25-01743 Reqs and Specs.pdf
PDF 177 KB Posted
- Attached to
- NIST - Calcium Quadrupole Laser
- Solicitation number
- NB688000-25-01743_Calcium_Quadrupole_Laser
About this file
This document is a Requirements/Specifications document for a Calcium quadrupole laser issued by the National Institute of Standards and Technology (NIST). The Ion Storage Group at NIST requires a highly specialized 729 nm laser for quantum computing, quantum simulation, and optical clock experiments with specific technical requirements, including an instantaneous linewidth < 10 kHz, power output > 300 mW, phase-locking capability with feedback bandwidth > 1 MHz, and stability against environmental perturbations.
The procurement involves one primary item: a Calcium quadrupole laser with driving and locking electronics. Key specifications include the need for PID locking electronics, a PDH module for EOM modulation and demodulation, and proof of previous locking performance. The document outlines delivery criteria of 18 weeks after receipt (ARO), requires turn-key installation, mandates electronic manuals and software, and includes planned government acceptance testing over 7 business days. No specific training, maintenance, or travel requirements are included, and the base manufacturer warranty is deemed acceptable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-01743 Detailed Specs.pdf | ||
| POST Sources Sought Notice Calcium Quad Laser.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
Requirements / Specifications: Calcium quadrupole laser 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Calcium quadrupole laser Requesting Lab/Division/Group: PML 688.10
General Statement of Need The Ion Storage Group at NIST performs a variety of quantum computing, quantum simulation, and optical clock experiments using trapped ions. These experiments require addressing narrow transitions in ions with narrow-linewidth, frequency-stabilized lasers. We require a 729 nm laser with an instantaneous linewidth < 10 kHz and a power output > 300 mW, as well as electronics to drive the laser. The laser needs to the capability of being phase locked with a feedback bandwidth > 1 MHz. We require proof of previous locking performance of the laser.
We also require PID locking electronics and a PDH module that allows us to modulate and demodulate an EOM. The nature of the experiments requires a laser that is stable against environmental perturbations such as temperature and pressure changes. Please see the attached Detailed Specification document for more details.
Items and/or Ancillary Services
Item 1: Calcium quadrupole laser at 729 nm, as well as driving electronics and locking electronics.
Quantity: 1 Specifications: See attachment for detailed specifications. All listed specifications must be met to satisfy the need.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
Click or tap here to enter text.
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
Standard shipping Shipping criteria:
☐ Partial delivery acceptable
Requirements / Specifications: Calcium quadrupole laser 2
☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than:
18 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☐ N/A
[Enter electronic media requirements by item here.] ☒ Software ☒ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☐ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☒ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
No utility or facility requirements.
☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]
Requirements / Specifications: Calcium quadrupole laser 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
No training requirements ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A none Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A none ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here]
Requirements / Specifications: Calcium quadrupole laser 4
☐ Other: [Enter other details here] Travel ☒ N/A none ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail specifications/requirements for an item and/or ancillary services. |
| TITLE: Calcium quadrupole laser |
| Requesting Lab/Division/Group: PML 688.10 |
| General Statement of Need |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .