accordance with and conforming to ASTM

C1433.

D-701-4

701-2.10 Precast concrete pipe. Precast concrete structures shall be furnished by a plant meeting National Precast Concrete Association Plant Certification Program or American

Concrete Pipe Association QCast Plant Certification program.

CONSTRUCTION METHODS

701-3.1 Excavation. The width of the pipe trench shall be sufficient to permit satisfactory jointing of the pipe and thorough tamping of the bedding material under and around the pipe, but it shall not be less than the external diameter of the pipe plus 12 inches (300 mm) on each side.

The trench walls shall be approximately vertical.

The Contractor shall comply with all current federal, state and local rules and regulations governing the safety of men and materials during the excavation, installation and backfilling operations. Specifically, the Contractor shall observe that all requirements of the Occupational

Safety and Health Administration (OSHA) relating to excavations, trenching and shoring are strictly adhered to. The width of the trench shall be sufficient to permit satisfactorily jointing of the pipe and thorough compaction of the bedding material under the pipe and backfill material around the pipe, but it shall not be greater than the widths shown on the plans trench detail.

Where rock, hardpan, or other unyielding material is encountered, the Contractor shall remove it from below the foundation grade for a depth of at least 8 inch (200 mm) or 1/2 inch (12 mm) for each foot of fill over the top of the pipe (whichever is greater) but for no more than three-quarters of the nominal diameter of the pipe. The excavation below grade should be filled with granular material to form a uniform foundation.

Where a firm foundation is not encountered at the grade established, due to soft, spongy, or other unstable soil, the unstable soil shall be removed and replaced with approved granular material for the full trench width. The RPR shall determine the depth of removal necessary. The granular material shall be compacted to provide adequate support for the pipe.

The excavation for pipes placed in embankment fill shall not be made until the embankment has been completed to a height above the top of the pipe as shown on the plans.

701-3.2 Bedding. The bedding surface for the pipe shall provide a foundation of uniform density to support the pipe throughout its entire length.

a. Rigid pipe. The pipe bedding shall be constructed uniformly for the full length of the pipe barrel, as required on the plans. The maximum aggregate size shall be 1 in when the bedding thickness is less than 6 inches, and 1-1/2 in when the bedding thickness is greater than 6 inches.

Bedding shall be loosely placed uncompacted material under the middle third of the pipe prior to placement of the pipe.

b. Flexible pipe. For flexible pipe, the bed shall be roughly shaped to fit the pipe, and a bedding blanket of sand or fine granular material shall be provided as follows:

D-701-5

Flexible Pipe Bedding

Pipe Corrugation

Depth

Minimum Bedding

Depth inch mm inch mm

1/2 12 1 25

1 25 2 50

2 50 3 75

2-1/2 60 3-1/2 90

c. Other pipe materials. For PVC, polyethylene, polypropylene, or fiberglass pipe, the bedding material shall consist of coarse sands and gravels with a maximum particle size of 3/4 inches (19 mm). For pipes installed under paved areas, no more than 12% of the material shall pass the No. 200 (0.075 mm) sieve. For all other areas, no more than 50% of the material shall pass the No. 200 (0.075 mm) sieve. The bedding shall have a thickness of at least 6 inches (150

mm) below the bottom of the pipe and extend up around the pipe for a depth of not less than 50% of the pipe’s vertical outside diameter.

701-3.3 Laying pipe. The pipe laying shall begin at the lowest point of the trench and proceed upgrade. The lower segment of the pipe shall be in contact with the bedding throughout its full length. Bell or groove ends of rigid pipes and outside circumferential laps of flexible pipes shall be placed facing upgrade.

Paved or partially lined pipe shall be placed so that the longitudinal center line of the paved segment coincides with the flow line.

Elliptical and elliptically reinforced concrete pipes shall be placed with the manufacturer’s reference lines designating the top of the pipe within five degrees of a vertical plane through the longitudinal axis of the pipe.

701-3.4 Joining pipe. Joints shall be made with (1) cement mortar, (2) cement grout, (3) rubber gaskets, (4) plastic gaskets, (5) coupling bands.

Mortar joints shall be made with an excess of mortar to form a continuous bead around the outside of the pipe and shall be finished smooth on the inside. Molds or runners shall be used for grouted joints to retain the poured grout. Rubber ring gaskets shall be installed to form a flexible watertight seal.

a. Concrete pipe. Concrete pipe may be either bell and spigot or tongue and groove. Pipe sections at joints shall be fully seated and the inner surfaces flush and even. Concrete pipe joints shall be sealed with rubber gaskets meeting ASTM C443 when leak resistant joints are required, or the concrete pipe joints shall be sealed with butyl mastic meeting ASTM C990 or mortar when soil tight joints are required. Joints shall be thoroughly wetted before applying mortar or grout.

b. Metal pipe. Metal pipe shall be firmly joined by form-fitting bands conforming to the requirements of ASTM A760 for steel pipe and AASHTO M196 for aluminum pipe.

c. PVC, Polyethylene, or Polypropylene pipe. Joints for PVC, Polyethylene, or

Polypropylene pipe shall conform to the requirements of ASTM D3212 when leak resistant

D-701-6 joints are required. Joints for PVC and Polyethylene pipe shall conform to the requirements of

AASHTO M304 when soil tight joints are required. Fittings for polyethylene pipe shall conform to the requirements of AASHTO M252 or ASTM M294. Fittings for polypropylene pipe shall conform to ASTM F2881, ASTM F2736, or ASTM F2764.

d. Fiberglass pipe. Joints and fittings shall be as detailed on the plans and in accordance with the manufacturers recommendations. Joints shall meet the requirements of ASTM D4161 for flexible elastomeric seals.

701-3.5 Embedment and Overfill. Pipes shall be inspected before any fill material is placed;

any pipes found to be out of alignment, unduly settled, or damaged shall be removed and re-laid or replaced at the Contractor’s expense.

701-3.5-1 Embedment Material Requirements

a. Concrete Pipe. Embedment material and compaction requirements shall be in accordance with the applicable Type of Standard Installation (Types 1, 2, 3, or 4) per ASTM C1479. If a concrete cradle or CLSM embedment material is used, it shall conform to the plan details.

b. Plastic and fiberglass Pipe. Embedment material shall meet the requirements of ASTM

D3282, A-1, A-2-4, A-2-5, or A-3. Embedment material shall be free of organic material, stones larger than 1.5 inches in the greatest dimension, or frozen lumps. Embedment material shall extend to 12 inches above the top of the pipe.

c. Metal Pipe. Embedment material shall be granular as specified in the contract document and specifications, and shall be free of organic material, rock fragments larger than 1.5 inches in the greatest dimension and frozen lumps. As a minimum, backfill materials shall meet the requirements of ASTM D3282, A-1, A-2, or A-3. Embedment material shall extend to 12 inches above the top of the pipe.

701-3.5-2 Placement of Embedment Material

The embedment material shall be compacted in layers not exceeding 6 inches (150 mm) on each side of the pipe and shall be brought up one foot (30 cm) above the top of the pipe or to natural ground level, whichever is greater. Thoroughly compact the embedment material under the haunches of the pipe without displacing the pipe. Material shall be brought up evenly on each side of the pipe for the full length of the pipe.

When the top of the pipe is above the top of the trench, the embedment material shall be compacted in layers not exceeding 6 inches (150 mm) and shall be brought up evenly on each side of the pipe to one foot (30 cm) above the top of the pipe. All embedment material shall be compacted to a density required under Item P-152.

Concrete cradles and flowable fills, such as controlled low strength material (CLSM) or controlled density fill (CDF), may be used for embedment provided adequate flotation resistance can be achieved by restraints, weighing, or placement technique.

It shall be the Contractor’s responsibility to protect installed pipes and culverts from damage due to construction equipment operations. The Contractor shall be responsible for installation of any extra strutting or backfill required to protect pipes from the construction equipment.

D-701-7

701-3.6 Overfill

Pipes shall be inspected before any overfill is in place. Any pipes found to be out of alignment, unduly settled, or damaged shall be removed and re-laid or replaced at the Contractor’s expense.

Evaluation of any damage to RCP shall be evaluated based on AASHTO R73.

Overfill material shall be place and compacted in layers as required to achieve compaction to at least 95 percent standard proctor per ASTM D698. The soil shall contain no debris, organic matter, frozen material, or stones with a diameter greater than one half the thickness of the compacted layers being placed.

701-3.7 Inspection Requirements

An initial post installation inspection shall be performed by the RPR no sooner than 30 days after completion of installation and final backfill. Clean or flush all lines prior to inspection.

Use a camera with lighting suitable to allow a clear picture of the entire periphery of the pipe interior. Center the camera in the pipe both vertically and horizontally and be able to pan and tilt to a 90 degree angle with the axis of the pipe rotating 360 degrees. Use equipment to move the camera through the pipe that will not obstruct the camera’s view or interfere with proper documentation of the pipe’s condition. The video image shall be clear, focused, and relatively free from roll, static, or other image distortion qualities that would prevent the reviewer from evaluating the condition of the pipe.

For pipe sizes larger than 48 inches, a walk-through visual inspection shall be performed.

Incorporate specific inspection requirements for the various types of pipes beneath the general inspection requirements.

Reinforced concrete pipe shall be inspected, evaluated, and reported on in accordance with

ASTM C1840, “Standard Practice for Inspection and Acceptance of Installed Reinforced

Concrete Culvert, Storm Drain, and Storm Sewer Pipe.” Any issues reported shall include still photo and video documentation. The zoom ratio shall be provided for all still or video images that document any issues of concern by the inspection firm.

Flexible pipes shall be inspected for rips, tears, joint separations, soil migration, cracks, localized buckling, settlement, alignment, and deflection. Determine whether the allowable deflection has been exceeded by use of a laser profiler for internal pipe diameters of 48 inches or less, or direct measurement for internal pipe diameters greater than 48 inches. Laser profile equipment shall utilize low barrel distortion video equipment. Deflection of installed pipe shall not exceed the limits provided in the table below, as a percentage of the average inside diameter of the pipe.

D-701-8

Maximum Allowable Pipe Deflection

Type of Pipe Maximum Allowable Deflection (%)

Corrugated Metal Pipe 5

Concrete Lined CMP 3

Thermoplastic Pipe 5

Fiberglass 5

If deflection readings in excess of the allowable deflection are obtained, remove the pipe with excessive deflection and replace with new pipe. Isolated areas may exceed allowable by 2.5% with concurrence of RPR. Repair or replace any pipe with cracks exhibiting displacement across the crack, bulges, creases, tears, spalls, or delaminations. The report for flexible pipe shall include as a minimum, the deflection results and final post installation inspection report. The inspection report shall include: a copy of all video taken, pipe location identification, equipment used for inspection, inspector name, deviation from design line and grade, and inspector’s notes.

METHOD OF MEASUREMENT

701-4.1 The quantity of 18” RCP (Class III) shall be measured in linear feet of pipe in place, completed, and approved. It shall be measured along the centerline of the pipe from end or inside face of structure to the end or inside face of structure, whichever is applicable. The several classes, types, and size shall be measured separately. All fittings shall be included in the footage as typical pipe sections in the pipe being measured.

701-4.2. The quantity of 24” RCP (Class III) shall be measured in linear feet of pipe in place, completed, and approved. It shall be measured along the centerline of the pipe from end or inside face of structure to the end or inside face of structure, whichever is applicable. The several classes, types, and size shall be measured separately. All fittings shall be included in the footage as typical pipe sections in the pipe being measured.

BASIS OF PAYMENT

701-5.1 Payment will be made at the contract unit price per linear foot (meter) for 18” RCP

(Class III)

701-5.2 Payment will be made at the contract unit price per linear foot (meter) for 24” RCP

(Class III)

Item D-701-5.1 – 18” RCP (Class III) – per linear foot

Item D-701-5.2 – 24” RCP (Class III) – per linear foot

D-701-9

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

American Association of State Highway and Transportation Officials (AASHTO)

AASHTO M167 Standard Specification for Corrugated Steel Structural Plate, Zinc-

Coated, for Field-Bolted Pipe, Pipe-Arches, and Arches

AASHTO M190 Standard Specification for Bituminous-Coated Corrugated Metal

Culvert Pipe and Pipe Arches

AASHTO M196 Standard Specification for Corrugated Aluminum Pipe for Sewers and Drains

AASHTO M219 Standard Specification for Corrugated Aluminum Alloy Structural

Plate for Field-Bolted Pipe, Pipe-Arches, and Arches

AASHTO M243 Standard Specification for Field Applied Coating of Corrugated

Metal Structural Plate for Pipe, Pipe-Arches, and Arches

AASHTO M252 Standard Specification for Corrugated Polyethylene Drainage Pipe

AASHTO M294 Standard Specification for Corrugated Polyethylene Pipe, 300- to

1500-mm (12- to 60-in.) Diameter

AASHTO M304 Standard Specification for Poly (Vinyl Chloride) (PVC) Profile

Wall Drain Pipe and Fittings Based on Controlled Inside Diameter

AASHTO MP20 Standard Specification for Steel Reinforced Polyethylene (PE)

Ribbed Pipe, 300- to 900-mm (12- to 36-in.) Diameter

ASTM International (ASTM)

ASTM A760 Standard Specification for Corrugated Steel Pipe, Metallic Coated for Sewers and Drains

ASTM A761 Standard Specification for Corrugated Steel Structural Plate, Zinc

Coated, for Field-Bolted Pipe, Pipe-Arches, and Arches

ASTM A762 Standard Specification for Corrugated Steel Pipe, Polymer

Precoated for Sewers and Drains

ASTM A849 Standard Specification for Post-Applied Coatings, Pavings, and

Linings for Corrugated Steel Sewer and Drainage Pipe

ASTM B745 Standard Specification for Corrugated Aluminum Pipe for Sewers and Drains

ASTM C14 Standard Specification for Nonreinforced Concrete Sewer, Storm

Drain, and Culvert Pipe

ASTM C76 Standard Specification for Reinforced Concrete Culvert, Storm

Drain, and Sewer Pipe

ASTM C94 Standard Specification for Ready Mixed Concrete

D-701-10

ASTM C144 Standard Specification for Aggregate for Masonry Mortar

ASTM C150 Standard Specification for Portland Cement

ASTM C443 Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets

ASTM C506 Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe

ASTM C507 Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain and Sewer Pipe

ASTM C655 Standard Specification for Reinforced Concrete D-Load Culvert, Storm Drain and Sewer Pipe

ASTM C990 Standard Specification for Joints for Concrete Pipe, Manholes, and

Precast Box Sections Using Preformed Flexible Joint Sealants

ASTM C1433 Standard Specification for Precast Reinforced Concrete Monolithic

Box Sections for Culverts, Storm Drains, and Sewers

ASTM D1056 Standard Specification for Flexible Cellular Materials Sponge or

Expanded Rubber

ASTM D3034 Standard Specification for Type PSM Poly (Vinyl Chloride) (PVC)

Sewer Pipe and Fittings

ASTM D3212 Standard Specification for Joints for Drain and Sewer Plastic Pipes

Using Flexible Elastomeric Seals

ASTM D3262 Standard Specification for "Fiberglass" (Glass-Fiber Reinforced

Thermosetting Resin) Sewer Pipe

ASTM D3282 Standard Practice for Classification of Soils and Soil-Aggregate

Mixtures for Highway Construction Purposes

ASTM D4161 Standard Specification for "Fiberglass" (Glass-Fiber Reinforced

Thermosetting Resin) Pipe Joints Using Flexible Elastomeric Seals

ASTM D6690 Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements

ASTM F477 Standard Specification for Elastomeric Seals (Gaskets) for Joining

Plastic Pipe

ASTM F667 Standard Specification for 3 through 24 in. Corrugated

Polyethylene Pipe and Fittings

ASTM F714 Standard Specification for Polyethylene (PE) Plastic Pipe (DR PR)

Based on Outside Diameter

ASTM F794 Standard Specification for Poly (Vinyl Chloride) (PVC) Profile

Gravity Sewer Pipe & Fittings Based on Controlled Inside

Diameter

D-701-11

ASTM F894 Standard Specification for Polyethylene (PE) Large Diameter

Profile Wall Sewer and Drain Pipe

ASTM F949 Standard Specification for Poly (Vinyl Chloride) (PVC)

Corrugated Sewer Pipe with a Smooth Interior and Fittings

ASTM F2435 Standard Specification for Steel Reinforced Polyethylene (PE)

Corrugated Pipe

ASTM F2562 Specification for Steel Reinforced Thermoplastic Ribbed Pipe and

Fittings for Non-Pressure Drainage and Sewerage

ASTM F2736 Standard Specification for 6 to 30 in. (152 to 762 mm)

Polypropylene (PP) Corrugated Single Wall Pipe…