25-0143_Questions and Answers dated 01-13-2026_SP AAON HVAC Replacement Parts.pdf

PDF 173 KB Posted

Attached to
SP AAON HVAC Replacement Parts
Solicitation number
26-557THA-OPERA-B-49755
Issued by
Dupage County, Niles Village, Illinois

About this file

This is a Questions and Answers document issued by the Illinois Tollway on January 13, 2026, regarding Small Purchase 25-0143 for AAON Replacement Parts (BidBuy Reference # B-49755). The document addresses clarifications on the Request for Quote (RFQ) related to HVAC replacement parts procurement. The Q&A does not modify the original RFQ terms and conditions. Key clarifications include confirmation that vendor and staff specifications outlined in Section 1.3 of the RFQ apply to the prime bidder rather than subcontractors, and that work surface tops should be provided in laminate rather than veneer format.

The document provides technical specifications regarding material preferences for the AAON replacement parts being procured. The Illinois Tollway's stated preference for laminate work surfaces indicates product quality and finish specifications relevant to the competitive bidding process. No pricing information, set-asides, incumbent contractor details, or specific funding amounts are addressed in this Q&A document, as it serves primarily to clarify contractual requirements and product specifications for prospective bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A # B-49755 AAON Replacement Parts 1

I L L I N O I S T O L L W A Y 2700 Ogden Avenue │Downers Grove, IL 60515 │ Phone: 630.241.6800 Ext 4667 www.illinoistollway.com

Questions and Answers (Q&A) Dated 01/13/2026 Small Purchase

25-0143 AAON Replacement Parts BidBuy Reference # B-49755

Bid Opening Date: As Published in BidBuy

Please be advised the following Q&A pertains to the above-mentioned solicitation. The information set forth herein does not result in any modification to the Request for Quote (RFQ), nor does it amend the terms and conditions thereof pursuant to the RFQ in BidBuy.

1. Question: Does Section 1.3 Vendor/Staff Specifications of the RFQ apply to the prime bidder or to the vendor the prime will be subcontracting?

2.

Answer: The Illinois Tollway prefers the LAMINATE option.

3. Question: Regarding the Work Surface tops. Do you want it in Veneer or Laminate?

Answer: The Illinois Tollway prefers the LAMINATE option.

Answer: The statement in Section 1.3 of the RFQ applies to the prime bidder.